You are on page 1of 148
STRUCTURAL CALCULATIONS FOR Linear Accelerator Replacement UCI Medical Center Orange, CA KNA No. 240.072 April, 2013 Prepared Under the Direction of: Registered Structural Engineer, S.E. 2553 (CA) KNA Consulting Engineers, Inc. 9931 Muitlands Bivd., vine, CA 92618. ‘Tel (949) 462-3200 « Fax (949) 462-3201 wow KNAconsuiting.com INDEX OF CALCULATIONS Linear Accelerator Replacement UCI Medical Center Orange, California Description ‘Sheet Number Site location & coordinates —~ Seismic Criteria Generator Cabinet Anchorage—— Modular Cabinet Anchorage ~ Base Frame Anchorage~ Console Cabinet Anchorage In-Room Monitor & Optical Imaging Camera Anchorage — TrueBeam In-Room Ceiling Monitor Anchorage ~ Xray Detector & Infrared Camera Anchorage- Duct Shielding Support Anchorage————-— Lead Brick Support Column —— References = Brainlab Seismic Calculations GPS Visualizer: Quick Geocoder Page | of 1 eelbijey Sa SS @: soem nace aGemkias alate tes septa, Free Online + PS Visualizer’s Quick Geocoder GPS Visualizer's Quic ‘wom sosGalny ge er carte ved GetWaps, Gerber anaes tae Deectons, Steet yas anapes wn ne rine hone Views & Trafic with Stnon Seno mand le cas Freeinaat “nh conan ae cen 295. Yann h, Oa Soe ne, SR) wee i Big ncieneravenn oan ] vem f ————— ome gO per ee Fass se iathy | coro ene HESS ae. http://www. gpsvisualizer.com/geocode 3/8/2013 Conterminous 48 States 2005 ASCE 7 Standard Latitude = 33.7882858 Longitude = -117.8936142 Spectral Response Accelerations Ss and S1 Ss and S1 = Mapped Spectral Acceleration Values Site Class B- Fa = 1.0 ,Fv=1.0 Data are based on a 0.01 deg grid spacing Period Sa (sec) (9) 0.2 1.367 (Ss, Site Class B) 1.0 0.494 (St, Site Class B) Conterminous 48 States 2005 ASCE 7 Standard Latitude = 33.7882858 Longitude = -117.8936142 Spectral Response Accelerations SMs and SM1 SMs = Fa x Ss and SM1 = Fvx S1 Site Class D - Fa= 1.0 Fv = 1.506 Period Sa (sec) (g) 0.2 1.367 (SMs, Site Class D) 1.0 0.744 (SM1, Site Class D) Conterminous 48 States 2005 ASCE 7 Standard Latitude = 33.7882858 Longitude = -117.8936142 Design Spectral Response Accelerations SDs and SD1 SDs = 2/3 x SMs and SD1 = 2/3 x SM1 Site Class D - Fa = 1.0 Fv = 1.506 Period Sa (sec) (g) 0.2 0.911 (SDs, Site Class D) 1.0 0.496 (SD1, Site Class D) CLIENTNO. REVIEWED BY. ‘TAS CALHANONS CON MFORAATON PROPRETI To MA GENSAT ENGINEERS, WE. Ts ‘HoEAMENT on TS CMTE WT HO E REPOOIED On SECC To OMENS WONT HE FO ‘TEN CONSENT OF XA CMSIING ENGEL TS RESEND SHEET oF prosect UCIMC Lin Acc yosno 240.072 Generator Cabinet pate 03/13 cuent _Liebke ey AL EQUIPMENT ANCHORAGE. EQUIPMENT OVERTURNING CALCULATIONS ARE BASED ON A SEISMIC LOAD APPLIED AT A CRITICAL ANGLE EQUIPMENT DESCRIPTION : Generator OPERATING WEIGHT, W,, 710 # 0.4(a,\Sco)l,) (: 42 SEISMIC HORIZONTAL FORCE, z, DATE WHERE: a, = COMPONENT AMPLIFICATION FACTOR : 1.0 R, = COMPONENT RESPONSE FACTOR 7 25 Sps = SEISMIC COEFFICIENT (ASSUME SITE CLASS D) : 0.911 IMPORTANCE FACTOR 2 1.50 HEIGHT OF COMPONENT ATTACHMENT VS. GRADE : Of HEIGHT OF ROOF VS. GRADE : 15 ft F, SHALL NOT BE LESS THAN 0.3(Sps)\I_)(W,) F, NEED NOT EXCEED | .6(Sps)(t,)(W,) F, = 0219W, = I55# F, MIN = 0.410 W, 291 # GOVERNS: F, MAX = 2.186 W, 1552 # VERTICAL COMPONENT, Fy = 0.2(Sps)(W,) Fey = 0.162W, = 1298 MULTIPLY ABOVE VALUES BY 0.7 FOR WORKING STRESS DESIGN F, = 204# Fy = # SHEET prosect UCIMC Lin Acc yoBNno 240.072 Generator Cabinet. pate 03/13. ‘CLIENT Liebke. BY AL g EQUIPMENT ANCHORAGE (CONT'D) é 4 i 3 S) | & 05 ss} Y Rain iT ' x 2 ran g [we Fi ale Bw col Bs # r ; 4 ELEVATION ELEVATION LENGTH BETWEEN SUPPORTS, b, : 21.6" WIDTH BETWEEN SUPPORTS, bz : 21.6" HEIGHT OF CENTER OF GRAVITY, hog : 59.0" NUMBER OF MOUNTS, N : 4 CONSIDER LOAD APPLIED IN ANY HORIZONTAL DIRECTION TRANSVERSE COMPONENT = F,cos® LONGITUDINAL COMPONENT = F;sin@ UPLIFT ON ATTACHMENT 2: ‘eS CLCUATONS CoM WFORAATON PUPRIERY To COAG HOKE, e. ‘COWEN os COTES WY NOE REPODIEE bk LSE Te MENG WIV ‘MITE CONSENT OFX CNSLTNG ENCES AL MTS RSE. COMPRESSIVE LOAD ON ATTACHMENT 4: (WF), (Freos0)(na)(bs/2) (F200) hg) (6/2) N CLIENTNO. REVIEWED BY. KIND consuttina engineers, ine: PROJECT (CLIENT DATE. suet oF UCIMC Lin Ace yosno 240.072 Generator Cabinet pare 03/13 Liebke ey AL EQUIPMENT ANCHORAGE (CONT'D) FOR MAXIMUM P, OR P+ aP, ae ar, ro HENCE: (F,21n®)(hea)(be/2) _ (Fcos8)(h, by te (bn) a el) 473.1 in? = 473.1 in? ene = 45.00° MAXIMUM UPLIFT LOAD ON ATTACHMENT 2 P,= -307 MAXIMUM COMPRESSIVE LOAD ON ATTACHMENT 4 Pe = 591 MAXIMUM SHEAR PER ATTACHMENT. P= 5! G Cail ns Profs Archon 23.8 Sev a ome ; cory me Toue om Biron: Mee So. \ aS Sts 2 Scr oon 1 Input data Anctorypeandconeer: Kw 80812-08380) i=l Ctecretreomet ot, fe200 Inna vc Coens ceumnoeieeret: en me Stoo 098/859 wer “Geom pa hss ute none vere oot aes nce, n+ 2p gn 400 src thaws cron shrcnaton noire terse pio Seismic loads (ca. C,D. E, oF) Goometry [in] & Loading fb, nb} ‘edge reinforcement: none or < No, 4 bar ‘gana a emt te aaa ongene in he nig nao wa aba ‘RESSRo)aor ov cf saoconcan sea Sgumrea seman set fe, chan ores Profis Anchor 2.3.5 Company KNA Page: 2 Specter: Project ucime ‘Astess: Sub-Projct | Pos. No. Generator Phone | Fax: Hl Date: ‘32872083 EMal 2 Load case/Resulting anchor forces Load case: Design loads [Anchor reactions [15] ‘Tension force: (+Tension, Compression) ‘Anchor Tension focoe__Shearforce_Shearforce x _Shear force y a a a ‘max. conerete compressive strain: Ph ‘ax. concrete compressive sess “Ips resulting tension free in xy)=(0.00000.000): 0) resulting compression force in (xy}=(0:000/0.000): 0 [1] 3 Tension load _ oad Ms) anacty 9 01 “Sis svenath — ee aay Putout Stength* 570 1618 ‘Concrete Breakout Strength 570 we * anchor having the highest loading “anchor group (anchors in tension) 344 Stool Strength Nw =ESRvake refer oICC-ES ESR 1917 Nese Noe ‘ACI 318-08 Eq, (1) Variables 0 Aa 3) fun (psi, + tos 000 Ccateulations Nab) Results Ng) am Na) Nu Oo a8r5 370 3.2 Pullout Strength Npxg = Naat Vids refer to ICC-ES ESR 1917 ACI 318-08 E49. (0-1) Ngo OL ‘Bar Results 9 trap 1 inp aaa ea rato haan oyna wh tp cing coins aif (Pet cars) 0 sts nF eae Sanaa Tow wares rama tA, Sean tization p= Nun w 96 4 Coa vemahitns Profis Anchor 23.5 Conny: wa Fao A Speier Pret ome fears StbPropetiPos.No: Generator Pane Fax ' Bae saseors She 3.3 Concrete Breakout Strogth (&) A Na = (RE) voew ven ven Ne $C1312-08 Ea. (0-4) pret ACI 318.099. (0°) Ais eect 1008, rat0.521. Fe R05210) p01 31808 9,606 7m) =10 Acisi808 9.09 7+03 (Sgt) <10 Aci 189869, (049 Sh) « 1h) 54.9 ACI 31808 £4, 0-19 Aci 3160869. (07 vaibes tnd set) Sagan m ooo "seo “tt —— sqfo) nN fps ae 1 + ‘0 catcuators Axe fin] Aro (0) cn via - ‘ean Neo fb) “00 ‘san 388 18 4885 704 ests Nef) eames Nf ee Sass whe 0 ican ra sc mine messin ageenar inh ocaing sno arpa PRS acr(o) 200 Sco a nc Fb Sa ajar asst A, Stan a Coal Profis Anchor 2.3.5 KNA Page! 7 Spectr: Project cme Adress: SubsProject Pos. No. Generator Phone | Fax I Date: 372872013 Eat 4 Shear load Load Va 8) Capacity Vn lb] Utilization py= VulgVn Status “Sisal Sienaih™ 35 7 OK ‘Stee fare (th ever army" NA NA NA NA Pryout Strength* 95 1048 0K Concrete edge flue in direction y+** 6 3001 4 ok “anchor having the highest loading “anchor group (relevant anchers) 44 Stool Strength Va =ESR abe refertoICC-ES ESR 1917 Mana Van ‘ACI 318.08 Eq, (0-2) Variables n Ayn?) tbs a0 Cautions Ve “te Revuns Vel a io — ee hs ra 42 pryoutstronath Me hel (At) van venvon's] pcts100864. 0-9 M02 Von ‘AC1318-08 Eq. (0-2) AvP eothci 210-08, Part 052.1. Fig. RO.82.10) Aes * 9h Aci 318089. 08) 1 wos (Gzm) 10 Aci 318.089 (0-9 am veas207 +03 (S484) 51.0 AcI318.08 Eq, 11) von = wax( 2, 18) 40 Aci 318089, 0-19) a Monit Aci S1808€9. 0-7 Pe fin Seip fin) Seay fir.) ase (i) 2000 thos “sor ‘Zo00 ven exefin) ek lps 180 3 ——- no Ceateuatons Aci’) Ayalin’) 7 wa . ve "eo co) +b ? +85 Rosuts Va) forsee 4¥e 0) Ve) “ete 88 "i 3 inp anand usta chen ayeonesl wih ba oierg abo es plasty Pets occ) won ate an Ac FubeSoan Tain ete sara oh, San Coal] ore tus Profis Anchor 2.3.5 Compe: ma Page: 5 Specter Project: ucime Adoress. ‘Sub-Project | Pos. No Generator Phone | Fax 1 Date: si28n013, EMat 4.3 Concrete edge falluro In direction y+ Vo = (RYE) ve vev vv vor Yo AC1318-08 €4.(0-21) $¥a2 Ya Aci 91608 Ea. 0-2) Jc ee ACI 918-08, Part 06.2.1, Fi. RO.2.10) Ae "45 AC 310-0869. 