You are on page 1of 5

ARCH

(Temporary Sheathing Methods Using Arch Waling)

(Chun-Ho Kim), , chkim@joongbu.ac.kr


(Hee-Jeong Shin), ()
(Tae-Moo Shim),

1.

. Raker

,

3.
1.

( 3)



.



2. Raker


(Strut) ( 1) Raker( 2).
62

2012 12

. ,

.

2. ARCH

.
Arch

2.1

Arch ( 4)

( 20%

) .

Arch

() .

2.2
Arch 1
. 5m20m 5m
.

6. Arch
4. Arch
1. Arch

Arch
Arch
, Arch

5m

10m

15m

20m

L(mm)

5000

10000

15000

20000

H(mm)

823

938

1400

2070

.( 5)
Arch 7
Arch +Raker ,

5.

Arch Wale+Arch

Wale+ARCH

7. Arch +Raker

KSSC Dec. 2012

63

9 2
10 3 .
2. 30m

8. Arch +

30m

Arch Beam

1802.28 f/

Arch

184.96 f/

505.19 f/

H-Pile

403.16 f/

8 Arch+
.
Arch Raker

.

3. ARCH
Arch

10. 30m

30m Arch
,
.
Arch .

3.1
H-Pile : 300300914

3. 30m

30m

Arch Beam

504.20 f/

Arch

196.28 f/

830.11 f/

H-Pile

606.84 f/

0.3m. 30m
: 2100 f/

1802.28 f/ < 2100 f/, 1802.28

, 1890 f/

f/ < 1890 f/

1200f/, 1080f/ .


830.11 f/ < 1200 f/, 830.11 f/ < 1080
f/ .
30m
11 .
8.54cm . 12
.
24.2mm
30.00mm

9. 30m
64

2012 12

14.
11. 30m

15
Arch
.
423.7KN.

12. 30m

3.2 Full Scale Test


Arch
.
1 L=10000, H=950

15. P-Load Cell

. 13 .
Arch Arch

.

13. Arch

SS400 M10
. 14
Arch
.
16.

KSSC Dec. 2012

65

1. , (2008), ,

2. , (2001),
- SPS
3. , (2004), ,
4. , (2002),
(2)
5. , (1997), , Prestress

17.

4.
31.2m 18m 11.6m

.
.( 4)
4.

Arch

150 ton

122 ton

122

76

100 %

70%

100 %

80%

5.
Arch Arch

Arch
.

.
, ,
.

66

2012 12

You might also like