YOKOGAWA

DCS Introduction
CS 3000 Integrated Control System Overview
Advanced , Flexible Operator Functions
Powerful Control Station Features
Flexibility in Engineering
Integrated Solutions Extended Applications
Unique Advantages leading to Lower TCO

DCS Background
C
DD

System Cost

DDC

a
ctu

log
a
An

cted
e
p
Ex

No. of Loops
Early1960s

Computer
Compatible
Controller
62H

Nest Type
Controller
(SPEC-200)

DCS
(TDC-2000)
1975

Base:
* Computer Compatible System
* Process I/O with PID back up

*Position DDC as a Future System


*Justify DDC cost by Automation
Promotion

DCS
(CENTUM)
1975

Base:
* Enhancement of DDC from cost, failure problem, engineering
point of view

First Generation DCS


1975: CENTUM was developed based on DDC Experience
< CENTUM is the first Distributed Control System in the world.>
High Confidence on Reliability /Dependability
First Token Pass Highway in the world.
Token Pass Data High Way
-- No Electronic Parts at System Common.
-- Redundant Highway alternately used for Complete Error Detection
-- Became the Base of IEC Standard PROWAY.
then IEEE 802.4, MAP, and FieldBus.

Duplex Control Station


CPU redundancy
-- Memory Update is a Key and Most Difficult
-- Block by Block and Table by Table Memory Copy was applied.
Internal Bus Redundancy
-- Redundant Internal bus between CPU and I/Os with Alternate Use
-- Power Supply for I/Os are also Redundant.

Easy Engineering for Automation and Advanced Control

User Friendly CAD (Fill-in Type) based Engineering

History of Yokogawa DCS


1965

1970

1975

1980

1985

1990

1995

2000

Supervisory Computer System


YEWCOM, HP9000
Computer Systems for Control
CCS

YODIC100 YODIC1000
Production Line Control System
Concentrated Control System

YEWMAC

ASTMAC

YODIC500 YODIC600
CS1000

DCS

CENTUM

CENTUM-V CENTUM-XLCENTUM CS/CS3000

YEWPACK
YS 80
Analog Control

ECS

EBS

I SERIES

XL
YS 100

Progress of Yokogawa DCS


system
75 78

79 82

82 88

84

88

98

92

INTEGRATED SYSTEMOPEN SYSTEM


EXCELLENT SYSTEM

NEW MODEL
1.
High Speed
Comunication
THE FIRST DCS
Bus
1.
Unified Operator
SYSTEM IN THE
2.
WORLD Stations
Adoption of
2. Redundant
HDD
1. Distribution of Control
Control Stations
3. CMOS Memory
2. FIF
4. One-Touch
-
Operation

2.
Voice Output
3.
Japanese
Language
Support
4.
SequenceCE NTU M- V
oriented Control
Station

(Function Key
Development)

ENTU M

CENT UM- XL

XLAIS

Computer
EOPS ENGS
Station

ICS
10Mbps
BCV

COPSV

V net

FCS

COPS2

7DF
COPS
7DF

1. WINDOWS-NT OS
1. UNIX OS
2. Client / Server
1. Function Assignment 2. Advanced Control
3. Migration
3. Open Net Work
2. Separation of Engneering
USER ORIENTED
4. High Reliability
3. High Peroformance 4. High Reliability
OPERATION 4. Touch Operation
5. Utilisation of Users Assets
6. Easy Engineering
5. Window
1.
Enhanced
6. Integration (Super Window)
CENTUM
Functions of OPS7. Expanded Control Capacity

7VP

EFCS
1Mbps
HF-BUS

CFFS

256Kbps
CFCS

CFSS

CFCS2
HF/F Converter
Station

F-BUS
7FS

Control Loops
Sequence
Tables

32
20

32
20

40
40

40
200

80
200

4096 Blocks

HIS

Technology waves on Control Systems

Windows 2000
Internet
IT

NT
and
Microsoft
UNIX
Micro processor

1st CENTUM

XL

CS

CS 3000

CS 3000 R3

June 1975

82

88

93

98

01

time

Enterprise Technology & Solution


Business (Top Management) Domain

Business
Domain

Corporate Information systems


Enterprise Resource Planning (ERP)
Supply Chain Management (SCM)

