You are on page 1of 20

CONCRET

COLUMN
FLOOR
F-1ST
1ST - 2ND
2ND - 3RD
3RD - 4TH
4TH - 5TH
5TH -6TH
6TH - 7TH
7TH - 8TH
8TH - 9TH
9TH -10TH
10TH - 11TH
11TH -12TH
12TH - ME
ME-DECK

TOTAL (m3)
197.25
210.4
210.4
210.4
210.4
276.15
276.15
276.15
276.15
276.15
224.28
224.28
434.54
54.96
3357.66

% A3
43.33%
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333

% A2
30%
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3

CONCRETE
SLAB
FLOOR
SLAB OF GRADE
2ND
3RD
4TH
5TH
6TH
7TH
8TH
9TH
10TH
11TH
12TH
UPPER DECK
ME DECK

TOTAL AREA m3
940.8
538.8768
789.6528
789.6528
833.3928
833.3928
833.3928
833.3928
833.3928
833.3928
833.3928
833.3928
349.92
614.69
10,690.73

% A3
43.33%
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333

% A2
30%
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3

CONCRETE
BEAM
FLOOR
FTB
2ND
3RD
4TH
5TH
6TH
7TH
8TH
9TH
10TH
11TH
12TH
ME
DECK

TOTAL (m3)

% A3
43.33%
0.43333
0.43333
0.43333
0.43333
0.43333
0.43333
0.43333
0.43333
0.43333
0.43333
0.43333
0.43333
0.43333
0.43333

376.992
354.807
526.116
526.116
525.198
525.198
525.198
525.198
525.198
471.342
471.342
487.686
318.546
204.306
6363.243
FLOOR

GROUND
2ND
3RD
4TH
5TH
6TH
7TH
8TH
9TH
10TH
11TH
12TH
RD

% A2
30%
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3

CONCRETE
% A1
26.66667%
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667

CONCRETE
% A1
26.66667%
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667

A3
85.47
91.17
91.17
91.17
91.17
119.66
119.66
119.66
119.66
119.66
97.18
97.18
188.29
23.81
1454.87

per area m3
A2
59.18
63.12
63.12
63.12
63.12
82.85
82.85
82.85
82.85
82.85
67.28
67.28
130.36
16.49
1007.30

A1
52.60
56.11
56.11
56.11
56.11
73.64
73.64
73.64
73.64
73.64
59.81
59.81
115.88
14.66
895.38

A3
407.65
233.50
342.16
342.16
361.11
361.11
361.11
361.11
361.11
361.11
361.11
361.11
151.62
266.35
4,632.30

per area m3
A2
282.24
161.66
236.90
236.90
250.02
250.02
250.02
250.02
250.02
250.02
250.02
250.02
104.98
184.41
3,207.22

A1
250.88
143.70
210.57
210.57
222.24
222.24
222.24
222.24
222.24
222.24
222.24
222.24
93.31
163.92
2,850.86

CONCRETE
% A1
26.66667%
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667

A3
163.36
153.75
227.98
227.98
227.58
227.58
227.58
227.58
227.58
204.25
204.25
211.33
138.04
88.53
2757.38

per area m3
A2
113.10
106.44
157.83
157.83
157.56
157.56
157.56
157.56
157.56
141.40
141.40
146.31
95.56
61.29
1908.97

A1
100.53
94.62
140.30
140.30
140.05
140.05
140.05
140.05
140.05
125.69
125.69
130.05
84.95
54.48
1696.86

A3
656.48
478.41
661.30
661.30
679.86
708.35
708.35
708.35
708.35
685.01
662.54
669.62
477.94
7809.38

TOTAL m3
A2
454.51
331.23
457.85
457.85
470.70
490.42
490.42
490.42
490.42
474.27
458.70
463.61
330.90
5406.79

A1
404.01
294.42
406.98
406.98
418.40
435.93
435.93
435.93
435.93
421.57
407.74
412.10
294.13
4806.04

FLOOR
F-1ST
FOOTING m3

3357.55

10,690.38

A3

m3 PER GRID LINE


A2
17.09
19.73
578.813685
581.445

6363.22

18022.21

A1
17.53
579.2533333553

FLOORS

2nd
3rd - 4th
5th - 9th
10th -11th
12th
deck above cafeteria
mech deck

REBARS TOTAL (kg)

