MEASUREMENT SHEET JOINTLY ARRIVED BY M/S. DSWE and HARINI ENTERPR


PROJECT : 33/11 KVA SUB STATION WORK NORTH CHENNAI.
SITE : KORATTUR
CLIENT : M/S. DRAKE & SCULL WATER & ENERGY PVT LTD.
MEASUREMNT ARRIVED BY: Mr.Mohammed Nazer ( Manager Civil,DSWE) and Mr.Rajaraman (P
Engg,Harini),Mr.Anbarasan (Site Engg)
CHECKED & RE-ARRIVED BY : Mr.Sivasubramanian(Engineer Civil,DSWE) and Mr.Anbarasan(Sit

SI NO

DESCRIPTION OF ACTIVITIES

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

A SUB STRUCTURE
1.a EARTH WORK IN EXCAVATION
2
1

25.6
7.3

3.5
3.5

1.975
1.975

2
1

25.6
7.3

3.5
3.5

0.5
0.5

ALONG GRID B1 TO B2

2
1

25.6
7.3

0.5
0.5

1.975
1.975

3 RIVER SAND BEDDING


ALONG GRID A & C
ALONG GRID B1 TO B2

2
1

25.15
6.85

2.9
2.9

0.1
0.1

4 PCC FOR FOOTINGS


ii PCC ALONG GRID A & C
PCC ALONG GRID B1 TO B2

2
1

25.15
6.85

2.9
2.9

0.075
0.075

5 FOOTING
i SHUTTERING
ATF1
ATF2

4
2

27.7
10

ii REBAR (from BBS sheet )

ALONG GRID A1 TO A7*& C1 TO C7

ALONG GRID B1 TO B2
1.b ALONG GRID A1 TO A7*& C1 TO C7
ALONG GRID B1 TO B2
2 CNS SOIL (MURROM)
ALONG GRID A1 TO A7*& C1 TO C7

iii RCC
AT F1
AT F1 SLOPE
AT F2
AT F1 SLOPE
STRAP BEAM

2
2
1
1
1
1

6 COLUMN UP TO PLINTH LVL


SHUTTERING
i AT C1
AT C2

14
2
1

0.55
0.55

25
2.7
25
1.025
6.7
2.7
6.700
1.025
25.000
0.650
6.700
0.650

3.4
3.4

0.2
0.25
0.2
0.25
0.6
0.6

1.8
1.46
1-12

SI NO

DESCRIPTION OF ACTIVITIES

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

DEDUCTIONS AT GRADE LEVEL


AT GB3 BEAM JUNCTIONS FOR C1
AT GB4 BEAM JUNCTIONS FOR C1
AT GB1 BEAM JUNCTIONS FOR C1
AT GB2 BEAM JUNCTIONS FOR C1
AT GB1 IN CANTILEVER FOR C2
AT GB3 IN CANTILEVER FOR C2

-20
-6
-10
-8
-1
-1

0.23
0.23
0.3
0.23
0.23
0.23

0.3
0.45
0.6
0.45
0.6
0.3

DEDUCTIONS AT PLINTH LEVEL


AT BEAM PB3 JUNCTIONS FOR C1
AT BEAM PB2 JUNCTIONS FOR C1 & C2
AT BEAM PB1 JUNCTIONS FOR C1
AT BEAM PB6 JUNCTIONS FOR C1
ATBEAM PB4 JUNCTION FOR C2

-20
-8
-2
-4
-6

0.23
0.23
0.3
0.23
0.23

0.3
0.45
0.6
0.45
0.45

ii REBAR

iii RCC COLUMN


AT C1
AT C2

14
2

3.4
3.4

0.4
0.23

0.5
0.5

7 GRADE BEAM
i PCC
AT GB-1
AT GB-1 Cantilever for stair
AT GB-2
AT GB-2
AT GB-3
AT GB-3 Cantilever for stair
AT GB-4

5
1
2
2
10
1
3

10.5
1.5
4.75
5.25
3.3
1.5
3.3

0.5
0.5
0.43
0.43
0.43
0.43
0.43

0.075
0.075
0.075
0.075
0.075
0.075
0.075

iiI REBAR
IV SHURTTERING FOR G.BEAMS
AT GB-1
AT GB-1 Cantilever for stair
AT GB-2
AT GB-2
AT GB-3
AT GB-3 Cantilever for stair
AT GB-4

v RCC
AT GB-1
AT GB-2
AT GB-2
AT GB-3
AT GB-4
GB1 FOR STAIR
2

10
1
4
4
20
1
6

10.5
1.5
4.75
5.25
3.3
1.5
3.3

5
2
2
10
3
1

10.5
4.75
5.25
3.3
3.3
1.5

0.6
0.6
0.45
0.45
0.3
0.3
0.45

0.3
0.23
0.23
0.23
0.23
0.3

0.6
0.45
0.45
0.3
0.45
0.6
1-12

SI NO

DESCRIPTION OF ACTIVITIES

GB3 FOR STAIR


8 BACK FILLING STAGE 1
REFER EXCAVTION QTY
DEDUCTIONS
RIVER SAND FILLING BELOW FOOTING
MURROM FILLING
PCC BELOW FOOTING
RCC FOOTING
COLUMN
GARDE BEAM PCC
9 PLINTH BEAM
SHUTTERING
AT PB-1
AT PB-2
AT PB-2
AT PB-3
AT PB-4
AT PB-5
AT PB-6
REBAR
RCC
AT PB-1
AT PB-2
AT PB-2
AT PB-3
AT PB-4
AT PB-5
AT PB-6
10 STAIRS FROM FGL TO +1.60M
i SHUTTERING
FOR RISER WALL
GROUND LANDING
WAIST SLAB
EDGE SIDE
LANDING

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

1.5

0.3

506.76

-1
-1
-1
-1
-1
-1

16.5735
57.7688
12.4301
57.51
10.30
4.10

2
4
4
18
8
2
8

10.5
4.75
5.25
3.3
3.3
3.35
1.23

1
2
2
9
4
1
4

10.5
4.75
5.25
3.3
3.3
3.47
1.5

0.3
0.23
0.23
0.23
0.23
0.23
0.23

4
2
2
2
2

1.5
1
3.06
4.06
3.3

1.75
1.75
0.15
1.75

2
2
2
2

1.5
1
3.06
3.3

0.15
1.77
1.77
1.77

0.3

0.75
0.45
0.45
0.3
0.45
0.45
0.45

0.75
0.45
0.45
0.3
0.45
0.45
0.45

0.2

ii REBAR
iii RCC
RAISER WALL
GROUND LANDING
WAIST SLAB
LANDING
3

0.2
0.15
0.15
0.15
1-12

SI NO

DESCRIPTION OF ACTIVITIES

11 BRICK WORK BELOW PLINTH


AT PB1
AT PB2
AT PB2
AT PB3
AT PB4
AT PB5
AT PB6
STEPS FROM 0M LVL TO +1.5 M LVL
12 CABLE TRENCH
i RIVER SAND FILLING
RIVER SAND FILLING (Middle)
ii PCC

iii SHUTTERING
SHUTTERING FOR RAFT
SHUTTERING FOR WALL

SHUTTERING FOR COVER SLAB


DEDUCTIONS
JUN OF IN COMING CABLE DUCT
WALL
Deduction of corners
JUNCTION OF CABLE DUCT FROM PLINTH

iv REBAR

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

1
2
2
9
4
1
2

10.5
4.75
5.25
3.3
3.3
3.3
1.5

0.23
0.23
0.23
0.23
0.23
0.23
0.23

1.1
1.4
1.4
1.55
1.4
1.95
1.95

1.75

0.23

0.15

2
2
1

18.185
6.5
6.5

2
2
2.1

0.1
0.1
0.1

2
2
1

18.185
6.5
6.5

2
2
2.1

0.075
0.075
0.075

2
4
2
2
4
4
4
4
3
4

12.485
6.7
17.785
10.1
6.6425
6.2425
7.1
6.7
7.1
1.5

-2
-4
-1

1.5
1.9
3.25

0.2
0.2
1.65
1.5
1.5
1.5
1.5
1.5
1.5
1.5

1.5
0.15
1.5

v RCC
AT RAFT
AT WALL

COVER SLAB
RCC (FOR THE PLAN AREA OTHER THAN
CABLE DUCT)- SLAB ON GRADE
4

2
3
2
2
4
4
3
4

18.185
6.7
18.185
10.1
6.443
6.9
7.1
1.7

1.9
1.9
0.2
0.2
0.2
0.2
1.9
1.9

0.2
0.2
1.65
1.5
1.5
1.5
0.15
0.15

7.1

6.243

0.1
1-12

SI NO

DESCRIPTION OF ACTIVITIES

DEDUCTION
JUN OF IN COMING CABLE DUCT
corners
JUNCTION OF CABLE DUCT FROM PLINTH

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

-2
-4
-1

1.5
1.9
3.25

1.5
0.2
1.5

0.2
0.15
0.2

1
1

12.74
3.3

6.7
10.27

2.12
2.12

-4

10.50

0.3

0.6

i RIVER SAND FILLING

1
1

12.485
10.27

6.7
3.3

0.08
0.08

ii PCC

1
1

12.485
10.27

6.7
3.3

0.1
0.1

4.42
4.42

1.8
1.46

13 BACK FILLING STAGE 2


QTY ABOVE NGL TO CONTROL ROOM
TOILET SATIR AREA
DEDUCTIONS
GRADE BEAM GB1

iii REBAR
B SUPER STRUCTURE UP TO FF
1 COLUMN UP TO FF
i REBAR
ii SHUTTERING
AT C1
AT C2
DEDUCTIONS AT BEAM LEVEL
AT BEAM FB4 JUNCTIONS FOR C1
AT BEAM FB5 JUNCTIONS IN C1
AT BEAM FB8 JUNCTIONS IN C1
AT BEAM FB1 JUNCTIONS IN C1
AT BEAM FB2&FB3 JUNCTIONS IN C1
AT BEAM FB6 JUNCTIONS FOR C1
Lintel Junction
AT BEAM JUNCTION C2

-20
-4
-2
-10
-8
-7
-32
-2

iii RCC
AT C1
AT C2

14
2

2 LINTEL S.SHADE& LATH (DROP)


i SHUTTERING FOR SUN SHADE ABOVE
WINDOWS
SHUTTERING FOR LINTEL

Toilet & Battery room

14
2

0.23
0.23
0.23
0.4
0.23
0.23
0.3
0.23

0.4
0.6
0.5
0.75
0.6
0.4
0.23
0.45

4.42
4.42

0.4
0.23

0.5
0.5

12

1.6

0.7

6
22
4
4

10.5
3.3
3.3
1.9

0.3
0.3
0.3
0.3

1-12

SI NO

DESCRIPTION OF ACTIVITIES

DROP ABOVE VARANDAH

NOS

II REBAR

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

25.5

iii RCC SUN SHADE ABOVE WINDOWS


RCC LINTEL

TOILET FLOOR LVL BEAM


MID LVL 4.5"

12
1
1
1
1
1

1.6
67.65
3.3
3.3
10.4
3.8

0.6
0.23
0.23
0.115
0.23
0.115

0.1
0.3
0.3
0.3
0.3
0.3

DROP ABOVE VARANDAH

25.60

0.08

3 FF BEAM
i REBAR
ii SHUTTEREING
AT FB-1
AT FB-2
AT FB-3
AT FB-4
AT FB-5
AT FB-6
AT FB-7
AT FB-8
ABOVE ROLLING SHUTTER- PB-6

5
2
2
10
2
7
6
1
2

10.5
4.75
5.25
3.3
3.3
1.52
3.3
3.3
1.75

1.62
1.15
1.15
0.75
1.15
0.82
0.57
0.95
0.83

iii RCC
AT FB-1
AT FB-2
AT FB-3
AT FB-4
AT FB-5
AT FB-6
AT FB-7
AT FB-8
ABOVE ROLLING SHUTTER- PB-6

5
2
2
10
3
7
6
1
2

10.5
4.75
5.25
3.3
3.3
1.5
3.4
3.3
1.75

0.4
0.23
0.23
0.23
0.23
0.3
0.23
0.23
0.23

5
1
6
2

10.54
5.45
1.45
34.20

3.3000
3.3000
3.3000

2
2

2.75
2.75

4 FF SLAB
i SHUTTERING
FS 1
FS3
FS2
OUTER SIDES
ADDITIONAL SLAB ABOVE R SHUTTER
OUTER SIDE
LANDING AS LIKE GF
ii REBAR

0.75
0.6
0.6
0.4
0.6
0.4
0.3
0.5
0.45

0.1500
0.15
1.75

1
6

1-12

SI NO

DESCRIPTION OF ACTIVITIES

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

iii RCC
FS-1
FS-1
FS-2
FB-3
SLAB ABOVE ROLLING

4
1
6
1
1

10.5
10.5
3.4
5.385
2.75

3.3
3.385
1.52
3.385
1.75

5 STAIR FROM +1.5M TO- 5.85M LVL


i SHUTTERING FOR STAIR UP TO FF
MID LANDING BEAM AT +3.675M
MID LANDING SLAB AT +3.675M
WAIST SLABS 1 &2

1
1
2

3.745
3.745
4.05

0.83
1.385
2.03

1
1
2

3.3
3.385
4.06

0.23
1.385
1.6

0.45
0.2
0.2

12
2
1
1
14

3.3
10
10.5
3.3
1.72

0.23
0.23
0.23
0.23
0.25

3.7
3.65
3.65
3.5
0.145

-12
-10
-3
-3
-1
-1
-1

1.18
1.18
0.8
0.9
2.75
1.5
1.2

0.23
0.23
0.23
0.23
0.23
0.23
0.23

1.48
0.58
0.58
2.1
3.6
2.4
1.2

1
2
2
-2

3.3
1.9
1.05
0.9

14
2

3.5
3.5

0.14
0.14
0.14
0.15
0.15

Ii REBAR
IiI RCC
STAIR FROM +1.5M TO- 5.85M LVL
MID LANDING BEAM AT +3.675M
MID LANDING SLAB AT +3.675M
WAIST SLABS 1 &2
6 BRICK WORKS AT GF
ALONG GRID A&C
ALONG GRID 1,2
ALONG GRID 7
WALL BETWEEN GRID B& C
STEPS FROM +1.5 TO FF
DEDUCTIONS
WINDOW -W
VENTILATORS-V
VENTILATORS-V
DOOR D1
ROLLING SHUTTER
COLLAPSABLE GATE
JOLLEY
7 4.5"HALF BRICK WALL
WALL AT GRID B
WALL AT TOILET
DEDUCTIONS
DOOR D2
C SUP STRUC. FROM FF TO ROOF
1 COLUMN UP TO ROOF
i REBAR
ii SHUTTERING
AT C1
AT C2
DEDUCTIONS AT BEAM LEVEL
7

3.5
3.5
3.5
2.1

1.8
1.46

1-12

SI NO

DESCRIPTION OF ACTIVITIES

AT BEAM RB4 JUNCTIONS


AT BEAM RB7 JUNCTIONS
AT BEAM RB1 JUNCTIONS
AT BEAM RB6 JUNCTIONS
AT BEAM RB5 JUNCTIONS
ATBEAM JUNCTION C2

IN
IN
IN
IN
IN

C1
C1
C1
C1
C1

NOS

LENGTH
IN M

-22
-2
-10
-4
-7
-6

iii RCC
AT C1
AT C2

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

0.23
0.23
0.4
0.23
0.23
0.23

0.4
0.5
0.75
0.5
0.5
0.5

0.5
0.5

14
2

3.5
3.5

0.4
0.23

8
24
1
2
2
2
1

1.6
3.3
10.5
10
18.185
9.3
25.6

0.7
0.3
0.6
0.6
0.68
0.68

8
12
1
1
1
2
2
1

1.6
3.3
10.5
2.775
3.76
18.185
9.34
25.6

0.6
0.23
0.23
0.115
0.23
0.6
0.6
0.08

3 ROOF BEAM
i SHUTTERING
AT RB1
AT RB3
AT RB4
AT RB5
AT RB6
AT RB7

5
6
11
7
2
1

10.5
3.4
3.3
0.75
10
3.3

1.62
0.69
0.8
1.27
0.72
0.95

ii REBAR
iii RCC
AT RB1
AT RB3
AT RB4
AT RB5
AT RB6
AT RB7

5
6
11
7
2
1

10.5
3.4
3.3
1.5
10
3.3

0.4
0.23
0.23
0.3
0.23
0.23

2 LINTEL ,SSHADE& LATH (DROP)


i SHUTTERING FOR SUN SHADE
SHUTTERING FOR LINTEL

LOFT
DROP ABOVE VARANDAH

II REBAR
iii RCC SUN SHADE
RCC LINTEL
ABOVE 4.5" WALL
LOFT
DROP ABOVE VARANDAH

0.1
0.3
0.3
0.3
0.3
0.08
0.08
1

0.75
0.3
0.4
0.5
0.5
0.5
1-12

SI NO

DESCRIPTION OF ACTIVITIES

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

4 ROOF SLAB
i SHUTTERING
5
1
6
2

10.50
5.25
1.54
34.06

3.30
3.30
3.30

4
1
1
6

10.50
10.50
5.39
1.52

3.30
3.39
3.39
3.40

0.14
0.14
0.14
0.14

11
2
1
2
11

3.3
10
10.5
3.3
1.73

0.23
0.23
0.23
0.23
0.25

2.8
2.75
2.45
2.6
0.145

-11
-7
-2
-2
-1

1.18
0.8
0.9
0.9
1.2

0.23
0.23
0.23
0.23
0.23

1.48
0.58
2.1
2.1
1.2

2
2
1
2
-4

1.5
1.05
1.5
1.15
0.9

7 9' BRICK WORKS AT VARANDAH

25

0.23

8 STAIR CASE STRUCTURE


i SHUTTERING
STAIR FROM + 5.85M TO 9.04
MID LANDING BEAM AT +7.445M
MID LANDING SLAB AT +9.04M
SMALL LANDING AT +5.85MLVL
WAIST SLAB 3 & 4

1
1
1
2

3.745
3.745
1.6
3.182

0.83
1.385
0.75
2.03

ii REBAR FOR STAIR

OUTER SIDES
ii REBAR
iii RCC
RSI
RSI
RS3
RS2
5 9" BRICK WORKS AT FF
ALONG GRID A&C
ALONG GRID 1,2
ALONG GRID 1,2&7
WALL BETWEEN GRID A& C
STEPS
DEDUCTIONS
WINDOW -W
VENTILATORS-V
DOOR D1
DOOR D
JOLLY
6 4.5"WALL AT FF
WALL AT GEN TOILET
WALL AT LADIES TOILET
DEDUCTIONS -DOOR D2

0.15

3.05
3.05
3.05
3.05
2.1
0.9

iii RCC FOR STAIR


9

1-12

SI NO

DESCRIPTION OF ACTIVITIES

STAIR FROM + 5.85M TO 9.04


MID LANDING BEAM AT +7.445M
MID LANDING SLAB AT +9.04M
SMALL LANDING AT +5.85MLVL
WAIST SLAB 3&4

LENGTH
IN M

NOS

1
1
1
2

9 ROOF WORKS
a. ROOF LVL RCC & head room
i SHUTTEREING
HB1 Outer side
HB1 Inner side
HB2 Outer side
HB2 Inner side
HB3 Outer side
HB3 Inner side
HS1
C1
C2

3.745
3.745
1.6
3.182

1
3
2
2
1
1
1
2
2

ii REBAR
iii RCC
COLUMN C1 AT PARAPET
COLUMN C1
COLUMN C2
BEAM HB1
BEAM HB2
BEAM H3
SLAB HS1
b BRICK WORK 9"
AT PARAPET

AT HEAD ROOM
HEAD ROOM PARAPET
DEDUCTIONS
DOOR D1
WINDOW
JOLLY
c 9 "RICK WORKS-PASSAGE
D EXTERNAL FINISHING AND YARD WORKS
1 EXTERNAL WORKS & YARD
a EXCAVATION TRANS FTNG
CABLE TRENCH
b RIVER SAND
10

