DESIGN OF SEWER SYSTEM
INTRODUCTION
‘Sewer system pays a vital rol the economic development of county. Sewers are must forte dranage of waste water In order fo have an
effective sewage system the sewers shouldbe peopel designed ang more care should be taken In fing the vert levels otherwise whole
design may gel wrong. Sewers are designed forthe drainage of waste water coming ftom houses, industries, sets, uot eto protect the
environment and people from serious dlseases, as more than 80 dseases spread from sewage. So fora good Wving, te sewers should be
propety designed and the sewage shouldbe teated propery beter alscharging lint the ve
‘Some of the important and relovant terms for sewer system are discussed below.
Sewage
NisLigda Wastor We Wit proce a eso aes
Sewer
Its the pipe or conduit fr carrying sewage. Ils generally closed an flow takes place unde gray (Atmospheric Pressure),
Sewerage
‘Sewerage i the system of cotecbon of wastewater and conveying it toa pln offal alsposal wth or without treatment
Sources of waste water
Following are the pncpal sources of wast water oo
+ Domestic
+ dust
+ Storm water
tpiilenginsespk comiesign-of-sewer-systeny 170e605 Design of Saver System - Cul Engingers PK
Domestic
1s the waste water from houses, ofices, ether bulsings, hotels and instutlons
Industrial
Its the quid wast rom the instil places ftom ther diferent industil processes Ike dying, paper mating, tanneries, chemical ndusties,
ote,
Storm Water
it incudes surface runt generated from ralnfall andthe street wash,
Types of Sewer Systems
Fotiowing are the types of sewerage
Separate System
Iti the system in which storm waters carted separate
instal waste wate. This systom i proferred when
om domestic and
+ There san immediate need for eotecton of sanitary sewage but not for storm
water
+ When sanitary sewage needs treatment but the stm water does not
Combined System
=,
Its the type of eystem in wi sewer cartes both the sartary and storm water, o bs
Combined systom is favored when
“Combined sewage can be deposed of without treatment —
+ Both sanitary and stm water need treatment
+ Streets are narrow and wo separate sewers cannot be lid
tpiilenginsespk comiesign-of-sewer-systenyas2015
Design of Saver System - Cul Engingers PK
Types of Sewers
RHADSCreEeaEs
ng
sn Se] neve tn Su
House
Sewer
Lateral Lateral
uta Sewer
MainTrunk Sewer
‘Sub Main Sewer
Sub Main Sewer
civilengineerspk.com
Sanitary Sewers
Iteamies santary sewage. waste water fom municipality including Domestic and Industral wastewaters,
Storm Sewer
I cies storm sewage including Surface Runoff and Steet Wash
tpiilenginsespk comiesign-of-sewer-systenye605
Design of Saver System - Cul Engingers PK
Combined Sewer
Ieaties domes indus and stom sewage,
House Sewer
Its the sewer conveying sewage fom plumbing system of bling to commarvmunicipal ewer.
Lateral sewer
‘This sewer cates discharge from wo or mote house sewers.
Sub-Main Sewer
“This sewer caries discharge from two or more laterals
Main/ Trunk Sewer
Itrecoves dscharge trom two or more sub-mains.
Outfall Sewer
It receives dscharge from all collecting system and conveys ito the point of ral cisposl
tpiilenginsespk comiesign-of-sewer-systenye605 Design of Saver System - Cul Engingers PK
[Roots Separred.oins Iarine Sewer
Sewage flow
Its fow derived trom te sanitary and instal sewage taste raw wale om these inusties and houses, soit means thas ret relation
wit the amount of water consumed
Generally 80 to 90% ofthe water consumption fe laken at sewage of waste wale lw.
Variation in sewage flow
Lice water supply, sevage flow varies from ime to ime, Since sewers must beable to accommodate Matimmum Rate of Flow, the arson inthe
sewage flow must be stuted
Generally Herman Formula suse to estimate the ratio of Maximum to Average Flow
Peak Factor = M = @% = 14 (4)
Qavg 44VP-
>is popaon in ousans
\WASA ahr Dson Coser nfo elatortip fr ewe eon
rage Senage Flow ni meek Facer
e200 40
2500-5000 a
5000 10000 3
4000-28000 a
25000 50009 2
0000 — 10000 23
10000 — 250000 218
25000050000 208
or) 20
Infiltration
tis amount of water thal enters into the sewers trough poor joints, cracked pipes, walls and covers of manholes.
tpiilenginsespk comiesign-of-sewer-systenyas2015
Design of Saver System - Cul Engingers PK
+ tis nonexistent during dry weather but increases during rainy season.