94787.93
256231.03
676585.2
799876.9
124450.82
45247.11
73874.85
2,071,053.84

STAIR
RAMP

41,211.93
17,839.21

CISTERN WATER TANK

59,459.87
33,639.41

STP
FLOORS

REBARS TOTAL (kg)

2nd
3rd - 4th
5th - 9th
10th - 11th
12th
deck above cafeteria
mech deck

20753.89
58337.27
139656.95
65405.36
32721.7
9280.28
15211.74
341,367.19

FLOOR
GROUND
2nd
3rd - 4th
5th - 9th
10th - 11th
12th
deck above cafeteria
mech deck

FLOORS

REBARS TOTAL (kg)


28445.34
79323.26
233041.4
582603.5
233041.4
116520.7
41150.81
70212.38
1,384,338.79

REBARS TOTAL (kg)

2nd
3rd - 4th
5th - 9th
10th - 11th
12th
deck above cafeteria
mech deck

15089.33
38147.1
101550.26
41374.21
20955.39
6881.2
10687.97
234,685.46

FLOORS
FOUNDATAION
FOUNDATAION

REBARS TOTAL (kg)


57308.11
84889.3
TOTAL REBARS (kg)

COLUMNS
FOUNDATION - 1ST
1ST - 2ND
2ND - 3RD
3RD - 4TH
4TH - 5TH
5TH - 6TH
6TH - 7TH
7TH - 8TH
8TH - 9TH
9TH - 10TH
10TH - 11TH
11TH - 12TH
12TH - ME DECK

848116.1

TOTAL
FLOORS
GROUND
2nd
3rd
4th
5th
6th
7th
8th

9th
10th
11th
12th
deck above cafeteria
mech deck

FLOORS
FOUNDATAION
FOUNDATAION

REBARS TOTAL (kg)


57308.11
84889.3

STRUCTURE

% A3
43.33%

% A2
30.00%

% A1
26.66%

GIRDER
GIRDER
GIRDER
GIRDER
GIRDER
GIRDER
GIRDER

0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333

0.3
0.3
0.3
0.3
0.3
0.3
0.3

0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667

% A3
43.33%
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333

% A2
30.00%
0.3
0.3
0.3
0.3
0.3
0.3
0.3

% A1
26.66%
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667

SLAB (CONVENTIONAL)
SLAB (CONVENTIONAL)
SLAB (CONVENTIONAL)
SLAB (CONVENTIONAL)
SLAB (CONVENTIONAL)
SLAB (CONVENTIONAL)
SLAB (CONVENTIONAL)
SLAB (CONVENTIONAL)

% A3
43.33%
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333

% A2
30.00%
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3

% A1
26.66%
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667

STRUCTURE

% A3

% A2

% A1

93,099.28
STRUCTURE
PRECAST BEAM
PRECAST BEAM
PRECAST BEAM
PRECAST BEAM
PRECAST BEAM
PRECAST BEAM
PRECAST BEAM

REBARS TOTAL (kg)

43.33%

30.00%

26.66%

BEAMS (TOP ONLY)


BEAMS (TOP ONLY)
BEAMS (TOP ONLY)
BEAMS (TOP ONLY)
BEAMS (TOP ONLY)
BEAMS (TOP ONLY)
BEAMS (TOP ONLY)

0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333

0.3
0.3
0.3
0.3
0.3
0.3
0.3

0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667

STRUCTURE
FOOTING-TIE-BEAM
FOOTING

% A3
0.4333
0.4333

% A2
0.3
0.3

% A1
0.266666667
0.266666667

0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333

0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3

0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667

AREA PER FLOOR


65239.7
65239.7
65239.7
65239.7
65239.7
65239.7
65239.7
65239.7
65239.7
65239.7
65239.7
65239.7
65239.7

TOTAL PER AREA OF REBARS (kg)

