This is a power point Test Prep.


Each Question has one correct answer

Which of the following is NOT a


Project Cost Management process?
Cost

Estimating

Cost

Control

Cost

Budgeting

Resource

Leveling

Which of the following processes are


included in the planning process?

Scope Definition, Project Plan Development,


Quality Assurance, Cost Estimating

Scope Planning, Staff Acquisition, Stakeholder


Identification, and Cost Estimating

Project Closure, Cost Estimating, Risk


Management, Schedule Development, and Team
Development

Scope Planning, Schedule Development, Project


Plan Development, Risk Response Development

A goal of portfolio management is:


Manage

content of the project

Timely

exclusion of projects not meeting the


portfolios strategic objectives

Leveling

projects

Project

heuristics across the organizations

cost leveling

Project Integration Management


ensures:
The

project is completed within schedule


and budget
The proper scope has been identified for
the project
All elements of the project are properly
coordinated
The project will satisfy all the
stakeholders

Determining the method and timing of releasing team


members, benefits both the project and: Best answer

Team

Sponsor

Project
Team

Leader

Members

Departing

Team Member

Formal acceptance is an output of


which of the following processes?
Scope

definition

Scope

planning

Scope

verification

Scope

change control

Gantt charts help determine?


A tasks

starting and stopping point

Accountability

matrix

Decomposition
Amount

task

of effort it takes to complete a

Providing for reimbursement of allowable costs, plus a


fixed fee paid proportionately as the contract progresses
is defined as:

Cost

Plus Percentage of Cost (CPPC)

Cost

Plus Fixed Fee (CPFF)

Contract
Cost

Evaluation

Plus Incentive Fee (CPIF)

Which of the following response is not a Strategy


for Both Threats and Opportunity Acceptance?
Can

be either passive or active

May

be adopted for either threats or


opportunities

A strategy

that is adopted because it is seldom


possible to eliminate all risk from

Project

scope statement

A ____ is a structured, independent review to determine


whether project activities comply with organizational
policies and procedures.

Quality

Audit

Quality

Metrics

Quality

Analysis

Quality

Planning

Constraints that can limit flexibility in the Human


Resources Planning process are all of the following,
except:

Organizational

Structure

Resource

Availability

Economic

Conditions

Collective

Bargaining Agreements

Who should contribute to the


development of the project plan?
The

entire project team

The

project coordinator

The

planning department

The

senior management

A lump-sum contract under which the seller


furnishes goods or services at a fixed price is:
Cost

Plus Incentive Fee (CPIF)

Contract
Firm

Initiation

Fixed Price (FFP)

Fixed

Price Incentive Fee (FPIF)

Cost _____ is a time-phased budget that is used to


measure, monitor and control overall cost performance on
the project.

Baseline

Aggregation
Performance
Management

Of the following, which is not true


about bottom-up estimating?
Its

accuracy increases if the activities are


smaller
The WBS must be accurate and complete
before this process can be used
It is not a useful methodology in the early
phases using project planning processes
The cost is largely independent of the desired
accuracy, so it is the methodology of choice

What is a PMIS?
Performance

Measurement Independent

System
Project

Matrix Informal System

Project

Management Information System

Project

Management Inter-related system

Policies and procedures that protect team members from


safety hazards are included in the staff management plan
and:

Organizational
Resource
Risk

Chart

Breakdown Structure

Register

Position

Descriptions

Which of the following is not a use of


the Work Breakdown Structure?
Configuration

Management

Focusing

attention on the project


objectives

Funding
Integrated

logistic support

Why should constructive changes be uniquely identified


and documented by project correspondence?
Changes

may be disputed by one party and


lead to a claim against the other party

Changes

can include direction provided by the

Changes

should never be documented

buyer

Changes

are processed for review and


approval through Integrated Change Control
process

_____ are factors that can limit the


project management teams options.
Logistics
Methodologies
Constraints

Assumptions

Which of the terms below is not a stage of


contract negotiation?
Closure
Weighting

system

Probing
Scratch

bargaining

What is the responsibility of the sender in the


communications process? Best Answer
Ensuring

the right person gets the right


information

Making

sure that the information is received in


its entirety and understood correctly

Making

the information clear and complete so


the receiver can receive it correctly and
confirming that it is properly understood

Manage

stakeholder requirements

The degree to which a set of inherent characteristics


fulfills requirements is know as:

Quality

Grade
Performance
Scope

An output of Risk Identification is:


Plan

for mitigation

Corrective
A risk

actions

register

Expected

events

monetary value of the risk

Which of the following is not a scenario


considered in a Three-point estimate?
Optimistic
Most

likely

Analogous
Pessimistic

The Resource Breakdown Structure (RBS) is a _____ of


identified resources by resource category and resource
type.