Manufacturing Exec. System Domain


Plant Information & Management System

MES Domain

(PIMS)
Maintenance Management (MM)

Control Domain
Control Domain

Advanced Application
Advanced Process Control (APC)
Advance Operation Assistance (AOA)
Plant Control Room/Factory Floor

DCS/PLC/PC/ESD/F&G

Field Domain

Field Domain
Fieldbus and conventional
Field Instrumentation.

DCS Introduction
CS 3000 Integrated Control System Overview
Advanced , Flexible Operator Functions
Powerful Control Station Features
Flexibility in Engineering
Integrated Solutions Extended Applications
Unique Advantages leading to Lower TCO

Integrated Plant Control System (IPCS)

Hi-Tech Solutions Available in


CS1000/3000
Foundation Fieldbus
Profibus
ExaOPC - OPC Interface

OLE for Process


Control

OPC Compliance
Exaopc:

Domain wide
OPENInterface

PIMS / Maint.Mgt.

M
E
S

OPC Client

OPC Interface

APC/AOA

Process Data

OPC Client

C
O
N
T
R
O
L

Eng. Data

HIS/
ENG

HIS
OPC Server

V-net
ABC-H
FCS

CENTUM-XL

HF-Bus

Positioning of CS 3000 R3
Well-balanced
open architecture
and reliability
New migration path
supplies open
architecture with
existing systems.

Migration

Business Systems
ERP/SCM

PIMS

HMI
CENTUM
CS 3000 R3

APC
AOA
MM

FCS
Rich interface by
new I/O.

Existing Systems
CENTUM-XL
CENTUM V

Featuring
cutting-edge
open
technologies

Field Network

FOUNDATION
Fieldbus

Typical System Configuration


Remote DCS
Domain

Business Domain

Ethernet
Closed-type HIS LCD-type HIS
AOA

APC
PIMS

HIS/ENG

MM
ACG

Vnet
APCS
FCS
With I/O

Mulcom

Incl. Fieldbus
Engg.

Prosafe-ESD

RS-232/485/Ethernet

I/O in the Remote Field

(ExaCoast)

BCV
Migration
bus converter
CS/CS 1000/3000
CENTUM-XL/V/ XL

H1 Fieldbus

Field Devices
PLC / Remote I/O / Subsystems

System Scalable
Min. Configuration
Single Domain
Configuration

Expanded. System
Configuration

Controller

Max. No. of Tags


Max. No. of Stations

One Process
Unit

Whole Complex

: 100,000 per HIS


: 64
Expanded System
Max. No. of Domains
Max. No. of Stations

: 16
: 256

Security
User
Group
Check user
name

User in

User
Permission
Check operation
and monitoring
scope

Function block operation


and monitoring

Check operation
and monitoring
authority

Windows operation and


monitoring
Receipt of messages

Operation
History

Tag Basis
Important
Tag

(Major Alarm)

Operation Mark
Key Access

Ordinary Tag
(Medium Alarm)

Auxiliary
Tag1

(Minor Alarm)

Auxiliary
Tag2

(Logging Alarm)

Windows user
security

PV
CONTROL 0007
PVPVPVPVPVPVPVPVPV
SVSVSVSVSVSVSVSVSV
FIC001

DCS Introduction
CS 3000 Integrated Control System Overview
Advanced , Flexible Operator Functions
Powerful Control Station Features
Flexibility in Engineering
Integrated Solutions Extended Applications
Unique Advantages leading to Lower TCO

Monitoring & Operation


Human Interface Station

Management
Information
Easy integration with higher
level systems
Historical database packages
etc...

