You are on page 1of 5
PROJECT LOS: Student Name: Joey Alfred bate: 09/03/15 ‘Stare Tn End Time: 5:30PM Totals: 1.5 Accumulative Project Hours: Describe Activky J Camments: Started working on Autodesk, Neds Het 2D Tang. Discuss cesign, materals, & the physics of Tall that reeds tobe researched before Uhe nent Meeting lacvisor's Signature: Zz” BS 09/03/15 Date: 09/10/13 Start Time:_a:onpm End Time:_5:30 PM Total Hs. Accumulative Project Houre: 3.0 Descibe Aciiviy Comments Ward on TERR [Gontiue withthe desen ONTO advisor’ Signature: Zz 09/08 ate: 09/17/15, Start Time: 400M End Time:_s:20eM TotalHrs: 1.5 AccumulativeProject Hours: 4.5 [Describe Activity /Commants: eT TT SCT ETO [ecatinve with the design on AUG oe 2 loare: 09/24/15, Start Time: 4:00PM End Time: s30PM_ TotalHrs: 1.5 ‘Accumulative Project Hours: 6.0 Deseribe Activity / Comments sre results (Tom Teseansh regarding Whth MAeTals woud be BET Carbon NON] SRT [Continue with the design on Autodesk aaTaGIO ZLS Rie aa bat 10/01/35 Start Time: Describe Retiity / Comments: Discussed research Tor aero apnaTes HOW MOVES TOA and other Mads, propulsion, ana soay design to be able To operate Ibo aisors Sanowwres Yee JP bae__10/01/i Pagel of 5 pRoicer Los Student Name: Jocy Alfred 10/08/15 Start Time: 4 loa End Time:_5:30PM_ Total Hi ‘Accumulative Project Hours: [Describe Activity / Comments: recused creating the model What prograri ls needed? 3D Hiventar? Who can help me learn tinue with the design on Autodesk. Se aL rr TT loate: __ 20/35/15 Start Time: a5 4:00PM End Time:_s:30 PM Total Accumulative Project Hours: 10.5, Describe Activity / Comments: [biccussed power source What oallpropell he vehile? Gas Solar Power (absorbed inthe Graphene], radioactive Thorium, Ithiom batteries Je [Advisors Siznature: Date 40/15/15 Pa End Time:_5:30eM Total Hrs: pate: __ 10/22/15 Start Tim 20 [Describe Activity / Comments: issued suamersion method ‘ntirue with the design on AutodesT BAL Jadsisor's signature: Date:___10/22/15 End Time: 5:30PM Totaliirs:___4.5, bate: 10/25/35 start Time:_4: ‘Accumulative Project Hours: 13.5, [Descrive Activity / Comments: facused wh arate [Continue with the design on Autodesk Jadvisor's Signature: Date:___10/29/15 11/05/25 Start Time:_400eM_ End Time:_S:30PM_ Total Hrs: ‘Accumulative Project He loate: [Describe Activity / Comments: Takeo abou mot [Continue with the design on Autodesk ot 11/05/35 Page? of PROJECT LOG ‘Student Name: Joey Alfred fewer 44/40/15 san Yime_sooPm era Time_agePm Tolar 35 Accumulative ProjectHours: 465 sere Rawiy 7 Comment aR Ta eeTg METTO [Continue with the design on Autodesk. fadisorssienatire, Bees JS Date,___13/22/35 Date: 12/19/15 ‘Start Timer _ 4:00PM End Time: _5:30PM_ Total Hrs. is ‘Accumulative Project Hours: [Describe Activity / Comments: prcaserprapation water Tontinve with the design on AUTOTEIE oa immense ELE ES, omen ia aaa” Deseribe Aetivity 7 Connmente precossea Tod mans Continue withthe design on Autodesk aA disor erates LZ Date, 2/05/88 ate: 12/10/15 StartTime:_400pM_ End Time:_530°N1 Total Hrs 45. ‘Accumulative Project Hours 20 Desa ‘tivity / Comments: | akee aboot suorrarTes and how Weir design ara BopusTon canbe uted ony ORE contrive wih ORE cesT On Auta enearemins ALE ES—aa —a pate: 12/75 StartTime: 400PM —EndTime:_530eM Totals: 1.5, Accumulative Project Hours: 225 bescribe Activity / comments Digcussed eering and Wada Gimbal to Oe Tre ModeT [Continue with the design on Autowede. Cy iaaaareSgretner EBLE? Daw aS Pages of PROJECT LOG ‘Student Name: Joey Alfred Date: 01/07/16 530°M_ Total Hi 45 ‘Accumulative Project Hours: 240 [Describe Activity / Commente [Bicuss and deign the Wont wheels [Continue withthe design on Autogeek lAdvizors senatere Boz AR bate: loste: 01/14/26 Start Time: ovpm End Time: 5:30PM Total Hrs. ‘Accumulative Project Hours: Describe Activity / Comments: [Discuss and design te back wheels [continue withthe design on Autoder 4/14/16 Date: 01/24/16 StartTime;_4:00PM —Ené Time: 5:30PM Totals: 1.5 Accumulative Project Hours: 27.0 Describe Activity / Comments: Discussed the process of pintiam out the mOceT [Continue with the design on AWodesk, 01/24/16 End Time: 530M ‘Total Hi ‘Accumulative ProjectHours: 285, Describe Activity / Comments: Analyzed the fret pnted model & alscase the plan fo COmBEte mid when to mesttosendand pane [Continue with the design on Autodesk. ox/z5/16 bate: 07/05/16 StartTime:_400PM End Time:_§:30PIM TotalHrs: 1.5 Accumulative Project Hours: 30.9, Describe Acivity / Comments: Worked re-do water version of The vehicle, Discussed which wigs work best and Inalied ine Ges Cortnue with the design on Autodes = lachisorssignstue: ZZ PL JZ owe _g J 4f[l Paget of5, PROIECT Log Student Name: Jooy Alfred Date: 02/06/36 Start Time: 9:00AM End Time:_s:00PM Total Hrs. 8 38, Accumulative Project Hour Deseribe Activity / Comment anced, Paty, Fatrved Tsk Coat [Gad Windows) on Vehicle Model created rom the 3D printer hanosipare ZI owe alee Date: 02/07/16 Start Time: %:00AM End Time: 2:00PM Total Hrs: 5 Accumulative Project Hours: ___43.0, [Describe Activity / Comments: Carn prate San ing, Data PTATIng [ees Doay & OTaeK WHET, ne Corer with S CTeaT CORT aE Le Ee eee Date: Start Tim End Time: Total Hee: ‘Accumulative Project Hour [Describe Activity / Comments: laduisor's Signature: Date: bat Start Time: End Time: Total Hrs: ‘Accumulative Project Hourt: [Describe Activity / Comments bate: Start Time: End Time: Total Hes ‘Accumulative Project Hours: Describe Activity 7 Comments: Jadvisor's Signature: Date, Page 5 ofS

You might also like