Professional Documents
Culture Documents
Faqs TSCM 60
Faqs TSCM 60
*
*
*
*
Delivery date and tax information- From Ship to Party master record
Payment terms, Credit limit check- From Payer master record
Address to which invoiced to sent- From Bill to Party master record
Shipping conditions, Pricing, incoterms-From Sold to Party
Master data
Customizing
Other SD document/Existing document with data
Hard coded controls
In sales order with fast change option what are the fields which you can change?
Reason for rejection, Delivery block, Billing block, delivery date, delivery
priority and Plant.
With Mass change option in a sales document list you can change?
Plant, Materials, currency and Pricing.
Where you assign Billing block in Sales and Distribution?
A Billing Block can assigned at sales document header level and item level
Where you assign delivery block in Sales and Distribution?
A delivery block can assigned at sales document header and schedule line level
What are Different Times involved in delivery scheduling?
1
2
3
4
Pick/Pack Time
Loading Time
Transportation Lead Time
Transit Time
In the Rush order sales document type, the immediate delivery switch and delivery
type LF are configured
------------------------------------------------------------------------------------------------------------------------------------------------------------Unit
15: Incompleteness
Sales- Header
Sales- Item
Sales- Schedule Line
Partner
Sales activities
Delivery header
Delivery Item
What are the setting to be done for BOM to explode in a sales order?
In the item category for the line item of the sales order, the field structure
scope should be selected and in the material master the item category group should
be maintained as ERLA.
We want to explode Bill of Material automatically at time of Order entry and
explode an Equipment BOM in the sales order. What are the setting required?
Use an item category that is configured for bills of material for having a sales
BOM to explode automatically. Standard SAP item categories are: TAQ - Pricing and
inventory control take place at the BOM header level. TAP - Pricing and inventory
control take place at the BOM item level. These can be automatically derived using
the item category groups ERLA and LUMF, respectively.
-----------------------------------------------------------------------------------------------------------------------------------------------------------Unit 21: Overview of the Delivery Process
How many levels are there for Delivery Document?
A delivery Document has two level- Header and Item. There is no schedule line. The
reason is each schedule line in the sales order can become an item in delivery
document.
What is shipping processing?
Shipping processing begins when the delivery document is created. It supports
creating outbound deliveries, picking( by creating transfer orders), packing and
post goods issue.
What is picking?
Picking involves creating the correct quantity and quality of goods for shipping
on schedule to a customer. Picking can tales place automatically when the delivery
is created or at specified times or can be triggered manually by an employee in
the shipping department. In picking a transfer order will be created for an
outbound delivery.
-----------------------------------------------------------------------------------------------------------------------------------------------------------Unit 22: Basic Customizing Settings for the Delivery Process
Pick/Pack Time
Loading Time
Transportation Time
Transit Time
How the system determines the Picking location / storage location determination?
There are three rules for Picking Location i.e. MALA, RETA, MARE
MALA: - determination based on the shipping point, the delivering plant, and the
storage location (Material master-plant data/storage 1)
RETA: - Determination based on the delivering plant, situation, the storage
condition.
MARE: - First MALA then RETA
What is Transfer order?
A transfer order is an instruction to move material from a source storage bin to a
destination storage bin within a warehouse complex.
What are the effect of PGI?
The effect of PGI are as follows;
1 Reduce warehouse stock
2 Post the value change to the stock accounts in inventory accounting
3 Enter status information in the outbound delivery.
4 Reduce delivery requirement.
5 Is store in document flow and update status of preceding document
6 Create work list for billing.
------------------------------------------------------------------------------------------------------------------------------------------------------------Unit
What master data is used to for proposing the partial delivery flag in the order
item?
The proposal for the Partial delivery for the order item comes from the customer
master
What is the transfer order?
The transfer order is an instruction to move material from a source storage bin to
a destination storage bin within a warehouse complex. It includes the information
about the material number, quantity to be removed and source and destination
storage bin.
What do you mean by Lean Warehouse Management?
Lean warehouse management is fixed bin warehouse management type. This WM does not
have inventory management at the level of storage bin. In fixed bin storage area,
a particular material is always in the same storage bin.
-----------------------------------------------------------------------------------------------------------------------------------------------------------Unit 25: Packing
------------------------------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------------------------------