SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
A SUB STRUCTURE
1.a EARTH WORK IN EXCAVATION
2
1
25.6
7.3
3.5
3.5
1.975
1.975
2
1
25.6
7.3
3.5
3.5
0.5
0.5
ALONG GRID B1 TO B2
2
1
25.6
7.3
0.5
0.5
1.975
1.975
2
1
25.15
6.85
2.9
2.9
0.1
0.1
2
1
25.15
6.85
2.9
2.9
0.075
0.075
5 FOOTING
i SHUTTERING
ATF1
ATF2
4
2
27.7
10
ALONG GRID B1 TO B2
1.b ALONG GRID A1 TO A7*& C1 TO C7
ALONG GRID B1 TO B2
2 CNS SOIL (MURROM)
ALONG GRID A1 TO A7*& C1 TO C7
iii RCC
AT F1
AT F1 SLOPE
AT F2
AT F1 SLOPE
STRAP BEAM
2
2
1
1
1
1
14
2
1
0.55
0.55
25
2.7
25
1.025
6.7
2.7
6.700
1.025
25.000
0.650
6.700
0.650
3.4
3.4
0.2
0.25
0.2
0.25
0.6
0.6
1.8
1.46
1-12
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
-20
-6
-10
-8
-1
-1
0.23
0.23
0.3
0.23
0.23
0.23
0.3
0.45
0.6
0.45
0.6
0.3
-20
-8
-2
-4
-6
0.23
0.23
0.3
0.23
0.23
0.3
0.45
0.6
0.45
0.45
ii REBAR
14
2
3.4
3.4
0.4
0.23
0.5
0.5
7 GRADE BEAM
i PCC
AT GB-1
AT GB-1 Cantilever for stair
AT GB-2
AT GB-2
AT GB-3
AT GB-3 Cantilever for stair
AT GB-4
5
1
2
2
10
1
3
10.5
1.5
4.75
5.25
3.3
1.5
3.3
0.5
0.5
0.43
0.43
0.43
0.43
0.43
0.075
0.075
0.075
0.075
0.075
0.075
0.075
iiI REBAR
IV SHURTTERING FOR G.BEAMS
AT GB-1
AT GB-1 Cantilever for stair
AT GB-2
AT GB-2
AT GB-3
AT GB-3 Cantilever for stair
AT GB-4
v RCC
AT GB-1
AT GB-2
AT GB-2
AT GB-3
AT GB-4
GB1 FOR STAIR
2
10
1
4
4
20
1
6
10.5
1.5
4.75
5.25
3.3
1.5
3.3
5
2
2
10
3
1
10.5
4.75
5.25
3.3
3.3
1.5
0.6
0.6
0.45
0.45
0.3
0.3
0.45
0.3
0.23
0.23
0.23
0.23
0.3
0.6
0.45
0.45
0.3
0.45
0.6
1-12
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
1.5
0.3
506.76
-1
-1
-1
-1
-1
-1
16.5735
57.7688
12.4301
57.51
10.30
4.10
2
4
4
18
8
2
8
10.5
4.75
5.25
3.3
3.3
3.35
1.23
1
2
2
9
4
1
4
10.5
4.75
5.25
3.3
3.3
3.47
1.5
0.3
0.23
0.23
0.23
0.23
0.23
0.23
4
2
2
2
2
1.5
1
3.06
4.06
3.3
1.75
1.75
0.15
1.75
2
2
2
2
1.5
1
3.06
3.3
0.15
1.77
1.77
1.77
0.3
0.75
0.45
0.45
0.3
0.45
0.45
0.45
0.75
0.45
0.45
0.3
0.45
0.45
0.45
0.2
ii REBAR
iii RCC
RAISER WALL
GROUND LANDING
WAIST SLAB
LANDING
3
0.2
0.15
0.15
0.15
1-12
SI NO
DESCRIPTION OF ACTIVITIES
iii SHUTTERING
SHUTTERING FOR RAFT
SHUTTERING FOR WALL
iv REBAR
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
1
2
2
9
4
1
2
10.5
4.75
5.25
3.3
3.3
3.3
1.5
0.23
0.23
0.23
0.23
0.23
0.23
0.23
1.1
1.4
1.4
1.55
1.4
1.95
1.95
1.75
0.23
0.15
2
2
1
18.185
6.5
6.5
2
2
2.1
0.1
0.1
0.1
2
2
1
18.185
6.5
6.5
2
2
2.1
0.075
0.075
0.075
2
4
2
2
4
4
4
4
3
4
12.485
6.7
17.785
10.1
6.6425
6.2425
7.1
6.7
7.1
1.5
-2
-4
-1
1.5
1.9
3.25
0.2
0.2
1.65
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
0.15
1.5
v RCC
AT RAFT
AT WALL
COVER SLAB
RCC (FOR THE PLAN AREA OTHER THAN
CABLE DUCT)- SLAB ON GRADE
4
2
3
2
2
4
4
3
4
18.185
6.7
18.185
10.1
6.443
6.9
7.1
1.7
1.9
1.9
0.2
0.2
0.2
0.2
1.9
1.9
0.2
0.2
1.65
1.5
1.5
1.5
0.15
0.15
7.1
6.243
0.1
1-12
SI NO
DESCRIPTION OF ACTIVITIES
DEDUCTION
JUN OF IN COMING CABLE DUCT
corners
JUNCTION OF CABLE DUCT FROM PLINTH
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
-2
-4
-1
1.5
1.9
3.25
1.5
0.2
1.5
0.2
0.15
0.2
1
1
12.74
3.3
6.7
10.27
2.12
2.12
-4
10.50
0.3
0.6
1
1
12.485
10.27
6.7
3.3
0.08
0.08
ii PCC
1
1
12.485
10.27
6.7
3.3
0.1
0.1
4.42
4.42
1.8
1.46
iii REBAR
B SUPER STRUCTURE UP TO FF
1 COLUMN UP TO FF
i REBAR
ii SHUTTERING
AT C1
AT C2
DEDUCTIONS AT BEAM LEVEL
AT BEAM FB4 JUNCTIONS FOR C1
AT BEAM FB5 JUNCTIONS IN C1
AT BEAM FB8 JUNCTIONS IN C1
AT BEAM FB1 JUNCTIONS IN C1
AT BEAM FB2&FB3 JUNCTIONS IN C1
AT BEAM FB6 JUNCTIONS FOR C1
Lintel Junction
AT BEAM JUNCTION C2
-20
-4
-2
-10
-8
-7
-32
-2
iii RCC
AT C1
AT C2
14
2
14
2
0.23
0.23
0.23
0.4
0.23
0.23
0.3
0.23
0.4
0.6
0.5
0.75
0.6
0.4
0.23
0.45
4.42
4.42
0.4
0.23
0.5
0.5
12
1.6
0.7
6
22
4
4
10.5
3.3
3.3
1.9
0.3
0.3
0.3
0.3
1-12
SI NO
DESCRIPTION OF ACTIVITIES
NOS
II REBAR
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
25.5
12
1
1
1
1
1
1.6
67.65
3.3
3.3
10.4
3.8
0.6
0.23
0.23
0.115
0.23
0.115
0.1
0.3
0.3
0.3
0.3
0.3
25.60
0.08
3 FF BEAM
i REBAR
ii SHUTTEREING
AT FB-1
AT FB-2
AT FB-3
AT FB-4
AT FB-5
AT FB-6
AT FB-7
AT FB-8
ABOVE ROLLING SHUTTER- PB-6
5
2
2
10
2
7
6
1
2
10.5
4.75
5.25
3.3
3.3
1.52
3.3
3.3
1.75
1.62
1.15
1.15
0.75
1.15
0.82
0.57
0.95
0.83
iii RCC
AT FB-1
AT FB-2
AT FB-3
AT FB-4
AT FB-5
AT FB-6
AT FB-7
AT FB-8
ABOVE ROLLING SHUTTER- PB-6
5
2
2
10
3
7
6
1
2
10.5
4.75
5.25
3.3
3.3
1.5
3.4
3.3
1.75
0.4
0.23
0.23
0.23
0.23
0.3
0.23
0.23
0.23
5
1
6
2
10.54
5.45
1.45
34.20
3.3000
3.3000
3.3000
2
2
2.75
2.75
4 FF SLAB
i SHUTTERING
FS 1
FS3
FS2
OUTER SIDES
ADDITIONAL SLAB ABOVE R SHUTTER
OUTER SIDE
LANDING AS LIKE GF
ii REBAR
0.75
0.6
0.6
0.4
0.6
0.4
0.3
0.5
0.45
0.1500
0.15
1.75
1
6
1-12
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
iii RCC
FS-1
FS-1
FS-2
FB-3
SLAB ABOVE ROLLING
4
1
6
1
1
10.5
10.5
3.4
5.385
2.75
3.3
3.385
1.52
3.385
1.75
1
1
2
3.745
3.745
4.05
0.83
1.385
2.03
1
1
2
3.3
3.385
4.06
0.23
1.385
1.6
0.45
0.2
0.2
12
2
1
1
14
3.3
10
10.5
3.3
1.72
0.23
0.23
0.23
0.23
0.25
3.7
3.65
3.65
3.5
0.145
-12
-10
-3
-3
-1
-1
-1
1.18
1.18
0.8
0.9
2.75
1.5
1.2
0.23
0.23
0.23
0.23
0.23
0.23
0.23
1.48
0.58
0.58
2.1
3.6
2.4
1.2
1
2
2
-2
3.3
1.9
1.05
0.9
14
2
3.5
3.5
0.14
0.14
0.14
0.15
0.15
Ii REBAR
IiI RCC
STAIR FROM +1.5M TO- 5.85M LVL
MID LANDING BEAM AT +3.675M
MID LANDING SLAB AT +3.675M
WAIST SLABS 1 &2
6 BRICK WORKS AT GF
ALONG GRID A&C
ALONG GRID 1,2
ALONG GRID 7
WALL BETWEEN GRID B& C
STEPS FROM +1.5 TO FF
DEDUCTIONS
WINDOW -W
VENTILATORS-V
VENTILATORS-V
DOOR D1
ROLLING SHUTTER
COLLAPSABLE GATE
JOLLEY
7 4.5"HALF BRICK WALL
WALL AT GRID B
WALL AT TOILET
DEDUCTIONS
DOOR D2
C SUP STRUC. FROM FF TO ROOF
1 COLUMN UP TO ROOF
i REBAR
ii SHUTTERING
AT C1
AT C2
DEDUCTIONS AT BEAM LEVEL
7
3.5
3.5
3.5
2.1
1.8
1.46
1-12
SI NO
DESCRIPTION OF ACTIVITIES
IN
IN
IN
IN
IN
C1
C1
C1
C1
C1
NOS
LENGTH
IN M
-22
-2
-10
-4
-7
-6
iii RCC
AT C1
AT C2
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
0.23
0.23
0.4
0.23
0.23
0.23
0.4
0.5
0.75
0.5
0.5
0.5
0.5
0.5
14
2
3.5
3.5
0.4
0.23
8
24
1
2
2
2
1
1.6
3.3
10.5
10
18.185
9.3
25.6
0.7
0.3
0.6
0.6
0.68
0.68
8
12
1
1
1
2
2
1
1.6
3.3
10.5
2.775
3.76
18.185
9.34
25.6
0.6
0.23
0.23
0.115
0.23
0.6
0.6
0.08
3 ROOF BEAM
i SHUTTERING
AT RB1
AT RB3
AT RB4
AT RB5
AT RB6
AT RB7
5
6
11
7
2
1
10.5
3.4
3.3
0.75
10
3.3
1.62
0.69
0.8
1.27
0.72
0.95
ii REBAR
iii RCC
AT RB1
AT RB3
AT RB4
AT RB5
AT RB6
AT RB7
5
6
11
7
2
1
10.5
3.4
3.3
1.5
10
3.3
0.4
0.23
0.23
0.3
0.23
0.23
LOFT
DROP ABOVE VARANDAH
II REBAR
iii RCC SUN SHADE
RCC LINTEL
ABOVE 4.5" WALL
LOFT
DROP ABOVE VARANDAH
0.1
0.3
0.3
0.3
0.3
0.08
0.08
1
0.75
0.3
0.4
0.5
0.5
0.5
1-12
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
4 ROOF SLAB
i SHUTTERING
5
1
6
2
10.50
5.25
1.54
34.06
3.30
3.30
3.30
4
1
1
6
10.50
10.50
5.39
1.52
3.30
3.39
3.39
3.40
0.14
0.14
0.14
0.14
11
2
1
2
11
3.3
10
10.5
3.3
1.73
0.23
0.23
0.23
0.23
0.25
2.8
2.75
2.45
2.6
0.145
-11
-7
-2
-2
-1
1.18
0.8
0.9
0.9
1.2
0.23
0.23
0.23
0.23
0.23
1.48
0.58
2.1
2.1
1.2
2
2
1
2
-4
1.5
1.05
1.5
1.15
0.9
25
0.23
1
1
1
2
3.745
3.745
1.6
3.182
0.83
1.385
0.75
2.03
OUTER SIDES
ii REBAR
iii RCC
RSI
RSI
RS3
RS2
5 9" BRICK WORKS AT FF
ALONG GRID A&C
ALONG GRID 1,2
ALONG GRID 1,2&7
WALL BETWEEN GRID A& C
STEPS
DEDUCTIONS
WINDOW -W
VENTILATORS-V
DOOR D1
DOOR D
JOLLY
6 4.5"WALL AT FF
WALL AT GEN TOILET
WALL AT LADIES TOILET
DEDUCTIONS -DOOR D2
0.15
3.05
3.05
3.05
3.05
2.1
0.9
1-12
SI NO
DESCRIPTION OF ACTIVITIES
LENGTH
IN M
NOS
1
1
1
2
9 ROOF WORKS
a. ROOF LVL RCC & head room
i SHUTTEREING
HB1 Outer side
HB1 Inner side
HB2 Outer side
HB2 Inner side
HB3 Outer side
HB3 Inner side
HS1
C1
C2
3.745
3.745
1.6
3.182
1
3
2
2
1
1
1
2
2
ii REBAR
iii RCC
COLUMN C1 AT PARAPET
COLUMN C1
COLUMN C2
BEAM HB1
BEAM HB2
BEAM H3
SLAB HS1
b BRICK WORK 9"
AT PARAPET
