RENCANA ANGGARAN BIAYA

RANGKA BAJA LAPANGAN TENIS


No.
I
1
2
3
4
5

Uraian Pekerjaan
Pekerjaan Persiapan
Pembersihan
Mobilisasi - demobilisasi
Fasilitas kerja ,air & listrik
Bouwplank
Gudang material / bedeng

Sat

Qty

m2
ls
ls
m1
bh

1,944.00
1.00
1.00
180.00
1.00

m2
m1
kg
kg
kg
kg
pcs
pcs
kg
kg
kg
bh
bh
bh
kg
pcs
m
kg
pcs
pcs
kg
m2

2,128.00
56.00
-

Harga Satuan (Rp)

Total Harga (Rp)

Sub Total I
VI
1
2
3
4
5
6
7
8
9
10
11
14
15
17
19
20
21
22
26
27
28
29

Pekerjaan Konstruksi Baja (Atap & Structure)


Atap zincalume t.0,4mm
Bubungan atap
Rafter & voult IWF 250x125x6x9
Over stek & voult IWF 150x75x5x7
Gording CNP 125x50x20
Dudukan Gording besi siku 100x100x7 berikut sambungan
Trakstang besi beton 10mm berikut aksesoris
Ikatan angin besi beton 16mm berikut aksesoris
Kolom baja IWF 250x125x6x9 (K1)
Kolom baja IWF 200x100x5,5x8 (K2)
Sokongan tiang CNP 100x50x20x2.6 & Besi beton 10mm
Mur baut 5/8"
Mur baut 3/8"
Angkur bolt 3/4" L.50cm
Plate Connection 12mm, 10mm, 8mm, 6mm
Begel Talang L40.40.4
Flasingsheet zincalume
Pengaku Talang L 40.40.4
Klem PVC Plate strip
Paku Roofing
Cat Meny & finishing
Pasang dinding cleading zincalume t=0,4
Sub Total V
Grand Total
Dibulatkan

Bobot
Pekerjaan

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00%

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00%
100.00%