Lusail Bridge

(Desgin & Construction of Lusail Bridge)

(Dong-joo Kim),

() , ,

(Jong-ho Yang),

() ,

(Hyun-yang Shin),

() ,

djk776.kim@samsung.com

1.

2.

Lusail Development

2.1

15km Lusail .
2

(Bridge8&9) Qetaifan Lusail

38km ,

204m, 186m .

Al Khor 2006

2,500m3 , 2,000m3

1)

. ,

2) ,

, 17 Construction Package

3)

CP3A

4) Lock Coil Strand

Qetaifan 4

Iconic .

, COWI , Parsons

6 ,

CP 3A Bridge
8 Bridge 9

. .
1)

1. Lusail Development / (2006 - 2009)


72

2012 4

Bridge 8

Bridge 9

2. Lusail Development

2) ,

3) Gantry Crane

4) ,

5)

6)

2.2
, .

,
. 136
.
3 .

4.

2.3
RSM ,
RSS , RST .
Hammer Head Macalloy Hars
.
RSS-1 RSS-2
3.

KSSC Apr. 2012

73

. RSS-1 RSS-2

, .

RSS RSS 1 2 .
RST 300t

2.5

600t

Parallel Wire AS

400t

PPWS .

RST 150t .

RST-3 ,

RSS-3 RSM-3

Lock Coil

2.4
,
. ,
Gantry Crane ,
.
5 .

6.

Lock Coil
5.

3 Z
. .


,
.

1.
Tensile stress

1570 MPa min

Pool stress Rpo.2

1180 MPa min

Elongation at break

Wires ductility

EN 10264 class A

Wires hot dip


galvanizing

EN 10264 class A

, ,

250mm(4%)

74

2012 4

.
.
,
.
, 2 .
2.
Foundation, Tower, Stiffening Ggirder

Previous
work

Temporary structure erection


Catwalk system erection
Preparation of a main cable erection

Main cable erection

Catwalk repositioning
Cable band erection
Hanger rope erection & Connection with girder

Follow on
work

Cable Wrapping
Hand rope erection
Dehumidification system installation
Cable accessories installation
Catwalk & temporary structure removal

3.

. Lusail City
, Qatar 'Q'
,
.
,
.
,
. CP3A
24 2011 11 2013
11 .


.
KSSC Apr. 2012

75