AT HEAD ROOM
HEAD ROOM PARAPET
DEDUCTIONS
DOOR D1
WINDOW
JOLLY
c 9 "RICK WORKS-PASSAGE
D EXTERNAL FINISHING AND YARD WORKS
1 EXTERNAL WORKS & YARD
a EXCAVATION TRANS FTNG
CABLE TRENCH
b RIVER SAND
10
3.930
3.470
7.115
6.425
3.930
3.470
7.115
1.800
1.460
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
0.23
1.385
0.75
1.6
0.45
0.2
0.2
0.2
0.500
0.360
0.500
0.360
0.300
0.160
3.930
2.200
2.200
8
2
2
2
2
1
1
0.90
2.40
2.40
3.30
5.87
3.3
6.425
0.40
0.40
0.23
0.23
0.23
0.23
3.47
0.50
0.50
0.50
0.50
0.50
0.3
0.14
6
1
1
1
1
3.3
10.5
5.25
16.17
20.9
0.23
0.23
0.23
0.23
0.23
0.9
0.9
0.9
1.9
0.3
-1
-1
-1
0.9
1.18
1.2
0.23
0.23
0.23
1.9
1.48
1.2
25
0.23
0.9
1
2
2
1
3.9
1.2
3
12.5
12.9
12.9
1.2
6.2
1.5
1.5
1.5
0.1
1-12
SI NO
DESCRIPTION OF ACTIVITIES
c PCC
NOS
LENGTH
IN M
12.5
1
2
8
2
8
4
1
2
2
25.22
19.76
2
2
72
18
-2
3.25
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
6.2
0.075
1.2
1.36
0.25
0.35
2.10
2.10
0.325
0.325
d SHUTTERING
TRANSFORMER FOUNDATION & FIRE WALLBASE
STRAP BEAM
COLUMN
BEAM B1
BEAM B2
SLAB
FIRE WALL
CABLE DUCT RAFT ALONG PLINTH
CABLE DUCT RAFT ARROUND PLINTH-WALL
COVER SLAB
DEDUCTIONS
JUN OF CABLE DUCT FROM CNT. ROOM
e
f
3.35
4.50
0.20
1.30
1.2
1.30
WALL
COVER SLAB
DEDUCTIONS
JUN OF CABLE DUCT FROM CNT. ROOM
2
ii
ii
iii
iv
2.475
2.475
3.35
4.23
18
1
2
8
2
2
4
8
2
1
9.38
9.38
0.3
0.45
0.45
2.175
2.175
3
4.5
3.275
0.5
0.3
0.3
0.23
0.3
0.3
3
0.23
0.25
0.35
2.10
1.00
1.10
0.33
0.33
0.18
4.95
2
4
1
8
2
4
12.07
3
46.94
2.175
12.07
3
1.5
1.5
0.15
0.15
1.2
1.2
0.20
0.20
1.55
1.55
0.15
0.15
-2
3.25
1.3
0.15
1
1
1
5.74
5.74
5.74
4.2
3.8
3.8
1.50
0.08
0.10
1-12
SI NO
v
vi
DESCRIPTION OF ACTIVITIES
RAFT
WALL
COVER SALB
REBAR
RCC
RAFT
WALL
v
vi
i
ii
iii
iv
v
vi
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
2
2
2
18.48
36.96
9.24
1.5
1
2
1
2
1
1
5.74
5.74
5.74
3.65
3.65
5.74
3.65
0.2
0.25
0.3
0.35
3.6
0.20
1.20
1.20
0.30
0.20
0.20
2
2
2
12.07
12.07
12.07
1.7
1.8
1.8
1.50
0.08
0.10
COVER
2
2
2
2
12.07
12.07
12.07
12.07
1.5
REBAR
RCC
RAFT
WALL
COVER
2
2
2
12.07
12.07
12.07
1.7
1.2
1.7
0.20
0.20
0.15
2
2
2
10.93
10.93
10.93
2.5
2.1
2.1
1.50
0.08
0.10
COVER
2
4
4
2
23.76
10.93
10.93
10.93
1.5
REBAR
RCC
RAFT
WALL
COVER
2
4
2
10.93
10.93
10.93
1.9
1.2
1.9
BEAM
BEAM
COVER SLAB
3
i
ii
iii
iv
NOS
0.20
1.50
0.20
1.30
1.15
0.20
1.30
1.15
0.20
0.20
0.15
1-12
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
66.40
1
1
1
1
1
1
22.00
22.00
22.00
22.00
22.00
22.00
0.3
0.15
0.15
0.05
1
1
1
4.50
4.10
4.10
1
1
1
1
1
1
1
12.00
22.80
3.90
44.70
3.90
11.40
3.90
1
1
1
1
3.00
9.60
3.00
6
6
6
6
6
2.7
2.3
2.3
1.5
0.1
0.1
0.2
2.1
2.1
2.1
2.1
2.1
22
0.2
0.15
0.15
1.8
2.2
1.8
21.7
10.5
1
-1
-1
-1
-2
-1
-2
51
22.2
12.30
2.50
3.70
3.00
7.40
21
11
6
3.6
1.9
2.5
1.75
57.31
4.25
1.18
1.18
2.75
1.48
0.58
4.1
E FINISHING WORKS
1 PLASTERING INTERNAL
a GF
WALL-CONTROL ROOM
DEDUCTIONS
W
V
RS
-12
-9
-1
13
0.7
0.7
0.7
0.7
0.7
0.7
0.7
1-12
SI NO
DESCRIPTION OF ACTIVITIES
D1
D1
Beam Surface on Wall
BATTERY ROOM
GENTS TOILET
DEDUCTIONS
Bath & Toilet walls
D1 & D2
URINAL ENTRY
VENTILATOR
D1 BATTERY ROOM
STAIR ROOM
DEDUCTION FOR CG
DEDUCTION FOR JOLLEY
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
-2
-1
-8
1
1
0.9
1.2
0.4
11.25
27.17
2.1
2.1
0.61
3.8
3.8
-4
-5
-2
-3
-1
1
-1
-1
0.115
0.9
1.05
0.8
1.2
17.27
1.5
1.2
3.8
2.1
3.8
0.6
2.1
4.25
2.1
1.2
57.3
3.3
-11
-2
-2
2
1
-5
-5
2
-2
1
-5
-2
1
-1
-1
1.18
0.9
1.1
5.1
12.4
0.8
0.8
5.5
0.8
8.32
0.8
0.8
17.27
3.3
1.2
1.48
2.1
2.1
3.3
3.3
2.1
0.6
3.3
2
3.3
2.1
0.6
3.3
3.1
1.2
c HEAD ROOM
WALL
DEDUCTION DOOR
WINDOW
JOLLY
1
-1
-1
-1
16.58
0.9
1.18
1.2
2.25
1.9
1.48
1.2
2 CEILING PLASTERING
Gf
CEILING
FB1 BEAM DROP
WET AREAS
BATTERY ROOM
STAIR MID LANDING
WAIST 1 &2
1
4
1
1
1
2
18.185
10.5
3.385
3.385
3.385
1.87
b PLASTERING INTERNAL FF
WALL OFFICE
DEDUCTIONS
W
D1
D
GENTS TOILET/BATH
WALL URINAL/PASSAGE
DEDUCTION FOR DOORS-D2& D1
VENTILATORS
LADIES TOILET
DEDUCTION FOR DOORS-D1
PASSAGE
DEDUCTIONS D1 & D2
VENTILATORS
STAIR ROOM AT FIRST FLOOR
DEDUCTION AT ENTRANCE
JOLLY
14
10.5
1.2
3.015
2.24
1.4
4.06
1-12
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
VARANDAH
FB6 BEAM DROP
FB7 BEAM DROP
1
7
6
22
1.5
3.3
1.75
SRAIR AT 00 LVL
WAIST
SOFFIT
BEAM PP 5 &6 DROP
2
2
2
3.13847
3.385
6.47
1.5
1.5
1
1
1
1
4
6
6
18.18
55
3.385
22.2
10.5
1.5
3.3
10.5
1.2
5
1.75
1
1
2
3.745
1.6
3.182
1.385
0.75
2.03
1
1
2
6.885
3.38
1.5
3.38
18.185
10.5
-1
-1
14.385
12.585
1.9
1.9
1
1
3.155
3.385
2.9
2.24
b CEILING PLASTERING FF
OFFICE
LOFT
WEWT AREA
VARANDAH
RB1 BEAM DROP
RB5 BEAM DROP
RB3 BEAM DROP
STAIR AREA
MID LANDING
SMALL LANDING
WAIST SLAB 3 & 4
c HEAD ROOM
CEILING
BEAM DROP HB3
BEAM DROP HB2
0.52
0.16
0.25
1.2
0.72
0.39
0.15
0.35
3 PAINTING INTERNAL
a GF
WALL RFEFER QTY FROM PLASTER
DEDUCT WALL TILING
CEILING
b FF
WALL REF QTY FROM PLASTER
DEDUCT WALL TILING
CEILING
4 FLOORING
a GROUND FLOOR
CERAMIC FLOORING
DEDUCTION FOR CABLE TRENCH
GENTS TOILET-FLOORING
BATTERY ROOM
15
1-12
SI NO
DESCRIPTION OF ACTIVITIES
NOS
DEDUCTION
WINDOW
DOORS
DOORS
ROLLING SHUTTER
b FF
GENTS TOILET/BATH
WALL URINAL/PASSAGE
DEDUCTION FOR DOORS-D2& D1
VENTILATORS
LADIES TOILET
DEDUCTION FOR DOORS-D1
PASSAGE
DEDUCTIONS D1 & D2
VENTILATORS
16
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
2
20
1
3.7
1.75
5.25
1
29
3.385
1.6
1.25
18.185
3.385
3.385
22.2
10.5
3.015
2.24
1.63
1
1
1
1
2 WALL DADO
a GROUND FLOOR
WALL TOILET/BATH
WALL URINAL
BATH PASSAGE
DEDUCTION FOR DOORS-D2
VENTILATORS
DEDUCTION FOR DOORS-D1
WALL SKIRTING
STAIR AREA
DEDUCTION FO CG
CONTROLL ROOM WALL TILING
LENGTH
IN M
1.75
0.46
3.385
0.395
20
1
1
1
1.6
3.385
3.385
3.385
0.395
2
1
1
-4
-3
-1
5.9
4.755
8.77
0.8
0.8
0.8
2.1
2.1
2.1
2.1
0.6
2.1
1
-1
2
2
17.27
1.5
18.185
10.5
0.1
0.1
2.1
2.1
-12
-2
-1
-1
1.18
0.9
1.2
2.75
1.48
2.1
2.1
2.1
2
1
-5
-5
2
-2
1
-5
-2
5.1
12.4
0.8
0.8
5.5
0.8
8.32
0.8
0.8
2.1
2.1
2.1
0.6
2.1
2
2.1
2.1
0.6
0.75
1.25
1.12
1-12
SI NO
DESCRIPTION OF ACTIVITIES
SKIRTING
OFFICE
DEDUCTION DOOR D
DOOR D1
STAIR AREA
DEDUCTION FOR ENTRANCE
PASSAGE
DEDUCTIONS FOR D
3 EXTERNAL FINISHING WORKS
a PLASTERING EXTERENAL WALL
CORNICHE AT PARAPET LVL
CORNICHE AT HEAD ROOM ROOF
COLUMN PEOJECTIONS @ SOUTH
COLUMN PEOJECTIONS @ EAST/WEST
WARANDAH PARAPET WALL AT FF
SLAB ABOVE ROLLING SHUTTER
DROPS AT FIRST FLOOR LVL
COLUMN AT NORTH
ROOF LEVEL DROP ABOVE VARANDAH
SUNSHADES AT GF
SUNSHADES AT FF
HEAD ROOM PLASTERING EXTERNAL
HEAD ROOM PARAPET
COLUMN FACES
PARAPET IN PASSAGE AT ROOF
DEDUCTIONS
WINDOWS
CG
RS
DOORS D AT FF
DEDUCTION FOR STAIR ENTRY @FF
DOOD D AT ROOF D1
JOLLY
FIRE WALL
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
1
-2
-2
1
-1
2
-2
57.37
1.1
0.9
17.27
3.3
23.5
1.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
1
1
1
12
3
1
1
1
12
1
7
8
1
1
1
2
68.2
66.4
22.2
0.25
0.17
25
5.17
25
0.25
25.7
3.4
3.4
18.13
22.2
1.81
1.5
11.14
-24
-1
-1
-2
-1
-1
-3
1
0.72
1.04
2.29
0.64
3.3
0.44
0.74
9.25
10.75
10.75
1.8
2.73
2.1
9.3
2.1
1.2
1.2
2.4
0.6
2.7
1.9
1.02
1.87
3.87
1.87
3.87
1.87
0.74
9.5
4 EXTERNAL PAINTING
EXTERNAL WALL
5 SS HAND RAILS
HANDRAIL AT O TO 1.5M
HANDRAIL AT STAIR
WAIST SLABS 1 &2
WAIST SLAB 3&4
6 WATER TANK 1000 LITER
7 BATERY ROOM WALL ACID RESISTANT
8 ELECTRICAL WORKS WITH FITTINGS
17
2
2
4.05
3.182
2
1
1
10.25
2.1
1-12
SI NO
DESCRIPTION OF ACTIVITIES
NOS
1
1
1
1
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
30.00
1
3
2
2
6
1.1
0.9
2.1
2.1
6
1
1
0.9
2.75
1.5
2.1
3.6
2.1
e WINDOW(ALUMINIUM)
VENTILATOR IN CONTROL ROOM
VENTILATOR IN TOILETS
WINDOW IN THE PLACE OF JOLLY
WINDOW HEAD ROOM
23
9
10
3
1
1.18
1.18
0.8
1.2
1.2
1.48
0.58
0.58
1.2
1.2
23
1
1.18
1.2
1.48
1.2
18 BOREWELL
19 ACCESS LADDER MS- 4M AT ROOF
1
1
18
1-12
HARINI ENTERPRISES
ARRIVED BY M/S. DSWE and HARINI ENTERPRISES
ORTH CHENNAI.