| Water and Sanitation Agency (ASA) Lanore uses te folling inition rates for the design of sever system,
Sewer Diameter Initation
225 mm to 600 mm 5 % of Aug. Sewage Flow
> 600.mm 10% of Avg, Sewage Flow
Design Period
Sewer System
Period of design is indefit, The syst is designed to take care forthe maximum development othe area, But wo lake design pia of 29
year for our sewer sytem
Sewer Pumping Station
+ Design perioa is 104years
+ Rate of Flow are average daly, peak and minimum flow incueing infiraton
PROJECT DESCRIPTION
“The projects based on the design of Patally combined sewerage systom of @ community which is having approximatly 2 fat train because
the diference inthe reduce levels fs very smal | have designed the sewage pumping sation along with the hydraulic statement and the
required drawings plus some extra drawings. | am confdent that my design wll work successfully and there ill be na any problems. The
Layout ofthe community is given as under.
DESIGN CRITERIA
Design Flow
Frist of al calculate the average sewage flow onthe basis of water consumption and the population atthe end of the design period. Le atthe full
development of he area. Then he design Now fr sanitary sewer and partly combined sewers can by calculated by using he fllowing
formulae.
+ ForSantay Sewer
Qsengg® Peak sewage ow + intration
+ Eocpataly combined somes (WASA Criteria)
Quesn * 23Peak sewage Now + infration
tpiilenginsespk comiesign-of-sewer-systenye605
Design of Saver System - Ci Engrs PK
Design Equation
Manning's Equations used fr sewers owing under gravity
Leaner
i
whece
\V= Velocity of flow in mise
R= Hydraulic mean depth (AP) = D/4 when pipe is lowing ful or hal ll
= Slope ofthe sewer
CCoetcent of roughness fr pipes
Minimum (Self Cleansing) Velocity
Sewage shoul ow a ol tines wih scent veloty to prevent he stteren fod matin the sewer. Sef learsng Veo isthe
minimum locy tat ensues non setlement of suspended materin the sewer.
‘The following minimum velocities are genealy employed
Sanitary sewer = 06 misee
“Storm sewer = 1.0 mise
+ Parially combined sewer = 0.7 misee
Maximum velocity
‘The maximum volts inthe sewer pipes should ol exceed more than 2.4 msec. Tis max velocity in the sewer should not exceed tile
of 24 mise Its to avoid the excessive sever abrasion and also fo avid steep slopes.
Minimum Sewer Size
225mm|s taken as the minimum sewer size. The reason being that, the choking does na ake place even with the bigger size parties, which
are usvaly thrown info the sewer through manholes.
Minimum Cover of Sewer
‘mistaken as the minimum cover over he sewers fo avoid damage fom ve loads coming onthe sewer.
Spacing of Manhole (WASA, Criteria)
For (Sewer Size) 225mm to 380mm spacing not moce than 100m
For (Sewer Size) 460mm to 760mm spacing not more than 120m
For (Sewer Size) greater than 760mm spacing not more than 180
Direction of Sewer Line
‘Sewer shoul low, as for as possible the Natural Slope.
Design of Sewer
Use the flowing relation o find the clameter of sewer
tpiilenginsespk comiesign-of-sewer-systeny
70Design of Saver System - Cul Engingers PK
Select the minimum velo value and use the Manning's formula
a
1 persase
”
Invert Level
“The lomoat isto lvel any cosssecton of seer pipes known a Iver Level a thal Cross-section
'SLRoad Level - Depth of Sewer— Thickness of Sewer Dia. of Sewer
Crem of ie
pe sseassaiens
Warten ( \a-“ soe
love ere
EVEL OF PPE
Joints in Sewers
+ Bell & Spigot Joint
+ Tongue &Gra0ve Joint
Manholes
‘These are provided for
+ Cleaning
+ inspection and t
+ house connection
+ Change in Sewer airetion sien
+ Change in sewer diameter
+ Change in slope
PRECAST MANHOLE
OVER EXISTING SEWER DETAIL
(One man hole to be provided for 2 plots
SEWERAGE DESIGN DATA
No of Plots = 281
No of partments = 2
No ofFiats =3
tpiilenginsespk comiesign-of-sewer-systenye605 Design of Saver System - Cul Engingers PK
Design period = 20 years
POPULATION FORECAST
Prosont (2008) Design (2028)
Personsiplot 7 0
Persons/apartment 400 600
Porsonsitat 200 400
POPULATION FORECASTING
Present Population P
‘Design Population P
‘Annual Growth Rate
) 281% 7+400%3"200%3.