Off line engineering


On line engineering
Powerful engineering &
testing tools
One global database
etc....

Engineering

Maintenance
Extensive self diagnostics
Maintenance & report
functions
On-line maintenance
Remote maintenance
etc....

100.000 tagnames
2,500 Display Panels
Enhanced trending
Intelligent alarm functions
Reliable security functions
Windowing operation
etc....

Process
Information

(HIS)

Web based Plant Monitoring


General-purpose PC

HIS graphic/trend
windows are
converted into HTML
files and Java Applets

Web
Server

Ethernet

Plant LAN/WAN

HIS
General-purpose PC

Dial-up
Internet
Connection

Graphic windows,
trend windows,
and ITV windows

V net
FCS

Plant monitoring on a business


trip, at home, at maintenance
office, etc. using Web Browser

Browser

Yokogawa FIELDEYE ITV system

The Web camera server enables ITV images to be displayed


via a Web browser at an incredible low cost.

FIELDEYE System
HIS

Internet
Explorer (free)
Ethernet or dial-up connection

Web camera
server
ITV image
signal

ITV camera control signal

ITV camera

Multiple Monitor
Efficient monitoring/control of Advanced Process
Control/Operation by a single operator with dual monitor

Single Monitor
Windows overlap each
other. Hard to see!

Dual Monitors
Much easier
to see!

Operation and Monitoring


Standard Operation and
Monitoring Windows

Operation and Monitoring Support


Functions

Graphic,Tuning, Trends, Alarms,


Operator guidance

Process & Historical message reports, Security


ITV camera & CENTUM desktop customization

Control Status Display


Window
Control drawing, Sequence table
Logic chart window SEBOL & SFC
windows

Common Operation and


Monitoring Functions
Window call-up, Window or Full
screen, System message, Window
sizing, Window hierarchy, Navigator
window

Trend Functions
Real time, Historical trends Long term data
archive, External recorder, Expert trend
viewer &Tuning trend

System Maintenance Functions


System status, System alarm, HIS setting,
Time setting dialog & Help dialog

Lets have a
look at some
samples

Operation and Monitoring


Windows
Navigator Window

Overview Window

Control Group Window

Trend Window

Tuning Window

Sequence Table Window

DCS Introduction
CS 3000 Integrated Control System Overview
Advanced , Flexible Operator Functions
Powerful Control Station Features
Flexibility in Engineering
Integrated Solutions Extended Applications
Unique Advantages leading to Lower TCO

Control
Field Control Station
Processor
RISC processor
Fixed scan times
4000 free configurable function blocks
Powerful math. capacity
etc...

Redundancy
Redundant CPU, Power Supply
and Communication Interface
INPUT

BUFFER
CPU

BUFFER

CPU

CPU

CPU

COMP

COMP

BUFFER

BUFFER

Unique Pair & Spare


Design

OUTPUT

Easy integration
subsystems e.g. PLC, SER..
Data exchange between FCS
Support Fieldbus
etc...

Integration

Large control block library


Advanced control functions
Calculation functions
C-language
Graphic Flowchart (SFC)
etc...

Analog &
Digital Control

Input Output
Analog single card I/O Unit
Current/Voltage In
mV, Thermocouple, RTD
Input
Pulse Input
Current/Voltage Out

I/OUnit
16 channels

Input/Output
Modules
I/OUnit
128 channels

Analog Multiplexer Unit (16 channels)

RIO bus (max. 20 km)


Node Interface Unit
Max. 8 units per FCS

Input / Output Units


Max. 5 units per NIU

Digital I/O unit connector type

16 -pt. Input (isolated)


16 -pt Output (isolated)
32 -pt. Input
32 -pt. Output

Voltage Input
mV Input
Thermocouple Input
RTD Input
2-wire transmitter input
4-20 mA Output

