Gaafar 2001
Aggregate
planning
Materials
requirement
planning
Shop-floor
scheduling
and control
Inventory
management
Sales and
order entry
Customer
Production
Shipping
and
receiving
Inventory
Vendors
Gaafar 2001
Requires:
Inventory
Status
Master Production
Scheduling
Material Requirements
Planning
Quantities and
Order Times
Inventory status
Lead times
Production Planning and Control- Materials Requirement Planning (3)
Gaafar 2001
Assumptions
1. Known deterministic demands.
2. Fixed, known production leadtimes.
3. Infinite capacity.
Gaafar 2001
MRP Procedure
1. Netting: net requirements against projected inventory
2. Lot Sizing: planned order quantities
3. Time Phasing: planned orders backed out by leadtime
4. BOM Explosion: gross requirements for components
Gaafar 2001
Inputs
Master Production Schedule (MPS): due dates and
quantities for all top level items
Bills of Material (BOM): for all parent items
Inventory Status: (on hand plus scheduled receipts) for all
items
Planned Leadtimes: for all items
Gaafar 2001
Period
1
2
3
4
5
6
7
8
GR
10
15
12
16
15
12
18
14
Period
CT
B00
X10
8
0
0
0
Gaafar 2001
Time
GR
SOR
BI
NR
POR
EI
PORE
1
10
12
0
-2
0
2
11
2
15
14
2
-1
0
1
16
3
12
0
1
11
11
0
15
4
16
0
0
16
16
0
12
5
15
0
0
15
15
0
18
6
12
0
0
12
12
0
14
7
18
0
0
18
18
0
?
8
14
0
0
14
14
0
?
B00
LT = 1
Gaafar 2001
Gaafar 2001
Gaafar 2001