0-29) ‘ ev ( -=)s ° ‘ACI 31608 Eq, (028) my #07 +03( 982) 340 Ac1 318089 26 gov = VERS 10 AC131808 9 (026) w =(7(¢)G) har AC} 318-08 9. (24) Voriabies astm) cain} ein} atid F000 3003 —— “so ito —— 00 — wn) {bo E000 5000 Cateuations Ave fin?) Ave in} v 1 ww Me {tb} = oD 18 Te25 Results Yes) me Net) Ve) “87 708 a0 % 5 Combined tension and shear loads Usiztion pes ofts big on pw gh phe 4 6 Warnings + To avoid falure ofthe anchor pat the required thickness canbe calcated in PROFIS Archer. Load restibutlons onthe anchors due to last deformations ofthe arcnor plate are not considered. The anchor plas assumed tobe suiclenty stil, order no tobe deformed when subjected tote loading! Condition A applies when supplementary reinforcements used. The & factors Increased for non ste! Design Strengths except Pulout Stength ‘and Pryout strength. ConcitionB apples when supplementary reinforcement isnot used and for Pulout Stength and Pryout Stenghh. Refer to your local stanaars, + Refer tothe mnufacture’s product Itersture for cleaning and installation instructions, + Checking the transfer oftoads into the base material andthe shear resistance are required in accordance wit ACIS18 or the relevant standart! Fastening meets the design criteria! itp da at mn min chased or ageonet win aon one ae pay Ponts ava) 208208 an Ke Fhe Sta ase aragered rat SA, Sean MU Coal ius ___Profis Anchor 2.3.5 Company: KNA Page: 3 Specter: Project: uoime ‘adress ‘Sub-Project | Pos. No Generator Phone | Fax 1 Date: 3082013 EMal 7 Installation data ‘Anchor plate, tee: - ‘Anchor type and dameter: Kwik Bol TZ CS, 318 2) Profi instalabon torque; 300.000 inte Hole ameter inthe ature - Hole dlameter in the base material: 0.375 in Plate thickness (put Hole depth inthe base materi 2.625 in, Recommended plate thickness: Minimum ticks ofthe base material: 4.000 in, ‘Cleaning: Manual ceering ofthe cried hole according fo instructions for use is required, Goorainates Anchor in Anchor xy on AP boa aoa Te Boe Bo 12 bo 12800" 8 Remarks; Your Cooperation Duties + Aay and alt information and data contained inthe Sofware concer solly the use of Hil products and are based on the principles, formulas and ‘ecurtyreguations in acatdance wih Hits technical drecione and operating, mounting and assembly instuctons, ec, hat must be stiely ‘omaled wih bythe user. A fgures contained teen are average fgures, and therefore use-spectic tests are fo be conducted price to using the relevant Hit product The reals of the calculations caries ext by means ofthe Sofware are based essentially on te data yau putin ‘Therefore, you bear the sole responsibilty forthe absence of ers, the completeness ard the relevance of the data tobe put ny you. Moreover, you beer sole responsibilty for having the results of he caluition checked and cleares by an expen, parbculary with regard to ‘compllance wih appeable norms and permis, prior to sing hem for your specie acy. The Sofware serves only asa ad Interpret noms land permits without any guarantee 26 fo the absence of errors, the correctness and the relevance of te resulsor suitably fora spectic application + You must tae al necessary and reasonable steps to prevent or Iii damage caused by the Sofware. In paticular, you must arrange forthe regular backup of programs and data and, i applicable, carry out the UpCates ofthe Sofware ofered by Hit on a regular bass. Ifyou donot use the AutoUpdate function ofthe Software, you must ensure tha you are using the current and thus Up-o-date version ofthe Sofware in each case by carrying oul manual updates via the Hi Website. Hit wil ot be lable for consequences, suchas the recovery fost or damaged deta or programs, sing from a culpable breach of duty By you. Provide (1)3/8" dia, Hilti KB-TZ (ICC-ES. ESR-1917) at each comer of unit. 2° embed Spt caasnpatn crease geen wah a wang sndnors warp Ron aca (c) 200208 ae AG FLEA Stan ss ee aa TH Mo, Sean DOCUMENT NUMBER 100047782 ‘at SEgga ‘SAMPLE STRUCTURAL CALCULATIONS: i. TrueBeam System ‘TrueBeam STx System Modulator Cabinet Anchorage (Design Update to 2007 CBC) CuENT: Varian Mecical Systems 3100 Hansen Way Building 4A, M/S E-165 Palo Alto, CA 94304-1038 STRUCTURAL ENGINEER: Rinne & Peterson 1121 San Antonio Road Suite C200 Palo Alto, California 94303 (650) 428-2860 REP #M9199 May 14, 2010 Rodney Hartunian, California SE 4438, Expires 12/31/11 ‘These are Sample Calculations for reference only. The individual installations must be ‘engineered by the purchaser based on actual site conditions. ‘TrueBeam / TrueBeam STx Modulator C: May 14,2010 TrueBeam / TrueBeam STx Modulator Cabinet 2007 CBC SEISMIC ANALYSIS L3x2K w/¥"6 HOLE FA. END. PLAN WT. 1885 Ibs. €.G. 33” ABOVE FLOOR “ 1. SCOPE The purpose of this report is to provide a sample calculation and seismic anchorage detail for the TrueBeam / TrueBeam STx modulator cabinet to meet the 2007 California Building Code. 2, DESIGN REQUIREMENTS AND ASSUMPTIONS OF SAMPLE CALCULATIONS A. Analysis for the seismic anchorage is in accordance with 2007 California State Building (CBC) and ASCE 7-05, “Minimum Design Loads for Building and Other Seructures” B, Dimensions, weights and centers of gravity are provided by Varian Medical Systems. C. When installation is not in California, the engineer of record shall determine the applicability of the following design and modify, as required, following local city and state building codes. D. Anchorage is into a reinforced normal weight concrete slab of 4” minimum thickness and f, = 3000 psi minimum designed for the applied forces and allowable soil pressure. E_The location of installation is assumed to be at or below grade in a building assigned to Seismic Design Category F and Site Ciass D. Page 2 of 4 ‘TrueBeam / TrueBeam STx Modulator Cabinet Anchorage May 14, 2010 F. Sample calculations are based on a mapped MCE short period spectral response acceleration parameter(Ss), value of 2.5 and a Component Importance Factor(lp), of |. G. All concrete anchors shall be Hilti Kwik Bolt TZ expansion anchors(ICC ESR- 1917) or equivalent and be approved for installation in cracked concrete conditions, Minimum edge distance to a loaded edge is 3 5/8”. Anchor design in sample calculation is based on allowable stress design principles per CBC Section 1605A.3.1 H. All concrete anchors shall be installed and inspected per the manufacturer's recommendations and respective ICC evaluation report. |. Each site must submit documentation to the appropriate local or state Permitting agencies as required. 3. SUGGESTED PROCEDURE FOR ENGINEERING COMPUTATIONS. A. ASCE 7-05, Section 13.3: O4apSvsWp z Fy = 2 (ASCE 133-1 Be ( * iJ ‘ ) bb Frnn 2 0.3SvslpWp (ASCE 13.3-3) Sos =1667 0 p= 15 220 G4(L.0N1.667)¥e | o(2)) A00W, 25 h 1s Fp = 0.3(1.667)(1.5)¥> = 0.750%, GOVERNS Also, design for vertical component per ASCE 13.3.1 Epos = 40.2S0sWp Foros = £0.2(1.667)Wp = 40.3331 B. Forces on critical connection at allowable stress levels: 0.7 Fp* Zou ~(0.6Wp 0.7 Fma)* a 1. Uplife force, Tes = 2d Uplift force to connection, Tem = = Page 3 of 4 May 14,2010 2. Shear force to connection, Viens = 3. Design of concrete anchors based on ACI 318, Appendix D, ASCE 7-05 Sect. 13.4.2, and Hilti ICC report for converting to allowable stress design. Note: Per 2007 CBC Section 1908A.1.47, a ductile failure in the steel clement is not required in nonstructural component design regardless of Rp used. 4. SUMMARY OF SAMPLE SEISMIC COMPUTATIONS: We = 1885 Ibs Fp = 0.750 x 1885 = 1414 Ibs. FP = 0.333 x 1885 = 628 Ibs. Zone 33 in = 30.85 /2= 15.43 in Teonn = 356 Ibs Veonn = 247 Ibs ANCHORS Teonn = 356 x 1.3 = 463 Ibs Veonn = 247 x 1.3 = 321 Ibs From Hilti ICC report, Use 3/8” diameter TZ anchor with minimum effective embedment of 2 in, Tall = 1006 Ibs Vall = 999 Ibs Inceraction 2). 221) o7e<12 oK i006 }*\ 999 Page 4 of 4 Consulting Engineers, Inc. [NP consutens enaineeras inc. wer IL CLIENTNO. DBY REVIEW: prosect UCIMC Lin Acc yono 240.072 Modular Cabinet Anchorage vate O4/13 cuenr “Lebke ey AL EQUIPMENT ANCHORAGE EQUIPMENT OVERTURNING CALCULATIONS ARE BASED ON A SEISMIC LOAD APPLIED AT A CRITICAL ANGLE EQUIPMENT DESCRIPTION : Modular Cabinet OPERATING WEIGHT, W, 11865 # SEISMIC HORIZONTAL FORCE, Saath! ( +2 2) WHERE: . a, = COMPONENT AMPLIFICATION FACTOR : 10 g R, = COMPONENT RESPONSE FACTOR 28 # Sos = SEISMIC COEFFICIENT (ASSUME SITE CLASS D) : 1.300 6 |p = IMPORTANCE FACTOR : 0.91 z = HEIGHT OF COMPONENT ATTACHMENT VS. GRADE : oft h = HEIGHT OF ROOF VS. GRADE : 1S fe a F, SHALL NOT BE LESS THAN 0.3(Sps)(I,)(W,) fi i F, NEED NOT EXCEED | .6(Sps)(lp)(Wp) aE age Fe O.169W, = 357# ag F, MIN = 0355W, = 670# GOVERNS it F, MAX = 1895W, = 35724 He i VERTICAL COMPONENT, Fp, = 0.2(Sps)(W,) i Fev = 0.260W, = 4904 ag i MULTIPLY ABOVE VALUES BY 0.7 FOR WORKING STRESS DESIGN gis FI as i CLIENT NO. REVIEWED BY [SHOE os CMTS a RT He REPRODUCED OR USGLNSED To CHES THON HEP ‘RSE OALEALATOASCOKTAN FORMATION PRPREIAY TO CORSNG SHORES. rs (ann COM F A GERSUTNG HERES EAL TS ESIC, Ganaulting Engineers, ine NP consuttins Enaineers, tno. oveer I oF Prouect UCIMC Lin Acc sosno 240.072 Modular Cabinet Anchorage vate O4/13. cunt _Liebke sy AL EQUIPMENT ANCHORAGE (CONT'D) Ix PLAN DATE ELEVATION ELEVATION LENGTH BETWEEN SUPPORTS, b, : 535° WIDTH BETWEEN SUPPORTS, bo : 30.9" HEIGHT OF CENTER OF GRAVITY, hg 33.0" NUMBER OF MOUNTS, N 4 CONSIDER LOAD APPLIED IN ANY HORIZONTAL DIRECTION TRANSVERSE COMPONENT LONGITUDINAL COMPONENT UPLIFT ON ATTACHMENT 2: INT NO. cul REVIEWED BY. ‘EMEN RTs CONTENTS Ha RT Be REPRODOED OR SLOSS To ORES THI HE PDS (MNT CONSENT FA EASTING HEME MEAL STS ESE "THESE CAcALOWS cK FRNATON PROPHET TO CNSATOG ENOKERS, GTS Consutting Engineers, Inc. NP consutting Enaineors, inc. west 6% provecr UCIMC Lin Acc sosno 240.072 Modular Cabinet Anchorage pate 04/13, cunt _Liebke By AL EQUIPMENT ANCHORAGE (CONT'D) FOR MAXIMUM P, OR P-: Foo do aP. 9 ao DATE = 2662 in® 1, = Neale = 951.7 mn? ” 4 Gene = 29.97° MAXIMUM UPLIFT LOAD ON ATTACHMENT 2 P= -92 MAXIMUM COMPRESSIVE LOAD ON ATTACHMENT 4 Po = 846 MAXIMUM SHEAR PER ATTACHMENT PL= 117 (54 Call wets Profs Anchor 25.5 (CO Sorpeng Ta Canta Engine = 5 Srey a es dlc tn ae ame SeeiPee.o: Moar Gabe See 1 Es seas eu Speier comments 1 Input data Anchor type and diameter: wk Bot 12-63 382) a Efeciewbeumertsep: ye 20008, Pan # 23931, vet Caton Steet Eten Soren Rept: esr 1817 fovea Ven tirana Prot eign metiod ACI 3187 ACHBS Sanat rotten: “Recommended pate ees: sce) Prete no rie bose eel cracked ear, 300» 200 p= 4000 retrcornt tension: condtnB shea: codon 8 osupemeral sting ercemert present tee robert nm or «No. Aba Seumielees(e8. 6.0.8.0) we Geometry [in] & Loading [Ib n.b) ‘PRORISArcnr(e) 2003200908 AG, FL SMBe Schwan aoa oe py "agar reson tat Senn ots Company: KNA Consuling Engineers, ne Specie: aL Asrese Phone | Fax 1 Mal 2 Load case/Resulting anchor forces Load case: Design toads ‘Anchor reactions [tb] Tension force. (+Tenson, Compression) ‘Anchor Tension force Shear force __ Shear force x Ser 27 ° max. conczete compressive strain: max. concrete compressive sess fesuting tension force ey) =(0,000V0.000) ‘esuling compression force in ()=(0:000/.000): 0) 3 Tension load Load Na (8) “Steet Strength” Pullout Strength m CConecate Breakout Stength"™ wm * anehor having the highest loading “anchor group (anchors in tension) 34 Stoo! Strength Nu = ESRvalue —_rofertolOC-ES ESR 1917 WW? Na fol ste-08ea (1) Variables fn Any 03] fas (psi) ‘8000 Calculations NP resus Natl fo Nal Nah 00 Si ans i 2.2 Puout strength ote Naw *Nease Vetig refer to ICC-ES ESR 1917 Ning 2 Naw ACI 318-08 Eq. (0-1) Variables felpsi) Naso fb) ‘eo Sao Cateulations Next (00) Nuc fib} ee} — ef" “rr Page: Project Sub-Project | Pos. No Date: ‘Shear force y 27 Capacity ¢Ny Ib} 1616 ame Utization G9 Cail Profis Anchor 2.3.5 2 UcIMC Un Ace Modular Cabinet ariazor3 SS NalgNy Status ‘OK oK 10 oK ea eva ae ow senate cargoes merous PRES AA cfumales tne Fess Shan aw ea ajeote Tacosee cte 2, Sean wb Coal] Profis Anchor 2.3.5 KNA Consulting Engineers ne Page: 3 AL Project UcIMC Un Ace Sub-Project | Pos. No Madar Cabinet 1 Date! arvor013 2.3 Gonerete Breakout Stength ne = (8) vander vont acis10209 04 No? Now ACI91608 Eg, (0-1) Aw" Seth ste08, pat 052.1. Fig, 052.109 Aci ate00 9 0-6 ACI 316-08 Eq, (0) ACI 318-08 Eg. (041) von = me, 5B) «10 ACI 9160869, 0-19 Ne shea Veni Aciat808 Eq (7) Say lin) Same iP.) ven aco “8000 +0 4k __ fe lps) i 7 Cautions Ae fin?) Av jeer ee ge x) S80 785 $88 +805 18 Results Neat) — ai —_ a — 9-1 Cael vn tias Profis Anchor 23.5 onpany TG Gonaing Ergon Fe Pa 7 Sot i Proea foe tinace in. Seep pos os Modano Sete Fac 1 Bate ‘hanors eo 4 Shear load Capacity 4V, [Ib] Utilization p, = Vig, __ Status “Se sea ee % 5 ‘tet eee a Na NA wa ws Pry Stat” a teas ‘2 ox Cont edge fae decion yo a soot 2 ox “norte itestladhg “entero (evant rch) 44 tet strongth Ve ceSRvaue —ferto GOES ESR 1817 Note neisteoets ©) Varies . into 4 “ud ‘eeco cations Mag {0} recut Ver Cs oa Vat — se tar a sp — 2 pryoutstenath Vin he [ (BE) verrver vent] ‘ACI 318-08 Eq, (0-20) er Act 318009 (02 Aer LSher ten, pono 82.1.9 Ro.82.10) Powe = 9h ACI 318-08 Eq. (0-6) 1 wos (GER) =10 ACI 318.08 Eq. (0-9) oe vous 07 +03 (S42) 510 0131808 €a,0-11) vows War 28,15) 59 pot s100862. 0-9 Ne ska VERE ACI 318-08 Eq, (0-7) Ke tng eeutin) ean tin] " “se Solo van ao en) a ‘ipa deta a ens bo chechad fr oyfeomeri wih he ausing orders dle piusbilyy ieaneraesartanar Sanaa a 15-6 Cael] ets ee Profis Anchor 2.3.5 ‘Company: KNA Consuling Engineers, nc Page 3 Specter AL Project UcIMC Un Ace Aasress ‘Sub Project Pos. No, Modular Cabinet Phone | Fax f Date: arva0r3 Mal 44.3 Concrete edge failure in direction y+ ve = (SE) wavy ves ncssi9a8 4,029 ever poisieoaes 62 Re Doyo pan 0.621 Fg R0.8210) 5G; ACI 318-08 Eq, (0-23) ACL 318-08 Eg, (0-28) ACL318-08 Eg (0-28) ACI 318-08 Eg. (0-29) ACI 318-08 Eg. (0-24) seis) gp sla fe fin) a gin) ‘elpsi) “v a a a) Aue Bein’ bay _ tae oy Vopel $00 Fas 00 so he 7435 re Neo} Vea {0} Vex 0) 5 Combined tension and shear loads . Utlizaton guy 6) ‘status ofte nn a Bau Ba 86 6 Warnings + To avoid fare of the anchor pate the required thickness can be calculated in PROFIS Anchor. Load r-dstibutions onthe anchors due to elastic cefermations of he anchor plate are not considered. The anchor plates assumed fo be sufficiently sit. n oder nol to be defermed when subjected to the loading! + Condition A appies when supplementary reinforcement is used. The factor is increased for non-seel Design Strengths except Pullout Sength ‘and Prout strength. Condon 8 applies when supplementary reinforcements nol used and for Pulout Strength ana Pryout Strength, Refer your local standare + Refer othe manufacture’ produc erature for Geaning and instalation instruction. + Checking the ranster of loads into the base material and the shear reslstance ae requied In accordance wth ACI318 orth relevant stand! Fastening meets the design criteria! PROCS Ancor) 2008-20 8 AG. FLBWD4 Schaon shea estore Trader oN Ne Shaan oA Coal worl Profis Anchor 2.3.5 Company KNA Consulting Engineers, ne. Page: 3 Speciter: AL Project CIN Lin Ace ares ‘Sub-Projct | Pos. No, Modular Cabinet Phone | Fax 1 Date iar013 Mal 7 Installation data Anchor pale, tet: [Anchor type and diameter: Kwik Bok T2 CS, 38 2) Profle © Instataton torque: 300,000 in Hole ameter inthe fit: — Hote lamer Inte base materi 0.375 in Plate thickness (nput Hole depth in the base material 2.625 Recommended pat thickness: - “Mosimum thickness of tne base material 4.000 in Cleaning: Manual leaning of he orld hole according to instructions for use is requied. Coordinates Anchor In Anchor xy Su by tay ST DooT—ao9 F280 42 00 ¥2.600 12.860 8 Remarks; Your Cooperation Duties + Aay and ll information and data cortained inthe Sofware concer solely the use of Hat products and are based on te principles, formulas and security requatons in aceotdance with Hrs technical directions and operating, mounting and assembly instructors, etc, that must be sticty ‘ompled wi by the utr. Al fgures contained heren are average Ngures, and therefore use-specic tests are tobe conducted prior to using the relevant Hit product. The results ofthe calculation caried out by mean of the Sofware are based essenialy onthe daa you putin. ‘Therelore, you bear the sole responsibilty forthe absence of errors, the completeness and the relevance ofthe data tobe putin by you Moreover, you bear soe respons for having the resus ofthe calculation checked and cleared by an expert. particulary with regard to Compliance wih applicable norms and pecs, pir to using them for your specie facty. The Software serves only as an df interpret norms Sand permits without any guarantee asf te absence of erors, the correctness and the relevance of the ress o stabil for @spectic spptcaton. + You must take all necessary and reasonable steps to prevent or iit damage caused by the Software. In particular, you must arrange fr the regular backup of programs and data and, I appieble, cary out the updates ofthe Sofware offered by Mon a regular basi. you donot use the AutoUpdate function of tre Sofware, you must ensure fat you are using the curent and thus up-to-date version ofthe Software in each case by carrying out manual updates via the Fit Webel. Hil vl not be lable for consequences, suchas the recovery fost or damaged data or pogfams, aging rom a culpable reach of duly by you. Provide (1)3/8" dia Hilti KB-TZ at each comer of unit (4 total). ICC-ES ESR-1917 & 2" embed PRE sna an hs Psd Shean ede os Me, ean DOCUMENT NUMBER 11678 es SAMPLE STRUCTURAL CALCULATIONS: ‘TrueBeam System TrueBeam STx System Base Frame Anchorage (Design to 2007 CBC) ‘CUENT: Varian Medical Systems 3100 Hansen Way Building 4, M/S E-165 Palo Alto, CA 94304-1038 STRUCTURAL ENGINEER: Rinne & Peterson 1121 San Antonio Road Suite C200 Palo Alto, California 94303 (650) 428-2860 Rap #9199 May 14, 2010 Rodney Hartunian, California