You are on page 1of 18
Foreword ‘This index has been produced by the Ready-mixed Concrete Bureau to assist specifiers of ready-mixed concrete in the tse of the four parts of BS 5328, Concrete ‘The index is split into three sections: Page 2 - alphabetical index Page 11- mixes for typical jobs Page 14 - abbreviations used hin BS 5328, In the alphabetical index, where reference is made to a Note, either the number of the Note or the leter N is included within brackets, eg. Table 716], or 44IN} There are sure to be omissions of useful references from an index such as this, so where these are identified by users, it would be appreciated if they could be made known to the Ready-mixed Concrete Bureau so that later editions can be amended. A page that can be photocopied to submit additions /amenclments is inchuded at the back of the Index A specifier's index to BS 5328, Concrete Index Part1 Part 2 Part 3 Part 4 A abrasion 339 additional materials 36 admixture 34 33 Table 3 444 choice and approval 34 designated mixes 164 standard mixes prohibition 3a) storage 444 aggregates: 33 Table 2 443 choice and approval 33 content adjustment Table 5(2) 43.2 IN} designated mixes 63 freeze/thaw 4235 batching - mass 45 - volume 45 storage 443 air content: 63 36 tolerance 3.6121 lightweight aggregates 3.6131 air entrained concrete: Table 6131 designated mixes 1644 alkali content: 25 38, methods for test 3.82 test results 383 alkali-silica reaction: 424 441 designated mixes 177 minimising risk of cracks 39 all-in aggregate 333 applications Table 13 approval of materials 3a B bateh 24 inspection 46 batching: 45 accuracy 45 BRE Digest: 250 Table 712] 276 Table 712] 363 Foreword, za 2

You might also like