I/OUnit
32 channels

I/OUnit
2 ports

Communication unit

RS-232C
RS-422
RS-485
Fieldbus

Profibus

Ethernet

Field Control Station and FIO


feature
..
Vnet

Direct Node
Serial,
Ethernet

FCS

PLC

New Remote I/O Bus (Ethernet)

To Field Device

FF-H1
4-20mA

(Subsystem)

Remote Node

FF-H1
To Field Devices

4-20mA (Conventional)

Fieldbus

FIO Features
Small-sized
(Compact)
Two kinds of
connection
Direct Node
Remote Node
Dual redundant
I/O Module are
possible (for all
type)
Field Network
RS:2 ports
FF-H1 : 4
segments
Profibus-DP

KFCS (Remote I/O


type)
<CCR>

<Site>

KFCS
CP333
SB301

Local node

Generic cabinets
Remote node

ESB bus
128 Mbps
FIO

TB

FIO

TB

FIO

TB

FIO

TB

FIO

TB

Front

Rear

ER bus
( 10
Mbps )

FIO

TB

FIO

TB

Front
ERbus Enhanced Remote
BUS

Rear

FIO Node overview


Up to 8 I/O modules

Remote I/O Interface


(10Base2)
Power supply

5 units (222.3mm)

19 inches

Node / FIO Features


Environment

Zone2 Compliant

Temperature -20 -- 70 DEGC

corrosion gas resistant G3

Node
Direct Node : Max 10
Nodes/FCS
Remote Node :
- Max 9 Nodes/FCS
- Max 4 Nodes/RIO
- Max 4 RIO/FCS
Field Communication
- 2 ports : RS
- 4 segments : FF-H1

ALF111 Advantage (FF-H1)


No. of Segments
4 Segments / ALF111
No. of Points
48 Points / Segment
No. of total Points
3072 Points / FIO
LFCS
48 Points x 4
Segments
x 16 ALF111

Low cost of construction with FIO


FIO can be installed closely near
field devices to reduce wiring cost

Open architecture

FIO is compact:
Saves Space

Ethernet
based ER Bus
RS232/422/485

Cost-effective choice is available:


Single/Dual
Isolated/Non isolated/Channel isolation
Hi-Density modules
Built in interpose relays avoids relay cabinets

Rich Flexibility:

Field connections

Field wiring method according to the application & budget


Pressure Clamp Terminal block (Direct wiring for field
devices)

Yokogawa Terminal Board, Cable & I/O adapter


(Wiring of field devices via Terminal Boards/marshaling)

I/O module
Terminal Board & MIL Connector Cable
(Popular for low cost installations-Wiring of field devices via
Terminal Board/Marshaling)

Remote I/O installation


Explosive sites

Corrosive sites
FCU

ooo

CCR (Central Control Room)

Separated sites

FF Solution: Four-segments & Redundant


High density of segments provides Cost Effective FF solutions
Redundancy of modules adds high reliability for FF solutions

4 Segments
FF-H1

Port

ALF111

ALF111
SB40 SB40
1
1
IOM IOM IOM IOM IOM IOM or
or
PSU
EB50 EB50
1
1

PSU

Local Node or Remote Node

3
4

Redundant Configuration Available


Field Devices

Redundancy
Synchronous hot standby with fully redundant
hardware and duplex functionality in design

Unique Pair &


Spare Design

DCS Introduction
CS 3000 Integrated Control System Overview
Advanced , Flexible Operator Functions
Powerful Control Station Features
Flexibility in Engineering
Integrated Solutions Extended Applications
Unique Advantages leading to Lower TCO

En gi neer in g
Off line Engineering without Target Hardware
by using Hardware Simulation Technology
Off line Testing
and Hardware
Simulation

