SHEET _____1~o~f~1~---
,CONTRACTOR
DATE OF AWARD
You are hereby requested to make the herein described changes from the plans and specifications or do the
following described work not included in the plans and specifications on this contract.
NOTE THIS
Description:
CHANGES TO CONTRACT PLANS AND SPECIFICATIONS.
1
Addition: Supply all labor and materials necessary to complete the following : Reference
Bulletin #13, RFP #20, and PCO #38 (Otto's tracking number). Work includes insulating
between the floor joist at the indoor theater stage.
Agreed Lump Sum ............ ........ .................................................... ... .... .. .... ..
1,385.00
1,385.00
CONTRACT PRICE
CONTRACT TIME
No additional days
1,385.00
Increase
Decrease
Estimated
$
$
1,462,236.00
9,536.00
.00
0.7%
i
157.00
We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services
necessary for the work above specified, and will accept as full payment therefore the price shown above.
Contractor:
Title:
Submitted By:
..
Andy Vanderford
Date
Project Manager
Approved:
City Administrator
Doug Schmitz
~<DC/./..J-
Authorized:
Authorized:
Attachments:
/0-/~ls
Rob Mullane
Meeting Dated:
OTTO
Project
Forest Theater Renovation
PCOit:
Related RFP It:
15314100
Description o f Change
13
Related RFI It
N/A
DATE:
09/04/15
Below costs are associated with RFP #20 related Bulletin #13. Costs are
for mateial and labor associated with the Indoor Theater Stage.
Includes install of insulation between stage joists and placement of 6
mil poly.
Excludes engineering, design and permits.
COST
M/U%
38
20
M/U TOTAL
GC DIRECT COSTS
$236
$995
$0
$10
GC DIRECT LABOR
GC D IR ECT MATERIA LS
GC D IREC T EQUIPMENT
GC OTHER: INDIRECTS
$1,241
$236
$995
$0
$10
10.0%
10.0%
10.0%
10.0%
$24
$100
$0
$1
TOTAL MARKUP ON DIRECT COST
$124
GC SUBCONTRACT(S} OR 'OTHERS'
$0
so
$0
GC FEE ON SUBCONTRACT(S)
$0
5.0%
$0
$1,365
$20
$1,385
Otto Construction
OTTO
ID Description
Hrs
4.0
Rate
Labor
236
59
10
11
12
13
14
15
16
18
19
20
21
22
24
0
0
27
28
30
0
0
33
34
0
0
Totals
4.0
236
--
-.
..
--
.
-
31
1,241
-.
32
TOTAL
10
26
29
25
Sub/Mise
995
17
23
Equip
Matl
-995
10
1,241