QTY
SUB TOTAL
353.92
50.46125 404.38125
89.6
12.775
102.375
50.56
7.20875
57.76875
14.587
1.9865
16.5735
10.94025
1.489875 12.430125
60.94
11
71.94
3.8905
3.8905
27
12.8125
3.618
1.716875
9.75
2.613
57.51
85.68
9.928
19
1-12
QTY
SUB TOTAL
-1.38
-0.621
-1.8
-0.828
-0.138
-0.069
-1.38
-0.828
-0.36
-0.414
-0.621
87.169
5.0391
5.0391
9.52
0.78
10.30
1.97
0.06
0.31
0.34
1.06
0.05
0.32
4.10
3.19
3.19
63
0.9
8.55
9.45
19.8
0.45
8.91
111.06
9.45
0.98
1.09
2.28
1.02
0.27
20
1-12
QTY
SUB TOTAL
0.14
15.23
506.76
-16.5735
-57.76875
-12.430125
-57.510
-10.302
-4.102
348.070
15.75
8.55
9.45
17.82
11.88
3.015
4.428
70.893
2.3779
2.3779
2.36
0.98
1.09
2.05
1.37
0.36
0.62
8.83
1.20
3.50
10.71
1.22
11.55
28.18
0.588
0.588
0.09
0.53
1.62
1.75
4.00
21
1-12
QTY
SUB TOTAL
2.66
3.06
3.38
10.59
4.25
1.48
1.35
0.54
27.30
7.27
2.60
1.37
11.24
5.46
1.95
1.02
8.43
4.994
5.36
58.6905
30.3
39.855
37.455
42.6
40.2
31.95
9
-4.5
-1.14
-4.875
289.8895
5.8872
5.8872
13.82
7.64
12.00
6.06
7.73
8.28
6.07
1.94
8.87
22
1-12
QTY
SUB TOTAL
-0.90
-0.23
-0.98
70.30
180.96
71.85
-7.56
245.25
6.69
2.71
9.40
8.36
3.39
11.75
0.37
0.37
3.91
111.38
12.91
-1.84
-0.552
-0.23
-3
-1.104
-0.644
-2.208
-0.207
114.51
12.38
1.02
13.39
13.44
18.90
21.78
3.96
2.28
23
1-12
QTY
SUB TOTAL
25.50
85.86
0.81
1.15
4.67
0.23
0.11
0.72
0.13
2.05
9.06
6.9092
6.91
85.05
10.93
12.08
24.75
7.59
8.72
11.29
3.14
2.91
166.44
15.75
1.31
1.45
3.04
1.37
1.26
1.41
0.38
1.58
27.53
173.91
17.99
28.71
10.26
0.83
9.63
241.32
3.70
3.70
24
1-12
QTY
SUB TOTAL
19.40
4.98
4.34
2.73
0.72
32.18
3.11
5.19
16.44
24.74
1.05
1.05
0.34
0.94
2.60
3.88
33.70
16.79
8.81
2.66
0.87
-4.82
-1.57
-0.32
-1.30
-2.28
-0.83
-0.33
51.38
11.55
13.30
7.35
-3.78
28.42
3.18
3.18
88.20
10.22
25
1-12
QTY
SUB TOTAL
-2.024
-0.23
-3
-0.46
-0.805
-0.69
91.21
9.80
0.81
10.61
8.96
23.76
6.30
12.00
24.73
12.65
25.60
114.00
0.97
0.77
2.73
0.72
0.10
0.26
1.75
0.90
2.05
9.27
85.05
14.08
29.04
6.67
14.40
3.14
152.37
5.13
5.13
15.75
1.41
3.34
1.58
2.30
0.38
24.75
26
1-12
QTY
SUB TOTAL
173.25
17.33
30.49
10.22
231.29
3.21
3.21
19.40
4.98
2.55
4.34
31.27
23.38
12.65
5.92
3.95
0.69
-4.42
-0.75
-0.87
-0.87
-0.33
39.35
9.15
6.41
4.58
7.02
-7.56
19.59
5.18
5.18
3.11
5.19
1.20
12.92
22.41
0.87
0.87
27
1-12
QTY
SUB TOTAL
0.39
1.04
0.24
2.04
3.70
1.965
3.748
7.115
4.626
1.179
0.555
27.962
7.920
6.424
61.494
1.19
1.44
0.96
0.55
0.76
1.35
0.23
3.12
8.41
4.10
2.17
1.09
7.07
1.44
-0.39
-0.40
-0.33
14.74
5.18
5.18
75.47
46.44
10.80
7.75
75.47
46.44
10.80
7.75
28
1-12
QTY
SUB TOTAL
5.81
5.81
35.963
35.963
20.160
5.712
35.963
35.963
11.223
35.963
35.963
35.963
43.200
-8.450
323.58
6.0223
6.02
7.68
3.28
1.51
0.27
0.23
0.85
1.70
3.15
5.12
7.24
3.60
10.91
4.05
4.35
2.16
-1.268
54.83
36.16
1.74
2.18
36.16
29
1-12
QTY
SUB TOTAL
35.963
35.963
27.720
0.901
4.19
2.76
1.72
0.66
0.26
4.13
61.56
3.48
4.35
4.83
31.38
27.76
36.21
99.65
13.71
61.56
100.18
1.23
8.21
5.79
6.16
81.98
3.67
4.59
9.50
56.84
50.28
32.79
20.16
81.98
149.41
1.45
8.31
10.49
6.23
25.03
132.71
-7.75
-5.81
30
1-12
QTY
SUB TOTAL
-54.83
64.31
66.40
66.40
39.60
19.80
19.80
6.60
132.00
132.00
18.23
0.94
0.94
18.23
0.94
0.94
2.40
47.88
8.19
0.98
1.64
3.59
1.23
5.40
21.12
5.40
1.00
58.47
0.98
6.46
31.92
227.85
227.85
749.70
-170.94
-51.66
-6.30
-9.84
-5.25
-18.13
487.58
243.57
-20.96
-6.16
-11.28
31
1-12
QTY
SUB TOTAL
-3.78
-2.52
-1.95
42.75
103.25
-1.75
-9.45
-7.98
-1.44
-2.52
73.40
-3.15
-1.44
388.59
189.09
-19.21
-3.78
-4.62
33.66
40.92
-8.40
-2.40
36.30
-3.20
27.46
-8.40
-0.96
56.99
-10.23
-1.44
37.31
-1.71
-1.75
-1.44
354.19
190.94
50.40
10.21
7.58
4.74
15.18
32
1-12
QTY
SUB TOTAL
38.50
5.46
3.17
9.42
10.16
3.24
348.99
190.89
65.96
16.93
38.85
50.40
6.48
7.72
5.19
1.20
12.92
23.27
0.51
1.05
421.37
388.59
-132.36
326.18
354.19
-75.89
421.37
1282.07
190.94
-27.33
-23.91
9.15
7.58
33
1-12
QTY
SUB TOTAL
12.95
16.10
17.77
203.25
4.23
18.33
22.56
190.94
10.21
7.58
36.19
12.64
2.54
4.23
3.79
268.12
24.78
9.99
18.42
-6.72
-1.44
-1.68
1.73
-0.15
76.38
44.10
-20.96
-3.78
-2.52
-5.78
132.36
21.42
26.04
-8.40
-2.40
23.10
-3.20
17.47
-8.40
-0.96
34
1-12
QTY
SUB TOTAL
5.74
-0.22
-0.18
1.73
-0.33
4.70
-0.22
75.89
759.75
66.40
22.20
32.25
5.48
45.00
14.11
52.50
27.90
53.97
28.56
32.64
43.51
13.32
4.89
5.70
-17.63
-1.94
-8.86
-2.39
-12.77
-0.82
-1.64
87.88
1250.00
1250.00
16.00
8.10
6.36
21.53
35
30.46
2
21.53
1
1-12
QTY
SUB TOTAL
1
30
1
1
1
3
2
4.62
11.34
15.96
11.34
9.90
3.15
11.34
9.90
3.15
40.17
6.16
4.64
4.32
1.44
56.73
40.17
1.44
1165.00
1.00
1.00
1
1
36
1-12
HARINI ENTERPRISES
MEASUREMENT SHEET JOINTLY ARRIVED BY M/S. DSWE and HARINI ENTERPR
PROJECT : 33/11 KVA SUB STATION WORK NORTH CHENNAI.
SITE : KORATTUR
CLIENT : M/S. DRAKE & SCULL WATER & ENERGY PVT LTD.
MEASUREMNT ARRIVED BY: Mr.Mohammed Nazer ( Manager Civil,DSWE) and Mr.Rajaraman (P
Engg,Harini),Mr.Anbarasan (Site Engg)
CHECKED & RE-ARRIVED BY : Mr.Sivasubramanian(Engineer Civil,DSWE) and Mr.Anbarasan(Sit
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
A SUB STRUCTURE
1.a EARTH WORK IN EXCAVATION
2
1
25.6
7.3
3.5
3.5
1.975
1.975
2
1
25.6
7.3
3.5
3.5
0.5
0.5
ALONG GRID B1 TO B2
2
1
25.6
7.3
0.5
0.5
1.975
1.975
2
1
25.15
6.85
2.9
2.9
0.1
0.1
2
1
25.15
6.85
2.9
2.9
0.075
0.075
5 FOOTING
i SHUTTERING
ATF1
ATF2
4
2
27.7
10
ALONG GRID B1 TO B2
1.b ALONG GRID A1 TO A7*& C1 TO C7
ALONG GRID B1 TO B2
2 CNS SOIL (MURROM)
ALONG GRID A1 TO A7*& C1 TO C7
iii RCC
AT F1
AT F1 SLOPE
AT F2
AT F1 SLOPE
STRAP BEAM
2
2
1
1
1
1
14
2
37
0.55
0.55
25
2.7
25
1.025
6.7
2.7
6.700
1.025
25.000
0.650
6.700
0.650
3.4
3.4
0.2
0.25
0.2
0.25
0.6
0.6
1.8
1.46
1-12
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
-20
-6
-10
-8
-1
-1
0.23
0.23
0.3
0.23
0.23
0.23
0.3
0.45
0.6
0.45
0.6
0.3
-20
-8
-2
-4
-6
0.23
0.23
0.3
0.23
0.23
0.3
0.45
0.6
0.45
0.45
ii REBAR
14
2
3.4
3.4
0.4
0.23
0.5
0.5
7 GRADE BEAM
i PCC
AT GB-1
AT GB-1 Cantilever for stair
AT GB-2
AT GB-2
AT GB-3
AT GB-3 Cantilever for stair
AT GB-4
5
1
2
2
10
1
3
10.5
1.5
4.75
5.25
3.3
1.5
3.3
0.5
0.5
0.43
0.43
0.43
0.43
0.43
0.075
0.075
0.075
0.075
0.075
0.075
0.075
iiI REBAR
IV SHURTTERING FOR G.BEAMS
AT GB-1
AT GB-1 Cantilever for stair
AT GB-2
AT GB-2
AT GB-3
AT GB-3 Cantilever for stair
AT GB-4
v RCC
AT GB-1
AT GB-2
AT GB-2
AT GB-3
AT GB-4
GB1 FOR STAIR
38
10
1
4
4
20
1
6
10.5
1.5
4.75
5.25
3.3
1.5
3.3
5
2
2
10
3
1
10.5
4.75
5.25
3.3
3.3
1.5
0.6
0.6
0.45
0.45
0.3
0.3
0.45
0.3
0.23
0.23
0.23
0.23
0.3
0.6
0.45
0.45
0.3
0.45
0.6
1-12
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
1.5
0.3
506.76
-1
-1
-1
-1
-1
-1
16.5735
57.7688
12.4301
57.51
10.30
4.10
2
4
4
18
8
2
8
10.5
4.75
5.25
3.3
3.3
3.35
1.23
1
2
2
9
4
1
4
10.5
4.75
5.25
3.3
3.3
3.47
1.5
0.3
0.23
0.23
0.23
0.23
0.23
0.23
4
2
2
2
2
1.5
1
3.06
4.06
3.3
1.75
1.75
0.15
1.75
2
2
2
2
1.5
1
3.06
3.3
0.15
1.77
1.77
1.77
0.3
0.75
0.45
0.45
0.3
0.45
0.45
0.45
0.75
0.45
0.45
0.3
0.45
0.45
0.45
0.2
ii REBAR
iii RCC
RAISER WALL
GROUND LANDING
WAIST SLAB
LANDING
39
0.2
0.15
0.15
0.15
1-12
SI NO
DESCRIPTION OF ACTIVITIES
iii SHUTTERING
SHUTTERING FOR RAFT
SHUTTERING FOR WALL
iv REBAR
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
1
2
2
9
4
1
2
10.5
4.75
5.25
3.3
3.3
3.3
1.5
0.23
0.23
0.23
0.23
0.23
0.23
0.23
1.1
1.4
1.4
1.55
1.4
1.95
1.95
1.75
0.23
0.15
2
2
1
18.185
6.5
6.5
2
2
2.1
0.1
0.1
0.1
2
2
1
18.185
6.5
6.5
2
2
2.1
0.075
0.075
0.075
2
4
2
2
4
4
4
4
3
4
12.485
6.7
17.785
10.1
6.6425
6.2425
7.1
6.7
7.1
1.5
-2
-4
-1
1.5
1.9
3.25
0.2
0.2
1.65
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
0.15
1.5
v RCC
AT RAFT
AT WALL
COVER SLAB
RCC (FOR THE PLAN AREA OTHER THAN
CABLE DUCT)- SLAB ON GRADE
40
2
3
2
2
4
4
3
4
18.185
6.7
18.185
10.1
6.443
6.9
7.1
1.7
1.9
1.9
0.2
0.2
0.2
0.2
1.9
1.9
0.2
0.2
1.65
1.5
1.5
1.5
0.15
0.15
7.1
6.243
0.1
1-12
SI NO
DESCRIPTION OF ACTIVITIES
DEDUCTION
JUN OF IN COMING CABLE DUCT
corners
JUNCTION OF CABLE DUCT FROM PLINTH
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
-2
-4
-1
1.5
1.9
3.25
1.5
0.2
1.5
0.2
0.15
0.2
1
1
12.74
3.3
6.7
10.27
2.12
2.12
-4
10.50
0.3
0.6
1
1
12.485
10.27
6.7
3.3
0.08
0.08
ii PCC
1
1
12.485
10.27
6.7
3.3
0.1
0.1
4.42
4.42
1.8
1.46
iii REBAR
TOTAL(A)
B SUPER STRUCTURE UP TO FF
1 COLUMN UP TO FF
i REBAR
ii SHUTTERING
AT C1
AT C2
DEDUCTIONS AT BEAM LEVEL
AT BEAM FB4 JUNCTIONS FOR C1
AT BEAM FB5 JUNCTIONS IN C1
AT BEAM FB8 JUNCTIONS IN C1
AT BEAM FB1 JUNCTIONS IN C1
AT BEAM FB2&FB3 JUNCTIONS IN C1
AT BEAM FB6 JUNCTIONS FOR C1
Lintel Junction
AT BEAM JUNCTION C2
-20
-4
-2
-10
-8
-7
-32
-2
iii RCC
AT C1
AT C2
14
2
41
14
2
0.23
0.23
0.23
0.4
0.23
0.23
0.3
0.23
0.4
0.6
0.5
0.75
0.6
0.4
0.23
0.45
4.42
4.42
0.4
0.23
0.5
0.5
12
1.6
0.7
6
22
10.5
3.3
0.3
0.3
1-12
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
4
4
3.3
1.9
25.5
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
0.3
0.3
1
12
1
1
1
1
1
1.6
67.65
3.3
3.3
10.4
3.8
0.6
0.23
0.23
0.115
0.23
0.115
0.1
0.3
0.3
0.3
0.3
0.3
25.60
0.08
3 FF BEAM
i REBAR
ii SHUTTEREING
AT FB-1
AT FB-2
AT FB-3
AT FB-4
AT FB-5
AT FB-6
AT FB-7
AT FB-8
ABOVE ROLLING SHUTTER- PB-6
5
2
2
10
2
7
6
1
2
10.5
4.75
5.25
3.3
3.3
1.52
3.3
3.3
1.75
1.62
1.15
1.15
0.75
1.15
0.82
0.57
0.95
0.83
iii RCC
AT FB-1
AT FB-2
AT FB-3
AT FB-4
AT FB-5
AT FB-6
AT FB-7
AT FB-8
ABOVE ROLLING SHUTTER- PB-6
5
2
2
10
3
7
6
1
2
10.5
4.75
5.25
3.3
3.3
1.5
3.4
3.3
1.75
0.4
0.23
0.23
0.23
0.23
0.3
0.23
0.23
0.23
5
1
6
2
10.54
5.45
1.45
34.20
3.3000
3.3000
3.3000
2.75
4 FF SLAB
i SHUTTERING
FS 1
FS3
FS2
OUTER SIDES
ADDITIONAL SLAB ABOVE R SHUTTER
OUTER SIDE
42
0.75
0.6
0.6
0.4
0.6
0.4
0.3
0.5
0.45
0.1500
0.15
1-12
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LANDING AS LIKE GF