Activity

Attribute

Requested
Activity

Change

Resource Requirement

Hierarchical

Structure

A statistical method that may identify factors which


influence specific variables of a product or process under
development or in production is known as:

Cost-Benefit

Analysis

Benchmarking
Design
Cost

of Experiments

of Quality

What are the five processes of project


management?
Initiating,

Planning, Executing, Controlling,


Closing

Concept,

Planning, Development, Execution,


Termination

Planning,

Verifying, Development, Controlling,


Termination

Initiating,

Closing

Planning, Facilitating, Executing,

A bar chart illustrating the number of hours that a person


is needed each week or month over the course of the
project is called?

Gantt

Chart

Staffing

Management Plan

Histogram

Responsibility

Assignment Matrix

Activities such as measuring, examining and


verifying describe which of the following?
Flow

chart legend

Project

risk management

Activity

duration estimating

Inspection

Which of the following is not an advantage of


centralized contracting?
More

economical

Easier

to control overall contracting efforts

Less

attention to the special needs of


individual projects

Orders

can be consolidated across several


projects

What is Activity Resource Estimating?


Estimating

the type and quantities of


resources required to perform each scheduled
activity
Controlling changes to the project schedule
Analyzing activity sequences, durations,
resource requirements, and schedule
constraints to create the project schedule
Identifying and documenting dependencies
among scheduled activities

A _____ is a component that does not meet its


requirements or specifications, and needs to be repaired
or replaced.

Corrective

Action

Preventive

Action

Defect

Change

Changes to the Information Distribution process should trigger


changes to project management plan and the _____ management
plan.

Human

Resources

Quality
Communications
Risk

Cost budgeting is the process of


allocating:

The project budget to the various identified work


activities in order to establish a basis for the project
contingency reserve
The overall cost estimate to individual work activities
to establish the basis for the project contingency
reserve
The overall cost estimate to individual work activities
to establish a cost baseline for measuring project
performance
The project budget to the various identified work
activities in order to establish a basis for the project
estimate

Which of the following is not true concerning


project stakeholders? Best answer
They

may actively support the project

They

may exert influence over the projects


objectives and outcomes

They
Their

are actively involved in the project

interest may be affected by the projects


execution or completions

Which Human Resources Management process


addresses coordinating change?
Human

Resource Planning

Acquire

Project Team

Manage

Project Team

Develop

Project Team

A numbering system used to uniquely identify each


component of the work breakdown structure is the:

Project

Code

Chart

of Accounts

Error

Code

Code

of Accounts

Of the following, which is not a theme or issue


within Project Procurement Management?
Delphi

Technique

Contract

Administration

Procurement
Solicitation

Planning

Planning

Which involves choosing part of a


population of interest for inspection?
Pareto
Run

Chart

Chart

Scatter

Diagram

Statistical

Sampling

Which of the following is not a tools and


techniques of Information Delivery?
Communication

skills

Requested

changes

Information

distribution method

Lessons

learned process

Parametric estimating is most reliable when all of


the following occur except:
The

model works for large projects as well as


small projects

The

historical data used to develop the model


is accurate

Estimates

are predictions of conditions in the


projects future are forecasted

The

parameters of the project life cycle are


readily quantifiable

What defines when and how often the risk management process will
be performed throughout the project life cycle, and establishes risk
management activities to be included in the project schedule?

Risk

Management

Budgeting
Timing

Definitions

of risk probability and impact

Overall project duration is calculated as an


output of the _____.
Schedule
Activity

Development Process

Cost Estimates

Organizational
Enterprise

Process

Environmental Factors

The Project Quality Management process


includes all of the following except:
Quality

Planning

Quality

Assurance

Quality

Control

Quality

Variance

What is Information Distribution?


Collecting

and distributing performance


information
Making needed information available to project
stakeholders in a timely manner
Determining the information and
communications needs of the project
stakeholder
Managing communications to satisfy the
requirements of and resolve issues with
project stakeholders

Cost _____ are generally expressed in


units of currency.
Budgets
Variances
Estimates
Controls

To have a successful project, the team must do


all of the following except:
Select

process within the Project Management


Process Groups which require meeting the
project objectives
Apply the processes of the Project
Management Process Group which requires
meeting the project objectives
Balance time, scope, cost, quality, resources
Meet stakeholder needs, wants and
expectations

Matrix-based charts are used to illustrate the


connections between work that needs done and:
Stakeholders
Work

Breakdown Structure

Responsibilities
Team

Members

The sum of the products, services, and results to


be provided as a project is:
Planned
The

Value

Scope

S-Curve
Schedule

Variance

Which of the terms is generally used when the sellers


selection decision will be based on price (as when buying
commercial or standard items):

Technical

Approach

Proposal
Tender

Technical

Skills

Identification, response development, assessment and


documentation are major processes of risk management. Which of
the responses listed below is not a major process?