3.930
3.470
7.115
6.425
3.930
3.470
7.115
1.800
1.460

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

0.23
1.385
0.75
1.6

0.45
0.2
0.2
0.2

0.500
0.360
0.500
0.360
0.300
0.160
3.930
2.200
2.200

8
2
2
2
2
1
1

0.90
2.40
2.40
3.30
5.87
3.3
6.425

0.40
0.40
0.23
0.23
0.23
0.23
3.47

0.50
0.50
0.50
0.50
0.50
0.3
0.14

6
1
1
1
1

3.3
10.5
5.25
16.17
20.9

0.23
0.23
0.23
0.23
0.23

0.9
0.9
0.9
1.9
0.3

-1
-1
-1

0.9
1.18
1.2

0.23
0.23
0.23

1.9
1.48
1.2

25

0.23

0.9

1
2
2
1

3.9
1.2
3
12.5

12.9
12.9
1.2
6.2

1.5
1.5
1.5
0.1
1-12

SI NO

DESCRIPTION OF ACTIVITIES

c PCC

NOS

LENGTH
IN M

12.5

1
2
8
2
8
4
1
2
2

25.22
19.76

2
2

72
18

-2

3.25

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

6.2

0.075

1.2
1.36

0.25
0.35
2.10
2.10
0.325
0.325

d SHUTTERING
TRANSFORMER FOUNDATION & FIRE WALLBASE
STRAP BEAM
COLUMN
BEAM B1
BEAM B2
SLAB
FIRE WALL
CABLE DUCT RAFT ALONG PLINTH
CABLE DUCT RAFT ARROUND PLINTH-WALL
COVER SLAB
DEDUCTIONS
JUN OF CABLE DUCT FROM CNT. ROOM
e
f

REBAR FOR TRS. FORMER FND


RCC
TRANSFORMER FOUNDATION
STRAP BEAM
COLUMN C1
BELOW GROUND C2
ABOVE GROND C2
BEAM AT FLOOR LEVEL B1
BEAM AT FLOOR LEVEL B2
SLAB AT PLINT
FIRE WALL
CABLE DUCT AROUND PLINTH
RAFT

3.35
4.50
0.20
1.30
1.2
1.30

WALL
COVER SLAB
DEDUCTIONS
JUN OF CABLE DUCT FROM CNT. ROOM

2
ii
ii
iii
iv

2.475
2.475
3.35
4.23
18

CABLE DUCT FROM PLINTH TO


BUILDING
EARTHB WORK EXCAVATION
RIVER SAND
PCC
SHUTTEREING

1
2
8
2
2
4
8
2
1

9.38
9.38
0.3
0.45
0.45
2.175
2.175
3
4.5

3.275
0.5
0.3
0.3
0.23
0.3
0.3
3
0.23

0.25
0.35
2.10
1.00
1.10
0.33
0.33
0.18
4.95

2
4
1
8
2
4

12.07
3
46.94
2.175
12.07
3

1.5
1.5
0.15
0.15
1.2
1.2

0.20
0.20
1.55
1.55
0.15
0.15

-2

3.25

1.3

0.15

1
1
1

5.74
5.74
5.74

4.2
3.8
3.8

1.50
0.08
0.10

CABLE DUCT FROM TRANSFORMER TO


BUILDING
11

1-12

SI NO

v
vi

DESCRIPTION OF ACTIVITIES

RAFT
WALL
COVER SALB
REBAR
RCC
RAFT
WALL

v
vi

i
ii
iii
iv

v
vi

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

2
2
2

18.48
36.96
9.24

1.5

1
2
1
2
1
1

5.74
5.74
5.74
3.65
3.65
5.74

3.65
0.2
0.25
0.3
0.35
3.6

0.20
1.20
1.20
0.30
0.20
0.20

2
2
2

12.07
12.07
12.07

1.7
1.8
1.8

1.50
0.08
0.10

COVER

2
2
2
2

12.07
12.07
12.07
12.07

1.5

REBAR
RCC
RAFT
WALL
COVER

2
2
2

12.07
12.07
12.07

1.7
1.2
1.7

0.20
0.20
0.15

2
2
2

10.93
10.93
10.93

2.5
2.1
2.1

1.50
0.08
0.10

COVER

2
4
4
2

23.76
10.93
10.93
10.93

1.5

REBAR
RCC
RAFT
WALL
COVER

2
4
2

10.93
10.93
10.93

1.9
1.2
1.9

BEAM
BEAM
COVER SLAB
3
i
ii
iii
iv

NOS

INCOMING CABLE TRENCH


EXCAVATION
SAND FILLING
PCC
SHUTTERING
RAFT
WALLL

INCOMING CABLE TRENCH


EXCAVATION
SAND FILLING
PCC
SHUTTERING
RAFT
WALLL

0.20
1.50

0.20
1.30
1.15

0.20
1.30
1.15

0.20
0.20
0.15

BACK FILLING 3RD STAGE


REFER QTY OF EXCAVATION
DEDUCTION
R SAND FILLING OF TRANS FDN
PCC OF TRANS FDN
12

1-12

SI NO

DESCRIPTION OF ACTIVITIES

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

RCC OF TRANS FDN


5 PAVING
6 ROAD
ROAD BASE (METAL & GRAVEL)
PCC BY 40MM M5-1:4:8
RCC BY 20MM M15
TOPING BY 3TO 10MM M15
REBAR 8 @275 MM C/C-(3.03 KG/SQM)
ROAD/ SQM
7 UG SUMP (LUMPSUM)
a EXCAVATION
b RIVER SAND FILLING
c PCC
d SHUTTERING
FLOOR
WALL
COVER SLAB
e REBAR 22KG/SQM OF SURFACE AREA
f RCC FLOOR
RCC WALL
RCC COVER SLAB
g PLASTERING
FLOOR
WALL
CEILING
h MANHOLE COVER

66.40

1
1
1
1
1
1

22.00
22.00
22.00
22.00
22.00
22.00

0.3
0.15
0.15
0.05

1
1
1

4.50
4.10
4.10

1
1
1
1
1
1
1

12.00
22.80
3.90
44.70
3.90
11.40
3.90

1
1
1
1

3.00
9.60
3.00

6
6
6
6
6

2.7
2.3
2.3

1.5
0.1
0.1
0.2
2.1

2.1
2.1
2.1
2.1

22
0.2
0.15
0.15

1.8
2.2
1.8

8 WEATHERING COURSE & TILING

21.7

10.5

9 YARD OPEN AREA FILLING 4TH STAGE


SIZE OF THE PLTOT
DEDUCTION FOR BLG AREA
TRANSFORMER YARD
CABLE TRENCE AREA
INCOMING TRENCH AREA
WATER TANNK
STAIR AREA

1
-1
-1
-1
-2
-1
-2

51
22.2
12.30
2.50
3.70
3.00
7.40

21
11
6
3.6
1.9
2.5
1.75

57.31

4.25

1.18
1.18
2.75

1.48
0.58
4.1

E FINISHING WORKS
1 PLASTERING INTERNAL
a GF
WALL-CONTROL ROOM
DEDUCTIONS
W
V
RS

-12
-9
-1
13

0.7
0.7
0.7
0.7
0.7
0.7
0.7

1-12

SI NO

DESCRIPTION OF ACTIVITIES

D1
D1
Beam Surface on Wall
BATTERY ROOM
GENTS TOILET
DEDUCTIONS
Bath & Toilet walls
D1 & D2
URINAL ENTRY
VENTILATOR
D1 BATTERY ROOM
STAIR ROOM
DEDUCTION FOR CG
DEDUCTION FOR JOLLEY

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

-2
-1
-8
1
1

0.9
1.2
0.4
11.25
27.17

2.1
2.1
0.61
3.8
3.8

-4
-5
-2
-3
-1
1
-1
-1

0.115
0.9
1.05
0.8
1.2
17.27
1.5
1.2

3.8
2.1
3.8
0.6
2.1
4.25
2.1
1.2

57.3

3.3

-11
-2
-2
2
1
-5
-5
2
-2
1
-5
-2
1
-1
-1

1.18
0.9
1.1
5.1
12.4
0.8
0.8
5.5
0.8
8.32
0.8
0.8
17.27
3.3
1.2

1.48
2.1
2.1
3.3
3.3
2.1
0.6
3.3
2
3.3
2.1
0.6
3.3
3.1
1.2

c HEAD ROOM
WALL
DEDUCTION DOOR
WINDOW
JOLLY

1
-1
-1
-1

16.58
0.9
1.18
1.2

2.25
1.9
1.48
1.2

2 CEILING PLASTERING
Gf
CEILING
FB1 BEAM DROP
WET AREAS
BATTERY ROOM
STAIR MID LANDING
WAIST 1 &2

1
4
1
1
1
2

18.185
10.5
3.385
3.385
3.385
1.87

b PLASTERING INTERNAL FF
WALL OFFICE
DEDUCTIONS
W
D1
D
GENTS TOILET/BATH
WALL URINAL/PASSAGE
DEDUCTION FOR DOORS-D2& D1
VENTILATORS
LADIES TOILET
DEDUCTION FOR DOORS-D1
PASSAGE
DEDUCTIONS D1 & D2
VENTILATORS
STAIR ROOM AT FIRST FLOOR
DEDUCTION AT ENTRANCE
JOLLY

14

10.5
1.2
3.015
2.24
1.4
4.06
1-12

SI NO

DESCRIPTION OF ACTIVITIES

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

VARANDAH
FB6 BEAM DROP
FB7 BEAM DROP

1
7
6

22
1.5
3.3

1.75

SRAIR AT 00 LVL
WAIST
SOFFIT
BEAM PP 5 &6 DROP

2
2
2

3.13847
3.385
6.47

1.5
1.5

1
1
1
1
4
6
6

18.18
55
3.385
22.2
10.5
1.5
3.3

10.5
1.2
5
1.75

1
1
2

3.745
1.6
3.182

1.385
0.75
2.03

1
1
2

6.885
3.38
1.5

3.38

18.185

10.5

-1
-1

14.385
12.585

1.9
1.9

1
1

3.155
3.385

2.9
2.24

b CEILING PLASTERING FF
OFFICE
LOFT
WEWT AREA
VARANDAH
RB1 BEAM DROP
RB5 BEAM DROP
RB3 BEAM DROP
STAIR AREA
MID LANDING
SMALL LANDING
WAIST SLAB 3 & 4
c HEAD ROOM
CEILING
BEAM DROP HB3
BEAM DROP HB2

0.52
0.16

0.25

1.2
0.72
0.39

0.15
0.35

3 PAINTING INTERNAL
a GF
WALL RFEFER QTY FROM PLASTER
DEDUCT WALL TILING
CEILING
b FF
WALL REF QTY FROM PLASTER
DEDUCT WALL TILING
CEILING
4 FLOORING
a GROUND FLOOR
CERAMIC FLOORING
DEDUCTION FOR CABLE TRENCH

GENTS TOILET-FLOORING
BATTERY ROOM
15

1-12

SI NO

DESCRIPTION OF ACTIVITIES

ACCESS STEPS & STAIR


FLOOR LANDING SLAB AT +0.00M LVL
STEPS
STAIR PASSAGE AT ENTRANCE
b FLOOR TILING GF STAIR
MID LANDING AT +3.675M LVL
STEPS
c FLOOR TILING FF
FF-FLOORING
GENTS TOILET-FLOORING
LADIES TOILET
PASSAGE AT VARANDAH
STAIR
STEPS FROM FF TO ROOF
SMALL LANDING AT +5.85MLVL
MID LANDING SLAB
LANDING AT +9.04MLVL

NOS

DEDUCTION
WINDOW
DOORS
DOORS
ROLLING SHUTTER
b FF
GENTS TOILET/BATH
WALL URINAL/PASSAGE
DEDUCTION FOR DOORS-D2& D1
VENTILATORS
LADIES TOILET
DEDUCTION FOR DOORS-D1
PASSAGE
DEDUCTIONS D1 & D2
VENTILATORS
16

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

2
20
1

3.7
1.75
5.25

1
29

3.385
1.6

1.25

18.185
3.385
3.385
22.2

10.5
3.015
2.24
1.63

1
1
1
1

2 WALL DADO
a GROUND FLOOR
WALL TOILET/BATH
WALL URINAL
BATH PASSAGE
DEDUCTION FOR DOORS-D2
VENTILATORS
DEDUCTION FOR DOORS-D1
WALL SKIRTING
STAIR AREA
DEDUCTION FO CG
CONTROLL ROOM WALL TILING

LENGTH
IN M

1.75
0.46
3.385

0.395

20
1
1
1

1.6
3.385
3.385
3.385

0.395

2
1
1
-4
-3
-1

5.9
4.755
8.77
0.8
0.8
0.8

2.1
2.1
2.1
2.1
0.6
2.1

1
-1
2
2

17.27
1.5
18.185
10.5

0.1
0.1
2.1
2.1

-12
-2
-1
-1

1.18
0.9
1.2
2.75

1.48
2.1
2.1
2.1

2
1
-5
-5
2
-2
1
-5
-2

5.1
12.4
0.8
0.8
5.5
0.8
8.32
0.8
0.8

2.1
2.1
2.1
0.6
2.1
2
2.1
2.1
0.6

0.75
1.25
1.12

1-12

SI NO

DESCRIPTION OF ACTIVITIES

SKIRTING
OFFICE
DEDUCTION DOOR D
DOOR D1
STAIR AREA
DEDUCTION FOR ENTRANCE
PASSAGE
DEDUCTIONS FOR D
3 EXTERNAL FINISHING WORKS
a PLASTERING EXTERENAL WALL
CORNICHE AT PARAPET LVL
CORNICHE AT HEAD ROOM ROOF
COLUMN PEOJECTIONS @ SOUTH
COLUMN PEOJECTIONS @ EAST/WEST
WARANDAH PARAPET WALL AT FF
SLAB ABOVE ROLLING SHUTTER
DROPS AT FIRST FLOOR LVL
COLUMN AT NORTH
ROOF LEVEL DROP ABOVE VARANDAH
SUNSHADES AT GF
SUNSHADES AT FF
HEAD ROOM PLASTERING EXTERNAL
HEAD ROOM PARAPET
COLUMN FACES
PARAPET IN PASSAGE AT ROOF
DEDUCTIONS
WINDOWS
CG
RS
DOORS D AT FF
DEDUCTION FOR STAIR ENTRY @FF
DOOD D AT ROOF D1
JOLLY
FIRE WALL

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

1
-2
-2
1
-1
2
-2

57.37
1.1
0.9
17.27
3.3
23.5
1.1

0.1
0.1
0.1
0.1
0.1
0.1
0.1

1
1
1
12
3
1
1
1
12
1
7
8
1
1
1
2

68.2
66.4
22.2
0.25
0.17
25
5.17
25
0.25
25.7
3.4
3.4
18.13
22.2
1.81
1.5

11.14

-24
-1
-1
-2
-1
-1
-3
1

0.72
1.04
2.29
0.64
3.3
0.44
0.74
9.25

10.75
10.75
1.8
2.73
2.1
9.3
2.1
1.2
1.2
2.4
0.6
2.7
1.9
1.02
1.87
3.87
1.87
3.87
1.87
0.74
9.5

4 EXTERNAL PAINTING
EXTERNAL WALL
5 SS HAND RAILS
HANDRAIL AT O TO 1.5M
HANDRAIL AT STAIR
WAIST SLABS 1 &2
WAIST SLAB 3&4
6 WATER TANK 1000 LITER
7 BATERY ROOM WALL ACID RESISTANT
8 ELECTRICAL WORKS WITH FITTINGS
17

2
2

4.05
3.182

2
1
1

10.25

2.1

1-12

SI NO

DESCRIPTION OF ACTIVITIES

9 PLUMPING & SANITARYWERES


10 SEWAGE/ DRAINAGE WORKS
11 SEPTIC TANK& SOAKWAY WITH COVERS
12 RAIN WATER LINE & HARVESTING
ENTRANCE GATE 6m wide+ 2M WICKED
13 GATE
14 INSPECTION CHAMBER
15 GULLY TRAP
16 JOINERIES
a DOOR D (CW H C FLUSH DOOR)
DOOR D1 (CW HC FLUSH DOOR)

NOS

1
1
1
1

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

30.00

1
3
2
2
6

1.1
0.9

2.1
2.1

6
1
1

0.9
2.75
1.5

2.1
3.6
2.1

e WINDOW(ALUMINIUM)
VENTILATOR IN CONTROL ROOM
VENTILATOR IN TOILETS
WINDOW IN THE PLACE OF JOLLY
WINDOW HEAD ROOM

23
9
10
3
1

1.18
1.18
0.8
1.2
1.2

1.48
0.58
0.58
1.2
1.2

f GRILL WITH PAINTING W1


WINDOW IN THE PLACE OF JOLLY

23
1

1.18
1.2

1.48
1.2

18 BOREWELL
19 ACCESS LADDER MS- 4M AT ROOF

1
1

b DOOR D2 (PVC DOOR)


c ROLLING SHUTTER
d COLLAPSIBLE GATE(MS)

18

1-12

HARINI ENTERPRISES
ARRIVED BY M/S. DSWE and HARINI ENTERPRISES
ORTH CHENNAI.

RGY PVT LTD.


d Nazer ( Manager Civil,DSWE) and Mr.Rajaraman (Project

amanian(Engineer Civil,DSWE) and Mr.Anbarasan(Site Engg)

QTY

SUB TOTAL

353.92
50.46125 404.38125
89.6
12.775

102.375

50.56
7.20875

57.76875

14.587
1.9865

16.5735

10.94025
1.489875 12.430125

60.94
11

71.94

3.8905

3.8905

27
12.8125
3.618
1.716875
9.75
2.613

57.51

85.68
9.928
19

1-12

QTY

SUB TOTAL

-1.38
-0.621
-1.8
-0.828
-0.138
-0.069

-1.38
-0.828
-0.36
-0.414
-0.621

87.169

5.0391

5.0391

9.52
0.78

10.30

1.97
0.06
0.31
0.34
1.06
0.05
0.32

4.10

3.19

3.19

63
0.9
8.55
9.45
19.8
0.45
8.91

111.06

9.45
0.98
1.09
2.28
1.02
0.27
20

1-12

QTY

SUB TOTAL

0.14

15.23

506.76

-16.5735
-57.76875
-12.430125
-57.510
-10.302
-4.102

348.070

15.75
8.55
9.45
17.82
11.88
3.015
4.428

70.893

2.3779

2.3779

2.36
0.98
1.09
2.05
1.37
0.36
0.62

8.83

1.20
3.50
10.71
1.22
11.55

28.18

0.588

0.588

0.09
0.53
1.62
1.75

4.00

21

1-12

QTY

SUB TOTAL

2.66
3.06
3.38
10.59
4.25
1.48
1.35
0.54

27.30

7.27
2.60
1.37

11.24

5.46
1.95
1.02

8.43

4.994
5.36
58.6905
30.3
39.855
37.455
42.6
40.2
31.95
9

-4.5
-1.14
-4.875

289.8895

5.8872

5.8872

13.82
7.64
12.00
6.06
7.73
8.28
6.07
1.94
8.87
22

1-12

QTY

SUB TOTAL

-0.90
-0.23
-0.98

70.30

180.96
71.85
-7.56

245.25

6.69
2.71

9.40

8.36
3.39

11.75

0.37

0.37

3.91
111.38
12.91
-1.84
-0.552
-0.23
-3
-1.104
-0.644
-2.208
-0.207

114.51

12.38
1.02

13.39

13.44
18.90
21.78
3.96
2.28

23

1-12

QTY

SUB TOTAL

25.50

85.86

0.81
1.15
4.67
0.23
0.11
0.72
0.13
2.05

9.06

6.9092

6.91

85.05
10.93
12.08
24.75
7.59
8.72
11.29
3.14
2.91

166.44

15.75
1.31
1.45
3.04
1.37
1.26
1.41
0.38
1.58

27.53

173.91
17.99
28.71
10.26
0.83
9.63

241.32

3.70

3.70

24

1-12

QTY

SUB TOTAL

19.40
4.98
4.34
2.73
0.72

32.18

3.11
5.19
16.44

24.74

1.05

1.05

0.34
0.94
2.60

3.88

33.70
16.79
8.81
2.66
0.87
-4.82
-1.57
-0.32
-1.30
-2.28
-0.83
-0.33

51.38

11.55
13.30
7.35
-3.78

28.42

3.18

3.18

88.20
10.22

25

1-12

QTY

SUB TOTAL

-2.024
-0.23
-3
-0.46
-0.805
-0.69

91.21

9.80
0.81

10.61

8.96
23.76
6.30
12.00
24.73
12.65
25.60

114.00

0.97
0.77
2.73
0.72
0.10
0.26
1.75
0.90
2.05

9.27

85.05
14.08
29.04
6.67
14.40
3.14

152.37

5.13

5.13

15.75
1.41
3.34
1.58
2.30
0.38

24.75

26

1-12

QTY

SUB TOTAL

173.25
17.33
30.49
10.22

231.29

3.21

3.21

19.40
4.98
2.55
4.34

31.27

23.38
12.65
5.92
3.95
0.69
-4.42
-0.75
-0.87
-0.87
-0.33

39.35

9.15
6.41
4.58
7.02
-7.56

19.59

5.18

5.18

3.11
5.19
1.20
12.92

22.41

0.87

0.87

27

1-12

QTY

SUB TOTAL

0.39
1.04
0.24
2.04

3.70

1.965
3.748
7.115
4.626
1.179
0.555
27.962
7.920
6.424

61.494

1.19
1.44
0.96
0.55
0.76
1.35
0.23
3.12

8.41

4.10
2.17
1.09
7.07
1.44
-0.39
-0.40
-0.33

14.74

5.18

5.18

75.47
46.44
10.80
7.75

75.47
46.44
10.80
7.75

28

1-12

QTY

SUB TOTAL

5.81

5.81

35.963
35.963
20.160
5.712
35.963
35.963
11.223
35.963
35.963
35.963
43.200
-8.450