SE 4438, Expires 12/31/11 ‘These are Sample Calculations for reference only. The individual installations must be engineered by the purchaser based on actual site conditions. TrueBeam / TrueBeam STx Base Frame Anchorage May 25, 2010 SCOPE The purpose of this report isto provide a sample calculation and selsmie anchorage detail for the TrueBeam / TrueBeam STx machine to meet the 2007 California Building Code. DESIGN REQUIREMENTS AND ASSUMPTIONS OF SAMPLE CALCULATIONS A. Analysis for the seismic anchorage is in accordance with 2007 California State Building (CBC) and ASCE 7-05, “Minimum Design Loads for Building and Other Structures”. B. Dimensions, weights and centers of gravity are provided by Varian Medical Systems. C._ When installation is not in California, the engineer of record shall determine the applicability of the following design and modify as required, following local city and state building codes. D. Anchorage is into a reinforced normal weight concrete slab (bottom of pit located 12” below floor level) of 12” minimum thickness and f, = 3000 psi minimum designed for the applied forces and allowable soil pressure. The location of installation is assumed to be at or below grade in a building assigned to Seismic Design Category F and Site Class D. F. Sample calculations are based on a mapped MCE short period spectral response acceleration parameter(Ss), value of 2.5 and a Component Importance Factor(Ip), of 1.5. Design is based on allowable stress design principles specified in CBC Section 1605A.3.2. All concrete anchors shall be Hilti HDA-T Undercut anchors(ICC ESR-1546) or equivalent and be approved for installation in cracked concrete conditions. Minimum edge distance to a loaded edge is 12”. H. All concrete anchors shall be installed and inspected per the manufacturer's recommendations and respective ICC evaluation report. |. Each site must submit documentation to the appropriate local or state permitting agencies as required. J. Due to the location of the machine's Center of Mass and reduced anchor ‘capacities due to spacings, the sample calculations shown considers the design for the location where two(2) anchor bolts occur which will be the most critical. See drawing on page 5. SUGGESTED PROCEDURE FOR ENGINEERING COMPUTATIONS A. ASCE 7-05, Section 13.3: Fe (ASCE 133-1) Fron 2 0.3SvsIpWp (ASCE 13.3-3) o Sos = 1.667 Re=25 z=0 Page 2 of 8 \g ‘TrueBeam / TrueBeam STx Base Frame Anchorage May 25, 2010 Fp = 240.667 Wal, of 2) _ 0.40007, (3) 13 Fp = 0.3(1.667)(1.5)%» = 0.750W> GOVERNS. ‘Also, design for vertical component per ASCE 13.3.1: Fen = £0.28 rsp Forex = 20.2(1.667 Wo = £0.333Wp B. Forces on critical connection, based on CBC allowable stress load combination, E section 1605A.3.2: 0.9D (Ece)(ome) 1. Uplift force, + allowable stress dest X24X2 & ress design] T(¥1+ Yow) Uplift force to connection, Tivo = Yis¥2 Uplift Force to connection is based on Center of Mass location, 2, Shear force to connection, Veo = y(Vx)' + (Vy) [Allowable stress design] fpeeermeta] ec 14 * 14 om = Connection group moment of inertia Vx 3. Design of base angle based on AISC “Steel Construction Manual”, |3¢h edition, 4. Design of concrete anchors based on ACI 318, Appendix D, ASCE 7-05 Sect. 13.4.2, and Hilti ICC report for application using allowable stress design principles. Note: Per 2007 CBC Section 1908A. 1.47, a ductile fallure in the steel element is not required in nonstructural component design regardless of Rp used. 5. To convert to allowable stress design, per Hilti ICC report section 4.2: Page 3 of 8 a TrueBeam / TrueBeam STx Base Frame Anchorage May 25, 2010 Roiireas = a=l4 Ru = Re representing the limiting design strength in tension(@Nn) or shear(0Vn) from ACI 318, Appendix D. Page 4 of & ‘TrueBeam / TrueBeam STx Base Frame Anchorage May 25,2010 BASEFRAME (UNDER FLOOR COORDINATE SYSTEM AT BOTTOM OF PIT NI IT LAY’ BASE FRAME PLAN: GENI IN. OF ANCHORS Page S of & ‘TrueBeam / TrueBeam STx Base Frame Anchorage May 25, 2010 See drawings SK-I and SK-2 for seismic anchor layout and details. TraebeanTrateam STs Coukin¥ nw] Coukn ane —|CWT= Counterwelght |weightin & Center of Masai) wr wr [GantrySeand wa 020 x 20 co x 30 530 | 590 590 coy wh sao i380 x 00 40 | S40 ce 2 30 520 w) 00 2070 x 00 00 y oe oe 1 re ue Tomi weiey Wwe) 8 Tes] (Concer of Maui) Xe ° | ve 6 er | za s wo | Bracket Locations & Center of xi ns ns Resietance xa 250 30 wi ns ne x 359 9 xe co ao Ya 167 a7 4 ies no 40 ne leona) 1974 vis same Caleutation fe] 788 \7a88 Fon] 7B 00 faa 77 tn Forerslal S673 sn wion a] sexs 0s eon) 053 sas smear ve ates os | rn) von) ae | an | senerary conn] 4053 sas Yom] 4i94 on x12 orexpansion ——Teona| 589 «0 boie Yeo) sn | 710 2-16 Mill HDA anchors ovens [oom embes TACID18 Appendix gua| 15856 smelt. (Gclertote report gNeby| 12005 sige dle | forproduct specie Nps] 1060) oop ovens | design parameters | equredtor Appendix) ¢¥sa| 13371 spelt eve] 20095 ing oe Breet] 215 groin overs Allowable Stess Design agro] 1660 be oteve| ais. vide by aed Runt] ORO be Ronw| taise be nteracton ss10__,_sno 83 OK 2 Ds 1.67 Weld connection to frame: Provide fillet weld on 3 sides of L4x4 to frame attachment point 2bd+d* @(2b+d) . op= A = TA pis" 4-25" Stop Svot= Tad) Stop = 213 Sbot = 3.79 gun Vic Mert 432, 839.46 iin, Twa SS 115+2(2.5)° 3.79 Team ___ 5.085 Tom 3.085 0.31 kipsin. Tnat 11.5+2(25) tpsiin. gquew = qe? + ge =V2AG + 31 = 2.48 kipstin res eres 228627 16s Use ee wot Also, check reduced edge distance on bolts in angle Let minimum edge distance = 1.25". From AISC Manual Specification J3.10, Ra _1.2LeFe _ 1.2(656Y.625\58) Q- 20 2.0 = 14.3 kips > applied shear load in bolt Page 7 of 8 2B ‘TrueBeam / TrueBeam STx Base Frame Anchorage May 25, 2010 ~t x-2/ seisie Bott tocanon ———‘/ SK-1 TrueBeam / TrueBeam STx Base Frame Plan X22 ANGHOR AT STAND END (8 ewan) SK-2 TrueBeam / TrueBeam STx Base Frame Anchorage Details Page 8 of 8 Re bg Me ‘TrueBeam | TrueBeam STx Base Frame Anchorage May 25, 2010 SCOPE The purpose of this report is to provide a sample calculation and seismic anchorage detail for the TrueBeam / TrueBeam STx machine to meet the 2007 California Building Code. DESIGN REQUIREMENTS AND ASSUMPTIONS OF SAMPLE CALCULATIONS ‘A. Analysis for the seismic anchorage is in accordance with 2007 California State Building (CBC) and ASCE 7-05, “Minimum Design Loads for Building and Other Structures”, B. Dimensions, weights and centers of gravity are provided by Varian Medical Systems, C. When installation is not in California, the engineer of record shall determine the applicability of the following design and modify, as required, following local city and state building codes. D. Anchorage is into a reinforced normal weight concrete slab (bottom of pit located 12” below floor level) of 12" minimum thickness and f', = 3000 psi minimum designed for the applied forces and allowable soil pressure. E__ The location of installation is assumed to be at or below grade in a building assigned to Seismic Design Category F and Site Class D. F, Sample calculations are based on a mapped MCE short period spectral response acceleration parameter(Ss), value of 2.5 and a Component Importance Factor(Ip), of 1.5. Design is based on allowable stress design principles specified in CBC Section 1605A.3.2. G.__Allcconcrete anchors shall be Hilti HDA-T Undercut anchors(ICC ESR-1546) or equivalent and be approved for installation in cracked concrete conditions. Minimum edge distance to a loaded edge is 12”. H. All concrete anchors shall be installed and inspected per the manufacturer's recommendations and respective ICC evaluation report. p Each site must submit documentation to the appropriate local or state permitting agencies as required. J. Due to the location of the machine's Center of Mass and reduced anchor capacities due to spacings, the sample calculations shown considers the design for the location where two(2) anchor bolts occur which will be the most critical, See drawing on page 5. SUGGESTED PROCEDURE FOR ENGINEERING COMPUTATIONS. A. ASCE 7-08, Section 13.3: AapSvs¥p Fp =— | 142. (ASCE 13.3-1) a sce Tp Fan 2 0.3SvslpWp all (ASCE 13.3-3) ap =1.0 ‘Svs Re z ‘TrueBeam / TrueBeam STx Base Frame Anchorage May 25, 2010 F,=249) A(L.0)0.667)%e [1--(g)}ke 400%, 25 h ) oa oul Fp =0.3(L667)(1.5)W>=0750W> GOVERNS Also, design for vertical component per ASCE 13.3.1: Fox = £0.2SusWp Foor = £0.2( L667 Wo oT B. Forces on critical connection, based on CBC allowable stress load combination, section 1605432: 0.9D———— (Fe+za)-(o9m,— "laa ~ [allowable stress design] 1. Uplife force, 7 X2+X2 T(VL+K Yi+¥2 Uplife force to connection, Tin = Uplife Force to connection is based on Center of Mass location, 2. Shear force to