The

projects change control system

Planning,

Identification, Documentation, and


Assessment

Identification,

Planning, Evaluation, Response


Development, Mitigation, and Documentation

Planning,

Identification, Qualitative Analysis,


Response Planning, and Monitoring and
Control

A thorough review of the _____ will


help identify potential project risks.
Projects

mission statement

Projects

budget

Projects

change control system

Risk

identification checklists

Resource calendars are known inputs under


which two time management processes?
Activity

Sequencing and Scheduled


Development

Activity

Duration Estimating and Scheduled


Development

Activity

Resource Estimating and Scheduled


Development

Activity

Sequencing and Scheduled


Development

Process Analysis examines all of the


following except:
Problems

Experienced

Constraints
Work

Experienced

Performance

Non-Value-Added

Activities

A specific type of histogram, ordered by frequency of


occurrence, which shows the number of defects
generated by category or identified cause is known as a:

Flowchart
Scatter

Diagram

Pareto

Chart

Run

Chart

Which of the following is not an input


of Communication Planning?
Project

management plan

Communications
Project

management plan

scope statement

Enterprise

environmental factors

_____ information on the completion status of the deliverables and


what has been accomplished is collected as part of the project
execution, and is fed in the Performance Reporting process.

Performance
Change
Work

measurement

request

performance

Quality

control

Cost variance is computed as:


Actual

cost planned value

Planned
Actual

value actual cost

cost earned value

Earned

value actual cost

Identifying relevant quality standards and how to


address them should occur in which phase?
Planning
Quality
Risk

process phase

control phase

phase

Project

Life Cycle phase

Identifying relevant quality standards and how to


address them should occur in which phase?
Planning
Quality
Risk

process phase

control phase

phase

Project

Life Cycle phase

The Staffing Management Plan is an output of


which Human Resource Management process?
Develop

Project Team

Acquire

Project Team

Human

Resource Planning

Manage

Project Team

Scope Definition involves:


Developing

a scope management plan

Developing

a detailed project scope statement


as the basis for future decisions on the project

Controlling

the project scope

Formalizing

deliverables

acceptance of the project

Indirect costs are:


Also

known as risk management


(contingency) cost
Cost not arising out of the performance
of work on the project
Project costs that were not specifically
accounted for in the project budget
Costs other than the salary of project
team members such as sick and
vacation leave

A project is:
An

ongoing activity undertaken to meet a


market requirement

A set

of activities preformed in a system

A temporary

activity to create a unique product


result or service

Linked

by the results they produce

The following formats exist to document team


member roles and responsibilities, except:
Text

Oriented Format

Matrix

Responsibility Chart

Hierarchical-type
Work

Organization Chart

Breakdown Structure

Scope Definition involves:


Developing

a detailed project scope statement


as the basis for future decisions on the project

Controlling

the project scope

Formalizing

acceptance of the project

Developing

a scope management plan

deliverables

Enterprise environmental factors are one input of plan,


purchases and acquisitions. Which of the following is not
an input?

Project
WBS

Time Management

Dictionary

Project

Scope Statement

Organizational

Process Assets

Which of the following is not true about risk


identification?
It

is an interactive process

It

determines which risks might affect the


project and documents their characteristics

It

describes the content and format of the risk


register

All

project personnel should be encouraged to


identify risks

Which of the following is a risk monitoring


and control tool and technique?
Exploit
Risk

Register

Prioritized
Reserve

list of quantified risks

Analysis

Project Time Management includes


the processes required to:
Control

changes to the project schedule

Accomplish

project

Estimate

the timely completion of the

the number of work periods

Schedule

Activities

Monitoring specific project results to determine


relevance to quality standards is known as:
Quality

Variance

Quality

Assurance

Quality

Control

Quality

Planning

Which is not part of the Project


Communications Management process?
Cost

of Quality

Information

Distribution

Performance
Manage

Reporting

Stakeholders

Influencing the factors that create cost variances and


control changes to the project budget is defined as:

Cost

Budgeting

Cost

Benefit

Cost

Control

Cost

Variance

Of the following, which is not related to


cost recognition?
The

point in time when costs are


charged to the project
The allocation of contractor earned
bonuses to project costs
The way in which performance
incentives are integrated into project
costs
The point in time when costs are
budgeted to the various activities

What is the use and purpose of project


planning methodology?
Maximize

the value of the project phases

Any

structured approach to help prepare the


project plan

Project

phases within a project cycle

Implementation

of and inclusion of the portfolio

What are the two major types of


evaluation?
Change

process and status reports

Work

satisfaction and midpoint


evaluation

Midproject

and final evaluation

Customer

satisfaction and survey

A subset of the project team responsible for activities


such as planning, controlling, and closing is known as:

Stakeholders
Staffing

Management Team

Sponsor(s)
Project

Management Team

The _____ shows the time periods that team members are expected
to work on the project, along with information such as training plans,
certification requirements, and compliance issues.

