You are on page 1of 1

BET

WORK INSTRUCTIOS
INSTRUCTION
#
RESPONSIBILIT
Y

INS/04/01

SUBJECT

Lamination

Laminators

PROCEDURE:1

Follow the Factory Manager and QA Engineers


Instructions

2
3
4
5
6
7
8

Watch the pipe manufacturing process


There should not be any pin hole fish eye or overlapping
There should not be any breaks on the pipe surfaces
Glass resin ratios be followed
Help other laminators
Keep watch materials availability
Any other instructions from the Factory manager or QA
Engineer regarding maintaining the product quality

Prepared By:PRO/04/02
VERSION # 1

Approved By:-

You might also like