323.58

6.0223

6.02

7.68
3.28
1.51
0.27
0.23
0.85
1.70
3.15
5.12
7.24
3.60
10.91
4.05
4.35
2.16
-1.268

54.83

36.16
1.74
2.18

36.16

29

1-12

QTY

SUB TOTAL

35.963
35.963
27.720
0.901
4.19
2.76
1.72
0.66
0.26
4.13

61.56
3.48
4.35
4.83
31.38
27.76
36.21

99.65

13.71

61.56

100.18

1.23
8.21
5.79
6.16

81.98
3.67
4.59
9.50
56.84
50.28
32.79

20.16

81.98

149.41

1.45
8.31
10.49
6.23

25.03

132.71
-7.75
-5.81
30

1-12

QTY

SUB TOTAL

-54.83

64.31

66.40

66.40

39.60
19.80
19.80
6.60
132.00

132.00

18.23
0.94
0.94

18.23
0.94
0.94

2.40
47.88
8.19
0.98
1.64
3.59
1.23
5.40
21.12
5.40
1.00

58.47
0.98

6.46

31.92

227.85

227.85

749.70
-170.94
-51.66
-6.30
-9.84
-5.25
-18.13

487.58

243.57
-20.96
-6.16
-11.28
31

1-12

QTY

SUB TOTAL

-3.78
-2.52
-1.95
42.75
103.25
-1.75
-9.45
-7.98
-1.44
-2.52
73.40
-3.15
-1.44

388.59

189.09
-19.21
-3.78
-4.62
33.66
40.92
-8.40
-2.40
36.30
-3.20
27.46
-8.40
-0.96
56.99
-10.23
-1.44

37.31
-1.71
-1.75
-1.44

354.19

190.94
50.40
10.21
7.58
4.74
15.18
32

1-12

QTY

SUB TOTAL

38.50
5.46
3.17

9.42
10.16
3.24

348.99

190.89
65.96
16.93
38.85
50.40
6.48
7.72
5.19
1.20
12.92

23.27
0.51
1.05

421.37

388.59
-132.36
326.18

354.19
-75.89
421.37

1282.07

190.94
-27.33
-23.91
9.15
7.58
33

1-12

QTY

SUB TOTAL

12.95
16.10
17.77

203.25

4.23
18.33

22.56

190.94
10.21
7.58
36.19
12.64
2.54
4.23
3.79

268.12

24.78
9.99
18.42
-6.72
-1.44
-1.68
1.73
-0.15
76.38
44.10
-20.96
-3.78
-2.52
-5.78

132.36

21.42
26.04
-8.40
-2.40
23.10
-3.20
17.47
-8.40
-0.96
34

1-12

QTY

SUB TOTAL

5.74
-0.22
-0.18
1.73
-0.33
4.70
-0.22

75.89

759.75
66.40
22.20
32.25
5.48
45.00
14.11
52.50
27.90
53.97
28.56
32.64
43.51
13.32
4.89
5.70
-17.63
-1.94
-8.86
-2.39
-12.77
-0.82
-1.64
87.88

1250.00

1250.00

16.00
8.10
6.36

21.53

35

30.46
2
21.53
1
1-12

QTY

SUB TOTAL

1
30
1
1
1
3
2
4.62
11.34

15.96

11.34
9.90
3.15

11.34
9.90
3.15

40.17
6.16
4.64
4.32
1.44

56.73

40.17
1.44

1165.00

1.00
1.00

1
1

36

1-12

HARINI ENTERPRISES
MEASUREMENT SHEET JOINTLY ARRIVED BY M/S. DSWE and HARINI ENTERPR
PROJECT : 33/11 KVA SUB STATION WORK NORTH CHENNAI.
SITE : KORATTUR
CLIENT : M/S. DRAKE & SCULL WATER & ENERGY PVT LTD.
MEASUREMNT ARRIVED BY: Mr.Mohammed Nazer ( Manager Civil,DSWE) and Mr.Rajaraman (P
Engg,Harini),Mr.Anbarasan (Site Engg)
CHECKED & RE-ARRIVED BY : Mr.Sivasubramanian(Engineer Civil,DSWE) and Mr.Anbarasan(Sit

SI NO

DESCRIPTION OF ACTIVITIES

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

A SUB STRUCTURE
1.a EARTH WORK IN EXCAVATION
2
1

25.6
7.3

3.5
3.5

1.975
1.975

2
1

25.6
7.3

3.5
3.5

0.5
0.5

ALONG GRID B1 TO B2

2
1

25.6
7.3

0.5
0.5

1.975
1.975

3 RIVER SAND BEDDING


ALONG GRID A & C
ALONG GRID B1 TO B2

2
1

25.15
6.85

2.9
2.9

0.1
0.1

4 PCC FOR FOOTINGS


ii PCC ALONG GRID A & C
PCC ALONG GRID B1 TO B2

2
1

25.15
6.85

2.9
2.9

0.075
0.075

5 FOOTING
i SHUTTERING
ATF1
ATF2

4
2

27.7
10

ii REBAR (from BBS sheet )

ALONG GRID A1 TO A7*& C1 TO C7

ALONG GRID B1 TO B2
1.b ALONG GRID A1 TO A7*& C1 TO C7
ALONG GRID B1 TO B2
2 CNS SOIL (MURROM)
ALONG GRID A1 TO A7*& C1 TO C7

iii RCC
AT F1
AT F1 SLOPE
AT F2
AT F1 SLOPE
STRAP BEAM

2
2
1
1
1
1

6 COLUMN UP TO PLINTH LVL


SHUTTERING
i AT C1
AT C2

14
2
37

0.55
0.55

25
2.7
25
1.025
6.7
2.7
6.700
1.025
25.000
0.650
6.700
0.650

3.4
3.4

0.2
0.25
0.2
0.25
0.6
0.6

1.8
1.46
1-12

SI NO

DESCRIPTION OF ACTIVITIES

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

DEDUCTIONS AT GRADE LEVEL


AT GB3 BEAM JUNCTIONS FOR C1
AT GB4 BEAM JUNCTIONS FOR C1
AT GB1 BEAM JUNCTIONS FOR C1
AT GB2 BEAM JUNCTIONS FOR C1
AT GB1 IN CANTILEVER FOR C2
AT GB3 IN CANTILEVER FOR C2

-20
-6
-10
-8
-1
-1

0.23
0.23
0.3
0.23
0.23
0.23

0.3
0.45
0.6
0.45
0.6
0.3

DEDUCTIONS AT PLINTH LEVEL


AT BEAM PB3 JUNCTIONS FOR C1
AT BEAM PB2 JUNCTIONS FOR C1 & C2
AT BEAM PB1 JUNCTIONS FOR C1
AT BEAM PB6 JUNCTIONS FOR C1
ATBEAM PB4 JUNCTION FOR C2

-20
-8
-2
-4
-6

0.23
0.23
0.3
0.23
0.23

0.3
0.45
0.6
0.45
0.45

ii REBAR

iii RCC COLUMN


AT C1
AT C2

14
2

3.4
3.4

0.4
0.23

0.5
0.5

7 GRADE BEAM
i PCC
AT GB-1
AT GB-1 Cantilever for stair
AT GB-2
AT GB-2
AT GB-3
AT GB-3 Cantilever for stair
AT GB-4

5
1
2
2
10
1
3

10.5
1.5
4.75
5.25
3.3
1.5
3.3

0.5
0.5
0.43
0.43
0.43
0.43
0.43

0.075
0.075
0.075
0.075
0.075
0.075
0.075

iiI REBAR
IV SHURTTERING FOR G.BEAMS
AT GB-1
AT GB-1 Cantilever for stair
AT GB-2
AT GB-2
AT GB-3
AT GB-3 Cantilever for stair
AT GB-4

v RCC
AT GB-1
AT GB-2
AT GB-2
AT GB-3
AT GB-4
GB1 FOR STAIR
38

10
1
4
4
20
1
6

10.5
1.5
4.75
5.25
3.3
1.5
3.3

5
2
2
10
3
1

10.5
4.75
5.25
3.3
3.3
1.5

0.6
0.6
0.45
0.45
0.3
0.3
0.45

0.3
0.23
0.23
0.23
0.23
0.3

0.6
0.45
0.45
0.3
0.45
0.6
1-12

SI NO

DESCRIPTION OF ACTIVITIES

GB3 FOR STAIR


8 BACK FILLING STAGE 1
REFER EXCAVTION QTY
DEDUCTIONS
RIVER SAND FILLING BELOW FOOTING
MURROM FILLING
PCC BELOW FOOTING
RCC FOOTING
COLUMN
GARDE BEAM PCC
9 PLINTH BEAM
SHUTTERING
AT PB-1
AT PB-2
AT PB-2
AT PB-3
AT PB-4
AT PB-5
AT PB-6
REBAR
RCC
AT PB-1
AT PB-2
AT PB-2
AT PB-3
AT PB-4
AT PB-5
AT PB-6
10 STAIRS FROM FGL TO +1.60M
i SHUTTERING
FOR RISER WALL
GROUND LANDING
WAIST SLAB
EDGE SIDE
LANDING

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

1.5

0.3

506.76

-1
-1
-1
-1
-1
-1

16.5735
57.7688
12.4301
57.51
10.30
4.10

2
4
4
18
8
2
8

10.5
4.75
5.25
3.3
3.3
3.35
1.23

1
2
2
9
4
1
4

10.5
4.75
5.25
3.3
3.3
3.47
1.5

0.3
0.23
0.23
0.23
0.23
0.23
0.23

4
2
2
2
2

1.5
1
3.06
4.06
3.3

1.75
1.75
0.15
1.75

2
2
2
2

1.5
1
3.06
3.3

0.15
1.77
1.77
1.77

0.3

0.75
0.45
0.45
0.3
0.45
0.45
0.45

0.75
0.45
0.45
0.3
0.45
0.45
0.45

0.2

ii REBAR
iii RCC
RAISER WALL
GROUND LANDING
WAIST SLAB
LANDING
39

0.2
0.15
0.15
0.15
1-12

SI NO

DESCRIPTION OF ACTIVITIES

11 BRICK WORK BELOW PLINTH


AT PB1
AT PB2
AT PB2
AT PB3
AT PB4
AT PB5
AT PB6
STEPS FROM 0M LVL TO +1.5 M LVL
12 CABLE TRENCH
i RIVER SAND FILLING
RIVER SAND FILLING (Middle)
ii PCC

iii SHUTTERING
SHUTTERING FOR RAFT
SHUTTERING FOR WALL

SHUTTERING FOR COVER SLAB


DEDUCTIONS
JUN OF IN COMING CABLE DUCT
WALL
Deduction of corners
JUNCTION OF CABLE DUCT FROM PLINTH

iv REBAR

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

1
2
2
9
4
1
2

10.5
4.75
5.25
3.3
3.3
3.3
1.5

0.23
0.23
0.23
0.23
0.23
0.23
0.23

1.1
1.4
1.4
1.55
1.4
1.95
1.95

1.75

0.23

0.15

2
2
1

18.185
6.5
6.5

2
2
2.1

0.1
0.1
0.1

2
2
1

18.185
6.5
6.5

2
2
2.1

0.075
0.075
0.075

2
4
2
2
4
4
4
4
3
4

12.485
6.7
17.785
10.1
6.6425
6.2425
7.1
6.7
7.1
1.5

-2
-4
-1

1.5
1.9
3.25

0.2
0.2
1.65
1.5
1.5
1.5
1.5
1.5
1.5
1.5

1.5
0.15
1.5

v RCC
AT RAFT
AT WALL

COVER SLAB
RCC (FOR THE PLAN AREA OTHER THAN
CABLE DUCT)- SLAB ON GRADE
40

2
3
2
2
4
4
3
4

18.185
6.7
18.185
10.1
6.443
6.9
7.1
1.7

1.9
1.9
0.2
0.2
0.2
0.2
1.9
1.9

0.2
0.2
1.65
1.5
1.5
1.5
0.15
0.15

7.1

6.243

0.1
1-12

SI NO

DESCRIPTION OF ACTIVITIES

DEDUCTION
JUN OF IN COMING CABLE DUCT
corners
JUNCTION OF CABLE DUCT FROM PLINTH

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

-2
-4
-1

1.5
1.9
3.25

1.5
0.2
1.5

0.2
0.15
0.2

1
1

12.74
3.3

6.7
10.27

2.12
2.12

-4

10.50

0.3

0.6

i RIVER SAND FILLING

1
1

12.485
10.27

6.7
3.3

0.08
0.08

ii PCC

1
1

12.485
10.27

6.7
3.3

0.1
0.1

4.42
4.42

1.8
1.46

13 BACK FILLING STAGE 2


QTY ABOVE NGL TO CONTROL ROOM
TOILET SATIR AREA
DEDUCTIONS
GRADE BEAM GB1

iii REBAR

TOTAL(A)
B SUPER STRUCTURE UP TO FF
1 COLUMN UP TO FF
i REBAR
ii SHUTTERING
AT C1
AT C2
DEDUCTIONS AT BEAM LEVEL
AT BEAM FB4 JUNCTIONS FOR C1
AT BEAM FB5 JUNCTIONS IN C1
AT BEAM FB8 JUNCTIONS IN C1
AT BEAM FB1 JUNCTIONS IN C1
AT BEAM FB2&FB3 JUNCTIONS IN C1
AT BEAM FB6 JUNCTIONS FOR C1
Lintel Junction
AT BEAM JUNCTION C2

-20
-4
-2
-10
-8
-7
-32
-2

iii RCC
AT C1
AT C2

14
2

2 LINTEL S.SHADE& LATH (DROP)


i SHUTTERING FOR SUN SHADE ABOVE
WINDOWS
SHUTTERING FOR LINTEL

41

14
2

0.23
0.23
0.23
0.4
0.23
0.23
0.3
0.23

0.4
0.6
0.5
0.75
0.6
0.4
0.23
0.45

4.42
4.42

0.4
0.23

0.5
0.5

12

1.6

0.7

6
22

10.5
3.3

0.3
0.3
1-12

SI NO

DESCRIPTION OF ACTIVITIES

Toilet & Battery room

DROP ABOVE VARANDAH


II REBAR

NOS

LENGTH
IN M

4
4

3.3
1.9

25.5

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

0.3
0.3
1

iii RCC SUN SHADE ABOVE WINDOWS


RCC LINTEL

TOILET FLOOR LVL BEAM


MID LVL 4.5"

12
1
1
1
1
1

1.6
67.65
3.3
3.3
10.4
3.8

0.6
0.23
0.23
0.115
0.23
0.115

0.1
0.3
0.3
0.3
0.3
0.3

DROP ABOVE VARANDAH

25.60

0.08

3 FF BEAM
i REBAR
ii SHUTTEREING
AT FB-1
AT FB-2
AT FB-3
AT FB-4
AT FB-5
AT FB-6
AT FB-7
AT FB-8
ABOVE ROLLING SHUTTER- PB-6

5
2
2
10
2
7
6
1
2

10.5
4.75
5.25
3.3
3.3
1.52
3.3
3.3
1.75

1.62
1.15
1.15
0.75
1.15
0.82
0.57
0.95
0.83

iii RCC
AT FB-1
AT FB-2
AT FB-3
AT FB-4
AT FB-5
AT FB-6
AT FB-7
AT FB-8
ABOVE ROLLING SHUTTER- PB-6

5
2
2
10
3
7
6
1
2

10.5
4.75
5.25
3.3
3.3
1.5
3.4
3.3
1.75

0.4
0.23
0.23
0.23
0.23
0.3
0.23
0.23
0.23

5
1
6
2

10.54
5.45
1.45
34.20

3.3000
3.3000
3.3000

2.75

4 FF SLAB
i SHUTTERING
FS 1
FS3
FS2
OUTER SIDES
ADDITIONAL SLAB ABOVE R SHUTTER
OUTER SIDE
42

0.75
0.6
0.6
0.4
0.6
0.4
0.3
0.5
0.45

0.1500
0.15
1-12

SI NO

DESCRIPTION OF ACTIVITIES

NOS

LANDING AS LIKE GF

ii REBAR
iii RCC
FS-1
FS-1
FS-2
FB-3
SLAB ABOVE ROLLING

5 STAIR FROM +1.5M TO- 5.85M LVL


i SHUTTERING FOR STAIR UP TO FF
MID LANDING BEAM AT +3.675M
MID LANDING SLAB AT +3.675M
WAIST SLABS 1 &2

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

2.75

1.75

4
1
6
1
1

10.5
10.5
3.4
5.385
2.75

3.3
3.385
1.52
3.385
1.75

1
1
2

3.745
3.745
4.05

0.83
1.385
2.03

1
1
2

3.3
3.385
4.06

0.23
1.385
1.6

0.45
0.2
0.2

12
2
1
1
14

3.3
10
10.5
3.3
1.72

0.23
0.23
0.23
0.23
0.25

3.7
3.65
3.65
3.5
0.145

-12
-10
-3
-3
-1
-1
-1

1.18
1.18
0.8
0.9
2.75
1.5
1.2

0.23
0.23
0.23
0.23
0.23
0.23
0.23

1.48
0.58
0.58
2.1
3.6
2.4
1.2

1
2
2
-2

3.3
1.9
1.05
0.9

0.14
0.14
0.14
0.15
0.15

Ii REBAR
IiI RCC
STAIR FROM +1.5M TO- 5.85M LVL
MID LANDING BEAM AT +3.675M
MID LANDING SLAB AT +3.675M
WAIST SLABS 1 &2
6 BRICK WORKS AT GF
ALONG GRID A&C
ALONG GRID 1,2
ALONG GRID 7
WALL BETWEEN GRID B& C
STEPS FROM +1.5 TO FF
DEDUCTIONS
WINDOW -W
VENTILATORS-V
VENTILATORS-V
DOOR D1
ROLLING SHUTTER
COLLAPSABLE GATE
JOLLEY
7 4.5"HALF BRICK WALL
WALL AT GRID B
WALL AT TOILET
DEDUCTIONS
DOOR D2

3.5
3.5
3.5
2.1

TOTAL(B)
C SUP STRUC. FROM FF TO ROOF
43

1-12

SI NO

DESCRIPTION OF ACTIVITIES

NOS

1 COLUMN UP TO ROOF
i REBAR
ii SHUTTERING
AT C1
AT C2
DEDUCTIONS AT BEAM LEVEL
AT BEAM RB4 JUNCTIONS IN C1
AT BEAM RB7 JUNCTIONS IN C1
AT BEAM RB1 JUNCTIONS IN C1
AT BEAM RB6 JUNCTIONS IN C1
AT BEAM RB5 JUNCTIONS IN C1
ATBEAM JUNCTION C2

-22
-2
-10
-4
-7
-6

iii RCC
AT C1
AT C2

14
2

14
2

2 LINTEL ,SSHADE& LATH (DROP)


i SHUTTERING FOR SUN SHADE
SHUTTERING FOR LINTEL

LOFT
DROP ABOVE VARANDAH

LENGTH
IN M

3.5
3.5

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

1.8
1.46
0.23
0.23
0.4
0.23
0.23
0.23

0.4
0.5
0.75
0.5
0.5
0.5

3.5
3.5

0.4
0.23

0.5
0.5

8
24
1
2
2
2
1

1.6
3.3
10.5
10
18.185
9.3
25.6

0.7
0.3
0.6
0.6
0.68
0.68

8
12
1
1
1
2
2
1

1.6
3.3
10.5
2.775
3.76
18.185
9.34
25.6

0.6
0.23
0.23
0.115
0.23
0.6
0.6
0.08

5
6
11
7
2
1

10.5
3.4
3.3
0.75
10
3.3

1.62
0.69
0.8
1.27
0.72
0.95

II REBAR
iii RCC SUN SHADE
RCC LINTEL
ABOVE 4.5" WALL
LOFT
DROP ABOVE VARANDAH
3 ROOF BEAM
i SHUTTERING
AT RB1
AT RB3
AT RB4
AT RB5
AT RB6
AT RB7

