PROJECT LOS:
Student Name: Joey Alfred
bate: 09/03/15 ‘Stare Tn End Time: 5:30PM Totals: 1.5
Accumulative Project Hours:
Describe Activky J Camments:
Started working on Autodesk, Neds Het 2D Tang.
Discuss cesign, materals, & the physics of Tall that reeds tobe researched before Uhe nent Meeting
lacvisor's Signature: Zz” BS
09/03/15
Date: 09/10/13 Start Time:_a:onpm End Time:_5:30 PM Total Hs.
Accumulative Project Houre: 3.0
Descibe Aciiviy Comments
Ward on TERR
[Gontiue withthe desen ONTO
advisor’ Signature: Zz 09/08
ate: 09/17/15, Start Time: 400M End Time:_s:20eM TotalHrs: 1.5
AccumulativeProject Hours: 4.5
[Describe Activity /Commants:
eT TT SCT ETO
[ecatinve with the design on AUG
oe 2
loare: 09/24/15, Start Time: 4:00PM End Time: s30PM_ TotalHrs: 1.5
‘Accumulative Project Hours: 6.0
Deseribe Activity / Comments
sre results (Tom Teseansh regarding Whth MAeTals woud be BET Carbon NON] SRT
[Continue with the design on Autodesk
aaTaGIO ZLS Rie aa
bat
10/01/35 Start Time:
Describe Retiity / Comments:
Discussed research Tor aero apnaTes HOW MOVES TOA and other Mads, propulsion, ana
soay design to be able To operate Ibo
aisors Sanowwres Yee JP bae__10/01/i
Pagel of 5pRoicer Los
Student Name: Jocy Alfred
10/08/15 Start Time: 4
loa
End Time:_5:30PM_ Total Hi
‘Accumulative Project Hours:
[Describe Activity / Comments:
recused creating the model What prograri ls needed? 3D Hiventar? Who can help me learn
tinue with the design on Autodesk.
Se aL rr TT
loate: __ 20/35/15 Start Time:
a5
4:00PM End Time:_s:30 PM Total
Accumulative Project Hours: 10.5,
Describe Activity / Comments:
[biccussed power source What oallpropell he vehile? Gas Solar Power (absorbed inthe Graphene],
radioactive Thorium, Ithiom batteries
Je
[Advisors Siznature: Date 40/15/15
Pa End Time:_5:30eM Total Hrs:
pate: __ 10/22/15 Start Tim
20
[Describe Activity / Comments:
issued suamersion method
‘ntirue with the design on AutodesT
BAL
Jadsisor's signature: Date:___10/22/15
End Time: 5:30PM Totaliirs:___4.5,
bate: 10/25/35 start Time:_4:
‘Accumulative Project Hours: 13.5,
[Descrive Activity / Comments:
facused wh arate
[Continue with the design on Autodesk
Jadvisor's Signature:
Date:___10/29/15
11/05/25 Start Time:_400eM_ End Time:_S:30PM_ Total Hrs:
‘Accumulative Project He
loate:
[Describe Activity / Comments:
Takeo abou mot
[Continue with the design on Autodesk
ot 11/05/35
Page? ofPROJECT LOG
‘Student Name: Joey Alfred
fewer 44/40/15 san Yime_sooPm era Time_agePm Tolar 35
Accumulative ProjectHours: 465
sere Rawiy 7 Comment
aR Ta eeTg METTO
[Continue with the design on Autodesk.
fadisorssienatire, Bees JS Date,___13/22/35
Date: 12/19/15 ‘Start Timer _ 4:00PM End Time: _5:30PM_ Total Hrs. is
‘Accumulative Project Hours:
[Describe Activity / Comments:
prcaserprapation water
Tontinve with the design on AUTOTEIE
oa
immense ELE ES, omen
ia aaa”
Deseribe Aetivity 7 Connmente
precossea Tod mans
Continue withthe design on Autodesk
aA
disor erates LZ Date, 2/05/88
ate: 12/10/15 StartTime:_400pM_ End Time:_530°N1 Total Hrs 45.
‘Accumulative Project Hours 20
Desa
‘tivity / Comments:
| akee aboot suorrarTes and how Weir design ara BopusTon canbe uted ony ORE
contrive wih ORE cesT On Auta
enearemins ALE ES—aa —a
pate: 12/75 StartTime: 400PM —EndTime:_530eM Totals: 1.5,
Accumulative Project Hours: 225
bescribe Activity / comments
Digcussed eering and Wada Gimbal to Oe Tre ModeT
[Continue with the design on Autowede. Cy
iaaaareSgretner EBLE? Daw aS
Pages ofPROJECT LOG
‘Student Name: Joey Alfred
Date: 01/07/16 530°M_ Total Hi 45
‘Accumulative Project Hours:
240
[Describe Activity / Commente
[Bicuss and deign the Wont wheels
[Continue withthe design on Autogeek
lAdvizors senatere Boz AR bate:
loste: 01/14/26 Start Time:
ovpm End Time: 5:30PM Total Hrs.
‘Accumulative Project Hours:
Describe Activity / Comments:
[Discuss and design te back wheels
[continue withthe design on Autoder
4/14/16
Date: 01/24/16 StartTime;_4:00PM —Ené Time: 5:30PM Totals: 1.5
Accumulative Project Hours: 27.0
Describe Activity / Comments:
Discussed the process of pintiam out the mOceT
[Continue with the design on AWodesk,
01/24/16
End Time: 530M ‘Total Hi
‘Accumulative ProjectHours: 285,
Describe Activity / Comments:
Analyzed the fret pnted model & alscase the plan fo COmBEte mid when to mesttosendand pane
[Continue with the design on Autodesk.
ox/z5/16
bate:
07/05/16 StartTime:_400PM End Time:_§:30PIM TotalHrs: 1.5
Accumulative Project Hours: 30.9,
Describe Acivity / Comments:
Worked re-do water version of The vehicle, Discussed which wigs work best and Inalied ine Ges
Cortnue with the design on Autodes
=
lachisorssignstue: ZZ PL JZ
owe _g J 4f[l
Paget of5,PROIECT Log
Student Name: Jooy Alfred
Date: 02/06/36 Start Time: 9:00AM End Time:_s:00PM Total Hrs. 8
38,
Accumulative Project Hour
Deseribe Activity / Comment
anced, Paty, Fatrved Tsk Coat [Gad Windows) on Vehicle Model created rom the 3D printer
hanosipare ZI owe alee
Date: 02/07/16 Start Time: %:00AM End Time: 2:00PM Total Hrs: 5
Accumulative Project Hours: ___43.0,
[Describe Activity / Comments:
Carn prate San ing, Data PTATIng [ees Doay & OTaeK WHET, ne Corer with S CTeaT CORT
aE Le Ee eee
Date: Start Tim End Time: Total Hee:
‘Accumulative Project Hour
[Describe Activity / Comments:
laduisor's Signature: Date:
bat
Start Time: End Time: Total Hrs:
‘Accumulative Project Hourt:
[Describe Activity / Comments
bate: Start Time: End Time: Total Hes
‘Accumulative Project Hours:
Describe Activity 7 Comments:
Jadvisor's Signature: Date,
Page 5 ofS