ii REBAR
iii RCC
FS-1
FS-1
FS-2
FB-3
SLAB ABOVE ROLLING
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
2.75
1.75
4
1
6
1
1
10.5
10.5
3.4
5.385
2.75
3.3
3.385
1.52
3.385
1.75
1
1
2
3.745
3.745
4.05
0.83
1.385
2.03
1
1
2
3.3
3.385
4.06
0.23
1.385
1.6
0.45
0.2
0.2
12
2
1
1
14
3.3
10
10.5
3.3
1.72
0.23
0.23
0.23
0.23
0.25
3.7
3.65
3.65
3.5
0.145
-12
-10
-3
-3
-1
-1
-1
1.18
1.18
0.8
0.9
2.75
1.5
1.2
0.23
0.23
0.23
0.23
0.23
0.23
0.23
1.48
0.58
0.58
2.1
3.6
2.4
1.2
1
2
2
-2
3.3
1.9
1.05
0.9
0.14
0.14
0.14
0.15
0.15
Ii REBAR
IiI RCC
STAIR FROM +1.5M TO- 5.85M LVL
MID LANDING BEAM AT +3.675M
MID LANDING SLAB AT +3.675M
WAIST SLABS 1 &2
6 BRICK WORKS AT GF
ALONG GRID A&C
ALONG GRID 1,2
ALONG GRID 7
WALL BETWEEN GRID B& C
STEPS FROM +1.5 TO FF
DEDUCTIONS
WINDOW -W
VENTILATORS-V
VENTILATORS-V
DOOR D1
ROLLING SHUTTER
COLLAPSABLE GATE
JOLLEY
7 4.5"HALF BRICK WALL
WALL AT GRID B
WALL AT TOILET
DEDUCTIONS
DOOR D2
3.5
3.5
3.5
2.1
TOTAL(B)
C SUP STRUC. FROM FF TO ROOF
43
1-12
SI NO
DESCRIPTION OF ACTIVITIES
NOS
1 COLUMN UP TO ROOF
i REBAR
ii SHUTTERING
AT C1
AT C2
DEDUCTIONS AT BEAM LEVEL
AT BEAM RB4 JUNCTIONS IN C1
AT BEAM RB7 JUNCTIONS IN C1
AT BEAM RB1 JUNCTIONS IN C1
AT BEAM RB6 JUNCTIONS IN C1
AT BEAM RB5 JUNCTIONS IN C1
ATBEAM JUNCTION C2
-22
-2
-10
-4
-7
-6
iii RCC
AT C1
AT C2
14
2
14
2
LOFT
DROP ABOVE VARANDAH
LENGTH
IN M
3.5
3.5
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
1.8
1.46
0.23
0.23
0.4
0.23
0.23
0.23
0.4
0.5
0.75
0.5
0.5
0.5
3.5
3.5
0.4
0.23
0.5
0.5
8
24
1
2
2
2
1
1.6
3.3
10.5
10
18.185
9.3
25.6
0.7
0.3
0.6
0.6
0.68
0.68
8
12
1
1
1
2
2
1
1.6
3.3
10.5
2.775
3.76
18.185
9.34
25.6
0.6
0.23
0.23
0.115
0.23
0.6
0.6
0.08
5
6
11
7
2
1
10.5
3.4
3.3
0.75
10
3.3
1.62
0.69
0.8
1.27
0.72
0.95
II REBAR
iii RCC SUN SHADE
RCC LINTEL
ABOVE 4.5" WALL
LOFT
DROP ABOVE VARANDAH
3 ROOF BEAM
i SHUTTERING
AT RB1
AT RB3
AT RB4
AT RB5
AT RB6
AT RB7
0.1
0.3
0.3
0.3
0.3
0.08
0.08
1
ii REBAR
iii RCC
44
1-12
SI NO
DESCRIPTION OF ACTIVITIES
AT
AT
AT
AT
AT
AT
RB1
RB3
RB4
RB5
RB6
RB7
NOS
5
6
11
7
2
1
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
10.5
3.4
3.3
1.5
10
3.3
0.4
0.23
0.23
0.3
0.23
0.23
0.75
0.3
0.4
0.5
0.5
0.5
5
1
6
2
10.50
5.25
1.54
34.06
3.30
3.30
3.30
4
1
1
6
10.50
10.50
5.39
1.52
3.30
3.39
3.39
3.40
0.14
0.14
0.14
0.14
11
2
1
2
11
3.3
10
10.5
3.3
1.73
0.23
0.23
0.23
0.23
0.25
2.8
2.75
2.45
2.6
0.145
-11
-7
-2
-2
-1
1.18
0.8
0.9
0.9
1.2
0.23
0.23
0.23
0.23
0.23
1.48
0.58
2.1
2.1
1.2
2
2
1
2
-4
1.5
1.05
1.5
1.15
0.9
25
0.23
1
1
3.745
3.745
0.83
1.385
4 ROOF SLAB
i SHUTTERING
OUTER SIDES
ii REBAR
iii RCC
RSI
RSI
RS3
RS2
5 9" BRICK WORKS AT FF
ALONG GRID A&C
ALONG GRID 1,2
ALONG GRID 1,2&7
WALL BETWEEN GRID A& C
STEPS
DEDUCTIONS
WINDOW -W
VENTILATORS-V
DOOR D1
DOOR D
JOLLY
6 4.5"WALL AT FF
WALL AT GEN TOILET
WALL AT LADIES TOILET
DEDUCTIONS -DOOR D2
45
0.15
3.05
3.05
3.05
3.05
2.1
0.9
1-12
SI NO
DESCRIPTION OF ACTIVITIES
LENGTH
IN M
NOS
1
2
1
1
1
2
9 ROOF WORKS
a. ROOF LVL RCC & head room
i SHUTTEREING
HB1 Outer side
HB1 Inner side
HB2 Outer side
HB2 Inner side
HB3 Outer side
HB3 Inner side
HS1
C1
C2
1
3
2
2
1
1
1
2
2
ii REBAR
iii RCC
COLUMN C1 AT PARAPET
COLUMN C1
COLUMN C2
BEAM HB1
BEAM HB2
BEAM H3
SLAB HS1
b BRICK WORK 9"
AT PARAPET
AT HEAD ROOM
HEAD ROOM PARAPET
DEDUCTIONS
DOOR D1
WINDOW
JOLLY
c 9 "RICK WORKS-PASSAGE
TOTAL ( C)
46
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
1.6
3.182
0.75
2.03
3.745
3.745
1.6
3.182
0.23
1.385
0.75
1.6
3.930
3.470
7.115
6.425
3.930
3.470
7.115
1.800
1.460
0.45
0.2
0.2
0.2
0.500
0.360
0.500
0.360
0.300
0.160
3.930
2.200
2.200
8
2
2
2
2
1
1
0.90
2.40
2.40
3.30
5.87
3.3
6.425
0.40
0.40
0.23
0.23
0.23
0.23
3.47
0.50
0.50
0.50
0.50
0.50
0.3
0.14
6
1
1
1
1
3.3
10.5
5.25
16.17
20.9
0.23
0.23
0.23
0.23
0.23
0.9
0.9
0.9
1.9
0.3
-1
-1
-1
0.9
1.18
1.2
0.23
0.23
0.23
1.9
1.48
1.2
25
0.23
0.9
1-12
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
1
2
2
1
1
3.9
1.2
3
12.5
12.5
1
2
8
2
8
4
1
2
2
25.22
19.76
2
2
72
18
-2
3.25
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
12.9
12.9
1.2
6.2
6.2
1.5
1.5
1.5
0.1
0.075
1.2
1.36
0.25
0.35
2.10
2.10
0.325
0.325
d SHUTTERING
TRANSFORMER FOUNDATION & FIRE WALLBASE
STRAP BEAM
COLUMN
BEAM B1
BEAM B2
SLAB
FIRE WALL
CABLE DUCT RAFT ALONG PLINTH
CABLE DUCT RAFT ARROUND PLINTH-WALL
COVER SLAB
DEDUCTIONS
JUN OF CABLE DUCT FROM CNT. ROOM
e
f
2.475
2.475
3.35
4.23
18
3.35
4.50
0.20
1.30
1.2
1.30
WALL
COVER SLAB
DEDUCTIONS
JUN OF CABLE DUCT FROM CNT. ROOM
47
1
2
8
2
2
4
8
2
1
9.38
9.38
0.3
0.45
0.45
2.175
2.175
3
4.5
3.275
0.5
0.3
0.3
0.23
0.3
0.3
3
0.23
0.25
0.35
2.10
1.00
1.10
0.33
0.33
0.18
4.95
2
4
1
8
2
4
12.07
3
46.94
2.175
12.07
3
1.5
1.5
0.15
0.15
1.2
1.2
0.20
0.20
1.55
1.55
0.15
0.15
-2
3.25
1.3
0.15
1-12
SI NO
2
ii
ii
iii
iv
v
vi
DESCRIPTION OF ACTIVITIES
v
vi
i
ii
iii
iv
v
vi
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
1
1
1
5.74
5.74
5.74
2
2
2
18.48
36.96
9.24
1.5
1
2
1
2
1
1
5.74
5.74
5.74
3.65
3.65
5.74
3.65
0.2
0.25
0.3
0.35
3.6
0.20
1.20
1.20
0.30
0.20
0.20
2
2
2
12.07
12.07
12.07
1.7
1.8
1.8
1.50
0.08
0.10
COVER
2
2
2
2
12.07
12.07
12.07
12.07
1.5
REBAR
RCC
RAFT
WALL
COVER
2
2
2
12.07
12.07
12.07
1.7
1.2
1.7
0.20
0.20
0.15
2
2
2
10.93
10.93
10.93
2.5
2.1
2.1
1.50
0.08
0.10
COVER
2
4
4
2
23.76
10.93
10.93
10.93
1.5
REBAR
RCC
RAFT
10.93
1.9
3
i
ii
iii
iv
NOS
48
4.2
3.8
3.8
1.50
0.08
0.10
0.20
1.50
0.20
1.30
1.15
0.20
1.30
1.15
0.20
1-12
SI NO
DESCRIPTION OF ACTIVITIES
WALL
COVER
4
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
4
2
10.93
10.93
1.2
1.9
66.40
1
1
1
1
1
1
22.00
22.00
22.00
22.00
22.00
22.00
0.3
0.15
0.15
0.05
0.20
0.15
1
1
1
4.50
4.10
4.10
1
1
1
1
1
1
1
12.00
22.80
3.90
44.70
3.90
11.40
3.90
1
1
1
1
3.00
9.60
3.00
2.7
2.3
2.3
1.5
0.1
0.1
0.2
2.1
2.1
2.1
2.1
2.1
22
0.2
0.15
0.15
1.8
2.2
1.8
21.7
10.5
1
-1
-1
-1
-2
-1
-2
51
22.2
12.30
2.50
3.70
3.00
7.40
21
11
6
3.6
1.9
2.5
1.75
49
6
6
6
6
0.7
0.7
0.7
0.7
0.7
0.7
0.7
1-12
SI NO
DESCRIPTION OF ACTIVITIES
E FINISHING WORKS
1 PLASTERING INTERNAL
a GF
WALL-CONTROL ROOM
DEDUCTIONS
W
V
RS
D1
D1
Beam Surface on Wall
BATTERY ROOM
GENTS TOILET
DEDUCTIONS
Bath & Toilet walls
D1 & D2
URINAL ENTRY
VENTILATOR
D1 BATTERY ROOM
STAIR ROOM
DEDUCTION FOR CG
DEDUCTION FOR JOLLEY
b PLASTERING INTERNAL FF
WALL OFFICE
DEDUCTIONS
W
D1
D
GENTS TOILET/BATH
WALL URINAL/PASSAGE
DEDUCTION FOR DOORS-D2& D1
VENTILATORS
LADIES TOILET
DEDUCTION FOR DOORS-D1
PASSAGE
DEDUCTIONS D1 & D2
VENTILATORS
STAIR ROOM AT FIRST FLOOR
DEDUCTION AT ENTRANCE
JOLLY
c HEAD ROOM
WALL
DEDUCTION DOOR
WINDOW
JOLLY
50
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
57.31
4.25
-12
-9
-1
-2
-1
-8
1
1
1.18
1.18
2.75
0.9
1.2
0.4
11.25
27.17
1.48
0.58
4.1
2.1
2.1
0.61
3.8
3.8
-4
-5
-2
-3
-1
1
-1
-1
0.115
0.9
1.05
0.8
1.2
17.27
1.5
1.2
3.8
2.1
3.8
0.6
2.1
4.25
2.1
1.2
57.3
3.3
-11
-2
-2
2
1
-5
-5
2
-2
1
-5
-2
1
-1
-1
1.18
0.9
1.1
5.1
12.4
0.8
0.8
5.5
0.8
8.32
0.8
0.8
17.27
3.3
1.2
1.48
2.1
2.1
3.3
3.3
2.1
0.6
3.3
2
3.3
2.1
0.6
3.3
3.1
1.2
1
-1
-1
-1
16.58
0.9
1.18
1.2
2.25
1.9
1.48
1.2
1-12
SI NO
DESCRIPTION OF ACTIVITIES
2 CEILING PLASTERING
Gf
CEILING
FB1 BEAM DROP
WET AREAS
BATTERY ROOM
STAIR MID LANDING
WAIST 1 &2
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
1
4
1
1
1
2
18.185
10.5
3.385
3.385
3.385
1.87
VARANDAH
FB6 BEAM DROP
FB7 BEAM DROP
1
7
6
22
1.5
3.3
1.75
SRAIR AT 00 LVL
WAIST
SOFFIT
BEAM PP 5 &6 DROP
2
2
2
3.13847
3.385
6.47
1.5
1.5
1
1
1
1
4
6
6
18.18
55
3.385
22.2
10.5
1.5
3.3
10.5
1.2
5
1.75
1
1
2
3.745
1.6
3.182
1.385
0.75
2.03
1
1
2
6.885
3.38
1.5
3.38
b CEILING PLASTERING FF
OFFICE
LOFT
WEWT AREA
VARANDAH
RB1 BEAM DROP
RB5 BEAM DROP
RB3 BEAM DROP
STAIR AREA
MID LANDING
SMALL LANDING
WAIST SLAB 3 & 4
c HEAD ROOM
CEILING
BEAM DROP HB3
BEAM DROP HB2
10.5
1.2
3.015
2.24
1.4
4.06
0.52
0.16
0.25
1.2
0.72
0.39
0.15
0.35
3 PAINTING INTERNAL
a GF
WALL RFEFER QTY FROM PLASTER
DEDUCT WALL TILING
CEILING
b FF
WALL REF QTY FROM PLASTER
DEDUCT WALL TILING
CEILING
51
1-12
SI NO
DESCRIPTION OF ACTIVITIES
4 FLOORING
a GROUND FLOOR
CERAMIC FLOORING
DEDUCTION FOR CABLE TRENCH
GENTS TOILET-FLOORING
BATTERY ROOM
ACCESS STEPS & STAIR
FLOOR LANDING SLAB AT +0.00M LVL
STEPS
STAIR PASSAGE AT ENTRANCE
b FLOOR TILING GF STAIR
MID LANDING AT +3.675M LVL
STEPS
c FLOOR TILING FF
FF-FLOORING
GENTS TOILET-FLOORING
LADIES TOILET
PASSAGE AT VARANDAH
STAIR
STEPS FROM FF TO ROOF
SMALL LANDING AT +5.85MLVL
MID LANDING SLAB
LANDING AT +9.04MLVL
NOS
DEDUCTION
WINDOW
DOORS
DOORS
ROLLING SHUTTER
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
18.185
10.5
-1
-1
14.385
12.585
1.9
1.9
1
1
3.155
3.385
2.9
2.24
2
20
1
3.7
1.75
5.25
1.75
1
29
3.385
1.6
1.25
18.185
3.385
3.385
22.2
10.5
3.015
2.24
1.63
1
1
1
1
2 WALL DADO
a GROUND FLOOR
WALL TOILET/BATH
WALL URINAL
BATH PASSAGE
DEDUCTION FOR DOORS-D2
VENTILATORS
DEDUCTION FOR DOORS-D1
WALL SKIRTING
STAIR AREA
DEDUCTION FO CG
CONTROLL ROOM WALL TILING
LENGTH
IN M
0.46
3.385
0.395
20
1
1
1
1.6
3.385
3.385
3.385
2
1
1
-4
-3
-1
5.9
4.755
8.77
0.8
0.8
0.8
2.1
2.1
2.1
2.1
0.6
2.1
1
-1
2
2
17.27
1.5
18.185
10.5
0.1
0.1
2.1
2.1
1.18
0.9
1.2
2.75
1.48
2.1
2.1
2.1
-12
-2
-1
-1
0.395
0.75
1.25
1.12
b FF
52
1-12
SI NO
DESCRIPTION OF ACTIVITIES
GENTS TOILET/BATH
WALL URINAL/PASSAGE
DEDUCTION FOR DOORS-D2& D1
VENTILATORS
LADIES TOILET
DEDUCTION FOR DOORS-D1
PASSAGE
DEDUCTIONS D1 & D2
VENTILATORS
SKIRTING
OFFICE
DEDUCTION DOOR D
DOOR D1
STAIR AREA
DEDUCTION FOR ENTRANCE
PASSAGE
DEDUCTIONS FOR D
3 EXTERNAL FINISHING WORKS
a PLASTERING EXTERENAL WALL
CORNICHE AT PARAPET LVL
CORNICHE AT HEAD ROOM ROOF
COLUMN PEOJECTIONS @ SOUTH
COLUMN PEOJECTIONS @ EAST/WEST