2) 28110960003 +4000
1% (For Pakistan, 2008 report)
Design Population Pa
4) Pd= Pp x (142211100)
a= a7e79(142.111007 = 6709
d= 5810 (From Table)
Per capita water consumption = 360 + 4= 394 pod ers per capita per day)
‘Average Design flow = Pex water consumption x 0.8 1000,
(80% goes to sewers as waste water
194 x 5810 x08) / 1000
avg = 1831.312 miday
Peak factor = 4 (kom WASA table)
‘To-Check nfitation ratos
Qu=AV ox x O.Tivsec~
(gg = 22884812 a vale in dhe cable
if 2axG060
0.0423m'see
0.04232 x cs 0.7m/see ~ d~ 277.38mm
(Less then 600mm so infiltration = 5% of average sewage flow will be used)
tpiilenginsespk comiesign-of-sewer-systenye605 Design of Saver System - Cul Engingers PK
DESIGN OF WET WELL
max = 14742.1m9iday = 10.287 mimi
Pumping capacity
max = 10.257 m?imin
Minimum eye
Minimum Cyete ime must not be les than 5-minutes
For smaller pumps t min = 15 min
Volume =V= [Px inns
Ettocve Volume = (10.237 x18) /4= 38.30 m?
DIMENSIONS OF WET WELL.
Length = 3.8m
wth = 3.6m
Height = 3m
Volume = 36°3.6°3 = 38.88?
Purp must run fora east 2 minutos
(Check he ete time , shoul be grester than 2 minutes
{= VKP-Omin) = 38.9 7 (10.297 - 0.6358) = 3.98~=
S04 minutes is greater than 2 minutes .« OK)
Cycle Time for Minimum and Average Flow
cycle TNE
«viP-a}sqvt0)
For Omin = 38.39 (10.287 ~ 0.6358) + 38,3980.6358 = 64,391 min> 15min (OK)
For Gavg = 36.39 /(10.287 1.271) + 38.88/1271 = 3448 min> 15min. (OK)
tpiilenginsespk comiesign-of-sewer-systeny
1020e605 Design of Saver System - Cul Engingers PK
SEWAGE|PUMPINGISTATION)
civilengineerspk.com
Motor Room
Ground Level
Wet Well Ls
Perforated Plateform
*
Shaft
\ Gate valve|
Minimum
‘Submergence = 1m desir locit
suregereen 12 Oasle eon arc
isthe suo ge)
tpiilenginsespk comiesign-of-sewer-systenyas2015 Design of Saver System - Cul Engingers PK
WONGITUDINALPROFILE|OFISEWERS)
Nita Goud Lee
= Civ
sid wr .
on30b Fe
|
tpiilenginsespk comiesign-of-sewer-systeny
10as2015 Design of Saver System - Cul Engingers PK
MANHOLE
Ms-Mit
9-08 oo 4
cae MS
Cement mortar
-— plaster
150mm
wuode.
DROP MANHOLE
tpiilenginsespk comiesign-of-sewer-systenyas2015 Design of Saver System - Cul Engingers PK
M15
DROPIMANHOLE!
A
Road Level cover Gi vilé
Engpesisrn,
Ground Level
Concrete pipe,
Concrete block or.
Cast in place concrete
1.856m
From M14
&
8
ToM16
SEWER JOINTS
tpiilenginsespk comiesign-of-sewer-systenyra ei os comer
Borns)
BELL & SPIcor Jobir
(For Sewer size 220mm to 690mm }
hae
ute Dippod in coment Sirry
(12) Coment’Sand Mortar
(12) ComenvSané Mortar
Rubber RING Jue Dipped in coment. Surry
&
Jute Dipped in coment /Sirry
uber Ring
(1:2) Cement Sane Mortar
uber Ring
(1:2) ComentSand Mortar Jute Dipped in cament Swurry
SEWER BEDDINGS
tpiilenginsespk comiesign-of-sewer-systeny
1520e605 Design of Saver System - Cul Engingers PK
BRICK BALLAST BEDDING
Natural Ground Surface
Depth ot ener
(Gimgeneraty,
Inve Leet Ficus
ont Clit
Bo
0 in
Tx Donianaiaaneey + Soom
CRUSHED STONE BEDDING
f »
Natural Groune Surtece
Depth of sewer
(im general)
Invert Level ‘Thickness of
Si Dintanalaanaay’ Soonm
COMMENTS
+ This designs based on para combined sewerage system thus economic.