0.1
0.3
0.3
0.3
0.3
0.08
0.08
1

ii REBAR
iii RCC
44

1-12

SI NO

DESCRIPTION OF ACTIVITIES

AT
AT
AT
AT
AT
AT

RB1
RB3
RB4
RB5
RB6
RB7

NOS

5
6
11
7
2
1

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

10.5
3.4
3.3
1.5
10
3.3

0.4
0.23
0.23
0.3
0.23
0.23

0.75
0.3
0.4
0.5
0.5
0.5

5
1
6
2

10.50
5.25
1.54
34.06

3.30
3.30
3.30

4
1
1
6

10.50
10.50
5.39
1.52

3.30
3.39
3.39
3.40

0.14
0.14
0.14
0.14

11
2
1
2
11

3.3
10
10.5
3.3
1.73

0.23
0.23
0.23
0.23
0.25

2.8
2.75
2.45
2.6
0.145

-11
-7
-2
-2
-1

1.18
0.8
0.9
0.9
1.2

0.23
0.23
0.23
0.23
0.23

1.48
0.58
2.1
2.1
1.2

2
2
1
2
-4

1.5
1.05
1.5
1.15
0.9

7 9' BRICK WORKS AT VARANDAH

25

0.23

8 STAIR CASE STRUCTURE


i SHUTTERING
STAIR FROM + 5.85M TO 9.04
MID LANDING BEAM AT +7.445M
MID LANDING SLAB AT +9.04M

1
1

3.745
3.745

0.83
1.385

4 ROOF SLAB
i SHUTTERING

OUTER SIDES
ii REBAR
iii RCC
RSI
RSI
RS3
RS2
5 9" BRICK WORKS AT FF
ALONG GRID A&C
ALONG GRID 1,2
ALONG GRID 1,2&7
WALL BETWEEN GRID A& C
STEPS
DEDUCTIONS
WINDOW -W
VENTILATORS-V
DOOR D1
DOOR D
JOLLY
6 4.5"WALL AT FF
WALL AT GEN TOILET
WALL AT LADIES TOILET
DEDUCTIONS -DOOR D2

45

0.15

3.05
3.05
3.05
3.05
2.1
0.9

1-12

SI NO

DESCRIPTION OF ACTIVITIES

SMALL LANDING AT +5.85MLVL


WAIST SLAB 3 & 4

LENGTH
IN M

NOS

1
2

ii REBAR FOR STAIR

iii RCC FOR STAIR


STAIR FROM + 5.85M TO 9.04
MID LANDING BEAM AT +7.445M
MID LANDING SLAB AT +9.04M
SMALL LANDING AT +5.85MLVL
WAIST SLAB 3&4

1
1
1
2

9 ROOF WORKS
a. ROOF LVL RCC & head room
i SHUTTEREING
HB1 Outer side
HB1 Inner side
HB2 Outer side
HB2 Inner side
HB3 Outer side
HB3 Inner side
HS1
C1
C2

1
3
2
2
1
1
1
2
2

ii REBAR
iii RCC
COLUMN C1 AT PARAPET
COLUMN C1
COLUMN C2
BEAM HB1
BEAM HB2
BEAM H3
SLAB HS1
b BRICK WORK 9"
AT PARAPET

AT HEAD ROOM
HEAD ROOM PARAPET
DEDUCTIONS
DOOR D1
WINDOW
JOLLY
c 9 "RICK WORKS-PASSAGE
TOTAL ( C)
46

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

1.6
3.182

0.75
2.03

3.745
3.745
1.6
3.182

0.23
1.385
0.75
1.6

3.930
3.470
7.115
6.425
3.930
3.470
7.115
1.800
1.460

0.45
0.2
0.2
0.2

0.500
0.360
0.500
0.360
0.300
0.160
3.930
2.200
2.200

8
2
2
2
2
1
1

0.90
2.40
2.40
3.30
5.87
3.3
6.425

0.40
0.40
0.23
0.23
0.23
0.23
3.47

0.50
0.50
0.50
0.50
0.50
0.3
0.14

6
1
1
1
1

3.3
10.5
5.25
16.17
20.9

0.23
0.23
0.23
0.23
0.23

0.9
0.9
0.9
1.9
0.3

-1
-1
-1

0.9
1.18
1.2

0.23
0.23
0.23

1.9
1.48
1.2

25

0.23

0.9

1-12

SI NO

DESCRIPTION OF ACTIVITIES

D EXTERNAL FINISHING AND YARD WORKS


1 EXTERNAL WORKS & YARD
a EXCAVATION TRANS FTNG
CABLE TRENCH
b RIVER SAND
c PCC

NOS

LENGTH
IN M

1
2
2
1
1

3.9
1.2
3
12.5
12.5

1
2
8
2
8
4
1
2
2

25.22
19.76

2
2

72
18

-2

3.25

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

12.9
12.9
1.2
6.2
6.2

1.5
1.5
1.5
0.1
0.075

1.2
1.36

0.25
0.35
2.10
2.10
0.325
0.325

d SHUTTERING
TRANSFORMER FOUNDATION & FIRE WALLBASE
STRAP BEAM
COLUMN
BEAM B1
BEAM B2
SLAB
FIRE WALL
CABLE DUCT RAFT ALONG PLINTH
CABLE DUCT RAFT ARROUND PLINTH-WALL
COVER SLAB
DEDUCTIONS
JUN OF CABLE DUCT FROM CNT. ROOM
e
f

REBAR FOR TRS. FORMER FND


RCC
TRANSFORMER FOUNDATION
STRAP BEAM
COLUMN C1
BELOW GROUND C2
ABOVE GROND C2
BEAM AT FLOOR LEVEL B1
BEAM AT FLOOR LEVEL B2
SLAB AT PLINT
FIRE WALL
CABLE DUCT AROUND PLINTH
RAFT

2.475
2.475
3.35
4.23
18

3.35
4.50
0.20
1.30
1.2
1.30

WALL
COVER SLAB
DEDUCTIONS
JUN OF CABLE DUCT FROM CNT. ROOM

47

1
2
8
2
2
4
8
2
1

9.38
9.38
0.3
0.45
0.45
2.175
2.175
3
4.5

3.275
0.5
0.3
0.3
0.23
0.3
0.3
3
0.23

0.25
0.35
2.10
1.00
1.10
0.33
0.33
0.18
4.95

2
4
1
8
2
4

12.07
3
46.94
2.175
12.07
3

1.5
1.5
0.15
0.15
1.2
1.2

0.20
0.20
1.55
1.55
0.15
0.15

-2

3.25

1.3

0.15

1-12

SI NO

2
ii
ii
iii
iv

v
vi

DESCRIPTION OF ACTIVITIES

CABLE DUCT FROM PLINTH TO


BUILDING
EARTHB WORK EXCAVATION
RIVER SAND
PCC
SHUTTEREING

v
vi

i
ii
iii
iv

v
vi

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

1
1
1

5.74
5.74
5.74

2
2
2

18.48
36.96
9.24

1.5

1
2
1
2
1
1

5.74
5.74
5.74
3.65
3.65
5.74

3.65
0.2
0.25
0.3
0.35
3.6

0.20
1.20
1.20
0.30
0.20
0.20

2
2
2

12.07
12.07
12.07

1.7
1.8
1.8

1.50
0.08
0.10

COVER

2
2
2
2

12.07
12.07
12.07
12.07

1.5

REBAR
RCC
RAFT
WALL
COVER

2
2
2

12.07
12.07
12.07

1.7
1.2
1.7

0.20
0.20
0.15

2
2
2

10.93
10.93
10.93

2.5
2.1
2.1

1.50
0.08
0.10

COVER

2
4
4
2

23.76
10.93
10.93
10.93

1.5

REBAR
RCC
RAFT

10.93

1.9

CABLE DUCT FROM TRANSFORMER TO


BUILDING
RAFT
WALL
COVER SALB
REBAR
RCC
RAFT
WALL
BEAM
BEAM
COVER SLAB

3
i
ii
iii
iv

NOS

INCOMING CABLE TRENCH


EXCAVATION
SAND FILLING
PCC
SHUTTERING
RAFT
WALLL

INCOMING CABLE TRENCH


EXCAVATION
SAND FILLING
PCC
SHUTTERING
RAFT
WALLL

48

4.2
3.8
3.8

1.50
0.08
0.10

0.20
1.50

0.20
1.30
1.15

0.20
1.30
1.15

0.20
1-12

SI NO

DESCRIPTION OF ACTIVITIES

WALL
COVER
4

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

4
2

10.93
10.93

1.2
1.9

66.40

1
1
1
1
1
1

22.00
22.00
22.00
22.00
22.00
22.00

0.3
0.15
0.15
0.05

0.20
0.15

BACK FILLING 3RD STAGE


REFER QTY OF EXCAVATION
DEDUCTION
R SAND FILLING OF TRANS FDN
PCC OF TRANS FDN
RCC OF TRANS FDN
5 PAVING
6 ROAD
ROAD BASE (METAL & GRAVEL)
PCC BY 40MM M5-1:4:8
RCC BY 20MM M15
TOPING BY 3TO 10MM M15
REBAR 8 @275 MM C/C-(3.03 KG/SQM)
ROAD/ SQM
7 UG SUMP (LUMPSUM)
a EXCAVATION
b RIVER SAND FILLING
c PCC
d SHUTTERING
FLOOR
WALL
COVER SLAB
e REBAR 22KG/SQM OF SURFACE AREA
f RCC FLOOR
RCC WALL
RCC COVER SLAB
g PLASTERING
FLOOR
WALL
CEILING
h MANHOLE COVER

1
1
1

4.50
4.10
4.10

1
1
1
1
1
1
1

12.00
22.80
3.90
44.70
3.90
11.40
3.90

1
1
1
1

3.00
9.60
3.00

2.7
2.3
2.3

1.5
0.1
0.1
0.2
2.1

2.1
2.1
2.1
2.1

22
0.2
0.15
0.15

1.8
2.2
1.8

8 WEATHERING COURSE & TILING

21.7

10.5

9 YARD OPEN AREA FILLING 4TH STAGE


SIZE OF THE PLTOT
DEDUCTION FOR BLG AREA
TRANSFORMER YARD
CABLE TRENCE AREA
INCOMING TRENCH AREA
WATER TANNK
STAIR AREA
TOTAL OF (D )

1
-1
-1
-1
-2
-1
-2

51
22.2
12.30
2.50
3.70
3.00
7.40

21
11
6
3.6
1.9
2.5
1.75

49

6
6
6
6

0.7
0.7
0.7
0.7
0.7
0.7
0.7

1-12

SI NO

DESCRIPTION OF ACTIVITIES

E FINISHING WORKS
1 PLASTERING INTERNAL
a GF
WALL-CONTROL ROOM
DEDUCTIONS
W
V
RS
D1
D1
Beam Surface on Wall
BATTERY ROOM
GENTS TOILET
DEDUCTIONS
Bath & Toilet walls
D1 & D2
URINAL ENTRY
VENTILATOR
D1 BATTERY ROOM
STAIR ROOM
DEDUCTION FOR CG
DEDUCTION FOR JOLLEY
b PLASTERING INTERNAL FF
WALL OFFICE
DEDUCTIONS
W
D1
D
GENTS TOILET/BATH
WALL URINAL/PASSAGE
DEDUCTION FOR DOORS-D2& D1
VENTILATORS
LADIES TOILET
DEDUCTION FOR DOORS-D1
PASSAGE
DEDUCTIONS D1 & D2
VENTILATORS
STAIR ROOM AT FIRST FLOOR
DEDUCTION AT ENTRANCE
JOLLY
c HEAD ROOM
WALL
DEDUCTION DOOR
WINDOW
JOLLY
50

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

57.31

4.25

-12
-9
-1
-2
-1
-8
1
1

1.18
1.18
2.75
0.9
1.2
0.4
11.25
27.17

1.48
0.58
4.1
2.1
2.1
0.61
3.8
3.8

-4
-5
-2
-3
-1
1
-1
-1

0.115
0.9
1.05
0.8
1.2
17.27
1.5
1.2

3.8
2.1
3.8
0.6
2.1
4.25
2.1
1.2

57.3

3.3

-11
-2
-2
2
1
-5
-5
2
-2
1
-5
-2
1
-1
-1

1.18
0.9
1.1
5.1
12.4
0.8
0.8
5.5
0.8
8.32
0.8
0.8
17.27
3.3
1.2

1.48
2.1
2.1
3.3
3.3
2.1
0.6
3.3
2
3.3
2.1
0.6
3.3
3.1
1.2

1
-1
-1
-1

16.58
0.9
1.18
1.2

2.25
1.9
1.48
1.2
1-12

SI NO

DESCRIPTION OF ACTIVITIES

2 CEILING PLASTERING
Gf
CEILING
FB1 BEAM DROP
WET AREAS
BATTERY ROOM
STAIR MID LANDING
WAIST 1 &2

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

1
4
1
1
1
2

18.185
10.5
3.385
3.385
3.385
1.87

VARANDAH
FB6 BEAM DROP
FB7 BEAM DROP

1
7
6

22
1.5
3.3

1.75

SRAIR AT 00 LVL
WAIST
SOFFIT
BEAM PP 5 &6 DROP

2
2
2

3.13847
3.385
6.47

1.5
1.5

1
1
1
1
4
6
6

18.18
55
3.385
22.2
10.5
1.5
3.3

10.5
1.2
5
1.75

1
1
2

3.745
1.6
3.182

1.385
0.75
2.03

1
1
2

6.885
3.38
1.5

3.38

b CEILING PLASTERING FF
OFFICE
LOFT
WEWT AREA
VARANDAH
RB1 BEAM DROP
RB5 BEAM DROP
RB3 BEAM DROP
STAIR AREA
MID LANDING
SMALL LANDING
WAIST SLAB 3 & 4
c HEAD ROOM
CEILING
BEAM DROP HB3
BEAM DROP HB2

10.5
1.2
3.015
2.24
1.4
4.06

0.52
0.16

0.25

1.2
0.72
0.39

0.15
0.35

3 PAINTING INTERNAL
a GF
WALL RFEFER QTY FROM PLASTER
DEDUCT WALL TILING
CEILING
b FF
WALL REF QTY FROM PLASTER
DEDUCT WALL TILING
CEILING

51

1-12

SI NO

DESCRIPTION OF ACTIVITIES

4 FLOORING
a GROUND FLOOR
CERAMIC FLOORING
DEDUCTION FOR CABLE TRENCH

GENTS TOILET-FLOORING
BATTERY ROOM
ACCESS STEPS & STAIR
FLOOR LANDING SLAB AT +0.00M LVL
STEPS
STAIR PASSAGE AT ENTRANCE
b FLOOR TILING GF STAIR
MID LANDING AT +3.675M LVL
STEPS
c FLOOR TILING FF
FF-FLOORING
GENTS TOILET-FLOORING
LADIES TOILET
PASSAGE AT VARANDAH
STAIR
STEPS FROM FF TO ROOF
SMALL LANDING AT +5.85MLVL
MID LANDING SLAB
LANDING AT +9.04MLVL

NOS

DEDUCTION
WINDOW
DOORS
DOORS
ROLLING SHUTTER

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

18.185

10.5

-1
-1

14.385
12.585

1.9
1.9

1
1

3.155
3.385

2.9
2.24

2
20
1

3.7
1.75
5.25

1.75

1
29

3.385
1.6

1.25

18.185
3.385
3.385
22.2

10.5
3.015
2.24
1.63

1
1
1
1

2 WALL DADO
a GROUND FLOOR
WALL TOILET/BATH
WALL URINAL
BATH PASSAGE
DEDUCTION FOR DOORS-D2
VENTILATORS
DEDUCTION FOR DOORS-D1
WALL SKIRTING
STAIR AREA
DEDUCTION FO CG
CONTROLL ROOM WALL TILING

LENGTH
IN M

0.46
3.385

0.395

20
1
1
1

1.6
3.385
3.385
3.385

2
1
1
-4
-3
-1

5.9
4.755
8.77
0.8
0.8
0.8

2.1
2.1
2.1
2.1
0.6
2.1

1
-1
2
2

17.27
1.5
18.185
10.5

0.1
0.1
2.1
2.1

1.18
0.9
1.2
2.75

1.48
2.1
2.1
2.1

-12
-2
-1
-1

0.395
0.75
1.25
1.12

b FF
52

1-12

SI NO

DESCRIPTION OF ACTIVITIES

GENTS TOILET/BATH
WALL URINAL/PASSAGE
DEDUCTION FOR DOORS-D2& D1
VENTILATORS
LADIES TOILET
DEDUCTION FOR DOORS-D1
PASSAGE
DEDUCTIONS D1 & D2
VENTILATORS
SKIRTING
OFFICE
DEDUCTION DOOR D
DOOR D1
STAIR AREA
DEDUCTION FOR ENTRANCE
PASSAGE
DEDUCTIONS FOR D
3 EXTERNAL FINISHING WORKS
a PLASTERING EXTERENAL WALL
CORNICHE AT PARAPET LVL
CORNICHE AT HEAD ROOM ROOF
COLUMN PEOJECTIONS @ SOUTH
COLUMN PEOJECTIONS @ EAST/WEST
WARANDAH PARAPET WALL AT FF
SLAB ABOVE ROLLING SHUTTER
DROPS AT FIRST FLOOR LVL
COLUMN AT NORTH
ROOF LEVEL DROP ABOVE VARANDAH
SUNSHADES AT GF
SUNSHADES AT FF
HEAD ROOM PLASTERING EXTERNAL
HEAD ROOM PARAPET
COLUMN FACES
PARAPET IN PASSAGE AT ROOF
DEDUCTIONS
WINDOWS
CG
RS
DOORS D AT FF
DEDUCTION FOR STAIR ENTRY @FF
DOOD D AT ROOF D1
JOLLY
FIRE WALL

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

2
1
-5
-5
2
-2
1
-5
-2

5.1
12.4
0.8
0.8
5.5
0.8
8.32
0.8
0.8

2.1
2.1
2.1
0.6
2.1
2
2.1
2.1
0.6

1
-2
-2
1
-1
2
-2

57.37
1.1
0.9
17.27
3.3
23.5
1.1

0.1
0.1
0.1
0.1
0.1
0.1
0.1

1
1
1
12
3
1
1
1
12
1
7
8
1
1
1
2

68.2
66.4
22.2
0.25
0.17
25
5.17
25
0.25
25.7
3.4
3.4
18.13
22.2
1.81
1.5

11.14

-24
-1
-1
-2
-1
-1
-3
1

0.72
1.04
2.29
0.64
3.3
0.44
0.74
9.25

10.75
10.75
1.8
2.73
2.1
9.3
2.1
1.2
1.2
2.4
0.6
2.7
1.9
1.02
1.87
3.87
1.87
3.87
1.87
0.74
9.5

4 EXTERNAL PAINTING
EXTERNAL WALL

53

1-12

SI NO

DESCRIPTION OF ACTIVITIES

5 SS HAND RAILS
HANDRAIL AT O TO 1.5M
HANDRAIL AT STAIR
WAIST SLABS 1 &2
WAIST SLAB 3&4
6 WATER TANK 1000 LITER
7 BATERY ROOM WALL ACID RESISTANT
8 ELECTRICAL WORKS WITH FITTINGS
9 PLUMPING & SANITARYWERES
10 SEWAGE/ DRAINAGE WORKS
11 SEPTIC TANK& SOAKWAY WITH COVERS
12 RAIN WATER LINE & HARVESTING
ENTRANCE GATE 6m wide+ 2M WICKED
13 GATE
14 INSPECTION CHAMBER
15 GULLY TRAP
16 JOINERIES
a DOOR D (CW H C FLUSH DOOR)
DOOR D1 (CW HC FLUSH DOOR)

NOS

LENGTH
IN M

2
2

4.05
3.182

2
1
1
1
1
1
1

10.25

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

2.1

30.00

1
3
2
2
6

1.1
0.9

2.1
2.1

6
1
1

0.9
2.75
1.5

2.1
3.6
2.1

e WINDOW(ALUMINIUM)
VENTILATOR IN CONTROL ROOM
VENTILATOR IN TOILETS
WINDOW IN THE PLACE OF JOLLY
WINDOW HEAD ROOM

23
9
10
3
1

1.18
1.18
0.8
1.2
1.2

1.48
0.58
0.58
1.2
1.2

f GRILL WITH PAINTING W1


WINDOW IN THE PLACE OF JOLLY

23
1

1.18
1.2

1.48
1.2

18 BOREWELL
19 ACCESS LADDER MS- 4M AT ROOF

1
1

b DOOR D2 (PVC DOOR)


c ROLLING SHUTTER
d COLLAPSIBLE GATE(MS)

SUB TOTAL (E)


TOTAL
NOTE : ALL SPECIAL WORKS BOQS ARE DIRECTLY POSTED IN ABSTRACT

IMPORTED EARTH FOR FILLING =FILLING-EXCAVATION

54

1-12

HARINI ENTERPRISES

nd Mr.Rajaraman (Project

nd Mr.Anbarasan(Site Engg)