On line Engineering

CAE
Computer Aided
Engineering
ENG
Builder software

HIS

Concurrent
Engineering

Order

Electronic
Media
Input

V net

FCS

Start-up

Engineering can start direct after ordering


Engineering up to Configuration Testing can be done
Off Line

Concurrent Engineering
Engineering done by multiple PCs
DOWNLOAD the project

Engineering PC

Master Database
HIS

Engineering PC
FCS
backup

Engineering PC

Virtual Test Function


Virtual Testing
HIS Function

Virtual
Wiring

HIS

HIS

FCS
Simulator

Off line Testing


HIS
Function

FCS
Simulator

Exatif Communication Interface

Plant Simulator
Plant Model

- Off Line Virtual Testing using only one PC


- Connection with Plant Simulator using the FCS Simulator

DCS Introduction
CS 3000 Integrated Control System Overview
Advanced , Flexible Operator Functions
Powerful Control Station Features
Flexibility in Engineering
Integrated Solutions Extended Applications
Unique Advantages leading to Lower TCO

AOA: Advanced Operation Assistance


Yokogawas unique AOA Solutions for the Benefits of Customers

Exa plo g:

Event Analysis Package

-Detailed Analysis of Process and Operation events


-Helps in decision making for further Automation/Monitoring/Operation

Exa pil ot:

Operation Efficiency Improvement Packag

-Automation of St-Up, S/D, Transition & Emergency Procedures


-Reduction in Operating Time during Manual Operation
-Higher Productivity
-Maximization of Safe Operation
-Availability of EXPERT knowledge for uniform operation every time

Partners in
Advanced Process Control

Shell Global Solutions

The Alliance

The Alliance
Yokogawa
Shell
customers customers Market
a
c e b
Segmentation

f
d
ROW

EX: EXA-SMOC with CS3000


Optional
Remote
Operation/
Monitoring

Ethernet Card
Exasmoc
OPC Client
Exaopc
OS
Server

WIN
NT

VF701 Card

Etherne
t
Operation
/
Monitorin
g/
Control

Standard
Displays
APC
Displays

HIS

HIS/E
NG

SMOC-PC
(Builder)

Optional
Ethernet

Exasmoc
Station
Download

V Net / VL
Net

SFCS
Process Data
LFCS

Exasmoc Data

YOKOGAWA

Exa tas Ter minal


TAS-MS poll to Host System
Architec
ture
and searches
for the following

Sys tem
TAS-MS Client

Delivery data:

TAS-MS Management
- BOLServer
No.
- Delivery Number
- Host System Interface
- Order Management- Order Number
- Truck Number
- Traffic Management
- Product
and Quantity
- Ship Loading/Unloading
Management
- Data Gathering
- Management Data Handling
- Reporting
- Master Data Management

TAS-CS Control Station


TAS-CS Human Machine Interface

Loading Control, Pump Management, Bay Change,


Additive Control, Spot Loading, Loading Monitoring

Ex ata s Main F unc tio ns :


Inte gra tion
Host System
(e.g., SAP )
Exatas Terminal
Automation System
Refinery
Onsite Systems

Refinery
Offsite System

Ethernet

TAS-MS
Human Machine
Interface
(HIS)

Control Station
(FCS)

If the terminal is
a part of refinery.

If the terminal is
a part of refinery.
Tank
Gauging

Safety
System

MOV
System

Electronic
Preset

Card
Reader

Various
Subsystems

TIM3000 : Tank Inventory Management


Functionality
Real-time module
Tank data collection
Tank data calculation
Tank status management
Monitoring of job control conditions
Monitoring of tank behavior
Interface Module
Collection of tank snapshots into Database
Receipt of tank property

Features

Benefits

Modularity of functions
Adoption of Oracle RDBMS
Easy interface to other systems
Easy development of reports
Easy development of user interface
Connectable to various TGS
Reliable TGS

Safe tank operation


Provision of tank data
for operation accounting & scheduling
Precise grasp of tank inventory