connection, Voom =(Vx)’ + (Vy) [Allowable stress design] [fe rele2nra) [eae 4 Seow Tom s 14 We 14 oom = Connection group moment of inertia 3. Design of base angle based on AISC "Steel Construction Manual”, 13th edition, 4. Design of concrete anchors based on ACI 318, Appendix D, ASCE 7-05 Sect. 13.4.2, and Hilti ICC report for application using allowable stress design principles. Note: Per 2007 CBC Section 1908A.1.47, a ductile failure in the steel element is not required in nonstructural component design regardless of Rp used. 5. To convert to allowable stress design, per Hilt ICC report section 42: Page 3 of 8 ‘TrueBeam / TrueBeam STx Base Frame Anchorage May 25, 2010 Re @ Rates 14 Re = @Re representing the limiting design strength in tension(Nn) or shear(¥n) from ACI 318, Appendix D. Page 4 of 8 ‘TrueBeam / TrueBeam STx Base Frame Anchorage May 25, 2010 BASEFRAME (UNDER FLOOR COORDINATE SYSTEM AT BOTTOM OF PIT BASE FRAME PLAN: GENERAL RELATION OF ANCHORS Page 5 of 8 27 TrueBeam / TrueBeam STx Base Frame Anchorage May 25, 2010 See drawings SK-1 and SK-2 for seismic anchor layout and details. “TraeBeamTrueBeam ST Conde] — CoRR weighs) & Centar of Mase) ‘wr cwr (Ganerstand whoo 10200 y 30 S30 z 530 S90 | 00 sto z 20 S20 ae a | 0 ) y ae oe z ea oa Frowarweteny Wea Ta (Concer of Mars) xe ° as Yo 6 487 ze ” S40 laracket Locations & Center of xi nas ne Resitance al 350 350 “I ne ns ui 759 359 Xe te oo Ya 267 a7 i 8s no eon] 1576 sis sample Caleuaion Fo] 7808 7080 Fpen| oa me Feta) 7 tm Fovervlal —Se73 sn raion 7 5095 705 Yeom] 053 58 Isnear ve] aise 1s Yeon] 4194 on [surmary eon) 4053 soos vem] aie | a eine etn) a] x14 ae M16 Hits HDA anchors Gover (o=9.5 eminb") TACI3IS Appendix ge! 15856 sig bo (Refer tec report @Nebg| 12008 ingle bot for product specite ‘Non] 18650 grup Gover ‘Sega parameters requredtor Append) g¥sal_ 13371 single bot aveog| 20095 sre bo Svepe| 1215 group Gover [Allowable Stess Design aggre] 18660. bs rayon] 1215 be vide by alt Rent] 12229 be Ronw] 10154 be 610 N lOWT= Councerweight gost 7 v re 4y 0 Ca woew hitus Profis Anchor 2.3.5 ‘Company: RA Page: 7 Specter Project voime Aare: SSub-Project| Pos. No lin Ace Phone | Fax 1 Date: aezor3 Mai: ‘Specifior’s comments: Basetrame Anchorage 4 Input data Anchor type and diameter Eflecve embedment depth: Matera Evaluation Senice Report Issued | Vat: roo: ‘Stand off instaleton: ‘Anchor late: Protie: ‘Base materia: Inston Reinforcement ‘Solmic loads (cat ©, DE, or) Goometry fin] & Loading (Nb, Intb) HIT-HY 180 MAX-SD + HAS 518 — 1 ae 4.724 0. i =i) 58 ESR 3013 aisr20%0 | a/172011 esign method ACI 318 /AC308 {6 = 0.000. (no stand-of); t= 0.625 in. x1) x1 = 4000 ix 12000 in, 0.625 in; (Recommended plate thickness: not calculates) no profile cracked concrete, 3000, {= 3000 psi h= 6.000 in, Temp. shortiong: 32/32 hammer dited hol, instalation condton: dry tension: eonditon B, shear: condition B; no supplemental splting reinforcement present edge reinforcement: none or < No, 4 bar inp oe wrens tb hence ahs cing anos eel punny Rt avon) ate AG Fuad Sota Ties eee emt A, Sean 30 Call Profis Anchor 2.3.5 cory Pag 2 Project cine ‘Sub Project | Pos. No. Lin Ace Phone | Fax 1 Date: 372672013 EMal 2 Load case/Resulting anchor forces Load case: Design ads ‘Anchor ractons [1] ‘Tension orce: (Tension, -Compression) pocher Tension oreo Shear oreo _Shearorcex Shear force y T 2550 2185 v 7185 2 2500 2108 a 2185 max concrete cmpressive san = thax concrete compressive sess. =e resung terion force nf))e(0.0000.000; 50597) fesutng compression fre ny )0.0000.000: 0] 3 Tension load Load Ns Capacity 9 1b) “wears ; aE "0680 Bond Stengte= 5050 2450 Concrete Breakout Svongth* 089 10381 * anener having the highest leading “anchor group (anchors in tension) 34 Stool Strength Ng =ESRvake —_relerto ]OC-ES ESR 3013 Ra? Na ‘orateoseg 0) Varios a. Aantin| tap 4 én ‘ano Cateutatons Nat) 1388 osuts Na “ “Ne Nt) — tak ha $a alo petal o oe pil dna erase tb chad er yer wh erg onde nar pny PRESS roar ca 2b an AGF Buae Stan Tos nares rac ch, Sen Profis Anchor 2.3.6 ‘Company: KNA — Page: 3 Specter Project dome passe SwProeetPos.No: Un Ace Phone Fax ' Date 3282019 Ena '32.Bond Strength n= (2) verevanevnanvoneNs CES ACNE (080) Na BN ACI 916.089. 0-1) AI" Stee tec-es aczoe, pat o.67 eo "iu 1OC-ES ACIO8 (0-160) tou #201. V EE = 3 ty 1OC-ES ACSOB Eq, (0-16) com oS 1CC-ES ACI08 Eq, (0-108) vom 10709 ag) «10 OC-ES AC208 £9, (0-16m) vow *yuunt [(22)°-(t-vnad]® 19 160-8 403089. (0-189) vane = [oh (es)"]}e2 1CC-ES AC308 Eq. (D-18h) ame hat lec-Es Aca08 Ea (018) 4 sun = (srs) 10 recess O11 ona max ( 08 Se) 51.0 ICc-ES AC208 Eq. (0-165) Ne “ne Ree 1 Oh ICC-ES AC208 9, (0-18) Variables a has) “sannfin) Seal 0 alps “80 obs cr) ‘bo 2 ies fost canta) etn) os 7S S00 F128 16 Cateulatons Sexe] Sean} a sm ven *Tos0 ‘ co) "ear _— ve, 8 1 Resuts Na) foes tibia oes paz es nb as ear wih a sarg onan nde paey FROGS haere} tran AG FLbGe Son isa aoe Taco eA, Sean Call Profis Anchor 2.3.5 cory Page 7 Propet Some SibProectiPos No: Une \ Date nao 2. Conerate Breakout Strength (Fe) van wean ven ern Ne ACI918-08 a. (0-5) gas? Ne AC1318.08€4 (0-1) Ao feotc1s10.09, pat 52.1, Fe R052. 10) Rea *8he nciste08€5 (0-6 ‘ von = (GER) =10 pciste0ees © he or 07409 (848) 510 no131808 9, ©-11) = wax a, 5 . von =a See, 18a) 51.0 Aci 310009 0-19 Stk von noisteees. ©-7 Vavabios hati] ead axel afin _ tr st “0a “fe —— iti Sue fn} ke A {psi} = 00 Cateuttons Aa fi] Ares fin’) yet aN ean enn Nob] 33553 200.88 FBG 8 9562 eauts Nl Nag Natl 884 tee abr 5058 inp anasto crc ageonan wih ong snore warp Photo eynonimatan oF Sae Sean Pts aes Tena Re, Sean wr hts 33 Call Profis Anchor 2.3.5 Company: KNA Page: 3 Spectr: Project: voc ares ‘Sub-Project | Pos. No Un Ace Phone | Fax f Date: ‘12072013 Mal 4 Shear load Load Vos ib) Capacity gV_ 0b] Utilization py= Val4Ve___ Status Sea srergi - 2188 3605 38 OK ‘Stee falure (wih ever arm)" NA NA NA NA Pryout Strength (Bond Strength conto) 4370 18220 ey ox Concrete edge flue in rection ye™ 4370 6231 n ox * anchor having he highest loading 4.4 Stoo! Strongth Vg = {006 Ay fan) “anchor group (relevant anchers) toler to ICC-ES ESR 3013, Wa2 Vea nerste 099 2) Variabes . Ay in§ 7 oe Catetations Ye te00 Results Va Ma Ve a 285 ipa was mates resid or ageonen wih bs wing nai ana pny POSS rac) n otek Ao Fon San Tae a rego acer A, San 34 Coal wow itu Profis Anchor 2.3.5 Company ia Page 3 Speater Proset tome ores: SubProeet Pos. No: Un Aes Prone Fax ' Date sps2019 ema “42 Pryout Strength (Bond Strength control) Vey =to[ (f) veo vor ves vote No] ACI318-06 64. (0-91) Ye 2 Yow ‘ACI 318-08 Eq, (0-1) KO" seelice-es acave, pat 0.83.7 Aoao = Sine ICC-ES AC308 Eq, (-16c) fenm =200-V BE hy ICC-ES AC208 Ea, 0-166) com 2 ICC-ES AC208 Ea, (0-186) nw #07409 (288) 510 166-E5 908 Ea. (06m) vanw = yao [(22 (1 yame)]249 10-45 C308 Ea, (0-169) von 8 [oi - (te) Fe 10 ICC-ES AC908 Eq. (0-16r) amce® AG Vane 1OC-ES AC308 Eq, (0-18) 1 = wax( (208, S288) « tec : one = ax( Sas, 324) 40 ICC-ES AC308 9. (0-16) Ne ime tome Hd by 1cC-£8 ACI08 Eq (0-18) Variables sewn 5) ss B81 feoe 0} bata) a 2680“ nea 3 k fetos sti} Cane) actin) a — — ste ia300 128 +08 Ccalesations Seralin] ___eayatin} Artin) Actin’) vg nubs) ins Ye sao 18635 5 yan enn $33 pn Neo fo) 35 sob 186 7E16 Rosuts Veg Veg Ye) tes S08 wean “0 ‘ipa aia ta ooctaiecoguanen wit ws acorns aa ping rapaers ose tf, Sn PROS rears) a Sts aA Fae San 35 Cell ew tus - _ Profis Anchor 2.3.5 Company: cary Page 7 Specter Pret tome ‘eoress SubProjetiPos.No: — Lnace Phone Fax ' Bate parora eMat 4.3 Concrete edge failure in direction y+ — - Van * (RE) a yuu vev voy vot Vo Aci31808 4, (0-22) 4$¥on® Va ‘Ac131808 9,02) Ai eect a10.09, Pan 092.1, Fig. RO6.2.10) Ae *45c, Aci 31008 4,23) " vey “(-2)s cI 318.08 4,20) En 07 +03(S-)< 2 my =07+09(,38-) 10 Aci 31808 Ea, 26 ww VES 0 Ac1 31808 £9, (0-28) we # (78) @)akar ACI 318-08 Eg, (0-24) Varadies aif] sat} ee] " atid ‘8000 +2000 “8.000 160 “soo ten a 44 in) kos ms a "3000 "860 Ceateuations Are fin?) Arve tin7} acy fea yn Me Mb) —Fisoo “Bs 00 185 ‘st 185 soa78 Results Veg woe 4Magfl Ya er Sor oat a0 5 Combined tension and shear loads ae 7 gation pur) aus one ole a 8 ‘OK pu" it eet 6 Warnings + To avoid far ofthe anchor plate the required thickness can be calculated in PROFIS Anchor. Load re-cstbutions onthe anchors due to ‘asic deformatons ofthe anchor plate are not considered. The anchor pate s assumed fo be sufcienl if, in der not fo be deformed when ‘subjected to the loading! + Conaon apples when supplementary reinforcement is used. The © factor i increased for non steel Design Strength except Pullout Stength ‘and Pryout stengih. Conditon B apples when supplementary revorcements nel used and for Pulout Strength and Pryout Strengh. Refer