QTY

SUB TOTAL

353.92
50.46125 404.38125
89.6
12.775

102.375

50.56
7.20875

57.76875

14.587
1.9865

16.5735

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

71.94

3.8905

3.8905

27
12.8125
3.618
1.716875
9.75
2.613

57.51

PCC IN
CUM

404.38

102.38

57.77

16.5735

10.94025
1.489875 12.430125

60.94
11

RIVER
SAND
FILLING IN
CUM

12.430125

85.68
9.928
55

1-12

QTY

SUB TOTAL

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

-1.38
-0.621
-1.8
-0.828
-0.138
-0.069

-1.38
-0.828
-0.36
-0.414
-0.621

87.169

5.0391

5.0391

9.52
0.78

10.30

1.97
0.06
0.31
0.34
1.06
0.05
0.32

4.10

3.19

3.19

63
0.9
8.55
9.45
19.8
0.45
8.91

111.06

4.10

9.45
0.98
1.09
2.28
1.02
0.27
56

1-12

QTY

0.14

SUB TOTAL

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

15.23

506.76

-16.5735
-57.76875
-12.430125
-57.510
-10.302
-4.102

348.070

15.75
8.55
9.45
17.82
11.88
3.015
4.428

70.893

2.3779

2.3779

2.36
0.98
1.09
2.05
1.37
0.36
0.62

8.83

1.20
3.50
10.71
1.22
11.55

28.18

0.588

0.588

0.09
0.53
1.62
1.75

4.00
57

1-12

QTY

SUB TOTAL

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

2.66
3.06
3.38
10.59
4.25
1.48
1.35
0.54

27.30

7.27
2.60
1.37

11.24

5.46
1.95
1.02

8.43

11.24

8.43

4.994
5.36
58.6905
30.3
39.855
37.455
42.6
40.2
31.95
9

-4.5
-1.14
-4.875

289.8895

5.8872

5.8872

13.82
7.64
12.00
6.06
7.73
8.28
6.07
1.94
8.87
58

1-12

QTY

-0.90
-0.23
-0.98

SUB TOTAL

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

70.30

180.96
71.85
-7.56

245.25

6.69
2.71

9.40

8.36
3.39

11.75

0.37

0.37

9.40

11.75

404.38

102.38

57.77

37.22

36.72

3.91
111.38
12.91
-1.84
-0.552
-0.23
-3
-1.104
-0.644
-2.208
-0.207

114.51

12.38
1.02

13.39

13.44
18.90
21.78
59

1-12

QTY

SUB TOTAL

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

3.96
2.28
25.50

85.86

0.81
1.15
4.67
0.23
0.11
0.72
0.13
2.05

9.06

6.9092

6.91

85.05
10.93
12.08
24.75
7.59
8.72
11.29
3.14
2.91

166.44

15.75
1.31
1.45
3.04
1.37
1.26
1.41
0.38
1.58

27.53

173.91
17.99
28.71
10.26
0.83
60

1-12

QTY

SUB TOTAL

9.63

241.32

3.70

3.70

19.40
4.98
4.34
2.73
0.72

32.18

3.11
5.19
16.44

24.74

1.05

1.05

0.34
0.94
2.60

3.88

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

33.70
16.79
8.81
2.66
0.87
-4.82
-1.57
-0.32
-1.30
-2.28
-0.83
-0.33

51.38

11.55
13.30
7.35
-3.78

28.42

61

1-12

QTY

3.18

SUB TOTAL

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

3.18

88.20
10.22
-2.024
-0.23
-3
-0.46
-0.805
-0.69

91.21

9.80
0.81

10.61

8.96
23.76
6.30
12.00
24.73
12.65
25.60

114.00

0.97
0.77
2.73
0.72
0.10
0.26
1.75
0.90
2.05

9.27

85.05
14.08
29.04
6.67
14.40
3.14

152.37

5.13

5.13

62

1-12

QTY

SUB TOTAL

15.75
1.41
3.34
1.58
2.30
0.38

24.75

173.25
17.33
30.49
10.22

231.29

3.21

3.21

19.40
4.98
2.55
4.34

31.27

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

23.38
12.65
5.92
3.95
0.69
-4.42
-0.75
-0.87
-0.87
-0.33

39.35

9.15
6.41
4.58
7.02
-7.56

19.59

5.18

5.18

3.11
5.19
63

1-12

QTY

SUB TOTAL

1.20
12.92

22.41

0.87

0.87

0.39
1.04
0.24
2.04

3.70

1.965
3.748
7.115
4.626
1.179
0.555
27.962
7.920
6.424

61.494

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

1.19
1.44
0.96
0.55
0.76
1.35
0.23
3.12

8.41

4.10
2.17
1.09
7.07
1.44
-0.39
-0.40
-0.33

14.74

5.18

5.18
0

0
64

0
1-12

QTY

75.47
46.44
10.80
7.75
5.81

SUB TOTAL

75.47
46.44
10.80
7.75
5.81

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

75.47
46.44
10.80
7.75
5.81

35.963
35.963
20.160
5.712
35.963
35.963
11.223
35.963
35.963
35.963
43.200
-8.450

323.58

6.0223

6.02

7.68
3.28
1.51
0.27
0.23
0.85
1.70
3.15
5.12
7.24
3.60
10.91
4.05
4.35
2.16
-1.268

54.83

65

1-12

QTY

36.16
1.74
2.18

35.963
35.963
27.720
0.901
4.19
2.76
1.72
0.66
0.26
4.13

61.56
3.48
4.35
4.83
31.38
27.76
36.21

SUB TOTAL

36.16

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

36.16
1.74
2.18

99.65

13.71

61.56

61.56
3.48
4.35

100.18

1.23
8.21
5.79
6.16

81.98
3.67
4.59
9.50
56.84
50.28
32.79

20.16

81.98

81.98
3.67
4.59

149.41

1.45
8.31
66

1-12

QTY

10.49
6.23

SUB TOTAL

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

25.03

132.71
-7.75
-5.81
-54.83

64.31

66.40

66.40

39.60
19.80
19.80
6.60
132.00

132.00

18.23
0.94
0.94

18.23
0.94
0.94

2.40
47.88
8.19
0.98
1.64
3.59
1.23
5.40
21.12
5.40
1.00

58.47
0.98

6.46

31.92

227.85

227.85

749.70
-170.94
-51.66
-6.30
-9.84
-5.25
-18.13

487.58
312.40

0.00
67

0.00

16.64

16.93
1-12

QTY

SUB TOTAL

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

243.57
-20.96
-6.16
-11.28
-3.78
-2.52
-1.95
42.75
103.25
-1.75
-9.45
-7.98
-1.44
-2.52
73.40
-3.15
-1.44

388.59

189.09
-19.21
-3.78
-4.62
33.66
40.92
-8.40
-2.40
36.30
-3.20
27.46
-8.40
-0.96
56.99
-10.23
-1.44

37.31
-1.71
-1.75
-1.44

354.19
68

1-12

QTY

SUB TOTAL

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

190.94
50.40
10.21
7.58
4.74
15.18
38.50
5.46
3.17

9.42
10.16
3.24

348.99

190.89
65.96
16.93
38.85
50.40
6.48
7.72
5.19
1.20
12.92

23.27
0.51
1.05

421.37

388.59
-132.36
326.18

354.19
-75.89
421.37

1282.07

69

1-12

QTY

SUB TOTAL

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

190.94
-27.33
-23.91
9.15
7.58
12.95
16.10
17.77

203.25

4.23
18.33

22.56

190.94
10.21
7.58
36.19
12.64
2.54
4.23
3.79

268.12

24.78
9.99
18.42
-6.72
-1.44
-1.68
1.73
-0.15
76.38
44.10
-20.96
-3.78
-2.52
-5.78

132.36

70

1-12

QTY

SUB TOTAL

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

21.42
26.04
-8.40
-2.40
23.10
-3.20
17.47
-8.40
-0.96
5.74
-0.22
-0.18
1.73
-0.33
4.70
-0.22

75.89

759.75
66.40
22.20
32.25
5.48
45.00
14.11
52.50
27.90
53.97
28.56
32.64
43.51
13.32
4.89
5.70
-17.63
-1.94
-8.86
-2.39
-12.77
-0.82
-1.64
87.88

1250.00

1250.00

71

1-12

QTY

SUB TOTAL

MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM

RIVER
SAND
FILLING IN
CUM

PCC IN
CUM

16.00
8.10
6.36

21.53

30.46
2
21.53
1
1
30
1
1
1
3
2

4.62
11.34

15.96

11.34
9.90
3.15

11.34
9.90
3.15

40.17
6.16
4.64
4.32
1.44

56.73

40.17
1.44

1165.00

1.00
1.00

1
1
0

716.78

102.38

57.77

53.86

53.64

ABSTRACT

428.43

72

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

71.94
3.8905

57.51

73

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

87.169
5.0391

10.30

3.19

111.06

74

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

15.23

70.893
2.3779

8.83

28.18
0.588

4.00
75

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

27.30

289.8895

5.8872

76

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

70.30

0.37

659.13

21.35

166.17

0.00

27.30

0.00

0.00

0.00

3.91

114.51

13.39

77

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

85.86
0.81

9.06

6.91

166.44

27.53

78

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

241.32
3.70

32.18

24.74
1.05

3.9

51.38

28.42

632.8594 16.37908

86.06218 51.37911

79

28.42

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

3.18

91.21

10.61

114.00
0.97

9.27

152.37
5.13

80

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

24.75

231.29
3.21

31.27

39.35

19.59
5.18

81

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

22.41
0.87

3.70

61.494
1.19

8.41

14.74

672.77195 14.542475

5.18
88.010567 64.436224
82

19.585

0
1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

323.58
6.02

54.83

83

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

99.65
0.90

13.71

100.18
1.23

20.16

149.41
1.45

84

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

25.03

672.82

9.60

113.73

0.00
85

0.00

0.00

0.00

0.00
1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

388.59

354.19
86

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

348.99

421.37

87

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

88

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

89

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

1-12

SHUTTERI REBAR IN RCC IN GFNG IN SQM


MT
CUM

2637.58

61.87

279.90

RCC
OTHERS
CUM

9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM

174.07

143.12

48.01

90

INT ER.
PLASTER
IN SQM

CEILING
PLASTER
IN SQM

742.7748 770.35253
742.77

770.35

1-12

EXTL
PLASTER

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

91

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

1-12

EXTL
PLASTER

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

92

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

1-12

EXTL
PLASTER

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

348.0696

93

1-12

EXTL
PLASTER

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

94

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

1-12

EXTL
PLASTER

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

245.25

0.00

593.32

0.00

95

0.00

0.00

0.00

1-12

EXTL
PLASTER

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

96

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

1-12

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

EXTL
PLASTER

97

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

1-12

EXTL
PLASTER

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

98

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

1-12

EXTL
PLASTER

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

99

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

1-12

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

EXTL
PLASTER

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

0
100

0
1-12

EXTL
PLASTER

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

101

1-12

EXTL
PLASTER

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

102

1-12

EXTL
PLASTER

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

64.31

0.00

487.58
551.89

0.00
103

0.00

0.00

0.00
1-12

EXTL
PLASTER

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

104

1-12

EXTL
PLASTER

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

0.00

1282.07

105

1-12

EXTL
PLASTER

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

203.25

22.56

268.12

132.36

106

1-12

EXTL
PLASTER

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

75.89

1250.00

1250.00

107

1-12

EXTL
PLASTER

1249.9957
1250.00

BACK
FLOOR
FILLING IN TILING IN
CUM
SQM

WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM

0 493.92978
1145.21

493.93

108

208.2507 1282.0712 1249.9957


208.25

1282.07

1250.00

1-12

HARINI ENTERPRISES

BARBENDING SCHEDULE JOINTLY ARRIVED BY M/S. DSWE and HARINI ENTERPR


PROJECT : 33/11 KVA SUB STATION WORK NORTH CHENNAI.
SITE : KORATTUR
CLIENT : M/S. DRAKE & SCULL WATER & ENERGY PVT LTD.

BBS DONE ARRIVED BY: Mr.Mohammed Nazer ( Manager Civil,DSWE) and Mr.Rajaraman (Project Engg,Harini),Mr.Anbarasan (Site Engg
CHECKED & RE-ARRIVED BY : Mr.Sivasubramanian(Engineer Civil,DSWE) and Mr.Anbarasan(Site Engg)
S.
No

Member Details

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

A.1 Combined Footing Raft


Foundation F1-Main Rod

12

143

286

2.8

800.80

Distribution rod

10

16

32

26.1

835.20

Foundationn F2-main rod

12

42

42

2.8

117.60

Distribution rod

10

16

16

7.4

118.40

Both Bottom & Top main rods

20

16

27.7

443.20

Bottom extra at one end

20

10

6.95

69.50

Bottom extra at next end

20

2.7

21.60

Bottom extra at middles

20

16

32

2.7

86.40

Top extra at one end

16

4.75

38.00

Top extra

16

20

40

2.7

108.00

Stirrups at 240mm c/c

12

36

72

2.6

187.20

Stirrups at 140mm c/c

12

99

198

2.6

514.80

Combined Footing Beam For F1

109

1-18

S.
No

Member Details

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

Combined Footing Beam For F2


Both Bottom & Top main rods

20

7.4

59.20

Bottom extra

16

7.4

22.20

Stirrups at 240mm c/c

12

2.6

20.80

Stirrups at 140mm c/c

12

33

33

2.6

85.80

25

10

14

140

5.6

784

10

38

14

532

1.64

872.48

10

38

14

532

1.24

659.68

25

10

14

140

1.25

175.00

20

10

20

5.35

107.00

38

76

1.28

97.28

97.28

38

76

1.12

85.12

85.12

38

76

0.23

17.48

17.48

20

10

20

20.00

25

12

96.00

25

16

4.15

66.40

25

12

96.00

25

8.8

70.40

66

264

1.74

459.36

459.36

20

80

1.74

139.20

139.20

25

12

24.00

25

3.15

6.30

25

25

2 Column up plinth
Column C1
Ties outer spacing 100mm c/c
Ties Inner spacing 100mm c/c
column C1 over lap above plinth
Column C2
Ties outer spacing 100mm c/c
Ties Inner spacing 100mm c/c
Middle Hook
Column C2 over Lap above plinth
3 Grade Beam
GB1
Top Main Rod
Top Extra at end support
Bottom Main Rod
Bottom Extra Rod
2 Leg Stirips c/c 100mm
2 Leg Stirips c/c 200mm
GB1 (continious) with stair riser
Top Main Rod
Over lap at end for stair riser beam GB1
Top Extra at end support
Top Extra at continious support

110

4.15

8.30

5.65

11.30

1-18

S.
No

Member Details

Bottom Main Rod


Over lap at end for stair riser beam GB1
Bottom Extra Rod
2 Leg Stirips c/c 100mm
2 Leg Stirips c/c 200mm
GB2(continious)
Top Main Rod
Top Extra at end support
Top Extra at mid support
Bottom Main Rod
Bottom Extra Rod for 5750 beam
Bottom Extra Rod for 5250 beam
2 Leg Stirips c/c 100mm
2 Leg Stirips c/c 200mm for
GB3 continious on grid C
Top Main Rod including GB4
Top Extra at end support GB3
Top Extra at mid support GB3
Bottom Main Rod
Bottom Extra Rod at intermediate beams
2 Leg Stirips
GB3 continious on grid A
Top Main Rod
Top Extra at end support
Top Extra at mid support
Bottom Main Rod
Bottom Extra Rod at intermediate beams
Bottom Extra Rod at end beam
Bottom Extra Rod for cantilever portion
2 Leg Stirips
2 Leg Stirips for cantilever portion

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

25

12

24.00

25

3.15

6.30

25

8.8

17.60

81

81

1.74

140.94

140.94

20

20

1.74

34.80

34.80

16

12

48.00

16

12

2.475

29.70

16

3.95

23.70

16

12

72.00

16

4.425

8.85

16

3.93

7.86

68

136

1.02

138.72

138.72

16

32

1.02

32.64

32.64

20

24

48.00

20

1.65

1.65

20

2.6

10.40

16

19.86

39.72

20

2.8

11.20

34

170

1.32

224.40

20

26.5

53.00

20

1.65

1.65

20

2.6

15.60

16

19.86

39.72

20

2.62

15.72

20

2.8

2.80

20

0.9

0.90

34

204

0.96

195.84

195.84

16

16

0.96

15.36

15.36

111

224.40

1-18

S.
No

Member Details

GB4
Top for cont beam (already considered in GB3)
Top Extra at mid support
Top Extra at end support
Bottom Main Rod
Bottom Extra
2 Leg Stirips
Top for beam in stair area
Top Extra at end support
Bottom Main Rod
Bottom Extra
2 Leg Stirips
4 PLINTH BEAM
PB1
Top Main Rod
Top Extra Rod
skin bar at side
Bottom Main Rod
Bottom Extra Rod
2 Leg Stirips c/c 100
2 Leg Stirips c/c 200
PB2 CONTINIOUS
Top Main Rod (L rod)
Top Extra at end support
Top Extra at mid support
Bottom Main L Rod
2 Leg Stirips
PB3 CONTINIOUS at C grid
Top Main Rod
Top Extra at end support

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

20

2.6

5.20

20

1.81

3.62

20

4.72

9.44

16

4.72

9.44

34

34

1.32

44.88

20

4.72

9.44

20

1.81

7.24

20

4.72

9.44

16

4.72

9.44

34

34

1.32

44.88

25

12

24.00

25

4.36

26.16

16

11.45

22.90

25

12

24.00

25

8.8

26.40

66

66

2.14

141.24

141.24

20

20

2.14

42.80

42.80

16

12

72.00

20

2.535

15.21

20

12

3.95

47.40

20

12

72.00

106

212

1.2

254.40

16

19.86

39.72

20

1.7

5.10

112

44.88

44.88

254.40

1-18

S.
No

Member Details

Top Extra mid support


Bottom Main Rod
Bottom Extra Rod
2 Leg Stirips
PB3 CONTINIOUS at A grid
Top Main Rod from A/6 to A/2
Top Extra mid support
Bottom Main Rod
Bottom Extra Rod
2 Leg Stirips
PB4
Top Main Rod over lap with PB3
Top Extra at end support
Bottom Main Rod at continious
Bottom Extra Rod
2 Leg Stirips
PB4 AT TOILET AREA
Top & Bottom Main
Top extra
Bottom Extra Rod
2 Leg Stirips
PB5
Top Main Rod
Top Extra at end support
Bottom Main Rod
Bottom extra
2 Leg Stirips
PB6
Top Main Rod continious with PB3

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

20

15

2.6

39.00

16

19.1

57.30

16

2.8

14.00

34

170

1.02

173.40

16

12

24.00

20

15

2.6

39.00

16

16

48.00

16

2.8

11.20

34

136

1.02

138.72

20

6.31

37.86

20

1.8

10.80

20

4.4

39.60

20

2.8

16.80

33

132

1.32

174.24

20

4.58

22.90

20

1.65

6.60

20

2.8

5.60

34

34

1.32

44.88

12

4.58

9.16

12

1.6

6.40

12

3.88

7.76

12

2.62

5.24

35

35

1.32

46.20

16

4.075

32.60

113

8 mm

173.40

138.72

174.24

44.88

46.20

1-18

S.
No

Member Details

Bottom Main Rod


2 Leg Stirips @ 100 c/c
Additional beam at toilet area
for short wall
long wall
ties
beam below battery room wall
ties

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

16

12

2.35

28.20

16

64

1.32

84.48

12

2.1

16.80

12

4.05

16.20

8 mm

84.48

40

40

0.71

28.40

12

4.05

16.20

20

20

0.96

19.20

12

12

24

1.55

37.20

11

22

1.7

37.40

12

12

24

1.2

28.80

11

22

1.7

37.40

12

12

24

4.66

111.84

21

42

1.7

71.40

12

12

24

1.7

40.80

12

1.7

20.40

12

12

24

1.7

40.80

12

24

48

4.93

236.64

44

88

2.36

207.68

Raft bottom along grid A & C- short side & wall external
U shaped bar @125mm c/c for a length 13.285m

10

107

214
5.55

1187.70

Distributor for above 200mm c/c- only for full raft


over lap for above
Distributor for above18.135m long wall 200mm c/c
over lap for above

10

10

20

18.135

362.70

10

10

20

0.5

10.00

10

20

18.135

362.70

362.70

10

20

0.4

8.00

8.00

5 STAIR FROM 00M To +1.60 M


Starter bar outside
distribution for above
Starter bar inside face
distribution for above
waist slab bottom bar at FGL lvl
distribution for above
waist slab top at FGL lvl
distribution for above
scissor bar at FGL lvl
landing at +1.5m lvl
slab short side bar double layer
slab long side bar double layer

