Professional Documents
Culture Documents
Unset Ahc PKR PDF
Unset Ahc PKR PDF
WELL:
RIG :
DATE :
SYRAH-8X
EDC-87
07/01/2014
CUT ZONE
LENGTH=11.27"
11.27"
Calculations:
** IN THIS WELL WE SHOOTED RCT 4" FROM BTM OF CUT ZONE.
** SHOOTING DEPTH = BTM OF PKR (12337.52') - BTM OF PKR TO
BTM OF CUT ZONE (11.77") - (4" FORM BTM OF CUT ZONE)
SHOOTING DEPTH = 12336.21
FT
CCL TO RCT NOZZLE OFFSET = 166.5" =13.875'
STOP CCL @ = 12336.21'- 13.875' =12322.33'
NOTE: BEFORE R/U E/L WE MADE UP 3 1/2" N.VAM TBG STRG UNDER TENSION W/147 KLB's
(STRG WT W/T.B: 112 KLB's & 35 KLB's OVER PULL).
**** TO RETREIVE GAS COMPLETION ON AHC PKR & 13 % CR TBG YOU HAVE TO HANDLE THE FOLLOWING ITEMS:
*** YOU HAVE TO ARRANGE WITH GAS PRODUCTION TO REMOVE THE GAS PROD. LINE, CONCRETE, AND CLEAR
LOCATION BEFORE RIG MOVE BY ENOUGH TIME.
CC L TO RCT NOZZLE
OFFSET = 166.5"
Page 1