to your local stancar + Design Stengths of adhesive anchor systems are Influenced by the legning method. Refer to the INSTRUCTIONS FOR USE given in the Evaluation Service Repor for cleaning and instalation instructions + The present version ofthe software does not aesount for adhesve anchor special design provisions coresponsing to overhead applications. Refer fo the ICC-ES Evaluation Serice Repot e.g. section 4 11 of the ICG-ESR 2322) or deta, + Checking the transfer of oads ino the base material and the shear resistance are required in accordance with ACI318 or the relevant standar! Fastening meets the design criteria! i pcos wa ona ta oc agnerart inh rg endow wa nang PRGA hac tease sbotan ns FL basUScm hseareaceas rater tt me, Sta 3 Coal Profis Anchor 2.3.5 Company: KNA Page: 3 Specter Project uoiwe ‘sees Sub-Project| Pos. No Un Ace Phone | Fax 1 Date: 372672013 E-Mal 7 Installation data ‘Anchor plate stet:- Prot: ho prof, 0,000 x 0.000 x 0.000 in. Hole dameter inthe fixture: = 0.688 in Pat Dickness (nput): 0625 in Recommended pate thickness: not calculated ‘Anchor type and ameter HIT-HY 150 MAX-SD + HAS, 518 instalation torque: 720.001 in fb Hole diameter inthe base materi 0.750 in, Hole depth inthe base materi: 4.724 in ‘Minima thickness ofthe Bese materia 6.224 in, Cleaning: Premium cleaning of he cilled hole is required y 200 | 200 | g ba | 8 \3 | g | | On wae | SS 2 | 3 2000 | 20m | Coordinates Anchor in. ‘Anchor x en AP too aha oo 12 0010 deo a0 Fo 2 0000 4750 12000 12.000 20490 10.900 insane cae yp we win nave aT pay Peet rcar nts ie AGF ese Stcan rarer raat th, Sean Coal wre tus Profis Anchor 2.3. Company: KNA Page: 3 Specter Project ome adress: ‘Sub-Project | Pos. No. Li tos Phone | Fax 1 Date: sre82013 EMal 8 Remarks; Your Cooperation Duties + Any and all information and data contained in the Sofware concern solely the use of Ht products and are based on the principles, formulas and securty regulations in aocotdance with Hts technical drecons and operating, mounting and assembly Intuctions, el. nat mut be sity ‘ompled with bythe user. Al fgures contained therein ae average fgures, and therefore use-epecife tats are tobe conducted porto using {he reevant HEY product. The results of he calculatons carted out by means of the Sofware are based essentially onthe data you putin. ‘Therefore, you bear the sole responsibilty forthe absence of ears, the completeness and the relevance ofthe data to be putin by you. Moreover, you Dear soe esporsibit for having the resus of re calculation checked and cleared by an exper. paula with regrs to compliance wit applicable norms and permits, prior to using them for your spect facily. The Software serves only as an ald fo interpret norms and permis without ary guarantee a fo the absence of erors, the correctness and the elevance ofthe results or sultabilty fora spectic application ‘You must take all necessary and reasonable step to prevent or mit damage caused by the Sofware. In partuar, you must arrange forthe regular backup of programs and data and, i applicable, carry out the updates ofthe Software oflered by Hit on a regular basi. If you do not use the AutoUpdate function ofthe Software, you must ensure fat you are using the curent and thus up-¢-date vereion of tne Software in each case by carying out manual updates via the Hilti Website Hil wil not be liable for consequences, suchas the recovery of lost or damaged data or programs, ensng from a culpable breach of duty by you. Provide (2) 5/8" dia. threaded rods with Hilti HIT-HY 150 MAX-SD (ICC-ES ESR-3013) Tapa arena ratte cmstaiorageera wh nrg cos wa pay PRES nas) 206 soo ec Fe Bot Sheen nhs areyaae ema ss, Sehan “DOCUMENT NUMBER 100047783 “SAMPLE STRUCTURAL CALCULATIONS: ‘TrueBeam System ‘TrueBeam STx System Base Frame Anchorage (Design to 2010 CBC) CUNT: Varian Medical Systems 3100 Hansen Way Building 4A, M/S E-165 Palo Alto, CA 94304-1038 ‘STRUCTURAL ENGINEER: Rinne & Peterson Palo Alto, California 94303, Rap #12101 April 2, 2012 Rodney Hartunian, California SE 4438, Expires 12/31/13 ‘These are Sample Calculations for reference only. The individual installations must be engineered by the purchaser based on actual site conditions. ahr TrueBeam / TrueBeam STx Base Frame Anchorage April 2, 2012 SCOPE The purpose of this report is to provide a sample calculation and seismic anchorage detail for the TrueBeam / TrueBeam STx machine to meet the 2010 California Building Code. DESIGN REQUIREMENTS AND ASSUMPTIONS OF SAMPLE CALCULATIONS A ‘Analysis for the seismic anchorage is in accordance with 2010 California State Building (CBC) and ASCE 7-05, “Minimum Design Loads for Building and Other Structures”, Dimensions, weights and centers of gravity are provided by Varian Medical Systems. ‘When installation is required to be submitted to the California Office of Statewide Health Planning and Development(OSHPD) or outside of California, the engineer of record shall determine the applicability of the following design and modify, as required, following local city and state building codes enforced by the governing jurisdiction. ‘Anchorage is into a reinforced normal weight concrete slab (bottom of pit located 12" below floor level) of 12” minimum thickness and f, = 3000 psi minimum designed for the applied forces and allowable soil pressure. ‘The location of installation is assumed to be at or below grade in a building assigned to Seismic Design Category F and Site Class D. Sample calculations are based on a mapped MCE short period spectral response acceleration parameter(Ss), value of 2.5 and a Component Importance Factor(|p). of 1.5. Design is based on allowable stress design principles specified in CBC Section 1605.3.2. All concrete anchors shall be installed and inspected per the manufacturer's recommendations and respective ICC evaluation report. Each site must submit documentation to the appropriate local or state permitting agencies as required. Due to the location of the machine’s Center of Mass and reduced anchor capacities due to spacings, the sample calculations shown considers the design {for the location where two(2) anchor bolts occur which will be the most critical. See drawing on page 4. SUGGESTED PROCEDURE FOR ENGINEERING COMPUTATIONS A ASCE 7.05, Section 13.3: Fr Seats?) (ASCE 133-1) Re h hb Fran 2 0:3S0al¢Wp (ASCE 133-3) Sos z= 667 p=15 Page 2 of 7, A? ‘TrueBeam | TrueBeam STx Base Frame Anchorage April 2, 2012 Fp = 240. 0f0.667 6] {2 = 0.400% 25 A 1S. Fp =0.3(1.667)1.5)W» =0.750% GOVERNS Also, design for vertical component per ASCE 13.3.1: Fw = 40.2SasWp Foon = £0.2(1.667)p ~ £0.333Wp B. Forces on critical connection, based on CBC allowable stress load combination, section 1605.32: 0.9) -& ea} 1. Uplift force, 7 = [allowable stress design] T(¥1+ You) Y1+¥2 Uplife force to connection, Toon = Uplift Force to connection is based on Center of Mass location. 2. Shear force to connection, Veom= (Vx) +(Vy) [Allowable stress design] eee] feta 14 14 rom = Connection group moment of inertia 3. Design of base angle based on AISC “Steel Construction Manual”, 13th edition, 4. Design of concrete anchors based on ACI 318, Appendix D, ASCE 7-05 Sect. 13.4.2, and Hilti ICC report for application using allowable stress design principles. 5. To convert to allowable stress design, per Hilti ICC report section 4.2: Retonsso= a=l4 a Re = dc representing the limiting design strength in tension(@Nn) or shear(@Vn) from ACI 318, Appendix D. Page 3 of 7 wk ‘TrueBeam | TrueBeam STx Base Frame Anchorage April 2, 2012 BASEFRAME. (UNDER FLOOR COORDINATE SYSTEM AT BOTTOM OF PIT GENERAL EQUIPMENT LAYOUT ( BASE FRAME ENERAL RELATION OF ANCHORS Page 4 of 7 ‘TrueBeam / TrueBeam STx Base Frame April 2, 2012 Anchorage ‘See drawings SK-| and SK-2 for seismic anchor layout and details. my 9594, Coach ae weit) & Concer of Maen) cwr [eancy/Stand e200 00 530 [eae i380 sao oo faase 2070 0 ae es Toa weeny Ba \Cener of as) a6 er 340 lracket Locations & Center of ns ne Inesance 250 250 nas ns 789 Es oo ao 267 mer tas no tig 1974 [sample Cateuaion v7e8a v7 a 70 son sen |remion 3] sass eas com) 53 ses shear We ate 08 | ‘oo se Von) 4154 on [summary Teom] 053 soss Yeon) 4194 on x13 orexpansion Teoma) 5169 io bole Yeon) 5452 sno 2-16 Hits HOA anchors overs (on95",embee") "ACI3I8 Appendix ——_Nsal_ 21141 sf ok (Rter tote report ¢Mby| 12005 Se bt forproductspcite pn] 18640 youp Gores design parameters required r Append) 4Vsa]_ 17628 spl ble gree] 2007 Srp toe Wel 1381 grow Covers [atowabl Sess Design gern) 18600. os Ragve| 1381 te Gide by amt Rant] 13329 be Ran] 5H eeractione 2 ap 120K Page 5 of 7 nd |CWT= Counterweight ab ‘TrueBeam / TrueBeam STx Base Frame Anchorage April 2, 2012 TrueBeam / TrueBeam STx Holdown Angles: Design for machine base angles. From calculation summary: 5,085 Ibs 4,392 Ibs Design angle/weld for eccentricity between frame and anchor bolt reaction. wy (29s Oe» 1.67 Mangle . 