Project
Staffing

Management Plan
Management Plan

Resource
Gantt

Histogram

Chart

Which of the following are outputs of


the Scope Change Control process?
Corrective
Scope

action and schedule updates

changes and formal acceptance

Scope

changes, corrective action, and


lessons learned

Lessons

learned and scope definition

Milestone charts primarily are used to:


Show

significant events in the project

Show

the start and stop of a task

Show

the critical path

Demonstrate

constraints

What is the primary concern of a


procurement audit?
Maintaining

the project

A numbering
Work

system

Breakdown Structure

Identifying

successes and failures that


warrant recognition

Which of the following is a


constructive change?
Viewing

as negative, quantified and tabulated

Postponing

budget

as long as possible to protect the

Identifying

and documenting project


correspondence

Submitting

bids to relevant vendor list

The Delphi Technique is a way to reach consensus.


Which of the statements listed below is a characteristic of
the Delphi Technique?
Does

not help to reduce bias in the data

Project

risk experts participate anonymously

Consensus

may be reached in many rounds of


this process

Ensures

that one person may have a greater


influence on the outcome

Constructing a project schedule network diagram that


uses nodes to represent activities and connect them with
arrows that show dependencies is known as:

Gantt

Chart

Arrow

Diagramming Method

Precedence
Work

Diagramming Method

Breakdown Structure

The project management team determines the


dependencies that may require a _____ to accurately
define the logical relationship.

Mandatory

or External

Discretionary

or External

Discretionary

or Mandatory

Lead

or Lag

Of the following, which is not a benefit of


meeting quality requirements?
Increased
High

Productivity

Increased
Less

Costs

Stakeholder Satisfaction

Rework

The quality _____ records the


quality objectives of the project.
Checklists
Metrics
Measurements
Baseline

A flowchart is a graphical representation of


a process which shows:
Various

factors linked to potential problems

Activities,

decision points and the order of


processing

Predictable
Whether

performance

a process is stable

Which of the following is not an output


of Performance Reporting?
Resolved

Issues

Performance

Reports

Forecasts
Requested

Changes

All of the following resources are included


in activity cost estimating, except:
Information
Time

Technology

Shortages

Facilities
Materials

The cost management plan:


Is

a formal document integrated into the


overall project management plan

Should

be highly detailed and describe how all


cost variances are to be managed

May

be omitted if the integrated change


management plan is sufficiently detailed

Is

a tool that is used to adjust cost estimated


to reflect the realities of the project budget

Communication skills are related to, but


are not the same as _____.
Information

distribution

Communication
Project

planning

management communications

Performance

reporting

Which of the following is not an input


to cost budgeting?
Project

Schedule

Risk

Management Plan

Cost

Variances

Work

Breakdown Structure

In estimating the total of material resources required for a project,


you must first estimate the amount of waste to be expected. You will
most likely find this information in which process?

Supporting

detail

Parametric

modeling

Resource

requirements

Historical

information

The set of processes required to ensure the various


elements of the project that are coordinated are called:

Project

Charter Management

Project

Quality Control Management

Project

Integration Management

Project

Communications Management

Organization recognition dinners, certificates of appreciation,


newsletters, bulletin boards, Web sites, and other organizational
perquisites should be available to the _____ as part of the process.

Staffing

Management Team

Sponsor
Project

(s)

Management Team

Stakeholders

If project team members do not possess required


competencies, performance can be jeopardized. When
should competencies first be addressed? Best answer

When

Acquiring Project Team

When

defining Roles and


Responsibilities

In

the Project Management Plan

In

the Staffing Management Plan

What ensures that all work within the project is identified


and defined within a common framework?

Project
Risk

Plan

Analysis

Work

Breakdown Structure

Cost/Benefit

Analysis

Make-or-Buy Analysis should consider


which of the following?
Foreign
EV

Currency Exchange

minus PV

Project
Direct

team directory

and Indirect costs of a prospective


procurement

Congratulations Q&A Completed