28.40
19.20

37.40
37.40
71.40
20.40

207.68

6 CABLE TRENCH

114

1-18

S.
No

Member Details

Distributor for 13.285 m long 2 part walls


Raft top short bar at 175 mmc/c for length 13.285m
Distributor for above 200mm c/c for full raft length
over lap for above
Wall innerface vertical bar on either side for 13.285m
Distribution for above for 18.135m length with lap
over lap for above
Distribution for above for 13.285m length

Raft bottom along grid 7 & 2- short side & wall external
U shaped bar @125mm c/c for a length (7.10)m

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm
249.60

10

40

6.24

249.60

10

77

154

2.04

314.16

10

10

20

18.135

362.70

10

10

20

0.5

10.00

10

77

308

2.1

646.80

10

20

18.535

370.70

10

20

0.4

8.00

8.00

10

40

6.24

249.60

249.60

10

58

116
5.55

643.80

370.70

10

10

20

10.45

209.00

10

20

11.25

225.00

225.00

Distributor for above 7.10m long wall 200mm c/c

10

20

7.5

150.00

150.00

Raft top short bar at 125 mmc/c for length 7.1m


Distributor for above 200mm c/c for full length
wall innerface vertical bar on either side
Distribution for above for 10.5m length with lap
Distribution for above for 7.1m length with lap
Chair bar for cable trench raft

10

58

116

2.04

236.64

10

10

20

10.45

209.00

10

58

232

2.05

475.60

10

20

11.25

225.00

225.00
158.00

Distributor for above 200mm c/c- only for full raft


Distributor for above 10.5m long wall 200mm c/c

Trench at mid of controll room -Raft bottom short side


& wall external U shaped bar @125mm c/c for a length
(7.1)m
Distributor for above 200mm c/c- only for raft
Over lap for above on both end
Distributor for above only for vrtical 200mm c/c
Raft top short bar at 125 mmc/c for length 7.17m
Distributor for above 200mm c/c
Over lap for above on both end

10

20

7.9

158.00

10

34

34

1.2

40.50

10

58

58
5.55

321.90

10

10

10

7.1

71.00

10

10

10

10.00

20

40

7.1

284.00

10

58

58

2.04

118.32

10

10

10

7.1

71.00

10

10

10

10.00

115

284.00

1-18

S.
No

Member Details

wall innerface vertical bar on either side


Distribution for above

Trench common corner portion for length 1.7m


Raft bottom- L rod
Raft top bat -L rod
wall inner face vertical bar on only one side
All Distributors are considred already
Trench cover slab
Both top and bottom for Length 10.5m
Distributor for both top & bottom
Mid area trench cover
Both top and bottom for Length 7.1m
Distributor for both top & bottom
SLAB ON GRADE
SIZE-6.84M x7.1M AT 200MM C/C
short bar
long bar
FIRST STAGE REBAR SUB TOTAL

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

10

58

116

2.1

243.60

10

20

7.1

142.00

10

15

10

146

3.6

525.60

10

15

10

150

1.95

292.50

10

15

10

146

292.00

10

142

284

568.00

20

40

10.5

420.00

10

96

196

392.00

20

20

7.1

142.00

142.00

35

70.7

6.84

483.59

483.59

33

65.5

7.1

465.05

465.05

142.00

420.00

Total length

7136.38

Unit Wt

0.40

Wt in MT -Dia Wise

2.82

Total Wt in Mtonne

COLUMN ABOVE PLINTH TO FIRST FLOOR


1 COLUMN
Column C1
Ties outer spacing 100mm c/c
Ties Inner spacing 100mm c/c

25

10

14

140

4.4

616.00

10

20

14

280

1.64

459.20

10

20

14

280

1.24

347.20

116

1-18

S.
No

Member Details

Normal Ties c/c 250mm (Outer)


Normal Ties c/c 250mm (Inner)
column C1 over lap above ffloor
Column C2
Ties outer spacing 100mm c/c
Ties Inner spacing 100mm c/c
Middle Hook
Normal ties c/c 200mm (Outer)
Normal ties c/c 200mm (Outer)
Column C2 over Lap above plinth
2 LINTEL & SUNSHADE
Lintel -length-22.6
Ties
lintel- length-10.50m
Ties
lintel- length-3.875m
Ties
Lntel at toilet area
At door
ties
Sun shade Above windows only-12nos
Main bar
Distributor

3 GROUND FLOOR ROOF (FIRST FLOOR )SLAB


FB1& FB6continious
Top Main from FB6 towards FB1
over lap FB1
Top main from Fb1 towards FB6
over lap FB6(cantilever)
Top Extra at end support

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

10

14

28

1.64

45.92

10

14

28

1.24

34.72

25

10

14

140

1.25

175.00

20

10

20

4.4

88.00

20

40

1.28

51.20

51.20

20

40

1.12

44.80

44.80

22

44

0.23

10.12

10.12

1.34

5.36

5.36
5.36

1.34

5.36

20

10

20

20.00

12

12

23.45

281.40

23

12

276

0.96

264.96

12

12

11.85

142.20

138

138

0.96

132.48

12

18

4.275

76.95

27

54

0.96

51.84

12

4.05

16.20

20

20

0.71

14.20

10

12

12

140

1.44

201.60

12

72

1.57

113.04

25

10

12

120.00

25

10

3.07

30.70

25

10

12

120.00

25

10

4.5

45.00

25

20

4.4

88.00

117

264.96
132.48
51.84

14.20

113.04

1-18

S.
No

Member Details

Top Extra at mid support


Bottom Main for FB1
Bottom Extra For FB1
skin bar at sides
2 Leg Stirips @ 130 c/c
2 Leg Stirips @ 230 c/c
Spacer Bar FB1
FB6 cantilever
Top and extra support is considered in FB1
Bottom Main
bottom main
Ties 8 at 130c/c
FB2/FB3 & FB6
Top Main Rod (over laped with FB6)
Top Extra at end support
Top Extra at mid support
Bottom Main Rod
Bottom Extra Rod
Bottom Extra Rod
2 Leg Stirips at 100mm c/c
2 Leg Stirips at 200mm c/c
FB6 Grid A1 & A2 Top bar
Top Extra FB6 Grid A1 & A2
ties & bottom bor considered in FB6 cantilever
Spacer Bar FB2
FB4 & FB5 at grid C
Top Main continious from FB4 To FB5
Top extra at at end support at Fb4 & FB5
Top Extra at mid support
Bottom main continious for FB4
Bottom lap for FB4 up to column at C/2

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

25

20

5.55

111.00

25

20

12

240.00

25

20

8.1

162.00

12

10

10.92

109.20

10

52

260

2.1

546.00

10

18

90

2.1

189.00

25

14

70

0.4

28.00

20

14

2.45

34.30

25

2.45

17.15

12

84

1.24

104.16

20

12

72.00

25

2.75

11.00

25

4.1

16.40

20

12

72.00

20

2.95

11.80

20

3.45

13.80

16

128

1.5

192.00

192.00
60.00

10

40

1.5

60.00

25

4.55

36.40

25

4.45

35.60

25

14

28

0.4

11.20

20

24

48.00

20

1.8

7.20

20

10

2.7

27.00

20

12

24.00

20

8.12

16.24

118

104.16

1-18

S.
No

Member Details

Bottom Extra for FB4


Bottom Main for FB5
2 Leg Stirips at 100mm
2 Leg Stirips at 150mm
2 Leg Stirips at 100mm
2 Leg Stirips at 150mm
Spacer Bar FB4

c/c
c/c
c/c
c/c

for
for
for
for

FB4
FB4
FB5
FB5

FB5 STAIR & IN TOILET SUNKEN AREA


Top Main
Top extra at end support
Bottom main
2 Leg Stirips at 100mm c/c for FB5
2 Leg Stirips at 150mm c/c for FB5
FB4 & FB8 atgrid A
Top Main continious from FB4 To FB8
Top main over lap at FB8
Top extra at at end support at Fb4 & FB8
Top Extra at mid support
Bottom main continious for FB4
Bottom lap for FB4 & FB8
Bottom Extra for FB4 & FB8
2 Leg Stirips at 100mm c/c for FB4
2 Leg Stirips at 150mm c/c for FB4
2 Leg Stirips at 100mm c/c for FB8
2 Leg Stirips at 150mm c/c for FB8
FB7
Top continious from One end
Top over lab from other end
Top Extra at end support
Top Extra at mid support
Bottom Main Rod from one end

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

20

10

2.6

26.00

16

4.4

13.20

24

120

1.1

132.00

132.00

40

1.1

44.00

44.00

24

24

1.5

36.00

36.00

1.5

12.00

12.00

25

14

70

0.4

28.00

20

4.93

19.72

20

1.78

14.24

16

4.93

19.72

24

48

1.5

72.00

72.00

16

1.5

24.00

24.00

20

12

24.00

20

12

24.00

20

1.8

7.20

20

10

2.7

27.00

20

12

24.00

20

12

24.00

20

12

2.6

31.20

24

120

1.1

132.00

132.00

40

1.1

44.00

44.00

24

24

1.3

31.20

31.20

1.3

10.40

10.40

16

12

24.00

16

12

24.00

16

1.63

3.26

16

2.7

13.50

16

12

24.00

119

1-18

S.
No

Member Details

Bottom main from other end


Bottom Extara
2 Leg Stirips at 100mm c/c
2 Leg Stirips at 200mm c/c
ADDITIONAL BEAMS ABOVE ROLLING SHUTTER
DETAIL AS SAME OF PB6 BOTH TOP & BOT

2 legged stirrups
SLAB
FS1end pannel
Short bar at bottom at 125mmc/c
Short bar at bottom at 125mmc/c
long bar at bottom at 175mmc/c
long bar at bottom at 175mmc/c
Top extra at end support short side 250mm c/c
Distribution for above at 250mmc/c
Top extra at end support long side 350mm c/c
Distribution for above at 350mmc/c
Top extra at mid support long side 350mm c/c
Distribution for above at 350mmc/c
FS1mid pannel
Short bar at bottom at 125mmc/c
long bar at bottom at 175mmc/c
long bar at bottom at 175mmc/c
Top extra at mid support short side 250mm c/c
Distribution for above at 250mmc/c
Top extra at end support long side 350mm c/c
Distribution for above at 350mmc/c
Top extra at mid support long side 350mm c/c
Distribution for above at 350mmc/c
chair rod

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

16

12

24.00

16

2.6

15.60

24

144

0.9

129.60

129.60

36

0.9

32.40

32.40

16

16

48.00

18

36

1.14

41.04

10

43

86

4.12

354.32

10

42

84

5.27

442.68

10

20

10.99

219.80

219.80

10

20

11.575

231.50

231.50

10

43

86

1.52

130.72

10

10.95

109.50

109.50

10

20

3.5

70.00

70.00

18

72.00

72.00

10

20

4.115

82.30

82.30

18

72.00

72.00

10

85

255

5.3

1351.50

10

30

10.99

329.70

329.70

10

30

11.575

347.25

347.25

10

43

172

2.7

464.40

32

10.95

350.40

350.40

10

30

3.5

105.00

105.00

27

108.00

108.00

10

30

5.03

150.90

150.90

27

108.00

108.00

10

20

100

100.00

41.04

FS2
120

1-18

S.
No

Member Details

Bottom short side at 175c/c


Bottom long side at 175c/c for end panells
Bottom long side at 175c/c for end panells
Top extra at short side at end 350mm c/c
distribution for above
Top extra at long side at end support 350mmc/c
distribution for above
Top extra at long side at mid support 50mmc/c
Distribution for above
Distribution is already available from FS1
chair rod
FS3
Short bar at bottom at 150mm c/c
Long bar at bottom at 150mm c/c
Top extra at short side
Distribution for above
Top extra at long side
distribution for above
chair rod
Balcony drops 120mm c/c
Distribution for above
Balcony slab above Rolling shutter
slab short side bar double layer
slab long side bar double layer
Stair case slab
waist slab 1
Top bar at +1.5m lvl
Distribution for above
Scissor bar from top to bottom
Bottom bar
Distribution for above only for waist vslab

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

19

95

190.00

190.00

5.08

25.40

25.40

3.93

15.72

15.72

10

50

1.13

56.50

56.50

10

40.00

40.00

10

1.58

15.80

15.80

12.00

12.00

16

2.53

40.48

40.48

24

48.00

48.00

10

15

15.00

12

37

37

3.85

142.45

10

23

23

5.81

133.63

12

18

36

1.38

49.68

5.81

46.48

10

12

24

1.9

45.60

12

3.85

46.20

10

8.00

213

213

1.7

362.10

362.10

26.4

184.80

184.80

12

24

48

4.93

236.64

44

88

2.36

207.68

16

12

12

2.73

32.76

10

10

10

1.55

15.50

16

12

12

1.83

21.96

16

12

12

6.81

81.72

10

23

23

1.55

35.65

121

46.48
46.20

207.68

1-18

S.
No

Member Details

Top bar at mid landing


Distribution for above
scissor bar at mid landing from top bottom
distributor for above
Mid landing Beam
Top main bar
Top extra
Bottom main
Bottom extra
Ties
waist slab 2
Top bar from mid landing
Distribution for landing area covered already
Distribution for lwaist area
Scissor bar from top to bottom at mid landing
Bottom bar
over lap for above
Distribution for above for waist only
Top bar at floor landing
Distribution for above at floor landing
Distribution for above at waist slab
scissor bar at floor landing
Floor landing Slab
Distribution only bottom
Floor landing
Main bar on short vside
Main bar on long side
Extrav rod at to short side
Distribution for above on either side

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

16

12

12

3.38

40.56

16

16

16

3.86

61.76

16

12

12

2.3

27.60

16

3.86

23.16

20

4.57

9.14

20

1.7

3.40

20

4.57

9.14

20

2.98

2.98

31

31

1.2

37.20

16

12

12

2.59

31.08

10

1.55

7.75

16

12

12

2.485

29.82

16

12

12

7.6

91.20

16

12

12

0.8

9.60

10

23

23

1.6

36.80

10

12

12

3.63

43.56

10

11

11

3.76

41.36

10

1.55

13.95

16

12

12

1.89

22.68

10

11

11

3.76

41.36

10

23

23

2.2

50.60

10

11

11

44.00

10
8

23
8

1
1

23
8

0.6
4.05

13.80
32.40

122

8 mm

37.20

32.40

1-18

S.
No

Member Details

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

SUB TOTAL FOR SECOND STAGE OF WORKS


8.00
Total length

5507.27

Unit Wt

0.40

Wt in MT -Dia Wise

2.18

Total Wt in Mtonne

C FIRST FLOOR TO ROOF SLAB


1 COLUMN
Column C1
Column C1
Ties outer spacing 100mm c/c
Ties Inner spacing 100mm c/c
Normal Ties c/c 250mm (Outer)
Normal Ties c/c 250mm (Inner)
Column C2
Ties outer spacing 100mm c/c
Ties Inner spacing 100mm c/c
Middle Hook
Normal ties c/c 200mm (Outer)
Normal ties c/c 200mm (Outer)

2 LINTEL & SUNSHADE


Lintel -length-22.6 at grid C
Ties
Lintel -length-18.9m
Ties
lintel- length-10.50m
Ties
Lntel at toilet area
At door d2 of gents
ties

25

10

12

120

4.4

528.00

25

10

20

3.5

70.00

10

20

14

280

1.64

459.20

10

20

14

280

1.24

347.20

10

14

84

1.64

137.76

10

14

84

1.24

104.16

20

10

20

3.5

70.00

20

40

1.28

51.20

51.20

20

40

1.12

44.80

44.80

26

52

0.23

11.96

11.96

12

1.28

15.36

15.36

12

1.12

13.44

13.44

12

23.45

140.70

23

138

0.96

132.48

12

19.75

118.50

23

115

0.96

110.40

12

18

11.85

213.30

209

209

0.96

200.64

12

2.56

10.24

17

17

0.71

12.07

123

132.48
110.40
200.64

12.07

1-18

S.
No

Member Details

At door d2 of ladies
ties
Sun shade-8nos
Main bar
Distributor
LOFT
Short bar for 18 .615m
distribution
Short bar for 10 .5m
distribution
3 ROOF LVL SLAB
ROOF BEAMS
RB1& RB5 continious
Top Main from RB5 towards RB1
Top main from RB1 towards FB5
over lap RB1
over lap FB6(cantilever)
Top Extra at end support
Top Extra at mid support
Bottom Main for RB1
Bottom Extra For RB1
skin bar at sides
2 Leg Stirips @ 100 c/c
2 Leg Stirips @ 200 c/c
Spacer Bar RB1
RB5 cantilever
Top and extra support is considered in RB1
Bottom Main
bottom main
Ties 8 at 100c/c

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

12

2.87

11.48

19

19

0.71

13.49

10

12

96

1.44

138.24

48

1.57

75.36

10

124

248

0.6

148.80

18.965

151.72

10

62

124

0.6

74.40

10.45

83.60

25

10

12

120.00

25

10

12

120.00

25

10

3.07

30.70

25

10

4.6

46.00

20

15

4.35

65.25

20

15

5.6

84.00

25

20

12

240.00

20

15

8.4

126.00

12

10

10.92

109.20

66

330

2.08

686.40

686.40
208.00

20

100

2.08

208.00

25

14

70

0.4

28.00

20

10

2.77

27.70

25

2.77

13.85

15

75

1.38

103.50

124

13.49

75.36

151.72
83.60

103.50

1-18

S.
No

Member Details

RB6 & RB5


Top Main Rod (over laped with RB6)
over lap RB6(cantilever)
Top Extra at end support for RB6
Top Extra at mid support at RB5
Bottom Main Rod from RB6 to RB5
Bottom Extra Rod at RB6
2 Leg Stirips at 100mm c/c
2 Leg Stirips at 200mm c/c
Bottom Main RB5
Bottom main RB5
Ties 8 at 100c/c
Spacer Bar RB6
RB4 ALONG GRID C
Top Main continious from one end
Top main continious from other end
Top extra at at end supports
Top Extra at mid support
Bottom main continious from one end
Bottom main continious from other end
Bottom Extra
2 Leg Stirips at 100mm c/c
2 Leg Stirips at 200mm c/c
Spacer Bar RB4
RB4 & RB7 ALONG GRID A
Top Main continious from RB4 To RB7
Top main over lap at RB7
Top extra at at end support at RB4
Top Extra at mid support for RB4
Top extra at at end support at RB7

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

20

12

48.00

25

4.6

36.80

25

2.65

10.60

20

4.55

27.30

12

12

72.00

16

3.2

25.60

18

144

1.24

178.56

178.56

10

40

1.24

49.60

49.60

20

2.77

11.08

25

2.77

5.54

15

30

1.38

41.40

25

13

26

0.4

10.40

12

12

24.00

12

12

24.00

16

1.8

7.20

16

10

2.7

27.00

12

12

24.00

12

12

24.00

41.40

16

12

1.4

16.80

12

12

144

1.04

149.76

149.76
49.92

48

1.04

49.92

25

13

65

0.4

26.00

12

12

24.00

12

12

24.00

16

1.8

3.60

16

2.7

21.60

20

1.8

3.60

125

1-18

S.
No

Member Details

Top Extra at mid support for RB7


Bottom main continious from RB4 to RB7
Bottom Main from RB7 to RB4
Bottom Extra for RB4
Bottom Extra for RB7
2 Leg Stirips at 100mm c/c for RB4
2 Leg Stirips at 200mm c/c for RB4
2 Leg Stirips at 100mm c/c for RB7
2 Leg Stirips at 2000mm c/c for FB7
RB4 SUNKEN AREA
Top Main
Top extra at end support
Bottom main
Bottom Extra
2 Leg Stirips at 100mm c/c for FB5
2 Leg Stirips at 200mm c/c for FB5
RB3
Top continious from One end
Top over lab from other end
Top Extra at end support
Top Extra at mid support
Bottom Main Rod from one end
Bottom main from other end
Bottom Extara
2 Leg Stirips at 100mm c/c
2 Leg Stirips at 200mm c/c
SLAB
RS1end pannel
Short bar at bottom at 150mmc/c
Short bar at bottom at 150mmc/c
long bar at bottom at 175mmc/c