1000 =8.3in-kips For a L4x4x5/8" x 12" long angle, a 25.2inckips > 8.3 OK Weld connection to frame: Provide fillet weld on 3 sides of L4x4 to frame attachment point stop= 26d+d gee FRA) gigs gage 3(b+d) Sbot = 3.79 «4322 | 83 = 082, 83 9 46 kipsin. Louie S 115+2(2.5)" 3.79 si Tom ___5.085__ _ 931 kipsin Tet 115+ 2(2.5) quia ge +42 =V2.46 +31 =2.48kipsin. 258 a7 I6ths, Use 1/4” fillet weld 928 Thickness require ‘iso, check reduced edge distance on bolts in angle Let minimum edge distance = 1.25”. From AISC Manual Specification )3.10, Page 6 of 7 al ‘TrueBeam | TrueBeam STx Base Frame Anchorage April 2, 2012 DLT LOCATION SEISMIC BOLT LOCATION SK-1 TrueBeam / TrueBeam STx Base Frame Plan SK-2 TrueBeam / TrueBeam STx Base Frame Anchorage Details Page 7 0f7 DOCUMENT NUMBER 100047784 SAMPLE STRUCTURAL CALCULATIONS: ‘TrueBeam System ‘TrueBeam STx System Console Cabinet Anchorage (Design to 2007 CBC) ‘CUENT: Varian Medical Systems 3100 Hansen Way Building 4A, MIS E-165 Palo Alto, CA 94304-1038 STRUCTURAL ENGINEER: Rinne & Peterson 1121 San Antonio Road Suite €200 Palo Alto, California 94303, (650) 428-2860 REP ¥M7180 May 14, 2010 Jim Lentfer, California SE 2968, Expires 6/30/2010 ‘These are Sample Calculations for reference only. The individual installations must be ‘engineered by the purchaser based on actual site conditions. ‘TrueBeam / TrueBeam STx Console Cabinet Anchorage May 14, 2010 TrueBeam / TrueBeam STx Console C: 2007 CBC SEISMIC ANALYSIS FRONT wor_pes, 1. SCOPE ‘The purpose of this report is to provide a sample calculation and seismic anchorage detail for the TrueBeam / TrueBeam STx Console Cabinet to meet the 2007 California Building Code. 2. DESIGN REQUIREMENTS AND ASSUMPTIONS OF SAMPLE CALCULATIONS ‘A. Analysis for the seismic anchorage is in accordance with 2007 California State Building (CBC) and ASCE 7-05, “Minimum Design Loads for Building and Other Structures" B, Dimensions, weights and centers of gravity are provided by Varian Medical Systems. C. When installation is not in California, the engineer of record shall determine the applicability of the following design and modify, as required, following local city and state building codes. D. Anchorage is into a reinforced normal weight concrete slab of 4” minimum thickness and f, = 3000 psi minimum designed for the applied forces. E, The location of installation is assumed to be at (or below) grade, or in an upper floor located no higher than one-half of the roof height in a building assigned to Selsmic Design Category F and Site Class D. Page 2 of 4 ‘TrueBeam / TrueBeam STx Console Cabinet Anchorage May 14, 2010 F. Sample calculations are based on a mapped MCE short period spectral response acceleration parameter (Ss), value of 2.5 and a Component Importance Factor (lp). of 15, G. __Alllconerete anchors shall be Hitti Kwik Bolt TZ expansion anchors (ICC ESR- 1917) or equivalent and be approved for installation in cracked concrete conditions. Minimum edge distance to a loaded edge is 3 5/8”. Anchor design in sample calculation is based on allowable stress design principles per CBC Section 1605A.3.1 H. Allconerete anchors shall be installed and inspected per the manufacturer's recommendations and respective ICC evaluation report. 1. Each site must submit documentation to the appropriate local or state permitting agencies as required. 3. SUGGESTED PROCEDURE FOR ENGINEERING COMPUTATIONS. A. ASCE 7-05, Section 13.3: (ASCE 13.3-1 I ¢ ) Osa at (ASCE 13.3-3) B=l5 40.0467) {°8) oso, covers 25 h 15 Fp = 0.3(1.667)(1.5)Wp = 0.750W > ‘Also, design for vertical component per ASCE 13.3.1: Susp +£0.2(1.667/Wp - 40.333 B. Forces on critical connection at allowable stress levels (transverse): 0.7 Fp* Zu —(0.6Wp—0.7 Finen)* ¥2 |. Uplift force, T=: = 7 Uplift force to connection, Team =o *X1 XL Page 3 of 4 Al ‘TrueBeam / TrueBeam STx Console Cabinet Anchorage May 14, 2010 O.7F > 2*XL 3. Design of concrete anchors based on ACI 318, Appendix D, ASCE 7-05 Sect. 13.4.2, and Hilti ICC report for converting to allowable stress design. Note: Per 2007 CBC Section 1908A..47, a ductile failure in the steel element is not required in nonstructural component design regardless of Rp used 2. Shear force to connection, Von = x1 4, SUMMARY OF SAMPLE SEISMIC COMPUTATIONS: We = 900 Ibs. Fp = 0.800 x 900 = 720 Ibs. FP sg: = 0:333 x 904 XL = 266 in. Teonn = 715 Ibs Veonn = 157 Ibs ANCHORS Teonn = 715 x 1.3 = 930 Ibs Veonn = 157 x 1.3 = 204 Ibs From Hilti ICC report, Use 3/8" diameter TZ anchor with minimum effective embedment of 2 in. ( 930 ) () Interaction: —|+| 1006 } * |.999 I2<12 Ok Page 4 of 4 42. Gegesaes DOCUMENT NUMBER 100047785 tee SAMPLE STRUCTURAL CALCULATIONS: al TrueBeam TrueBeam STx In-Room Monitor & Optical Imaging Camera Ceiling Mount Anchorage (2007 California Building Code) CUNT: Varian Medical Systems 3450 Hillview Avenue MIS H-184 Palo Alto, CA 94304-1038 ‘STRUCTURAL ENGINEER: Rinne & Peterson 1121 San Antonio Road Suite C200 Palo Alto, California 94303, (650) 428-2860 Rap #MB014 May 14,2010 Jim Lentfer, California SE. 2968, Expires 6/30/2010 These are Sample Calculations for reference only. The individual installations must be ‘engineered by the purchaser based on actual site conditions. ys ‘TrueBeam / TrueBeam STx In-Room Monitor & Optical Imaging Camera C ‘Sample Calculations May 14, 2010 TrueBeam / TrueBeam ST) m M. Camera Ceiling Mount 2007 CBC SEISMIC ANALYSIS FORCE LEVEL 2007 California Building Code (CBC), Vol. 2, “1604 and ASCE 7-05 F, =042,S,.W, (1 22/h)/(R,/I) and vertical F, 025,,W, but F, > 03S,,,W, and F,<1.6S.,,W, 12: attachment level with respect to base of structure = roof elevation, for equipment at roof, therefore the term (| + 22/h) = 3.0 for installations at (or conservative if below) roof level Short Period Spectral Acceleration from map Figure 1613.5(3) 3.00 maximum mapped value. F, : Site Coefficient from Table 1 1-4-1 = 1,0 max. for $,> 1.25 Sy! Spectral Response Acceleration Parameter = F,* §,= 3.00 max. Soy Design Spectral Acceleration Parameter = 2/3 S,,= 2.00 max, structure Component Amplification Factor (Table 13.61). = 1,0 for “other mechanical or electrical equipment.” R,: Component Response Modification Factor (Table 16-0) = 15 for “other mechanical or electrical equipment." |, Importance Factor (§ 13.1.3) IS for hospitals (Occupancy Category IV) 4* 1.0% 2.00 * W,*30/(.5/ 15) =2.40W, check F, > 0.35,,,W,=090W, andF, <1.65,,,W,=480W, 2*2.00*W, =0.40W, For Working Stress Design, the coeficent is multiplied by 0.7, F, 7*240W, = 1.68W, F,=0.7 *040W, = 0.28W,, ATI ‘Two configurations, see following for Case One (Standard configuration) and Case Two (Optional configuration) Page 2 of 7 4 TrueBeam / TrueBeam STx In-Room Monitor & Optical Imaging Camera Ceiling Mount ~ Sample Calculations May 14, 2010 (CASE ONE (STANDARD CONFIGURATION) ‘ » Hep Be basa ' 1odpsetB8s sya ou a SU STSRE anda | : {Bot 58H B USI dase ror ‘ | 190 | on ' Page 3 of 7 5 ‘TrueBeam / TrueBeam STx In-Room Monitor & Optical Imaging Camera Ceiling Mount ~ ‘Sample Calculations May 14,2010 LATERAL LOADS DESIG) Case One (Mount with standard configuration) Seismic Loading: Attachment to Building Structure Weight 1 Weight 2 Sum Weight Xeg X offset Sum X Zeg Sum Weight Xeg Zeg Fp (ASD) Fp(ASD) Fv(ASD) Fv(ASD) Anchorage Load eases: Bolt spacing x Y x Y wus Mot G Rot Tmax G TminG Vera Mot Rot 2 Tmax Tmin V=Horiz/4 Mot Fp Rot 2 Tmax G Tmin G Mot Fp Rot 2 Tmax G Trin G V max Tmax Dead Load ‘Dead Load plus Fv down plus Fp toward back ‘Dead Load plus Fv down plus Fp toward back plus 3 Fp toward side Dead Load Dead Load plus Fv down Fp towards back 3Ep towards side Page 4 of 7 CBC 2007 Television Monitor in a hospital 30.0 ke flat panel mass 10.0 kg frame mass 40.0 kg sum 242.0 mm 38.7 mm 280.7 mm 799.0 mm 18.2 Ibs sum 11.0 inches 31.5 inches 1.64 29.8 lbs 0.23 4.18 Ibs 100.0 mm 120.0 mm 3.9 inches 4.7 inches 45 Tbs each 200.9 in bs 25.5 Ibs each 30.1 Ibs each -21.0 Tbs each Compr 5.6 Ibs each 247.1 in Ibs 314 Ibs each 37.0 Ibs each -25.8 Ibs each Compr 755 tbs each 938.0 in Ibs 119.1 Ibs each 119.1 Ibs each -119.1 Ibs each Compr 281.4 in Ibs 29.8 lbs each 29.8 Ibs each -298 Ibs each Compr 75 Ibs each 185.9 Ibs each Yo ‘TrueBeam / TrueBeam STx In-Room Monitor & Optical Imaging Camera Ceiling Mount ~ ‘Sample Calculations May 14, 2010 (CASE TWo (OPTIONAL CONFIGURATION) si SPS TSAS anton wie B0Ur > Page 5 of 7 ‘TrueBeam / TrueBeam STx In-Room Monitor & Optical Imaging Camera Ceiling Mount — ‘Sample Calculations May 14, 2010 LATERAL LOADS DESIGN: ‘Case Two(Mount with optional configuration) CBC 2007 Seismic Loading: Attachment to Building Structure Television Monitor in a hospital Weight 1 = 30.0 kg flat panel mass Weight2 = 50.0 kg frame mass Sum Weight = 80.0 kg sum Xeg. 217.0 mm X offset 0.0. mm sum X 217.0 mm Zee 1132.0 mm Sum Weight = 364 Tbs sum Xeg. = 85 inches Zeg = 446 inches, Fp (ASD) = 164 Fp(ASD) = 596 lbs Fv(ASD) 023 Fv (ASD) 8.36 Ibs Anchorage Toad cases: Dead Load Dead Load plus Fv down plus Fp toward back Dead Load plus Fv down plus Fp toward back plus 3 Fp toward side? Bolt spacing x = $59.0 mm Y 432.0 mm x = = 220 inches Y = 170 inches Dead Load wus 9.1 Ibs each Mot G 310.7 in bs Rot 7.1 Ibs each, Tmax G 16.1 Ibs each Tmin G 2.0 Ibs each Dead Load plus Fv down Vera = 112 Ibs each Mot = = 382.1 inibs Rot2 - 8,7 Ibs each Tmax - 19.9 Ibs each Trin - = 25 Ibs each Fp towards back V=Hori2/4 = 149 Ibs each Mot Fp 2657.8 in Ibs Rot 2 - 60.4 Ibs each TmxG = = 60-4 Ibs eaci Tin G = -60.4 Ibseach_ Compr 3Fp towards side Mot Fp . 