WARANDAH PARAPET WALL AT FF
SLAB ABOVE ROLLING SHUTTER
DROPS AT FIRST FLOOR LVL
COLUMN AT NORTH
ROOF LEVEL DROP ABOVE VARANDAH
SUNSHADES AT GF
SUNSHADES AT FF
HEAD ROOM PLASTERING EXTERNAL
HEAD ROOM PARAPET
COLUMN FACES
PARAPET IN PASSAGE AT ROOF
DEDUCTIONS
WINDOWS
CG
RS
DOORS D AT FF
DEDUCTION FOR STAIR ENTRY @FF
DOOD D AT ROOF D1
JOLLY
FIRE WALL
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
2
1
-5
-5
2
-2
1
-5
-2
5.1
12.4
0.8
0.8
5.5
0.8
8.32
0.8
0.8
2.1
2.1
2.1
0.6
2.1
2
2.1
2.1
0.6
1
-2
-2
1
-1
2
-2
57.37
1.1
0.9
17.27
3.3
23.5
1.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
1
1
1
12
3
1
1
1
12
1
7
8
1
1
1
2
68.2
66.4
22.2
0.25
0.17
25
5.17
25
0.25
25.7
3.4
3.4
18.13
22.2
1.81
1.5
11.14
-24
-1
-1
-2
-1
-1
-3
1
0.72
1.04
2.29
0.64
3.3
0.44
0.74
9.25
10.75
10.75
1.8
2.73
2.1
9.3
2.1
1.2
1.2
2.4
0.6
2.7
1.9
1.02
1.87
3.87
1.87
3.87
1.87
0.74
9.5
4 EXTERNAL PAINTING
EXTERNAL WALL
53
1-12
SI NO
DESCRIPTION OF ACTIVITIES
5 SS HAND RAILS
HANDRAIL AT O TO 1.5M
HANDRAIL AT STAIR
WAIST SLABS 1 &2
WAIST SLAB 3&4
6 WATER TANK 1000 LITER
7 BATERY ROOM WALL ACID RESISTANT
8 ELECTRICAL WORKS WITH FITTINGS
9 PLUMPING & SANITARYWERES
10 SEWAGE/ DRAINAGE WORKS
11 SEPTIC TANK& SOAKWAY WITH COVERS
12 RAIN WATER LINE & HARVESTING
ENTRANCE GATE 6m wide+ 2M WICKED
13 GATE
14 INSPECTION CHAMBER
15 GULLY TRAP
16 JOINERIES
a DOOR D (CW H C FLUSH DOOR)
DOOR D1 (CW HC FLUSH DOOR)
NOS
LENGTH
IN M
2
2
4.05
3.182
2
1
1
1
1
1
1
10.25
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
2.1
30.00
1
3
2
2
6
1.1
0.9
2.1
2.1
6
1
1
0.9
2.75
1.5
2.1
3.6
2.1
e WINDOW(ALUMINIUM)
VENTILATOR IN CONTROL ROOM
VENTILATOR IN TOILETS
WINDOW IN THE PLACE OF JOLLY
WINDOW HEAD ROOM
23
9
10
3
1
1.18
1.18
0.8
1.2
1.2
1.48
0.58
0.58
1.2
1.2
23
1
1.18
1.2
1.48
1.2
18 BOREWELL
19 ACCESS LADDER MS- 4M AT ROOF
1
1
54
1-12
HARINI ENTERPRISES
nd Mr.Rajaraman (Project
nd Mr.Anbarasan(Site Engg)
QTY
SUB TOTAL
353.92
50.46125 404.38125
89.6
12.775
102.375
50.56
7.20875
57.76875
14.587
1.9865
16.5735
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
71.94
3.8905
3.8905
27
12.8125
3.618
1.716875
9.75
2.613
57.51
PCC IN
CUM
404.38
102.38
57.77
16.5735
10.94025
1.489875 12.430125
60.94
11
RIVER
SAND
FILLING IN
CUM
12.430125
85.68
9.928
55
1-12
QTY
SUB TOTAL
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
-1.38
-0.621
-1.8
-0.828
-0.138
-0.069
-1.38
-0.828
-0.36
-0.414
-0.621
87.169
5.0391
5.0391
9.52
0.78
10.30
1.97
0.06
0.31
0.34
1.06
0.05
0.32
4.10
3.19
3.19
63
0.9
8.55
9.45
19.8
0.45
8.91
111.06
4.10
9.45
0.98
1.09
2.28
1.02
0.27
56
1-12
QTY
0.14
SUB TOTAL
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
15.23
506.76
-16.5735
-57.76875
-12.430125
-57.510
-10.302
-4.102
348.070
15.75
8.55
9.45
17.82
11.88
3.015
4.428
70.893
2.3779
2.3779
2.36
0.98
1.09
2.05
1.37
0.36
0.62
8.83
1.20
3.50
10.71
1.22
11.55
28.18
0.588
0.588
0.09
0.53
1.62
1.75
4.00
57
1-12
QTY
SUB TOTAL
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
2.66
3.06
3.38
10.59
4.25
1.48
1.35
0.54
27.30
7.27
2.60
1.37
11.24
5.46
1.95
1.02
8.43
11.24
8.43
4.994
5.36
58.6905
30.3
39.855
37.455
42.6
40.2
31.95
9
-4.5
-1.14
-4.875
289.8895
5.8872
5.8872
13.82
7.64
12.00
6.06
7.73
8.28
6.07
1.94
8.87
58
1-12
QTY
-0.90
-0.23
-0.98
SUB TOTAL
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
70.30
180.96
71.85
-7.56
245.25
6.69
2.71
9.40
8.36
3.39
11.75
0.37
0.37
9.40
11.75
404.38
102.38
57.77
37.22
36.72
3.91
111.38
12.91
-1.84
-0.552
-0.23
-3
-1.104
-0.644
-2.208
-0.207
114.51
12.38
1.02
13.39
13.44
18.90
21.78
59
1-12
QTY
SUB TOTAL
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
3.96
2.28
25.50
85.86
0.81
1.15
4.67
0.23
0.11
0.72
0.13
2.05
9.06
6.9092
6.91
85.05
10.93
12.08
24.75
7.59
8.72
11.29
3.14
2.91
166.44
15.75
1.31
1.45
3.04
1.37
1.26
1.41
0.38
1.58
27.53
173.91
17.99
28.71
10.26
0.83
60
1-12
QTY
SUB TOTAL
9.63
241.32
3.70
3.70
19.40
4.98
4.34
2.73
0.72
32.18
3.11
5.19
16.44
24.74
1.05
1.05
0.34
0.94
2.60
3.88
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
33.70
16.79
8.81
2.66
0.87
-4.82
-1.57
-0.32
-1.30
-2.28
-0.83
-0.33
51.38
11.55
13.30
7.35
-3.78
28.42
61
1-12
QTY
3.18
SUB TOTAL
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
3.18
88.20
10.22
-2.024
-0.23
-3
-0.46
-0.805
-0.69
91.21
9.80
0.81
10.61
8.96
23.76
6.30
12.00
24.73
12.65
25.60
114.00
0.97
0.77
2.73
0.72
0.10
0.26
1.75
0.90
2.05
9.27
85.05
14.08
29.04
6.67
14.40
3.14
152.37
5.13
5.13
62
1-12
QTY
SUB TOTAL
15.75
1.41
3.34
1.58
2.30
0.38
24.75
173.25
17.33
30.49
10.22
231.29
3.21
3.21
19.40
4.98
2.55
4.34
31.27
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
23.38
12.65
5.92
3.95
0.69
-4.42
-0.75
-0.87
-0.87
-0.33
39.35
9.15
6.41
4.58
7.02
-7.56
19.59
5.18
5.18
3.11
5.19
63
1-12
QTY
SUB TOTAL
1.20
12.92
22.41
0.87
0.87
0.39
1.04
0.24
2.04
3.70
1.965
3.748
7.115
4.626
1.179
0.555
27.962
7.920
6.424
61.494
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
1.19
1.44
0.96
0.55
0.76
1.35
0.23
3.12
8.41
4.10
2.17
1.09
7.07
1.44
-0.39
-0.40
-0.33
14.74
5.18
5.18
0
0
64
0
1-12
QTY
75.47
46.44
10.80
7.75
5.81
SUB TOTAL
75.47
46.44
10.80
7.75
5.81
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
75.47
46.44
10.80
7.75
5.81
35.963
35.963
20.160
5.712
35.963
35.963
11.223
35.963
35.963
35.963
43.200
-8.450
323.58
6.0223
6.02
7.68
3.28
1.51
0.27
0.23
0.85
1.70
3.15
5.12
7.24
3.60
10.91
4.05
4.35
2.16
-1.268
54.83
65
1-12
QTY
36.16
1.74
2.18
35.963
35.963
27.720
0.901
4.19
2.76
1.72
0.66
0.26
4.13
61.56
3.48
4.35
4.83
31.38
27.76
36.21
SUB TOTAL
36.16
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
36.16
1.74
2.18
99.65
13.71
61.56
61.56
3.48
4.35
100.18
1.23
8.21
5.79
6.16
81.98
3.67
4.59
9.50
56.84
50.28
32.79
20.16
81.98
81.98
3.67
4.59
149.41
1.45
8.31
66
1-12
QTY
10.49
6.23
SUB TOTAL
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
25.03
132.71
-7.75
-5.81
-54.83
64.31
66.40
66.40
39.60
19.80
19.80
6.60
132.00
132.00
18.23
0.94
0.94
18.23
0.94
0.94
2.40
47.88
8.19
0.98
1.64
3.59
1.23
5.40
21.12
5.40
1.00
58.47
0.98
6.46
31.92
227.85
227.85
749.70
-170.94
-51.66
-6.30
-9.84
-5.25
-18.13
487.58
312.40
0.00
67
0.00
16.64
16.93
1-12
QTY
SUB TOTAL
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
243.57
-20.96
-6.16
-11.28
-3.78
-2.52
-1.95
42.75
103.25
-1.75
-9.45
-7.98
-1.44
-2.52
73.40
-3.15
-1.44
388.59
189.09
-19.21
-3.78
-4.62
33.66
40.92
-8.40
-2.40
36.30
-3.20
27.46
-8.40
-0.96
56.99
-10.23
-1.44
37.31
-1.71
-1.75
-1.44
354.19
68
1-12
QTY
SUB TOTAL
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
190.94
50.40
10.21
7.58
4.74
15.18
38.50
5.46
3.17
9.42
10.16
3.24
348.99
190.89
65.96
16.93
38.85
50.40
6.48
7.72
5.19
1.20
12.92
23.27
0.51
1.05
421.37
388.59
-132.36
326.18
354.19
-75.89
421.37
1282.07
69
1-12
QTY
SUB TOTAL
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
190.94
-27.33
-23.91
9.15
7.58
12.95
16.10
17.77
203.25
4.23
18.33
22.56
190.94
10.21
7.58
36.19
12.64
2.54
4.23
3.79
268.12
24.78
9.99
18.42
-6.72
-1.44
-1.68
1.73
-0.15
76.38
44.10
-20.96
-3.78
-2.52
-5.78
132.36
70
1-12
QTY
SUB TOTAL
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
21.42
26.04
-8.40
-2.40
23.10
-3.20
17.47
-8.40
-0.96
5.74
-0.22
-0.18
1.73
-0.33
4.70
-0.22
75.89
759.75
66.40
22.20
32.25
5.48
45.00
14.11
52.50
27.90
53.97
28.56
32.64
43.51
13.32
4.89
5.70
-17.63
-1.94
-8.86
-2.39
-12.77
-0.82
-1.64
87.88
1250.00
1250.00
71
1-12
QTY
SUB TOTAL
MURROM
EXCAVATION EXCAVATION
FILLING IN
IN CUM (1a) IN CUM (1B)
CUM
RIVER
SAND
FILLING IN
CUM
PCC IN
CUM
16.00
8.10
6.36
21.53
30.46
2
21.53
1
1
30
1
1
1
3
2
4.62
11.34
15.96
11.34
9.90
3.15
11.34
9.90
3.15
40.17
6.16
4.64
4.32
1.44
56.73
40.17
1.44
1165.00
1.00
1.00
1
1
0
716.78
102.38
57.77
53.86
53.64
ABSTRACT
428.43
72
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
71.94
3.8905
57.51
73
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
87.169
5.0391
10.30
3.19
111.06
74
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
15.23
70.893
2.3779
8.83
28.18
0.588
4.00
75
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
27.30
289.8895
5.8872
76
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
70.30
0.37
659.13
21.35
166.17
0.00
27.30
0.00
0.00
0.00
3.91
114.51
13.39
77
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
85.86
0.81
9.06
6.91
166.44
27.53
78
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
241.32
3.70
32.18
24.74
1.05
3.9
51.38
28.42
632.8594 16.37908
86.06218 51.37911
79
28.42
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
3.18
91.21
10.61
114.00
0.97
9.27
152.37
5.13
80
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
24.75
231.29
3.21
31.27
39.35
19.59
5.18
81
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
22.41
0.87
3.70
61.494
1.19
8.41
14.74
672.77195 14.542475
5.18
88.010567 64.436224
82
19.585
0
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
323.58
6.02
54.83
83
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
99.65
0.90
13.71
100.18
1.23
20.16
149.41
1.45
84
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
25.03
672.82
9.60
113.73
0.00
85
0.00
0.00
0.00
0.00
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
388.59
354.19
86
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
348.99
421.37
87
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
88
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
1-12
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
89
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
1-12
2637.58
61.87
279.90
RCC
OTHERS
CUM
9"BRICK
4.5"BW IN
WORKS IN
SQM
CUM
174.07
143.12
48.01
90
INT ER.