PIMS: Plant Information & Management System

DATA
RECONCILIATION

PERFORMANCE
MONITORING

MASS BALANCING

PROCESS PLANT
PLANT
UNIT
TANK
FACILITY
STREAM

PRODUCTION
ACCOUNTING

ECONOMIC CHARACTERISTICS

MATERIALS

FEED
INTERMEDIATE
FINISHED PRODUCT
CHEMICALS
UTILITIES

PLANT MODEL
TECHNICAL CHARACTERISTICS

isa

PIMS

LIMS

ENVIRONMENTAL
MONITORING

ERP
CMMS
EDMS

OPERATIONS ACTIVITY
MANAGEMENT

DATA MANAGER

HISTORICAL
DATABASE

REAL TIME
DATABASE

REFERENCE
DATABASE

OPC CLIENT

quantum
OPC SERVER
PCS

YOKOGAWA

DCS Introduction
CS 3000 Integrated Control System Overview
Advanced , Flexible Operator Functions
Powerful Control Station Features
Flexibility in Engineering
Integrated Solutions Extended Applications
Unique Advantages leading to Lower TCO

Quick & High-quality configuration


The time for newly plant construction or
reconstruction should be minimum.
The longer time links the larger financial disadvantage.

R3 provides the following configuration environment.


Total Project management.
Advance Debugging.
You need not wait the hardware delivery or field wiring
construction.

Reuse of configuration data


This is available between several stations or between several
plants.

Unified configuration operation with LOOK&FEEL.


Several engineers can work at the same time.
On-line maintenance.
Pinpoint help viewer.

Concurrent engineering
Several engineers can work at the same time.

Only one database


Back

Total Project management.


All graphics,
all control logic
are in a database

The application of all


stations in a system is
included in one
database.

ooo

HIS No.1

HIS No.2

FCS No.1

ooo

FCS No.2
Back

Benefit of Project management.


The application of all stations in a system is
included in one database.
At least 1 PC is required to generate whole over a system.
You need not create same or similar graphics/sequences in
front of each engineering PC.

One PC (one configuration software) can handle several


projects.
You can reuse the application database of a plant to
another plant by a project, by a station, by a graphic, by a
control logic.
This shortens the configuration time.
This makes the configuration quality excellent
because the copy source has been working well in an actual
plant.

Optimum management of application data is available.

Back

Advance Debugging.
The delivery time of controller and construction time
of field wiring is much longer than the delivery time
of PC.
If you can advance your configuration work only with PC,
you can shorten your total configuration time.
If you can advance your debugging work without actually
connecting the controllers and field devices,
you can shorten your total configuration time.

Yokogawa provides the excellent debug functions.


Virtual Test
You can debug R3 configuration only with a PC.

Target Test
You can debug R3 configuration without field wiring.
Back

Advance Debugging Theory.


Virtual test (only with PC)
Check simple entry
mistakes.
Try new control logic.
Check graphic work
Operator training.

Normal operation is
available.

Memory in PC
FCS
FCS
Simulator

Target test ( without


wiring)

ooo
ooo
ooo

Virtual input is
Check actual FCS CPU
Virtual input is
created from the
created from the
performance
output from FCS
output from FCS
simulator.
Check the actual
relationship among each
Only station.
minimum check is needed

at start up !

HIS

For HIS, this


pretends FCS

FCS memory
Field
Field devices
devices
Auto
Auto
wiring
wiring

For FCS
For FCS, this
simulator, this
pretends the
pretends the
actual plant.
actual plant.

Start up Virtual
!Target
(Actual
plant)
test
Actual
plant

Reuse of configuration data.


Tag 1
Tag 2
Tag 3

Export CSV file to use in MS-EXCEL.


Import
CSVthe
file project
to reuse.
Reuse
Reuse the graphic Configuration tool is not needed
Reuse
logicwork
in another project
onlythe
forcontrol
simple entry

in another station Reuse the control logic


in another project
Reuse(Graphic
the control
logicavailable)
is also
in own station

Reuse the graphic


in own station

ooo

Plant A
(project A)

ooo

ooo

Plant B
(project B)

Back

Unified configuration with LOOK&FEEL.


Project
Detail configuration
(Each plant)
for each

Graphical configuration
FB in FCS and FF devices
are handled in a same tool.