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

20

2.7

5.40

12

12

24.00

12

12

24.00

16

10

1.4

14.00

16

4.05

4.05

24

120

1.04

124.80

124.80

25

1.04

26.00

26.00

24

24

1.24

29.76

29.76

1.24

6.20

6.20

12

4.48

8.96

16

1.65

6.60

12

4.48

17.92

16

1.4

5.60

12

24

1.04

24.96

24.96

1.04

5.20

5.20

12

12

24.00

12

12

24.00

16

1.55

3.10

16

2.53

12.65

12

12

24.00

12

12

24.00

16

1.4

8.40

24

144

0.9

129.60

129.60

10

60

0.9

54.00

54.00

10

36

72

4.1

295.20

10

35

70

5.25

367.50

10

20

11

220.00

126

220.00

1-18

S.
No

Member Details

long bar at bottom at 175mmc/c


Top extra at end support short side 300mm c/c
Distribution for above at 350mmc/c
Top extra at end support long side 350mm c/c
distribution for above given below seperately
Top extra at mid support long side 350mm c/c
distribution for above given below seperately
chair rod
RS1mid pannel
Short bar at bottom at 150mmc/c
long bar at bottom at 175mmc/c
long bar at bottom at 175mmc/c
Top extra at mid support short side 300mm c/c
Distribution for above at 300mmc/c
Top extra at end support long side 350mm c/c
distribution for above given below seperately
Top extra at mid support long side 350mm c/c
distribution for above given below seperately
chair rod
RS2 END PANNEL
Bottom short side at 175c/c
Bottom long side at 175c/c for end panells
Bottom long side at 175c/c for end panells
Top extra at short side at end 350mm c/c
distribution for above given below seperately
Top extra at long side at end support 350mmc/c
distribution for above
Distribution is already available from RS1
chair rod
RS2
Bottom short side at 175c/c

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm
231.70

10

20

11.585

231.70

10

36

72

1.52

109.44

10.95

87.60

87.60

10

20

3.5

70.00

70.00

10

20

4.115

82.30

82.30

10

20

40

40.00

10

71

213

5.25

1118.25

10

30

11

330.00

330.00

10

30

11.585

347.55

347.55

10

36

144

2.7

388.80

32

10.95

350.40

350.40

10

30

3.5

105.00

105.00

10

30

4.115

123.45

123.45

10

20

60

60.00

20

40

80.00

80.00

10

5.15

51.50

51.50

10

3.76

37.60

37.60

10

20

0.9

18.00

18.00

10

1.55

15.50

15.50

1.95

11.70

11.70

10

12

12.00

20

80

160.00

127

160.00

1-18

S.
No

Member Details

Bottom long side at 175c/c for end panells


Bottom long side at 175c/c for end panells
Top extra at short side at end 350mm c/c
distribution for above given below seperately
Top extra at long side at mid support 350mmc/c
distribution for above
Distribution is already available from RS1
chair rod
DISTRIBUTION
RS 1 -5 pannels on either side
RS 2 -6 pannels on either side
RS3
Short bar at bottom at 150mm c/c
Short bar at bottom at 150mm c/c
Long bar at bottom at 175mm c/c
Top extra at short side at end support 300mmc/c
Distribution for above
Top extra at long side mid support
Top extra at long side end support
distribution for above
Chair rod
Balcony drops 120mm c/c
Distribution for above

Stair case slab


waist slab 3
Top bar at first floor lvl
Distribution for above
Scissor bar at floor lvl
Bottom bar
over lap for above

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

20

5.15

103.00

103.00

20

3.76

75.20

75.20

10

60

0.9

54.00

54.00

25

2.53

63.25

63.25

40

1.95

78.00

78.00

10

24

24.00

22

22

19.25

423.50

423.50

22.95

91.80

91.80

10

18

18

3.93

70.74

10

19

19

5.08

96.52

20

20

5.865

117.30

117.30

18

1.75

31.50

31.50

10

5.9

59.00

59.00

18

18

2.53

45.54

45.54

18

18

1.38

24.84

24.84

5.815

34.89

34.89

10

10

10

10.00

213

213

1.7

362.10

362.10

26.4

184.80

184.80

16

12

12

24.00

10

12

12

1.55

18.60

16

12

12

2.8

33.60

16

12

12

5.55

66.60

16

12

12

0.8

9.60

128

1-18

S.
No

Member Details

Distribution for above


Distribution for above at floor lavl
Distribution for above at mid landing floor lvl
Bottom bar from mid landing to top
Distribution for above at landing
scissor bar at mid landing lvl

Mid landing Beam


Top main bar
Top extra
Bottom main
Bottom extra
Ties
waist slab 4
Top bar at mid landing lvl
Scissor bar at mid landing lvl
Distribution for above at waist slab
Bottom bar
over lap for above
Distribution for above at landing considered
Distribution for above at waist slab
Top bar of waist slab at second floor landing lvl
Distribution for above at waist slab
distribution at floor slab lvl
scissor bar at floor landing
chairs rod for stair area

HEAD ROOM COLUMNS, BEAMS & SLAB


COLUMN
Column C1
Ties outer spacing 100mm c/c

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

10

17

17

1.6

27.20

10

1.6

9.60

16

3.93

35.37

16

12

12

3.2

38.40

16

3.93

35.37

16

12

12

2.35

28.20

20

4.75

9.50

20

1.73

3.46

20

4.75

4.75

20

2.98

2.98

22

22

1.2

26.40

16

12

12

2.56

30.72

16

12

12

2.25

27.00

10

1.55

6.20

16

12

12

5.92

71.04

16

12

12

0.8

9.60

10

16

16

1.6

25.60

16

12

12

2.7

32.40

10

10

10

1.55

15.50

10

3.93

19.65

16

12

12

1.86

22.32

12

7.00

25

10

20

2.7

54.00

10

22

44

1.64

72.16

129

8 mm

26.40

1-18

S.
No

Member Details

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

1.24

54.56

8 mm

Ties Inner spacing 100mm c/c

10

22

44

Column C2
Ties outer spacing 100mm c/c
Ties Inner spacing 100mm c/c
Middle Hook

20

10

20

2.7

54.00

22

44

1.28

56.32

56.32

22

44

1.12

49.28

49.28

22

44

0.23

10.12

10.12

12

4.63

27.78

12

4.53

27.18

24

48

1.24

59.52

59.52

14

1.24

17.36

17.36

25

0.23

1.38

12

7.8

31.20

16

2.45

9.80

16

3.8

15.20

16

7.8

31.20

16

3.75

7.50

47

94

1.24

116.56

116.56

15

30

1.24

37.20

37.20

25

10

0.23

2.30

12

4.33

8.66

16

4.33

4.33

12

4.33

8.66

16

4.33

4.33

24

24

0.96

23.04

23.04

0.96

6.72

6.72

25

0.23

0.69

HB1
Top main bar
Bottom main bar
Stirrups @ 100mm c/c
Stirrups @ 200mm c/c
Spacer bar
HB2
Top main bar
Top extra at end support
Top extra at mid support with cantilever
Bottom main bar
Bottom extra
Stirrups @ 100mm c/c
Stirrups @ 200mm c/c
Spacer bar
HB3
Top main bar
Top main bar
Bottom main bar
Bottom main bar
Stirrups @ 100mm c/c
Stirrups @ 200mm c/c
Spacer bar
HS1

130

1-18

S.
No

Member Details

Dia of
Bar
mm

Short side bar @ 150mm c/c


Short side extra @ 300mm c/c
Distributors for above
Long side bar @ 150mm c/c
Long side extra @ 300mm c/c
Distributors for above
Chairs

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

10

43

43

4.1

176.30

10

43

86

1.5

129.00

16

7.065

113.04

10

22

22

7.115

156.53

10

22

44

1.33

58.52

16

4.05

64.80

10

6.00

8 mm

113.04

64.80

SUB TOTAL FOR SECOND STAGE OF WORKS


8.00
Total length

7435.56

Unit Wt

0.395

Wt in MT -Dia Wise

2.94

Total Wt in Mtonne

WORKS AT YARD
Raft for transformer plinth
Short side top & bottom bar at 120mmc/c
Long Side Top & bottom bar at 120mmc/c
strab beam 2nos
Both Top & bottom
Top Extra at end support
Top Extra at mid support
Top Extra at mid support
Bottom extra at end
Bottom extra at miid support
Ties at 150mmc/c
chairs at raft
Column C1
Main Bar
Main Bar
Ties at 150mmc/c
Ties diagonal at 150mmc/c

12

78

156

3.38

527.28

9.48

530.88

10

28

56

16

16

9.58

153.28

16

2.625

10.50

16

0.91

7.28

16

1.48

5.92

16

1.55

12.40

16

12

1.7

20.40

12

63

126

1.98

249.48

14.00

2.9

92.80

12

14

14

16

32

12

32

2.9

92.80

10

14

112

1.04

116.48

10

14

112

1.04

116.48

131

1-18

S.
No

Member Details

Column C2
Main bar
Ties at 150mm c/c
Ties at 150mm c/c
Grade beam
B1
Main Bar at both Bottom & top
Ties
B2
Main bar both bottom & top
Ties
Extra at Top
Extra at Bottom
Fire Wall
Beam
ties
wall rood vertical
wall rood horizondal
u bar for stability
Cable tyrench arround Trs Plinth
Raft bottom short side & wall external U shaped bar
@150mm c/c for a length 3.0m
Distributor for above 200mm c/c- only for full raft
Distributor for vertical 6m long wall 200mm c/c
Distributor for verrtical 3 m long wall
Raft top short bar at 150 mmc/c for length 3m
Distributor for above 200mm c/c for full raft length
Wall innerface vertical bar

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

16

16

6.8

108.80

10

40

80

1.5

120.00

10

40

80

1.44

115.20

20

24

3.4

81.60

1.38

165.60

8 mm

30

120

20

32

3.4

108.80

20

160

1.44

230.40

20

32

1.4

44.80

20

16

32.00

12

24

4.9

117.60

37

111

1.2

133.20

133.20

165.60

230.40

31

62

5.05

313.10

313.10

26

52

4.55

236.60

236.60

16

16.00

16.00

4.61

774.48

10

21

168

10

64

192.00

56

6.35

355.60

355.60

56

3.15

176.40

176.40

10

21

168

1.65

277.20

64

192.00

192.00

20

16

320

1.8

576.00

576.00

132

1-18

S.
No

Member Details

Distribution for above in external wall


Distribution for above in external wall

Trench common corner portion for length 1.5m


Raft bottom- L rod
Raft top mat -L rod
wall inner face vertical bar on only one side
Distributors are considred already
Trench cover slab
Both top and bottom for Length 6m
Distributor for both top & bottom
Trench from Yard to Controll Room
Length 5.74m
bottom main- u Shape 125mm c/c
distribution for above
inner face main vertical bars outer
distribution for above
inner face main vertical bars middle
distribution for above
cover slab main T & B
distribution ring shape for above
Incoming Cable trench Avg length 12m
bottom main- L Shape 150mm c/c
distribution for above at 200mmc/c
inner face main vertical bars 175mm c/c
distribution for above at 200mm c/c
cover slab main T & B at 150mm c/c
distribution for above at 200mm c/c

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

64

6.15

393.60

393.60

64

3.35

214.40

214.40

10

10

16

160

3.55

568.00

10

10

16

160

2.14

342.40

16

128

1.8

230.40

10

242

484

1.61

779.24

64

4.8

307.20

10

47

47

6.5

305.50

34

34

6.14

208.76

10

34

68

1.75

119.00

16

6.14

98.24

10

47

94

1.75

164.50

10

16

5.74

91.84

10

14

112

1.96

219.52

45

14

630

0.9

567.00

10

81

162

3.3

534.60

19

38

12

456.00

10

70

140

1.75

245.00

16

12

192.00

10

81

324

1.705

552.42

32

12

384.00

230.40

307.20

208.76
98.24

567.00

456.00
192.00
384.00

Incoming Cable trench Avg length 10.9m


133

1-18

S.
No

Member Details

bottom main- u Shape 150mm c/c


distribution for above at 200mmc/c
inner face main vertical bars 175mm c/c
distribution for above at 200mm c/c
cover slab main T & B at 150mm c/c
distribution for above at 200mm c/c

Dia of
Bar
mm

No of
No of
Memb
Bar
er

Total
Nos

Shape Code

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

10

75

150

4.75

712.50

25

50

11.7

585.00

10

63

252

1.75

441.00

32

11.7

374.40

10

75

300

1.91

573.00

10

40

11.3

452.00

10

-24

-48

1.75

-84.00

-8

-16

3.6

-57.60

At cable trench in transformer plinth


vertical wall bar at 150mm c/c
disortributor

10

-10

-20

1.45

-29.00

-8

-16

3.6

-57.60

At at cable trench Entry


vertical wall bar at 150mm c/c
disortributor

10

-10

-40

1.45

-58.00

-8

-32

1.95

-62.40

Deductions at the junction of Cable duct


At control room and yard for 3.6m width
Coth vertical bars 125 mm c/c
distribution

8 mm

585.00
374.40
452.00

-57.60

-57.60

-62.40
8.00

Total length

6680.30

Unit Wt

0.40

Wt in MT -Dia Wise

2.64

Total Wt in Mtonne

Total Steel for the project in M.Tonne

134

1-18

NI ENTERPRISES

san (Site Engg)

10 mm

12 mm

16 mm

20 mm

25 mm

800.80
835.20

117.60
118.40

443.20
69.50
21.60
86.40
38.00
108.00
187.20
514.80

135

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

20.80

0 588.3712 1533.576

85.80

229.22 1539.336

3891

784
872.48
659.68
175
107.00

20.00

78.9526 945.34272

314.96 3699.822

5039

96.00
66.40
96.00
70.40

24.00
6.30
8.30
11.30

136

1-18

10 mm

12 mm

16 mm

20 mm

25 mm
24.00
6.30
17.60

48.00
29.70
23.70
72.00
8.85
7.86

48.00
1.65
10.40
39.72
11.20

53.00
1.65
15.60
39.72
15.72
2.80
0.90

137

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

5.20
3.62
9.44
9.44
9.44
7.24
9.44
9.44

581.0529

0 452.8351

509.144 1645.8228

3189

24.00
26.16
22.90
24.00
26.4

72.00
15.21
47.40
72.00

39.72
5.10

138

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

39.00
57.30
14.00

24.00
39.00
48.00
11.20

37.86
10.80
39.60
16.80

22.90
6.60
5.60

9.16
12.4
7.76
10.48

32.60

139

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

41.3

16.80
16.20
16.20

453.4442

79.032 569.9414 887.5176 387.96048

147.8406

0 440.51904

2378

37.20
28.80
111.84
40.80
40.80

236.64

588

1187.70
362.70
10.00

140

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

314.16
362.70
10.00
646.80

643.80
209.00

236.64
209.00
475.60

40.50

321.90
71.00
10.00

118.32
71.00
10.00

141

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

243.60

525.60
292.50
292.00

568.00

392.00

1182.867 4704.3288

374.71201

10110.28
0.617
6.238

2312.08

797.45

0.888
2.053

1.58
1.260

1310.87
2.47
3.238

5887

375

1486.16
3.858
5.734

21.341

616
459.20
347.20

142

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

45.92
34.72
175
88.00

20.00

46.1518 547.30368

227.7254 124.3872

458.874

267.84 3051.678

3913

281.4
142.20
76.95

16.20

201.60

811

120.00
30.70
120.00
45.00
88.00

143

1-18

10 mm

12 mm

16 mm

20 mm

25 mm
111.00
256.4
162.00

109.20
546.00
189.00
28.00

34.30
17.15

72.00
11.00
16.40
41.7
13.8
13.8

36.40
35.60
11.20

48.00
7.20
27.00
24.00
16.24

144

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

26.00
13.20

28.00

19.72
14.24
19.72

24.00
24.00
7.20
27.00
24.00
24.00
31.20

24.00
24.00
3.26
13.50
24.00

145

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

24.00
15.60

48.00

433.236

453.495

96.9696 328.5696 1288.112 4308.8073

6909

354.32
442.68

130.72

1351.50

464.40

100.00

146

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

15.00

142.45
133.63
49.68
45.60
8.00

236.64

1440.7665 1879.2895 380.74776

3701

32.76
15.50
21.96
81.72
35.65

147

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

40.56
61.76
27.60
23.16

9.14
3.40
9.14
2.98

31.08
7.75
29.82
91.20
9.60
36.80
43.56
41.36
13.95
22.68

41.36

50.60
44.00
13.80

27.492 212.45161
148

744.023

61.1568

1045
1-18

10 mm

12 mm

10
5213.82
0.617
3.217

16 mm

12
1054.72

16
683.18

0.888
0.937

20 mm

1.58
1.079

20
652.06
2.47
1.611

25 mm

25
1907.85
3.858
7.360

16.379

528
70
459.20
347.20
137.76
104.16
70.00

54.0202 646.81344

173.6 2307.084

3182

140.7
118.5
213.30

10.24

149

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

11.48

138.24

148.80
74.40

308.0052 223.00848 438.86736

970

120.00
120.00
30.70
46.00
65.25
84.00
256.4
126.00
109.20

28.00

27.70
13.85

150

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

48.00
36.80
10.60
27.30
72.00
25.60

11.08
5.54
10.40

24.00
24.00
7.20
27.00
24.00
24.00
16.80

26.00

24.00
24.00
3.60
21.60
3.60

151

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

5.40
24.00
24.00
14.00
4.05

8.96
6.60
17.92
5.60

24.00
24.00
3.10
12.65
24.00
24.00
8.40

737.7257

0 440.51904

245.234 987.8584 2717.1508

5128

295.20
367.50

152

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

109.44

40.00

1118.25

388.80

60.00

12.00

153

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

24.00

70.74
96.52

10.00

1608.0529 1599.5417

3208

24.00
18.60
33.60
66.60
9.60

154

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

27.20
9.60
35.37
38.40
35.37
28.20

9.50
3.46
4.75
2.98

30.72
27.00
71.04
9.60
25.60
32.40
15.50
19.65
22.32

10.428 71.66455

7.00

6.216 728.8254

51.3112

868

54.00
72.16

155

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

54.56
54.00

27.78
27.18

1.38

31.20
9.80
15.20
31.20
7.50

2.30

8.66
4.33
8.66
4.33

0.69

156

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

176.30
129.00
156.53
58.52

218.8142 402.94419 91.89024 114.3288

6.00

10
4771.43
0.617
2.944

12
1100.78

16
692.78

0.888
0.977

1.580
1.095

20
543.02
2.470
1.341

133.38 225.19146

1187

25
1360.66
3.858
5.249

14.544

527.28
530.88
153.28
10.50
7.28
5.92
12.40
20.40
249.48
14.00

92.80
92.80
116.48
116.48

157

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

108.80
120.00
115.20

81.60

108.80
44.80
32.00

117.60

432.4855 616.40768 889.03008 645.8666

662.656

3246

774.48
192.00

277.20

158

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

568.00
342.40

779.24

966.012 1809.8584

2776

345.23 555.52212

901

407.64 821.85634

1229

305.50
119.00
164.50
91.84
219.52

534.60
245.00
552.42

159

1-18

10 mm

12 mm

16 mm

20 mm

25 mm

712.50
441.00
573.00

-84.00

-29.00

-58.00

487.351 959.7435
10
7720.24
0.617
4.763

12
1001.16

16
411.38

0.888
0.889

1.58
0.650

20
267.20
2.47
0.660

1447

25
0.00
3.858
0.000

61867.80963

9.601

61.866

160

1-18

HARINI ENTERPRISES

ABSTRACT SHEET JOINTLY ARRIVED BY M/S.DSWE and HARINI ENTERP


PROJECT : 33/11KVA SUB STATION WORK NORTH CHENNAI.
SITE : KORATTUR
CLIENT : M/S.DRAKE
SCULL
WATER & ENERGY
PVT LTD Civil,DSWE) and Mr.Rajaraman(Project
ABSTRACT
ARRIVED&BY
: Mr.Mohammed
Nazer(Manager
Mr.Anbarasan(Site Engg,HECEC)
ABSTRACT CHECKED & RE-ARRIVED BY : Mr.Sivasubramanian(Engineer Civil,DSWE) and Mr.An

SUB STATION AT KORATTUR-ABSTRACT


Sl
No

DESCRIPTION OF ACTIVITIES

SCOPE
QTY
UNIT

REDUCED
RATE

Total BOQ cost for this site = Rs. 13,896,171.00


A SUB STRUCTURE UP TO PLINTH LVL
AREA PREPARATION WORK
EXCAVTION UP TO 2M
EXCAVTION BEYOND 2M
RIVER SAND BEDDING
MURROM FILLING
PCC
SHUTTERING
REBAR
RCC
BACK BFILLING- STAGE 1&2
BACK FILLING BY IMPORTED EARTH
BRICK WORKS BELOW PLINTH BEAM
ANTI TERMITE TREATMENT

1087.25 SQM
404.38 CUM
102.38 CUM
37.22 CUM
57.77 CUM
36.72 CUM
659.13 SQM
21.35 MT
166.17 CUM
506.76 CUM
86.56 CUM
27.30 CUM
900.00 SQFT

55.00
150.00
180.00
2600.00
650.00
3800.00
550.00
58000.00
5800.00

75.00
650.00
5300.00
5.50

Initial Work cost (Additional works) (Breakup


attached end of this BOQ )