STRUCTURE
FOOTING-TIE-BEAM
FOOTING

total

% A3
0.4333
0.4333

% A2
0.3
0.3

per footing
6 footing
84889.3 1286.201515152 7717.209090909

% A1
0.266666667
0.266666667

A3

A2

A1

41071.61
111024.91
293164.37
346586.66
53924.54
19605.57

28436.38
76869.31
202975.56
239963.07
37335.25

25276.78
68328.27
180422.72
213300.51
33186.89

22162.46
585,579.56

19699.96
520,515.17

865,377.66

A3

A2

A1

8992.66
25277.54
60513.36
28340.14
14178.31
4021.15

6226.17
17501.18
41897.09
19621.61
9816.51

5534.37
15556.61
37241.85
17441.43
8725.79

4563.52
99,626.07

4056.46
88,556.51

141,323.16

A3

A2

A1

12325.37
34370.77
100976.84
252442.10
100976.84
50488.42
17830.65

8533.60
23796.98
69912.42
174781.05
69912.42
34956.21

7585.42
21152.87
62144.37
155360.93
62144.37
31072.19

21063.71
402,956.394

18723.30
358,183.462

569,410.97

A3

A2

A1

1,971,472.39

329,505.74

1,330,550.83

6538.21
16529.14
44001.73
17927.45
9079.97
2981.62

4526.80
11444.13
30465.08
12412.26
6286.62

4023.82
10172.56
27080.07
11033.12
5588.10

97058.112417

3206.39
68341.278

2850.13
60747.8027426014

226,147.19

A3
24831.604063
36782.53369

A2
17192.433
25466.79

A1
15282.1626857694
22637.1466949631

57,306.20
84,886.47

A3

A2

A1

28268.36
28268.36
28268.36
28268.36
28268.36
28268.36
28268.36
28268.36
28268.36
28268.36
28268.36
28268.36
28268.36
367,488.71

A3 (kg)
12325.37
119241.61
282076.78
282076.78
526924.65
678389.91
678389.91
678389.91

19571.91
19571.91
19571.91
19571.91
19571.91
19571.91
19571.91
19571.91
19571.91
19571.91
19571.91
19571.91
19571.91
254,434.83

A2 (kg)
8533.60
82558.23
195298.95
195298.95
469690.68
469690.68
469690.68
469690.68

17397.25
17397.25
17397.25
17397.25
17397.25
17397.25
17397.25
17397.25
17397.25
17397.25
17397.25
17397.25
17397.25
226,164.29

A1 (kg)
7585.42
73385.10
173599.07
173599.07
417502.83
417502.83
417502.83
417502.83

848,087.83

678389.91
522099.45
522099.45
155939.60
72707.35

469690.68
361481.27
361481.27
107966.49

417502.83
321316.69
321316.69
95970.22

19571.91
3,680,644.10

45329.85
3,299,616.24

A3
24831.60
36782.53

A2
17192.43
25466.79

A1
15282.16
22637.15

PER FOOTING
1226.08

PER FOOTING
1414.82

PER FOOTING
1257.62

7356.51

8488.93

7545.72

5,209,050.68

12,189,311.02

57,306.20
84,886.47

FLOORS
GROUND
2ND
3RD
4TH
5TH
6TH
7TH
8TH
9TH
10TH
11TH
12TH
MECH DECK
DECK ABOVE CAFETERIA

TOTAL AREA
2215.24
7445.94
9402.93
9402.93
9563.55
9832.83
9832.83
9832.83
9832.83
9832.83
9724.59
9724.59
6307.01
4028.94
116,979.85

% A3
43.33%
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333
0.4333

% A2
30%
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3

% A1
26.66667%
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667
0.266666667

A3

A2

959.86
3226.33
4074.29
4074.29
4143.89
4260.56
4260.56
4260.56
4260.56
4260.56
4213.66
4213.66

664.57
2233.78
2820.88
2820.88
2869.06
2949.85
2949.85
2949.85
2949.85
2949.85
2917.38
2917.38
1892.10

1745.74
47,954.54

33,885.27

A1
590.73
1985.59
2507.45
2507.45
2550.28
2622.09
2622.09
2622.09
2622.09
2622.09
2593.22
2593.22
1681.87
30,120.24

111,960.06