PLASTER
IN SQM
CEILING
PLASTER
IN SQM
742.7748 770.35253
742.77
770.35
1-12
EXTL
PLASTER
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
91
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
1-12
EXTL
PLASTER
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
92
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
1-12
EXTL
PLASTER
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
348.0696
93
1-12
EXTL
PLASTER
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
94
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
1-12
EXTL
PLASTER
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
245.25
0.00
593.32
0.00
95
0.00
0.00
0.00
1-12
EXTL
PLASTER
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
96
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
1-12
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
EXTL
PLASTER
97
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
1-12
EXTL
PLASTER
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
98
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
1-12
EXTL
PLASTER
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
99
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
1-12
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
EXTL
PLASTER
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
0
100
0
1-12
EXTL
PLASTER
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
101
1-12
EXTL
PLASTER
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
102
1-12
EXTL
PLASTER
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
64.31
0.00
487.58
551.89
0.00
103
0.00
0.00
0.00
1-12
EXTL
PLASTER
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
104
1-12
EXTL
PLASTER
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
0.00
1282.07
105
1-12
EXTL
PLASTER
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
203.25
22.56
268.12
132.36
106
1-12
EXTL
PLASTER
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
75.89
1250.00
1250.00
107
1-12
EXTL
PLASTER
1249.9957
1250.00
BACK
FLOOR
FILLING IN TILING IN
CUM
SQM
WALL
PAINT
EXTER
TILING IN CEILING IN
PAINTING
SQM
SQM
0 493.92978
1145.21
493.93
108
1282.07
1250.00
1-12
HARINI ENTERPRISES
BBS DONE ARRIVED BY: Mr.Mohammed Nazer ( Manager Civil,DSWE) and Mr.Rajaraman (Project Engg,Harini),Mr.Anbarasan (Site Engg
CHECKED & RE-ARRIVED BY : Mr.Sivasubramanian(Engineer Civil,DSWE) and Mr.Anbarasan(Site Engg)
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
12
143
286
2.8
800.80
Distribution rod
10
16
32
26.1
835.20
12
42
42
2.8
117.60
Distribution rod
10
16
16
7.4
118.40
20
16
27.7
443.20
20
10
6.95
69.50
20
2.7
21.60
20
16
32
2.7
86.40
16
4.75
38.00
Top extra
16
20
40
2.7
108.00
12
36
72
2.6
187.20
12
99
198
2.6
514.80
109
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
20
7.4
59.20
Bottom extra
16
7.4
22.20
12
2.6
20.80
12
33
33
2.6
85.80
25
10
14
140
5.6
784
10
38
14
532
1.64
872.48
10
38
14
532
1.24
659.68
25
10
14
140
1.25
175.00
20
10
20
5.35
107.00
38
76
1.28
97.28
97.28
38
76
1.12
85.12
85.12
38
76
0.23
17.48
17.48
20
10
20
20.00
25
12
96.00
25
16
4.15
66.40
25
12
96.00
25
8.8
70.40
66
264
1.74
459.36
459.36
20
80
1.74
139.20
139.20
25
12
24.00
25
3.15
6.30
25
25
2 Column up plinth
Column C1
Ties outer spacing 100mm c/c
Ties Inner spacing 100mm c/c
column C1 over lap above plinth
Column C2
Ties outer spacing 100mm c/c
Ties Inner spacing 100mm c/c
Middle Hook
Column C2 over Lap above plinth
3 Grade Beam
GB1
Top Main Rod
Top Extra at end support
Bottom Main Rod
Bottom Extra Rod
2 Leg Stirips c/c 100mm
2 Leg Stirips c/c 200mm
GB1 (continious) with stair riser
Top Main Rod
Over lap at end for stair riser beam GB1
Top Extra at end support
Top Extra at continious support
110
4.15
8.30
5.65
11.30
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
25
12
24.00
25
3.15
6.30
25
8.8
17.60
81
81
1.74
140.94
140.94
20
20
1.74
34.80
34.80
16
12
48.00
16
12
2.475
29.70
16
3.95
23.70
16
12
72.00
16
4.425
8.85
16
3.93
7.86
68
136
1.02
138.72
138.72
16
32
1.02
32.64
32.64
20
24
48.00
20
1.65
1.65
20
2.6
10.40
16
19.86
39.72
20
2.8
11.20
34
170
1.32
224.40
20
26.5
53.00
20
1.65
1.65
20
2.6
15.60
16
19.86
39.72
20
2.62
15.72
20
2.8
2.80
20
0.9
0.90
34
204
0.96
195.84
195.84
16
16
0.96
15.36
15.36
111
224.40
1-18
S.
No
Member Details
GB4
Top for cont beam (already considered in GB3)
Top Extra at mid support
Top Extra at end support
Bottom Main Rod
Bottom Extra
2 Leg Stirips
Top for beam in stair area
Top Extra at end support
Bottom Main Rod
Bottom Extra
2 Leg Stirips
4 PLINTH BEAM
PB1
Top Main Rod
Top Extra Rod
skin bar at side
Bottom Main Rod
Bottom Extra Rod
2 Leg Stirips c/c 100
2 Leg Stirips c/c 200
PB2 CONTINIOUS
Top Main Rod (L rod)
Top Extra at end support
Top Extra at mid support
Bottom Main L Rod
2 Leg Stirips
PB3 CONTINIOUS at C grid
Top Main Rod
Top Extra at end support
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
20
2.6
5.20
20
1.81
3.62
20
4.72
9.44
16
4.72
9.44
34
34
1.32
44.88
20
4.72
9.44
20
1.81
7.24
20
4.72
9.44
16
4.72
9.44
34
34
1.32
44.88
25
12
24.00
25
4.36
26.16
16
11.45
22.90
25
12
24.00
25
8.8
26.40
66
66
2.14
141.24
141.24
20
20
2.14
42.80
42.80
16
12
72.00
20
2.535
15.21
20
12
3.95
47.40
20
12
72.00
106
212
1.2
254.40
16
19.86
39.72
20
1.7
5.10
112
44.88
44.88
254.40
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
20
15
2.6
39.00
16
19.1
57.30
16
2.8
14.00
34
170
1.02
173.40
16
12
24.00
20
15
2.6
39.00
16
16
48.00
16
2.8
11.20
34
136
1.02
138.72
20
6.31
37.86
20
1.8
10.80
20
4.4
39.60
20
2.8
16.80
33
132
1.32
174.24
20
4.58
22.90
20
1.65
6.60
20
2.8
5.60
34
34
1.32
44.88
12
4.58
9.16
12
1.6
6.40
12
3.88
7.76
12
2.62
5.24
35
35
1.32
46.20
16
4.075
32.60
113
8 mm
173.40
138.72
174.24
44.88
46.20
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
16
12
2.35
28.20
16
64
1.32
84.48
12
2.1
16.80
12
4.05
16.20
8 mm
84.48
40
40
0.71
28.40
12
4.05
16.20
20
20
0.96
19.20
12
12
24
1.55
37.20
11
22
1.7
37.40
12
12
24
1.2
28.80
11
22
1.7
37.40
12
12
24
4.66
111.84
21
42
1.7
71.40
12
12
24
1.7
40.80
12
1.7
20.40
12
12
24
1.7
40.80
12
24
48
4.93
236.64
44
88
2.36
207.68
Raft bottom along grid A & C- short side & wall external
U shaped bar @125mm c/c for a length 13.285m
10
107
214
5.55
1187.70
10
10
20
18.135
362.70
10
10
20
0.5
10.00
10
20
18.135
362.70
362.70
10
20
0.4
8.00
8.00
28.40
19.20
37.40
37.40
71.40
20.40
207.68
6 CABLE TRENCH
114
1-18
S.
No
Member Details
Raft bottom along grid 7 & 2- short side & wall external
U shaped bar @125mm c/c for a length (7.10)m
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
249.60
10
40
6.24
249.60
10
77
154
2.04
314.16
10
10
20
18.135
362.70
10
10
20
0.5
10.00
10
77
308
2.1
646.80
10
20
18.535
370.70
10
20
0.4
8.00
8.00
10
40
6.24
249.60
249.60
10
58
116
5.55
643.80
370.70
10
10
20
10.45
209.00
10
20
11.25
225.00
225.00
10
20
7.5
150.00
150.00
10
58
116
2.04
236.64
10
10
20
10.45
209.00
10
58
232
2.05
475.60
10
20
11.25
225.00
225.00
158.00
10
20
7.9
158.00
10
34
34
1.2
40.50
10
58
58
5.55
321.90
10
10
10
7.1
71.00
10
10
10
10.00
20
40
7.1
284.00
10
58
58
2.04
118.32
10
10
10
7.1
71.00
10
10
10
10.00
115
284.00
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
10
58
116
2.1
243.60
10
20
7.1
142.00
10
15
10
146
3.6
525.60
10
15
10
150
1.95
292.50
10
15
10
146
292.00
10
142
284
568.00
20
40
10.5
420.00
10
96
196
392.00
20
20
7.1
142.00
142.00
35
70.7
6.84
483.59
483.59
33
65.5
7.1
465.05
465.05
142.00
420.00
Total length
7136.38
Unit Wt
0.40
Wt in MT -Dia Wise
2.82
Total Wt in Mtonne
25
10
14
140
4.4
616.00
10
20
14
280
1.64
459.20
10
20
14
280
1.24
347.20
116
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
10
14
28
1.64
45.92
10
14
28
1.24
34.72
25
10
14
140
1.25
175.00
20
10
20
4.4
88.00
20
40
1.28
51.20
51.20
20
40
1.12
44.80
44.80
22
44
0.23
10.12
10.12
1.34
5.36
5.36
5.36
1.34
5.36
20
10
20
20.00
12
12
23.45
281.40
23
12
276
0.96
264.96
12
12
11.85
142.20
138
138
0.96
132.48
12
18
4.275
76.95
27
54
0.96
51.84
12
4.05
16.20
20
20
0.71
14.20
10
12
12
140
1.44
201.60
12
72
1.57
113.04
25
10
12
120.00
25
10
3.07
30.70
25
10
12
120.00
25
10
4.5
45.00
25
20
4.4
88.00
117
264.96
132.48
51.84
14.20
113.04
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
25
20
5.55
111.00
25
20
12
240.00
25
20
8.1
162.00
12
10
10.92
109.20
10
52
260
2.1
546.00
10
18
90
2.1
189.00
25
14
70
0.4
28.00
20
14
2.45
34.30
25
2.45
17.15
12
84
1.24
104.16
20
12
72.00
25
2.75
11.00
25
4.1
16.40
20
12
72.00
20
2.95
11.80
20
3.45
13.80
16
128
1.5
192.00
192.00
60.00
10
40
1.5
60.00
25
4.55
36.40
25
4.45
35.60
25
14
28
0.4
11.20
20
24
48.00
20
1.8
7.20
20
10
2.7
27.00
20
12
24.00
20
8.12
16.24
118
104.16
1-18
S.
No
Member Details
c/c
c/c
c/c
c/c
for
for
for
for
FB4
FB4
FB5
FB5
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
20
10
2.6
26.00
16
4.4
13.20
24
120
1.1
132.00
132.00
40
1.1
44.00
44.00
24
24
1.5
36.00
36.00
1.5
12.00
12.00
25
14
70
0.4
28.00
20
4.93
19.72
20
1.78
14.24
16
4.93
19.72
24
48
1.5
72.00
72.00
16
1.5
24.00
24.00
20
12
24.00
20
12
24.00
20
1.8
7.20
20
10
2.7
27.00
20
12
24.00
20
12
24.00
20
12
2.6
31.20
24
120
1.1
132.00
132.00
40
1.1
44.00
44.00
24
24
1.3
31.20
31.20
1.3
10.40
10.40
16
12
24.00
16
12
24.00
16
1.63
3.26
16
2.7
13.50
16
12
24.00
119
1-18
S.
No
Member Details
2 legged stirrups
SLAB
FS1end pannel
Short bar at bottom at 125mmc/c
Short bar at bottom at 125mmc/c
long bar at bottom at 175mmc/c
long bar at bottom at 175mmc/c
Top extra at end support short side 250mm c/c
Distribution for above at 250mmc/c
Top extra at end support long side 350mm c/c
Distribution for above at 350mmc/c
Top extra at mid support long side 350mm c/c
Distribution for above at 350mmc/c
FS1mid pannel
Short bar at bottom at 125mmc/c
long bar at bottom at 175mmc/c
long bar at bottom at 175mmc/c
Top extra at mid support short side 250mm c/c
Distribution for above at 250mmc/c
Top extra at end support long side 350mm c/c
Distribution for above at 350mmc/c
Top extra at mid support long side 350mm c/c
Distribution for above at 350mmc/c
chair rod
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
16
12
24.00
16
2.6
15.60
24
144
0.9
129.60
129.60
36
0.9
32.40
32.40
16
16
48.00
18
36
1.14
41.04
10
43
86
4.12
354.32
10
42
84
5.27
442.68
10
20
10.99
219.80
219.80
10
20
11.575
231.50
231.50
10
43
86
1.52
130.72
10
10.95
109.50
109.50
10
20
3.5
70.00
70.00
18
72.00
72.00
10
20
4.115
82.30
82.30
18
72.00
72.00
10
85
255
5.3
1351.50
10
30
10.99
329.70
329.70
10
30
11.575
347.25
347.25
10
43
172
2.7
464.40
32
10.95
350.40
350.40
10
30
3.5
105.00
105.00
27
108.00
108.00
10
30
5.03
150.90
150.90
27
108.00
108.00
10
20
100
100.00
41.04
FS2
120
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
19
95
190.00
190.00
5.08
25.40
25.40
3.93
15.72
15.72
10
50
1.13
56.50
56.50
10
40.00
40.00
10
1.58
15.80
15.80
12.00
12.00
16
2.53
40.48
40.48
24
48.00
48.00
10
15
15.00
12
37
37
3.85
142.45
10
23
23
5.81
133.63
12
18
36
1.38
49.68
5.81
46.48
10
12
24
1.9
45.60
12
3.85
46.20
10
8.00
213
213
1.7
362.10
362.10
26.4
184.80
184.80
12
24
48
4.93
236.64
44
88
2.36
207.68
16
12
12
2.73
32.76
10
10
10
1.55
15.50
16
12
12
1.83
21.96
16
12
12
6.81
81.72
10
23
23
1.55
35.65
121
46.48
46.20
207.68
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
16
12
12
3.38
40.56
16
16
16
3.86
61.76
16
12
12
2.3
27.60
16
3.86
23.16
20
4.57
9.14
20
1.7
3.40
20
4.57
9.14
20
2.98
2.98
31
31
1.2
37.20
16
12
12
2.59
31.08
10
1.55
7.75
16
12
12
2.485
29.82
16
12
12
7.6
91.20
16
12
12
0.8
9.60
10
23
23
1.6
36.80
10
12
12
3.63
43.56
10
11
11
3.76
41.36
10
1.55
13.95
16
12
12
1.89
22.68
10
11
11
3.76
41.36
10
23
23
2.2
50.60
10
11
11
44.00
10
8
23
8
1
1
23
8
0.6
4.05
13.80
32.40
122
8 mm
37.20
32.40
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
5507.27
Unit Wt
0.40
Wt in MT -Dia Wise
2.18
Total Wt in Mtonne
25
10
12
120
4.4
528.00
25
10
20
3.5
70.00
10
20
14
280
1.64
459.20
10
20
14
280
1.24
347.20
10
14
84
1.64
137.76
10
14
84
1.24
104.16
20
10
20
3.5
70.00
20
40
1.28
51.20
51.20
20
40
1.12
44.80
44.80
26
52
0.23
11.96
11.96
12
1.28
15.36
15.36
12
1.12
13.44
13.44
12
23.45
140.70
23
138
0.96
132.48
12
19.75
118.50
23
115
0.96
110.40
12
18
11.85
213.30
209
209
0.96
200.64
12
2.56
10.24
17
17
0.71
12.07
123
132.48
110.40
200.64
12.07
1-18
S.