Actual cost at this stage


Previus Actual Billing
Balance Amount at this st
B SUPER STR FROM GF LVL TO FF LVL
SHUTTERING
REBAR
RCC
BRICK WORKS 9"
BRICK WORK 4.5"

632.86 SQM
550.00
16.38 MT
58000.00
86.06 CUM
6300.00
51.38 CUM
5300.00
28.42 SQM
850.00
Actual cost at this stage
Previus Actual Billing
Balance Amount at this st

C G.F AND TRANSFORMER YARD FINISHING WORKS


EXCAVTION UP TO 2M
312.40 CUM
RIVER SAND BEDDING
16.64 CUM
PCC
16.93 CUM
SHUTTERING
672.82 SQM
REBAR
9.60 MT
RCC
113.73 CUM
BACK BFILLING
312.40 CUM
161

150.00
2600.00
3800.00
550.00
58000.00
5800.00
75.00

1-3

Sl
No

DESCRIPTION OF ACTIVITIES
PLASTERING INT
CEILING PLASTERING
EXTERNAL PLASTERING
FLOOR TILING
WALL TILING
PAINTING INTERNAL
BATERY ROOM WALL ACID RESISTANT PAINT
ELECTRICAL WORKS WITH FITTINGS
PLUMPING WORKS & SANITARY WERES
DRAINAGE LINE UG WORKS
SOAKAWAY AND SANETARY WORKS
INSPECTION CHAMBER
GULLY TRAP
DOOR D (CW H C FLUSH DOOR) 1200x 2100
DOOR D1 (CW FLUSH DOOR) 900MM 2100
DOOR D2 (PVC DOOR) 900MMX 2100MM
ROLLING SHUTTER
WINDOWS (ALUMINIUM)
VENTILATOR LOUVER(1180x580) Z
VENTILATOR AT TOILET 800X580
MS GRILL WITH PAINTING 25KG/SQM

SCOPE
QTY
UNIT
445.66 SQM
385.18 SQM
875.00 SQM
222.27 SQM
156.19 SQM
769.24 SQM
21.525 SQM
1 LOT LS
1 LOT LS
30.00 m
1.00 LS
3.00 NOS
2.00 NOS
1.00 NOS
2.00 NOS
5.67 SQM
9.90 SQM
22.97 SQM
9.00 NOS
5.00 NOS
582.50 Kg

REDUCED
RATE
420.00
420.00
420.00
1320.00
1100.00
130.00
1100.00
450000.00
80000.00
900.00
90000.00
4500.00
600.00
17150.00
14680.00
2910.00
7600.00
3800.00
3700.00
2700.00
105.00

Actual cost at this stage


Previus Actual Billing
Balance Amount at this st
D SUPER STRUCTURE FROM FF TO ROOF
SHUTTERING
REBAR
RCC
BRICK WORKS 9"
BRICK WORK 4.5"

E FIRST FLOOR AND EXTERNAL FINISHING WORKS


PLASTERING INT
CEILING PLASTERING
EXTERNAL PLASTERING
FLOOR TILING
WALL TILING
PAINTING INTERNAL
ELECTRICAL WORKS WITH FITTINGS
PLUMPING WORKS & SANITARY WERES
DOOR D (CW H C FLUSH DOOR) 1200x 2100
DOOR D1 (CW FLUSH DOOR) 900MM 2100
DOOR D2 (PVC DOOR) 900MMX 2100MM
COLLAPSIBLE GATE(MS)
162

672.77 SQM
550.00
14.54 MT
58000.00
88.01 CUM
6300.00
64.44 CUM
5300.00
19.59 SQM
850.00
Actual cost at this stage
Previus Actual Billing
Balance Amount at this st
297.11 SQM
385.18 SQM
375.00 SQM
271.66 SQM
52.06 SQM
512.83 SQM
1 LOT LS
1 LOT LS
1.00 NOS
4.00 NOS
5.67 SQM
3.15 SQM

420.00
420.00
420.00
1320.00
1100.00
130.00
300000.00
40000.00
17150.00
14680.00
2910.00
7500.00

1-3

Sl
No

DESCRIPTION OF ACTIVITIES
WINDOWS (ALUMINIUM)
VENTILATOR AT TOILET 800X580
MS GRILL WITH PAINTING 25KG/SQM
EXTERNAL PAINTING
SS HAND RAILS
PVC WATER TANK 1000 LITER
RAINWATER LINE & HARVESTING
ENTRANCE GATE 6M +2M WICKED GATE
ACCESS LADDER MS 4M AT ROOF
PAVING
WEATHERING COURSE & TILING

TOTAL BOQ COST REQUIRED

163

SCOPE
REDUCED
QTY
UNIT
RATE
22.97 SQM
3800.00
5.00 NOS
2700.00
582.50 Kg
105.00
1250.00 SQM
130.00
30.464 LM
3280.00
2.00 NOS
5000.00
1.00 LS
35000.00
1.00 NO
95000.00
1.00 NO
13500.00
66.40 SQM
950.00
227.85 SQM
807.00
Actual cost at this stage
Previus Actual Billing
Balance Amount at this st

13,896,171.

1-3

ISES

SWE and HARINI ENTERPRISES

and Mr.Rajaraman(Project Engg,HECEC),

neer Civil,DSWE) and Mr.Anbarasan(Site Engg,HECEC)

R-ABSTRACT
AMOUNT

REMARKS

59,798.75 ADDITION
60,657.19 BOQ ITEM
18,427.73 BOQ ITEM
96,760.92 BOQ ITEM
37,549.69 ADDITION
139,518.24 BOQ ITEM
362,521.23 BOQ ITEM
1,238,102.71 BOQ ITEM
963,775.50 BOQ ITEM
38,006.72 BOQ ITEM
56,264.80 ADDITION
144,710.54 ADDITION
4,950.00 ADDITION

1
2
4
5
8
9
6
3

140,050.00 ADDITION
tual cost at this stage
3,361,094.01
evius Actual Billing
2,120,000.00
lance Amount at this stage
1,241,094.01

348,072.66 BOQ ITEM 8


949,986.45 BOQ ITEM 9
542,191.73 BOQ ITEM 7
272,309.26 ADDITION
24,157.00 ADDITION
tual cost at this stage
2,136,717.09
evius Actual Billing
2,120,000.00
lance Amount at this stage
16,717.09
46,859.85 BOQ
43,273.36 BOQ
64,332.10 BOQ
370,048.80 BOQ
556,780.24 BOQ
659,626.03 BOQ
23,429.93 BOQ

ITEM
ITEM
ITEM
ITEM
ITEM
ITEM
ITEM

1
4
5
8
9
6
3
164

1-3

AMOUNT

REMARKS

187,179.25 BOQ ITEM


161,773.16 BOQ ITEM
367,496.76 BOQ ITEM
293,393.78 BOQ ITEM
171,806.83 ADDITION
100,001.56 BOQ ITEM
23,677.50 BOQ ITEM
450,000.00 BOQ ITEM
80,000.00 BOQ ITEM
27,000.00 BOQ ITEM
90,000.00 BOQ ITEM
13,500.00 BOQ ITEM
1,200.00 BOQ ITEM
17,150.00 ADDITION
29,360.00 ADDITION
16,499.70 ADDITION
75,240.00 ADDITION
87,267.00 ADDITION
33,300.00 ADDITION
13,500.00 ADDITION
61,162.58 ADDITION

tual cost at this stage


evius Actual Billing
lance Amount at this stage

12
12
12
14
13
29
18
22
25
26
23
24

4,064,858.42
0.00
4,064,858.42

370,024.57 BOQ ITEM 8


843,463.56 BOQ ITEM 9
554,466.57 BOQ ITEM 7
341,511.98 ADDITION
16,647.25 ADDITION
tual cost at this stage
2,126,113.94
evius Actual Billing
0.00
lance Amount at this stage
2,126,113.94
124,786.17 BOQ ITEM
161,773.16 BOQ ITEM
157,498.61 BOQ ITEM
358,592.40 BOQ ITEM
57,268.94 ADDITION
66,667.70 BOQ ITEM
300,000.00 BOQ ITEM
40,000.00 BOQ ITEM
17,150.00 ADDITION
58,720.00 ADDITION
16,499.70 ADDITION
23,625.00 ADDITION

12
12
12
14
13
18
22

165

1-3

AMOUNT

REMARKS

87,267.00 ADDITION
13,500.00 ADDITION
61,162.58 ADDITION
162,499.44 BOQ ITEM 13
99,921.92 BOQ ITEM 30
10,000.00 BOQ ITEM 21
35,000.00 BOQ ITEM 27
95,000.00 BOQ ITEM 16
13,500.00 ADDITION
63,080.00 BOQ ITEM 10
183,874.95 BOQ ITEM 28
tual cost at this stage
2,207,387.59
evius Actual Billing
0.00
lance Amount at this stage
2,207,387.59

13,896,171.05

166

1-3

HARINI ENTERPRISES

SUMMARY OF QUANTITIES JOINTLY ARRIVED BY M/S.DSWE and HARINI EN


PROJECT : 33/11KVA SUB STATION WORK NORTH CHENNAI.
SITE : KORATTUR
CLIENT : M/S.DRAKE & SCULL WATER & ENERGY PVT LTD
ARRIVED BY : Mr.Mohammed Nazer(Manager Civil,DSWE) and Mr.Rajaraman(Project Engg,HECE
Engg,HECEC)
CHECKED & RE-ARRIVED BY : Mr.Sivasubramanian(Engineer Civil,DSWE) and Mr.Anbarasan(S
Sl
ACTUAL
REDUCED
DESCRIPTION OF ACTIVITIES
UNIT
No
QTY
RATE
1 AREA PREPARATION WORK
1087.25 SQM
55.00
2 EXCAVTION UP TO 2.0M
716.78 CUM
150.00
3 EXCAVTION BEYOND 2.M
102.38 CUM
180.00
4 ANTI TERMITTE TREATMENT
900.00 SQFT
5.50
5 RIVER SAND BEDDING
53.86 CUM
2600.00
6 MURROM FILLING
57.77 CUM
650.00
7 PCC
53.64 CUM
3800.00
8 SHUTTERING
2637.58 SQM
550.00
9 REBAR
61.87 MT
58000.00
10 RCC IN GROUND
279.90 CUM
5800.00
11 RCC ABOVE GROUND
174.07 CUM
6300.00
12 BACK FILLING
819.16 CUM
75.00
13 BACK FILLING BY IMPORTED EARTH
86.56 CUM
650.00
14 9" BRICK WORKS
143.12 CUM
5300.00
15 BRICK WORK 4.5"
48.01 SQM
850.00
16 PLASTERING INT
742.77 SQM
420.00
17 CEILING PLASTERING
770.35 SQM
420.00
18 EXTERNAL PLASTERING
1250.00 SQM
420.00
19 FLOOR TILING
493.93 SQM
1320.00
20 WALL TILING
208.25 SQM
1100.00
21 PAINTING INTERNAL
1282.07 SQM
130.00
22 EXTERNAL PAINTING
1250.00 SQM
130.00
23 PAVING
66.40 SQM
950.00
24 WEATHERING COURSE & TILING
227.85 SQM
807.00
25 SS HAND RAILS
30.46 LM
3280.00
26 PVC WATER TANK 1000 LITER
2.00 NOS
5000.00
27 BATERY ROOM WALL ACID RESISTANT PAINT
21.53 SQM
1100.00
28 ELECTRICAL WORKS WITH FITTINGS
1.00 LS
750000.00
29 PLUMPING WORKS & SANITARYWERES
1.00 LS
120000.00
30 DRAINAGE LINE
30.00 M
900.00
31 SOAKAWAY AND SANETARY WORKS
1.00 NOS
90000.00
32 RAIN WATER LINE & HARVESTING
1.00 LM
35000.00
33 ENTRANCE GATE 6M +2M WICKED GATE
1.00 NO
95000.00
34 INSPECTION CHAMBER
3.00 NOS
4500.00
35 GULLY TRAP
2.00 NOS
600.00
36 DOOR D (CW H C FLUSH DOOR) 1200x 2100
2.00 NOS
17150.00
37 DOOR D1 (CW FLUSH DOOR) 900MM 2100
6.00 NOS
14680.00
38 DOOR D2 (PVC DOOR) 900MMX 2100MM
11.34 SQM
2910.00
39 ROLLING SHUTTER
9.90 SQM
7600.00
167

1-2

Sl
No
40
41
42
43
44
45
46

ACTUAL
REDUCED
UNIT
QTY
RATE
COLLAPSIBLE GATE(MS)
3.15 SQM
7500.00
WINDOWS (ALUMINIUM)
45.93 SQM
3800.00
VENTILATOR LOUVER(1180x580) Z
9.00 NOS
3700.00
VENTILATOR AT TOILET 800X580
10.00 NOS
2700.00
MS GRILL WITH PAINTING 25KG/SQM
1165.00 kg
105.00
ACCESS LADDER
1.00 NO
13500.00
Initial Work cost (Additional works) (Breakup attached end of this BOQ )
TOTAL BOQ COST REQUIRED
DESCRIPTION OF ACTIVITIES

168

1-2

ARINI ENTERPRISES

TLY ARRIVED BY M/S.DSWE and HARINI ENTERPRISES


CHENNAI.

PVT LTD
il,DSWE) and Mr.Rajaraman(Project Engg,HECEC),Mr.Anbarasan(Site

nian(Engineer Civil,DSWE) and Mr.Anbarasan(Site Engg,HECEC)


AMOUNT

REMARKS

59,798.75 ADDITION
107,517.04 BOQ ITEM
18,427.50 BOQ ITEM
4,950.00 ADDITION
140,034.28 BOQ ITEM
37,549.69 ADDITION
203,850.34 BOQ ITEM
1,450,667.25 BOQ ITEM
3,588,332.96 BOQ ITEM
1,623,401.53 BOQ ITEM
1,096,658.30 BOQ ITEM
61,436.64 BOQ ITEM
56,264.80 ADDITION
758,531.78 ADDITION
40,804.25 ADDITION
311,963.74 BOQ ITEM
323,546.33 BOQ ITEM
524,995.37 BOQ ITEM
651,987.30 BOQ ITEM
229,075.77 ADDITION
166,669.26 BOQ ITEM
162,499.44 BOQ ITEM
63,080.00 BOQ ITEM
183,874.95 BOQ ITEM
99,921.92 BOQ ITEM
10,000.00 BOQ ITEM
23,677.50 BOQ ITEM
750,000.00 BOQ ITEM
120,000.00 BOQ ITEM
27,000.00 BOQ ITEM
90,000.00 BOQ ITEM
35,000.00 BOQ ITEM
95,000.00 BOQ ITEM
13,500.00 BOQ ITEM
1,200.00 BOQ ITEM
34,300.00 ADDITION
88,080.00 ADDITION
32,999.40 ADDITION
75,240.00 ADDITION
169

1
2
4
5
8
9
6
7
3

12
12
12
14
13
13
10
28
30
21
29
18
22
25
26
27
16
23
24

1-2

AMOUNT

REMARKS

23,625.00 ADDITION
174,534.00 ADDITION
33,300.00 ADDITION
27,000.00 ADDITION
122,325.17 ADDITION
13,500.00 ADDITION
140,050.00 ADDITION
13,896,170.25

170

1-2

ANNEXURE II
BOQ & SCHEDULE OF PRICES
33 / 11 KV SUB-STATION WORKS AT NORTH CHENNAI, INDIA

SR. NO.

1
2

DESCRIPTION OF ITEM

Excavation in all soils 0.00mtr to2.00 mtr, including disposal of earth upto 10 mtr
from the point.
Excavation in all soils 2.01mtr to2.50 mtr, including disposal of earth upto 10 mtr
from the point.

Back filling with excavated earth including consolidation asper specfication.

Back filling with bought out earth including consolidation asper specfication.(River
sand)

PCC M10 (1:3:6) asper specification

RCC M25 for strip foundation(combined footing)Grade beam,grade slab,cable


trench wall & grade slab GF incl Trf plinth and fire wall.

RCC M25 for lintel,sunshade,beam and slab

P&F form work for all RCC items

P&F of reinforcement steel TMT for all RCC items

10

P&L paved area -Access

11

P&L BB masonary of 300mm thick compound wall

12

P&A plastering I&O.

13

P&A painting I&O I OBD O cement paint

14

Flooring

15

Expansion joint

16

Entrance gate - Double leaf with RCC Pillar

17

Storm water drain arrangements

18

Internal Electrical works

19

Internal Road

20

Clear water sump

171 of 174

WORLD CREST TOWER

PO REF: SC0227 DATED 03.05.14

21

OHT sintex -Toilet and lab requirements

22

Plumbing and sanitary - building toilet

23

inspection chamber

24

Gully Trap

25

UG Sewer line Bldg

26

Soak Pit and Spectic tank

27

Rain water harvesting

28

Roof Water proofing with tiles

29

Acid proof tile work - Battery room area

30

SS Handrail with Siutable vertical posts.

SUB-CONTRACT PACKAGE VALUE (INCLUDING TAXES / DUTIES / INSURANCES / FREIGHT ETC.) EXCEPT
PAID EXTRA @ 4.944% ON THE CONTRACT PACKAGE VALUE

NOTE:
QTY. INDICATED ABOVE ARE ESTIMATED QTY. ONLY. VENDOR SHALL CARRY OUT
THE ACTUAL MEASUREMNT AT SITE BEFORE INSTALLATION WORKS. THIS
CONTRACT WILL BE OPERATED ON A LUMPSUM AND PAYMENT SHALL BE MADE
AS PER INVOICE CERTIFICATION AT SITE.
THE FORMAT OF THE BILL OF QUANTITIES / SCHEDULE OF PRICE SHOULD NOT
BE MODIFIED / ALTERED BY ADDITION OR DELETION OF ROW(S) / COLUMN(S)
ETC.
CONTRACTOR SHALL FURNISH METHODOLOGY OF ALL PROCESSES PROPOSED
FOR THE PROJECT FOR ENGINEER'S APPROVAL BEFORE INSTALLATION.

THE RATES QUOTED SHALL ALSO INCLUDE SUBMISSION & APPROVAL OF SHOP
DRAWINGS, AS-BUILT DRAWINGS (IF ANY).

CONTRACTOR TO LIST DOWN UNIT RATES FOR ALL RELEVANT ACCESSORIES,


DEVICES OR ANY OTHER EQUIPMENTS NOT MENTIONED ABOVE HOWEVER
NECESSARY TO COMMISSION THE ABOVE MENTIONED SYSTEM. THE CONTRACT
PRICE WILL NOT BE SUBJECTED TO ANY ESCALATION DUE TO THE SAME.
R.O. - Rate Only

172 of 174

WORLD CREST TOWER

PO REF: SC0227 DATED 03.05.14

CIVIL WORKS

HARINI ENTERPRISES
SUPPLY & INSTALLATION
UNIT

QTY.

RATE in
Rs.

AMOUNT in
Rs.

CUM

1,720.00

132.99

228,742.80

CUM

1,040.00

159.588

165,971.52

CUM

3,280.00

66.495

218,103.60

CUM

170.40

2305.16

392,799.26

CUM

195.20

3369.08

657,644.42

CUM

1,069.20

5142.28

5,498,125.78

CUM

744.00

5585.58

4,155,671.52

SQM

6,720.00

487.63

3,276,873.60

MT

172.80

51422.8

8,885,859.84

SQM

744.00

842.27

CUM

688.00

5230.94

3,598,886.72

SQM

7,440.00

372.372

2,770,447.68

SQM

12,040.00

115.258

1,387,706.32

SQM

3,520.00

1170.312

4,119,498.24

RMT

480.00

203.918

97,880.64

NOS

4.00

84227

336,908.00

RMT

240.00

975.26

234,062.40

LUMPSUM

4.00

664950

2,659,800.00

LUMPSUM

4.00

310310

1,241,240.00

LUMPSUM

4.00

70928

173 of 174

626,648.88

283,712.00

WORLD CREST TOWER

PO REF: SC0227 DATED 03.05.14

LUMPSUM

4.00

8866

35,464.00

LUMPSUM

4.00

106392

425,568.00

NOS

12.00

3989.7

47,876.40

NOS

8.00

531.6

4,252.80

RMT

120.00

797.4

95,688.00

LUMPSUM

4.00

79794

319,176.00

LUMPSUM

4.00

31031

124,124.00

715.4862

715,486.20

SQM

1,000.00

SQM

240.00

975.26

234,062.40

RMT

120.00

753.61

90,433.20

EIGHT ETC.) EXCEPT SERVICE TAX WHICH SHALL BE


ACKAGE VALUE

174 of 174

42,928,714

WORLD CREST TOWER