Each folder for each FCS

Drag&Drop enables
Copy& paste

FB : Function Block

Each folder for each HIS

Example : Control logic

I/O specification
Installation environment

ISA G3 for corrosive environment


Wide temperature range -20C to 70C
Conformed to EMC, C-tick.
Non-incendive for Explosion proof
Class I, Div.2, Group A,B,C,D, T4

Redundancy
Available for all types (analog, digital, Fieldbus, Modbus)

Replacement ability for the existing XL, V systems.

Full compatible size, connection, and function.

Flexible Field Wiring.


According to your plant,
any I/O modules can be
connected with
direct connection or
terminal board
connection.
Even in case of fieldbus,
you can choose
type.

Dedicated
eithercable

Field wiring
Terminal board

Change the front


blocks,

Field wiring

Flexible Field Wiring.


For dual

For single
Dedicated
cable
Terminal board

On-line maintenance.
In your plant operation, sometimes you would like to
modify or to add/remove your control logic or
graphics.
It is quite difficult (nearly impossible) to stop your controller
frequently.
You usually configured several control loops.
While modifying one of loops, you do not want to effect the
control of any other loops.

R3 provides the On-line maintenance function to


meet your above requirement.
You need not stop your controller when you modify small
parts of control logic, graphics, etc.
Any other parts of control logic are effected by this
modification, so the influence for your plant control is

Back

On-line maintenance.
No effect
No effect

Control logicNo effect

(1) R3 Controller is controlling


the plant with its control logic.

No effect

(2) You modify one of control loops.


(or sequence logic etc.)
Only this loop is stopped.
Others are going on working.
(3) Modified item loop is retrieved online to actual control without any
effect to other loops.
(4) In this term, CPU of controller
never stops.
Controller CPU

is Non-stop !

No effect

ooo

Controlling

No effect

Life Cycle Benefits


Efficient Engineering Function of CS 3000

Local Engineering Force

Short Engineering Period

Reasonable Engineering Pricing


Maintenance Service

Hardware maintenance
System upgrade
Remote Maintenance

Reduce
Customers Total
Cost of Ownership
in Life Cycle
Additional Service

ETS capability

System Integration Service


Network Engineering Service
APC/AOA/PRM/PIMS

Software support
Sub system support
Tuning & Control Solutions

R3 Summary & Benefits


(1)
HIS
Cost Effective LCD Displays,
Win 2000: More Open to IT, Dual Monitor, Web monitoring,
Low cost ITV Interfacing

FIO
Very Cost Effective, High Density & Compact I/O
Simple and low Engineering & Construction cost,
Application and Budget based Flexibility in Selection,
Cost cutting in field wiring on top of Fieldbus
More immune towards Corrosion & Temperature
Redundant modules even for Fieldbus
Migration Friendly

R3: Fieldbus & PRM


Hi density Module, Integrated Engineering, Maintenance Management

R3 Summary & Benefits (2)


APCS - Station
A Cost Effective station for Advanced Regulatory Control and Exacoast,
Reduce load on FCSs,
Compliments and Supplements Exasmoc and Exarqe based APC

AOA (Exaplog & Exapilot) & APC (Exasmoc & Exarqe)


Seamlessly Integrated (Almost embedded like) in System

R3: Fully Loaded with IT Power


PIMS, MES and Enterprise Integration

R3 Summary & Benefits (3)


R3: Better than Hybrid Systems
R3 is a Cost Effective Complete DCS solution against

V & XL Migration
A special FCS (RFCS2) is available for V & XL migration,
Field Wiring is not affected,
Phase wise and/or Customers budget wise plan can be offered.
Benefits of FIO, Win2000 HIS, FCS, APC & Fieldbus for Migrated system,
Additional Benefits on MES & Enterprise Integration

Migration of Other Vendor DCS


These Issues can be handled project by project.
New Customer is benefited by R3 features.