No
Member Details
At door d2 of ladies
ties
Sun shade-8nos
Main bar
Distributor
LOFT
Short bar for 18 .615m
distribution
Short bar for 10 .5m
distribution
3 ROOF LVL SLAB
ROOF BEAMS
RB1& RB5 continious
Top Main from RB5 towards RB1
Top main from RB1 towards FB5
over lap RB1
over lap FB6(cantilever)
Top Extra at end support
Top Extra at mid support
Bottom Main for RB1
Bottom Extra For RB1
skin bar at sides
2 Leg Stirips @ 100 c/c
2 Leg Stirips @ 200 c/c
Spacer Bar RB1
RB5 cantilever
Top and extra support is considered in RB1
Bottom Main
bottom main
Ties 8 at 100c/c
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
12
2.87
11.48
19
19
0.71
13.49
10
12
96
1.44
138.24
48
1.57
75.36
10
124
248
0.6
148.80
18.965
151.72
10
62
124
0.6
74.40
10.45
83.60
25
10
12
120.00
25
10
12
120.00
25
10
3.07
30.70
25
10
4.6
46.00
20
15
4.35
65.25
20
15
5.6
84.00
25
20
12
240.00
20
15
8.4
126.00
12
10
10.92
109.20
66
330
2.08
686.40
686.40
208.00
20
100
2.08
208.00
25
14
70
0.4
28.00
20
10
2.77
27.70
25
2.77
13.85
15
75
1.38
103.50
124
13.49
75.36
151.72
83.60
103.50
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
20
12
48.00
25
4.6
36.80
25
2.65
10.60
20
4.55
27.30
12
12
72.00
16
3.2
25.60
18
144
1.24
178.56
178.56
10
40
1.24
49.60
49.60
20
2.77
11.08
25
2.77
5.54
15
30
1.38
41.40
25
13
26
0.4
10.40
12
12
24.00
12
12
24.00
16
1.8
7.20
16
10
2.7
27.00
12
12
24.00
12
12
24.00
41.40
16
12
1.4
16.80
12
12
144
1.04
149.76
149.76
49.92
48
1.04
49.92
25
13
65
0.4
26.00
12
12
24.00
12
12
24.00
16
1.8
3.60
16
2.7
21.60
20
1.8
3.60
125
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
20
2.7
5.40
12
12
24.00
12
12
24.00
16
10
1.4
14.00
16
4.05
4.05
24
120
1.04
124.80
124.80
25
1.04
26.00
26.00
24
24
1.24
29.76
29.76
1.24
6.20
6.20
12
4.48
8.96
16
1.65
6.60
12
4.48
17.92
16
1.4
5.60
12
24
1.04
24.96
24.96
1.04
5.20
5.20
12
12
24.00
12
12
24.00
16
1.55
3.10
16
2.53
12.65
12
12
24.00
12
12
24.00
16
1.4
8.40
24
144
0.9
129.60
129.60
10
60
0.9
54.00
54.00
10
36
72
4.1
295.20
10
35
70
5.25
367.50
10
20
11
220.00
126
220.00
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
231.70
10
20
11.585
231.70
10
36
72
1.52
109.44
10.95
87.60
87.60
10
20
3.5
70.00
70.00
10
20
4.115
82.30
82.30
10
20
40
40.00
10
71
213
5.25
1118.25
10
30
11
330.00
330.00
10
30
11.585
347.55
347.55
10
36
144
2.7
388.80
32
10.95
350.40
350.40
10
30
3.5
105.00
105.00
10
30
4.115
123.45
123.45
10
20
60
60.00
20
40
80.00
80.00
10
5.15
51.50
51.50
10
3.76
37.60
37.60
10
20
0.9
18.00
18.00
10
1.55
15.50
15.50
1.95
11.70
11.70
10
12
12.00
20
80
160.00
127
160.00
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
20
5.15
103.00
103.00
20
3.76
75.20
75.20
10
60
0.9
54.00
54.00
25
2.53
63.25
63.25
40
1.95
78.00
78.00
10
24
24.00
22
22
19.25
423.50
423.50
22.95
91.80
91.80
10
18
18
3.93
70.74
10
19
19
5.08
96.52
20
20
5.865
117.30
117.30
18
1.75
31.50
31.50
10
5.9
59.00
59.00
18
18
2.53
45.54
45.54
18
18
1.38
24.84
24.84
5.815
34.89
34.89
10
10
10
10.00
213
213
1.7
362.10
362.10
26.4
184.80
184.80
16
12
12
24.00
10
12
12
1.55
18.60
16
12
12
2.8
33.60
16
12
12
5.55
66.60
16
12
12
0.8
9.60
128
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
10
17
17
1.6
27.20
10
1.6
9.60
16
3.93
35.37
16
12
12
3.2
38.40
16
3.93
35.37
16
12
12
2.35
28.20
20
4.75
9.50
20
1.73
3.46
20
4.75
4.75
20
2.98
2.98
22
22
1.2
26.40
16
12
12
2.56
30.72
16
12
12
2.25
27.00
10
1.55
6.20
16
12
12
5.92
71.04
16
12
12
0.8
9.60
10
16
16
1.6
25.60
16
12
12
2.7
32.40
10
10
10
1.55
15.50
10
3.93
19.65
16
12
12
1.86
22.32
12
7.00
25
10
20
2.7
54.00
10
22
44
1.64
72.16
129
8 mm
26.40
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
1.24
54.56
8 mm
10
22
44
Column C2
Ties outer spacing 100mm c/c
Ties Inner spacing 100mm c/c
Middle Hook
20
10
20
2.7
54.00
22
44
1.28
56.32
56.32
22
44
1.12
49.28
49.28
22
44
0.23
10.12
10.12
12
4.63
27.78
12
4.53
27.18
24
48
1.24
59.52
59.52
14
1.24
17.36
17.36
25
0.23
1.38
12
7.8
31.20
16
2.45
9.80
16
3.8
15.20
16
7.8
31.20
16
3.75
7.50
47
94
1.24
116.56
116.56
15
30
1.24
37.20
37.20
25
10
0.23
2.30
12
4.33
8.66
16
4.33
4.33
12
4.33
8.66
16
4.33
4.33
24
24
0.96
23.04
23.04
0.96
6.72
6.72
25
0.23
0.69
HB1
Top main bar
Bottom main bar
Stirrups @ 100mm c/c
Stirrups @ 200mm c/c
Spacer bar
HB2
Top main bar
Top extra at end support
Top extra at mid support with cantilever
Bottom main bar
Bottom extra
Stirrups @ 100mm c/c
Stirrups @ 200mm c/c
Spacer bar
HB3
Top main bar
Top main bar
Bottom main bar
Bottom main bar
Stirrups @ 100mm c/c
Stirrups @ 200mm c/c
Spacer bar
HS1
130
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
10
43
43
4.1
176.30
10
43
86
1.5
129.00
16
7.065
113.04
10
22
22
7.115
156.53
10
22
44
1.33
58.52
16
4.05
64.80
10
6.00
8 mm
113.04
64.80
7435.56
Unit Wt
0.395
Wt in MT -Dia Wise
2.94
Total Wt in Mtonne
WORKS AT YARD
Raft for transformer plinth
Short side top & bottom bar at 120mmc/c
Long Side Top & bottom bar at 120mmc/c
strab beam 2nos
Both Top & bottom
Top Extra at end support
Top Extra at mid support
Top Extra at mid support
Bottom extra at end
Bottom extra at miid support
Ties at 150mmc/c
chairs at raft
Column C1
Main Bar
Main Bar
Ties at 150mmc/c
Ties diagonal at 150mmc/c
12
78
156
3.38
527.28
9.48
530.88
10
28
56
16
16
9.58
153.28
16
2.625
10.50
16
0.91
7.28
16
1.48
5.92
16
1.55
12.40
16
12
1.7
20.40
12
63
126
1.98
249.48
14.00
2.9
92.80
12
14
14
16
32
12
32
2.9
92.80
10
14
112
1.04
116.48
10
14
112
1.04
116.48
131
1-18
S.
No
Member Details
Column C2
Main bar
Ties at 150mm c/c
Ties at 150mm c/c
Grade beam
B1
Main Bar at both Bottom & top
Ties
B2
Main bar both bottom & top
Ties
Extra at Top
Extra at Bottom
Fire Wall
Beam
ties
wall rood vertical
wall rood horizondal
u bar for stability
Cable tyrench arround Trs Plinth
Raft bottom short side & wall external U shaped bar
@150mm c/c for a length 3.0m
Distributor for above 200mm c/c- only for full raft
Distributor for vertical 6m long wall 200mm c/c
Distributor for verrtical 3 m long wall
Raft top short bar at 150 mmc/c for length 3m
Distributor for above 200mm c/c for full raft length
Wall innerface vertical bar
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
16
16
6.8
108.80
10
40
80
1.5
120.00
10
40
80
1.44
115.20
20
24
3.4
81.60
1.38
165.60
8 mm
30
120
20
32
3.4
108.80
20
160
1.44
230.40
20
32
1.4
44.80
20
16
32.00
12
24
4.9
117.60
37
111
1.2
133.20
133.20
165.60
230.40
31
62
5.05
313.10
313.10
26
52
4.55
236.60
236.60
16
16.00
16.00
4.61
774.48
10
21
168
10
64
192.00
56
6.35
355.60
355.60
56
3.15
176.40
176.40
10
21
168
1.65
277.20
64
192.00
192.00
20
16
320
1.8
576.00
576.00
132
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
8 mm
64
6.15
393.60
393.60
64
3.35
214.40
214.40
10
10
16
160
3.55
568.00
10
10
16
160
2.14
342.40
16
128
1.8
230.40
10
242
484
1.61
779.24
64
4.8
307.20
10
47
47
6.5
305.50
34
34
6.14
208.76
10
34
68
1.75
119.00
16
6.14
98.24
10
47
94
1.75
164.50
10
16
5.74
91.84
10
14
112
1.96
219.52
45
14
630
0.9
567.00
10
81
162
3.3
534.60
19
38
12
456.00
10
70
140
1.75
245.00
16
12
192.00
10
81
324
1.705
552.42
32
12
384.00
230.40
307.20
208.76
98.24
567.00
456.00
192.00
384.00
1-18
S.