+ i the necessary things ave taken om the WASA tabs an! Minimum velocty is taken a8 0.5 mi8ec which fs these cleansing velocity
and velocity must not be more than 2 mise
+ Minimum dametor of sewer is akon as 225 mm and other diameters ae rounded othe localy avaiable in the market according to WASA
standart,
+ Minimum rate of sewage Now s taken as 50% of average sewage ow.
+ Minimum clea cover of t-ms proved above the sewer in order to avoid rom impact of ve loading.
tpiilenginsespk comiesign-of-sewer-systeny 1620e605 Design of Saver System - Cul Engingers PK
+ Flush tanks are provided where velo i lees than 0.6 miSee,
RESULTS
+ Diameters are less then 600mm so inflaton rate Used Is 5% of average sewage Now,
Bell & Spigot joins have Been used as the dlameters ae less then 600mm,
+ One Drop Manhole is coming at 15 as the vereal érop ks more than 0.6m.
+ in Sewers (M8-MB, MB-MI1, Mi0.Mt1, MI2-MT3, ME-M18, MZO.M21, M24-M21, Mat-M22, M25-M28), Veooty is ess than the self
cleansing velocy So, Fh tanks willbe provided here,
+ Most ofthe iameters are of 225mm ensuring the economic side of he project.
+ Wet wal dimensions are 25x3.5x4.4
(ete time of 15 minutes is satistied ensuring the adaptabilty of small pumps so more economi
RECOMMENDATIONS:
Flush tanks shouldbe tushed once in 24 hours to avold sediment depostion.
+ Ifthe sewer isto be laid under the water able then crushed stone bedding should be used
“+ Sewers shouldbe joined in a manhole keeping the ecowns atthe same level
f, ¥ in = 9
16 thoughts on “DESIGN OF SEWER SYSTEM”
on November 7, 2014 1642s
Good Wore Sie
lam working as Sub Engineer at a TMA. | got enough uidance from work good work
Regards
THANKS
ary 26, 2015 at 20:39
‘You said thatthe drainage designs equal tow times the maximum dscharge while when calculated leakage reported that
rainage design is equal fo two times the rate of discharge . hope statement this point allowed
tpiilenginsespk comiesign-f-sewer-systeny 10e605 Design of Saver System - Cul Engingers PK
ol Ranoom Sissi
on danuary 20,2016 at 07.24 s20
Very good materia itl be more beneficial Ifyou could have shown te calculation of uploades supporting excel le,
=| on January 20,2016 a 16:38 sa
NoPE
on February 26, 2045 at 2:41 sis
You said thatthe drainage design is qual to we mes the maximum discharge while when calculaed leakage reported that drainage design is
equal fo two times the rate of escharge hope statement his point if alowed
HH
WOULD LIKE TO BLY PROGRAM FOR DESIGN SEWAGE NET WORK WITH PROFLE,
‘All softwares avaliable onthe site reuira membership,
tp telengineerspk convmembership!
con Mareh 31, 2046 at 07:33 sas
‘Wold ke to ingure more on how o overcome excess sewage in places where there Is already established sewerline yet there Is Increased
poputaion
tpiilenginse'spk comiesign-of-sewer-systemy 1820e605 Design of Saver System - Cul Engingers PK
How much sewage you ae taking about 7 @
ostrewana
‘on Apel 15,2018 a 09:2 esis:
WOULD LIKE TO BUY PROGRAM FOR DESIGN SEWAGE NET WORK WITH PROFILE
2 UBAIDAHIAD
on Apel 15,2015 a 14:59 sa:
Is akeady avalasle Foe ontne
Sonia
on Api 18,2015 a 10:23 sae:
‘Thanx alo, Ths article was a fesaver, | am doing something sma or my undergrad project 18 there information on ABR (Anasrob Safe
Reactor sizing and formuas?
‘Trarx again
2 UBAIDAHMIAD
cn Apel 18,2015 a 18:28 ac:
your welcome @
Noman Kran
on ay 4, 2016 at08.2¢ 524
Hell i your works very appreciable, sr can you pz tll me haw mary types of networking are therein sewerage syslem and what are their
names. And also where does the peak facor ko 45,43 come from.
Hope u would consider my question,
Trank you!
fl UBAIDAHMAD
tpiiilenginsespk comiesign-of-sewer-systeny
1920e605 Design of Saver System - Cul Engingers PK
on May 6, 2015 a 1048 sa
itp Yelongineerspk.convsesign-otsower-systomy
tpiilenginsespk comiesign-of-sewer-systeny