DESIGN OF PREFABRICATED GUTTER A CASE STUDY

PROJECT REPORT DETAILS:


Material Required:
Cement
Wood
Thermacol
Coarse Aggregates
Fine Aggregates

Tests Conducting on Material:


Specific Gravity Test
Consistency Test
Setting time of cement

Test Conducting on Concrete:


Slump Test
Compression strength Test

Week:1 [ jan 07-jan 09]


Collection of Materials Required for the Project.

Week:2 [ jan 21-jan 23]


Design of Gutter in Auto Cad.

Week:3 [jan 28-jan 30]


Prototype Model Preparation with Concrete.

Week:4 [feb 04-feb 06]


Prototype Model Preparation with Wood.

Week:5 [feb 11-feb 13]


Prototype Model Preparation with Thermacol.

Week:6 [feb 18-feb 20]


Slump Test on concrete.

Week:7 [feb 25-feb 27]


Prefabricated Gutter Mould Preparation.

Week:8 [mar 03-mar 05]


Cost Estimation.