No
Member Details
Dia of
Bar
mm
No of
No of
Memb
Bar
er
Total
Nos
Shape Code
Bar
Bending
Schedule
Cutting
Length
Total
Cutting
Length
10
75
150
4.75
712.50
25
50
11.7
585.00
10
63
252
1.75
441.00
32
11.7
374.40
10
75
300
1.91
573.00
10
40
11.3
452.00
10
-24
-48
1.75
-84.00
-8
-16
3.6
-57.60
10
-10
-20
1.45
-29.00
-8
-16
3.6
-57.60
10
-10
-40
1.45
-58.00
-8
-32
1.95
-62.40
8 mm
585.00
374.40
452.00
-57.60
-57.60
-62.40
8.00
Total length
6680.30
Unit Wt
0.40
Wt in MT -Dia Wise
2.64
Total Wt in Mtonne
134
1-18
NI ENTERPRISES
10 mm
12 mm
16 mm
20 mm
25 mm
800.80
835.20
117.60
118.40
443.20
69.50
21.60
86.40
38.00
108.00
187.20
514.80
135
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
20.80
0 588.3712 1533.576
85.80
229.22 1539.336
3891
784
872.48
659.68
175
107.00
20.00
78.9526 945.34272
314.96 3699.822
5039
96.00
66.40
96.00
70.40
24.00
6.30
8.30
11.30
136
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
24.00
6.30
17.60
48.00
29.70
23.70
72.00
8.85
7.86
48.00
1.65
10.40
39.72
11.20
53.00
1.65
15.60
39.72
15.72
2.80
0.90
137
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
5.20
3.62
9.44
9.44
9.44
7.24
9.44
9.44
581.0529
0 452.8351
509.144 1645.8228
3189
24.00
26.16
22.90
24.00
26.4
72.00
15.21
47.40
72.00
39.72
5.10
138
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
39.00
57.30
14.00
24.00
39.00
48.00
11.20
37.86
10.80
39.60
16.80
22.90
6.60
5.60
9.16
12.4
7.76
10.48
32.60
139
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
41.3
16.80
16.20
16.20
453.4442
147.8406
0 440.51904
2378
37.20
28.80
111.84
40.80
40.80
236.64
588
1187.70
362.70
10.00
140
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
314.16
362.70
10.00
646.80
643.80
209.00
236.64
209.00
475.60
40.50
321.90
71.00
10.00
118.32
71.00
10.00
141
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
243.60
525.60
292.50
292.00
568.00
392.00
1182.867 4704.3288
374.71201
10110.28
0.617
6.238
2312.08
797.45
0.888
2.053
1.58
1.260
1310.87
2.47
3.238
5887
375
1486.16
3.858
5.734
21.341
616
459.20
347.20
142
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
45.92
34.72
175
88.00
20.00
46.1518 547.30368
227.7254 124.3872
458.874
267.84 3051.678
3913
281.4
142.20
76.95
16.20
201.60
811
120.00
30.70
120.00
45.00
88.00
143
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
111.00
256.4
162.00
109.20
546.00
189.00
28.00
34.30
17.15
72.00
11.00
16.40
41.7
13.8
13.8
36.40
35.60
11.20
48.00
7.20
27.00
24.00
16.24
144
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
26.00
13.20
28.00
19.72
14.24
19.72
24.00
24.00
7.20
27.00
24.00
24.00
31.20
24.00
24.00
3.26
13.50
24.00
145
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
24.00
15.60
48.00
433.236
453.495
6909
354.32
442.68
130.72
1351.50
464.40
100.00
146
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
15.00
142.45
133.63
49.68
45.60
8.00
236.64
3701
32.76
15.50
21.96
81.72
35.65
147
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
40.56
61.76
27.60
23.16
9.14
3.40
9.14
2.98
31.08
7.75
29.82
91.20
9.60
36.80
43.56
41.36
13.95
22.68
41.36
50.60
44.00
13.80
27.492 212.45161
148
744.023
61.1568
1045
1-18
10 mm
12 mm
10
5213.82
0.617
3.217
16 mm
12
1054.72
16
683.18
0.888
0.937
20 mm
1.58
1.079
20
652.06
2.47
1.611
25 mm
25
1907.85
3.858
7.360
16.379
528
70
459.20
347.20
137.76
104.16
70.00
54.0202 646.81344
173.6 2307.084
3182
140.7
118.5
213.30
10.24
149
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
11.48
138.24
148.80
74.40
970
120.00
120.00
30.70
46.00
65.25
84.00
256.4
126.00
109.20
28.00
27.70
13.85
150
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
48.00
36.80
10.60
27.30
72.00
25.60
11.08
5.54
10.40
24.00
24.00
7.20
27.00
24.00
24.00
16.80
26.00
24.00
24.00
3.60
21.60
3.60
151
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
5.40
24.00
24.00
14.00
4.05
8.96
6.60
17.92
5.60
24.00
24.00
3.10
12.65
24.00
24.00
8.40
737.7257
0 440.51904
5128
295.20
367.50
152
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
109.44
40.00
1118.25
388.80
60.00
12.00
153
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
24.00
70.74
96.52
10.00
1608.0529 1599.5417
3208
24.00
18.60
33.60
66.60
9.60
154
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
27.20
9.60
35.37
38.40
35.37
28.20
9.50
3.46
4.75
2.98
30.72
27.00
71.04
9.60
25.60
32.40
15.50
19.65
22.32
10.428 71.66455
7.00
6.216 728.8254
51.3112
868
54.00
72.16
155
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
54.56
54.00
27.78
27.18
1.38
31.20
9.80
15.20
31.20
7.50
2.30
8.66
4.33
8.66
4.33
0.69
156
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
176.30
129.00
156.53
58.52
6.00
10
4771.43
0.617
2.944
12
1100.78
16
692.78
0.888
0.977
1.580
1.095
20
543.02
2.470
1.341
133.38 225.19146
1187
25
1360.66
3.858
5.249
14.544
527.28
530.88
153.28
10.50
7.28
5.92
12.40
20.40
249.48
14.00
92.80
92.80
116.48
116.48
157
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
108.80
120.00
115.20
81.60
108.80
44.80
32.00
117.60
662.656
3246
774.48
192.00
277.20
158
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
568.00
342.40
779.24
966.012 1809.8584
2776
345.23 555.52212
901
407.64 821.85634
1229
305.50
119.00
164.50
91.84
219.52
534.60
245.00
552.42
159
1-18
10 mm
12 mm
16 mm
20 mm
25 mm
712.50
441.00
573.00
-84.00
-29.00
-58.00
487.351 959.7435
10
7720.24
0.617
4.763
12
1001.16
16
411.38
0.888
0.889
1.58
0.650
20
267.20
2.47
0.660
1447
25
0.00
3.858
0.000
61867.80963
9.601
61.866
160
1-18
HARINI ENTERPRISES
DESCRIPTION OF ACTIVITIES
SCOPE
QTY
UNIT
REDUCED
RATE
1087.25 SQM
404.38 CUM
102.38 CUM
37.22 CUM
57.77 CUM
36.72 CUM
659.13 SQM
21.35 MT
166.17 CUM
506.76 CUM
86.56 CUM
27.30 CUM
900.00 SQFT
55.00
150.00
180.00
2600.00
650.00
3800.00
550.00
58000.00
5800.00
75.00
650.00
5300.00
5.50
632.86 SQM
550.00
16.38 MT
58000.00
86.06 CUM
6300.00
51.38 CUM
5300.00
28.42 SQM
850.00
Actual cost at this stage
Previus Actual Billing
Balance Amount at this st
150.00
2600.00
3800.00
550.00
58000.00
5800.00
75.00
1-3
Sl
No
DESCRIPTION OF ACTIVITIES
PLASTERING INT
CEILING PLASTERING
EXTERNAL PLASTERING
FLOOR TILING
WALL TILING
PAINTING INTERNAL
BATERY ROOM WALL ACID RESISTANT PAINT
ELECTRICAL WORKS WITH FITTINGS
PLUMPING WORKS & SANITARY WERES
DRAINAGE LINE UG WORKS
SOAKAWAY AND SANETARY WORKS
INSPECTION CHAMBER
GULLY TRAP
DOOR D (CW H C FLUSH DOOR) 1200x 2100
DOOR D1 (CW FLUSH DOOR) 900MM 2100
DOOR D2 (PVC DOOR) 900MMX 2100MM
ROLLING SHUTTER
WINDOWS (ALUMINIUM)
VENTILATOR LOUVER(1180x580) Z
VENTILATOR AT TOILET 800X580
MS GRILL WITH PAINTING 25KG/SQM
SCOPE
QTY
UNIT
445.66 SQM
385.18 SQM
875.00 SQM
222.27 SQM
156.19 SQM
769.24 SQM
21.525 SQM
1 LOT LS
1 LOT LS
30.00 m
1.00 LS
3.00 NOS
2.00 NOS
1.00 NOS
2.00 NOS
5.67 SQM
9.90 SQM
22.97 SQM
9.00 NOS
5.00 NOS
582.50 Kg
REDUCED
RATE
420.00
420.00
420.00
1320.00
1100.00
130.00
1100.00
450000.00
80000.00
900.00
90000.00
4500.00
600.00
17150.00
14680.00
2910.00
7600.00
3800.00
3700.00
2700.00
105.00
672.77 SQM
550.00
14.54 MT
58000.00
88.01 CUM
6300.00
64.44 CUM
5300.00
19.59 SQM
850.00
Actual cost at this stage
Previus Actual Billing
Balance Amount at this st
297.11 SQM
385.18 SQM
375.00 SQM
271.66 SQM
52.06 SQM
512.83 SQM
1 LOT LS
1 LOT LS
1.00 NOS
4.00 NOS
5.67 SQM
3.15 SQM
420.00
420.00
420.00
1320.00
1100.00
130.00
300000.00
40000.00
17150.00
14680.00
2910.00
7500.00
1-3
Sl
No
DESCRIPTION OF ACTIVITIES
WINDOWS (ALUMINIUM)
VENTILATOR AT TOILET 800X580
MS GRILL WITH PAINTING 25KG/SQM
EXTERNAL PAINTING
SS HAND RAILS
PVC WATER TANK 1000 LITER
RAINWATER LINE & HARVESTING
ENTRANCE GATE 6M +2M WICKED GATE
ACCESS LADDER MS 4M AT ROOF
PAVING
WEATHERING COURSE & TILING
163
SCOPE
REDUCED
QTY
UNIT
RATE
22.97 SQM
3800.00
5.00 NOS
2700.00
582.50 Kg
105.00
1250.00 SQM
130.00
30.464 LM
3280.00
2.00 NOS
5000.00
1.00 LS
35000.00
1.00 NO
95000.00
1.00 NO
13500.00
66.40 SQM
950.00
227.85 SQM
807.00
Actual cost at this stage
Previus Actual Billing
Balance Amount at this st
13,896,171.
1-3
ISES
R-ABSTRACT
AMOUNT
REMARKS
59,798.75 ADDITION
60,657.19 BOQ ITEM
18,427.73 BOQ ITEM
96,760.92 BOQ ITEM
37,549.69 ADDITION
139,518.24 BOQ ITEM
362,521.23 BOQ ITEM
1,238,102.71 BOQ ITEM
963,775.50 BOQ ITEM
38,006.72 BOQ ITEM
56,264.80 ADDITION
144,710.54 ADDITION
4,950.00 ADDITION
1
2
4
5
8
9
6
3
140,050.00 ADDITION
tual cost at this stage
3,361,094.01
evius Actual Billing
2,120,000.00
lance Amount at this stage
1,241,094.01
ITEM
ITEM
ITEM
ITEM
ITEM
ITEM
ITEM
1
4
5
8
9
6
3
164
1-3
AMOUNT
REMARKS
12
12
12
14
13
29
18
22
25
26
23
24
4,064,858.42
0.00
4,064,858.42
12
12
12
14
13
18
22
165
1-3
AMOUNT
REMARKS
87,267.00 ADDITION
13,500.00 ADDITION
61,162.58 ADDITION
162,499.44 BOQ ITEM 13
99,921.92 BOQ ITEM 30
10,000.00 BOQ ITEM 21
35,000.00 BOQ ITEM 27
95,000.00 BOQ ITEM 16
13,500.00 ADDITION
63,080.00 BOQ ITEM 10
183,874.95 BOQ ITEM 28
tual cost at this stage
2,207,387.59
evius Actual Billing
0.00
lance Amount at this stage
2,207,387.59
13,896,171.05
166
1-3
HARINI ENTERPRISES
1-2
Sl
No
40
41
42
43
44
45
46
ACTUAL
REDUCED
UNIT
QTY
RATE
COLLAPSIBLE GATE(MS)
3.15 SQM
7500.00
WINDOWS (ALUMINIUM)
45.93 SQM
3800.00
VENTILATOR LOUVER(1180x580) Z
9.00 NOS
3700.00
VENTILATOR AT TOILET 800X580
10.00 NOS
2700.00
MS GRILL WITH PAINTING 25KG/SQM
1165.00 kg
105.00
ACCESS LADDER
1.00 NO
13500.00
Initial Work cost (Additional works) (Breakup attached end of this BOQ )
TOTAL BOQ COST REQUIRED
DESCRIPTION OF ACTIVITIES
168
1-2
ARINI ENTERPRISES
PVT LTD
il,DSWE) and Mr.Rajaraman(Project Engg,HECEC),Mr.Anbarasan(Site
REMARKS
59,798.75 ADDITION
107,517.04 BOQ ITEM
18,427.50 BOQ ITEM
4,950.00 ADDITION
140,034.28 BOQ ITEM
37,549.69 ADDITION
203,850.34 BOQ ITEM
1,450,667.25 BOQ ITEM
3,588,332.96 BOQ ITEM
1,623,401.53 BOQ ITEM
1,096,658.30 BOQ ITEM
61,436.64 BOQ ITEM
56,264.80 ADDITION
758,531.78 ADDITION
40,804.25 ADDITION
311,963.74 BOQ ITEM
323,546.33 BOQ ITEM
524,995.37 BOQ ITEM
651,987.30 BOQ ITEM
229,075.77 ADDITION
166,669.26 BOQ ITEM
162,499.44 BOQ ITEM
63,080.00 BOQ ITEM
183,874.95 BOQ ITEM
99,921.92 BOQ ITEM
10,000.00 BOQ ITEM
23,677.50 BOQ ITEM
750,000.00 BOQ ITEM
120,000.00 BOQ ITEM
27,000.00 BOQ ITEM
90,000.00 BOQ ITEM
35,000.00 BOQ ITEM
95,000.00 BOQ ITEM
13,500.00 BOQ ITEM
1,200.00 BOQ ITEM
34,300.00 ADDITION
88,080.00 ADDITION
32,999.40 ADDITION
75,240.00 ADDITION
169
1
2
4
5
8
9
6
7
3
12
12
12
14
13
13
10
28
30
21
29
18
22
25
26
27
16
23
24
1-2
AMOUNT
REMARKS
23,625.00 ADDITION
174,534.00 ADDITION
33,300.00 ADDITION
27,000.00 ADDITION
122,325.17 ADDITION
13,500.00 ADDITION
140,050.00 ADDITION
13,896,170.25
170
1-2
ANNEXURE II
BOQ & SCHEDULE OF PRICES
33 / 11 KV SUB-STATION WORKS AT NORTH CHENNAI, INDIA
SR. NO.
1
2
DESCRIPTION OF ITEM
Excavation in all soils 0.00mtr to2.00 mtr, including disposal of earth upto 10 mtr
from the point.
Excavation in all soils 2.01mtr to2.50 mtr, including disposal of earth upto 10 mtr
from the point.
Back filling with bought out earth including consolidation asper specfication.(River
sand)
10
11
12
13
14
Flooring
15
Expansion joint
16
17
18
19
Internal Road
20
171 of 174
21
22
23
inspection chamber
24
Gully Trap
25
26
27
28
29
30
SUB-CONTRACT PACKAGE VALUE (INCLUDING TAXES / DUTIES / INSURANCES / FREIGHT ETC.) EXCEPT
PAID EXTRA @ 4.944% ON THE CONTRACT PACKAGE VALUE
NOTE:
QTY. INDICATED ABOVE ARE ESTIMATED QTY. ONLY. VENDOR SHALL CARRY OUT
THE ACTUAL MEASUREMNT AT SITE BEFORE INSTALLATION WORKS. THIS
CONTRACT WILL BE OPERATED ON A LUMPSUM AND PAYMENT SHALL BE MADE
AS PER INVOICE CERTIFICATION AT SITE.
THE FORMAT OF THE BILL OF QUANTITIES / SCHEDULE OF PRICE SHOULD NOT
BE MODIFIED / ALTERED BY ADDITION OR DELETION OF ROW(S) / COLUMN(S)
ETC.
CONTRACTOR SHALL FURNISH METHODOLOGY OF ALL PROCESSES PROPOSED
FOR THE PROJECT FOR ENGINEER'S APPROVAL BEFORE INSTALLATION.
THE RATES QUOTED SHALL ALSO INCLUDE SUBMISSION & APPROVAL OF SHOP
DRAWINGS, AS-BUILT DRAWINGS (IF ANY).
172 of 174
CIVIL WORKS
HARINI ENTERPRISES
SUPPLY & INSTALLATION
UNIT
QTY.
RATE in
Rs.
AMOUNT in
Rs.
CUM
1,720.00
132.99
228,742.80
CUM
1,040.00
159.588
165,971.52
CUM
3,280.00
66.495
218,103.60
CUM
170.40
2305.16
392,799.26
CUM
195.20
3369.08
657,644.42
CUM
1,069.20
5142.28
5,498,125.78
CUM
744.00
5585.58
4,155,671.52
SQM
6,720.00
487.63
3,276,873.60
MT
172.80
51422.8
8,885,859.84
SQM
744.00
842.27
CUM
688.00
5230.94
3,598,886.72
SQM
7,440.00
372.372
2,770,447.68
SQM
12,040.00
115.258
1,387,706.32
SQM
3,520.00
1170.312
4,119,498.24
RMT
480.00
203.918
97,880.64
NOS
4.00
84227
336,908.00
RMT
240.00
975.26
234,062.40
LUMPSUM
4.00
664950
2,659,800.00
LUMPSUM
4.00
310310
1,241,240.00
LUMPSUM
4.00
70928
173 of 174
626,648.88
283,712.00
LUMPSUM
4.00
8866
35,464.00
LUMPSUM
4.00
106392
425,568.00
NOS
12.00
3989.7
47,876.40
NOS
8.00
531.6
4,252.80
RMT
120.00
797.4
95,688.00
LUMPSUM
4.00
79794
319,176.00
LUMPSUM
4.00
31031
124,124.00
715.4862
715,486.20
SQM
1,000.00
SQM
240.00
975.26
234,062.40
RMT
120.00
753.61
90,433.20
174 of 174