797.3 in Ibs Rot 2 = 23.4 Ibs each Tmax G 23.4 Ibs each Tmin G - -23.4 Ibs each Compr Combined V max 149 Ibs each T max 103.7 Ibs each Page 6 of 7 ug ‘TrueBeam / TrueBeam STx In-Room Monitor & Optical Imaging Camera Ceil Sample Calculations May 14, 2010 LATERAL LOADS DESIGN: CBC 2007 Anchorage Television Monitor in a hospital Hilti KB TZ 3/8" with 2” embed and no edge distance and 3,625" minimum spacing (ICC ESR 1917) Vallow = Table 10 = 999 Ibs each Tallow = Tabled 1102 tbs each Case One (Mount with standard configuration) Vmax = - Tbs each T max = = 186 Ibs each Vmax! Va 0.01 <1.00K Tmax/Ta = O1T0.35,,LW, and F,< 1.6 SW, 12: attachment level with respect co base of structure = roof elevation, for equipment at roof, therefore the term (I+ 2.2/h) = 3.0 for installations at (or conservative if below) roof level ',: Short Period Spectral Acceleration from map Figure 1613.5(3) = 3.00 maximum mapped value. F, Site Coefficient from Table 114-1 1.0 max. for §,> 1.25 Su! Spectral Response Acceleration Parameter = F,* S,= 3.00 max. Su: Design Spectral Acceleration Parameter = 2/3 S,,= 2,00 max ). instructure Component Amplification Factor (Table = 1.0 for “other mechanical or electrical equipment.” R, : Component Response Modification Factor (Table 16-0) = 1.5 for “other mechanical or electrical equipment.” |, Importance Factor (§ 13.1.3) 1.5 for hospitals (Gecupancy Category IV) 4*1.0* 2.00% W,*3.0/(1.5/ 1.5) = 240 W, check F, > 0.35,,,W,=090W, and F, <1.68,,1,W, 80 W, Is TI Two configurations, see following for Case One (with welded extension) and Case Two (without welded extentions) Page 2 of 7 ‘Truebeam(tm) In-Room Ceiling Monitor Mount - Sample Calculations April 19, 2010 Casi ISION) Haag! gaa" sii 108 q sh me 7 | Shek NOMS dab? t | | many nies) ern 80Ur 9 7 Sue mp | a | i 238 i Rn HUB OW | wn i - | 7 | MW | | | Page 3 of 7 ‘Truebeam(tm) In-Room Celling Monitor Mount ~ Sample Calculations April 19, 2010 LATERAL LOADS DESIGN: CBC 2007 ‘Case One (Mount with welded extension) Seismic Loading: Attachment to Building Structure Television Monitor in hospital Weight 1 30.0 kg flat panel mass Weight 2 50.0 kg frame Sum Weight 80.0 kg sum Xeg 217.0 mm Xoffset = = 00mm sum X = 217.0 mm Zeg = 1132.0 mm ‘Sum Weight 36.4 Ibs sum Xeg 8.5 inches Zeg 446 inches. Fp(AsD) = 1.64 Fp(ASD) = 59.6 lbs FV(ASD) = 023 FV(ASD) = 8.36 Ibs Anchorage Toad cases: Dead Load Dead Load plus Fv down plus Fp toward back Dead Load plus Fv down plus Fp toward back plus 3 Fp toward side? Bolt spacing. x = 559.0 mm Y = 420mm x = 22.0 inches Y = 170 inches Dead Load wus = 9.1 Ibs each Mot G = 3107 in ibs Rot/2 - = 7.1 lbs each Tmax G - = 16.1 Ibs each Trin G = 2.0 Ibs each Dead Load plus Fv down Vert - = 11.2 Is each Mot = 382.1 in bs Rot 2 = "87 Ibs each Tmax - = 19.9 Ibs each Trin = = 255 Ibs each Fp towards back V=Horiz/4 = 149 Ibs each Mot Fp 2657.8 in Ibs Roti? = 60.4 Ibs each TmaxG = = 60-4 Ibs each TminG - = 60.4 Ibs each Compr 3Fp towards side Mot Fp = 797.3 in Ibs Rot 2 - 23.4 lbs each TmaxG = 23.4 lbs each TminG - -23.4 Tbs each Compr Combined V max - 14.9 Ibs each Tmax 103.7 Ibs each Page 4 of 7 ‘Truebeam(em) In-Room Ceiling Monitor Mount ~ Sample Calculations April 19, 2010 CASE |OUT WELDE! NSION) cape 3s 14: Roow won 92 wouNT wiTiour WELacD EXTENSION ite eects! Cour teugATioN FROME TSRACEE esas DIMERS TORS ARE wm? Aegon 3611" 378'dudwereR tt yt | it en meted Page 5 of 7 Truebeam(tm) In-Room Cé April 19, 2010 Monitor Mount - Sample Calculations LATERAL LOADS DESIGN: CBC 2007 Case Two (Mount without welded extension) Seismic Loading: Attachment to Building Structure Television Monitor in a pital Weight 1 = 30.0 kg fat panel mass Weight 2 10.0 kg frame mass Sum Weight 40.0 kg sum. Xeg = 420mm X offset 38.7 mm sum X 280.7 mm Zeg 799.0 mm ‘Sum Weight 18.2 bs sum. Xeg 11.0 inches Zeg 31.5 inches Fp(ASD) = 1.64 Fp(ASD) = = 298 Ibs FV(ASD) = 0.23 FV(ASD) = = 418 ibs Anchorage Load eases: Dead Load Dead Load plus Fv down plus Fp toward back ‘Dead Load plus Fv down plus Fp toward back plus 3 Fp toward side Bolt spacing x 100.0 mm Y 120.0 mm x = = 3.9 inches Y - 47 inches Dead Load wus - = _ 45 lbseach Mot G 200.9 in Ibs Rot?2 = 25.5 Ibs each, Tmax G 30.1 Ibs each Trin G - -21.0 Ibs each ‘Compr Dead Load plus Fv down Vert = 5.6 Ibs each Mot = 247.1 in bs Rot2 = = 31.4 lbseach Tmax = 37.0 lbs each Trin - -25.8 Ibs each Compe Fp towards back V=Horiz/4 = = 75 Tbs each Mot Fp = 938.0 in Ibs Rot 2 - = 119. Ibs each Tmax G = 119.1 Ibs each Tmin G = = =119:1 Ibs each Compr 3Fp towards side Mot Fp 7 = 281.4 in bs Rot 2 = = 298 Ibs each Tmax G = 298 lbs each ‘Tmin G = -29.8 Ibs each Compr Combined V max = = 75 Ibs each Tmax = 185.9 tbs each Page 6 of 7 ‘Truebeam(tm) In-Room Ceiling Monitor Mount - Sample Calculations April 19, 2010 LATERAL LOADS DESIGN: CBC 2007 Anchorage Television Monitor in a hospital Hilti KB TZ 3/8" with 2” embed and no edge distance and 3.625" minimum spacing (1 ESR 1917) Vallow Table 10 = 999 Ibs each Tallow rable 9 = 1102 Ibs each ‘Case One (Mount with welded extension) Vmax - - 15 Ibs each Tmax = 104 ts each Vax /Va = 0.01 <1.00K Tmax/Ta = = 009<1.00K Combined = section 4.2 equation 6 = o1l<120K ‘Case Two (Mount without welded extension) Vmax - = 7 Ibs each Tmax = = 186 Ibs each Vmax/Va = 0.01 <1.00K Tmax/Ta = = 017< 100K Combined = section 4.2 equation 6 = 018<120K Page 7 of 7 Service Manual earner ea Tocco concrete ceiling ‘variable § 3 y Figure 88 Side View: Celling Mount for Camera and Flat Pane! ‘SM 09-080 Revision 6 page 42 of 97 suspended ceiling Ceiling Mount (1) and the upper edge of the suspended ceiling must be reserved for the The clearence of y = 160 mm between the lower edge of the Interface plate of the ET A Installation and adjustment ofthe Brallab devices finished floor is $245mm. Rope tighteners are used to apply proper tension to the ropes, The maximum distance between interface plate and isocenter has to be $950mm. For an isocenter height of 1296mm, the maximum height of the interface plate above if vertical bars (1>80mm) are used for Ceiling Mount Installation. 7S [conrguration Ja i ie Ropes [Rope ceiing Anales xs [<220mm _|[S0mm [somm 7 | 2 | is '220-250mm — [a-t7Omm fa-t70mm 1 2 M [250-450mm — [a-170mm fa-170mm 4 4 L }450-2170mm —|(a-170mmy2 |(a-170mmy/2 [a-170mm 4 4 xt >2170mm —_[7000mm — |1000mm [200mm _ | 4 4 Table: ___Gellng ation configurations depending on distance between concrete celing and suspended ceiling So 57 Coal] otis Archor 255 "a Cos oom ae 7 Project: ucIMC: Becta: toa atcer am ust Spears coer 1 Input data Anchor ypeand ameter Kw Bok T2-€8 382) eile CSeceeeneanetonme fur 20000 ag 210 tone comm be! Ente Serves pa snr? wowat a wz eres ee teson mete C1187 2188 dent eto “recente te cess rt clog rate vovroe tone nt etd crt, 205, = S00 pan = 2400 fete tron cnn, oan 6 spre pling tame eet cate nbhroment toe. be Setriceais (2.0. 0.6.0°F) te Goometry fin] & Loading fb nb) ino tena be cho oon vhs citrg ion nts pas Pheer css Sten Ao Fae Sosa sarees Tact Ae, Satan ww hive Coal Profis Anchor 2.3.5 Company: NA Consuting Engineer, nc. Page: 2 Specter Project uoime ‘dares: ‘Sub-Project | Pos. No. Flat pane! detector Phone I Fax: ' Date: anirzors Mal: 2 Load case/Resulting anchor forces Load case: Design ioads ‘Anchor reactions [b) “Tension force: (Tension, Compression) ‘Anchor Tensionforce Shear force _Shear force x — 200 200 o max conc compressive san: =e) ‘hax concrete compressive sess: “fpsh {esutrg tension orcein)0.0000.000): Of] ‘esuling compression foes y)(0.0000 00): 0 1] 3 Tension load Load Ns Capacity 4M [1] _Utlzation p= Muli, Status ‘Steal Skeng a) a8 "s Pleat Seong 20 1616 13 oK Concrete Breakout Strength 200 ae B ok anchor having he highest loading ““enchor grup (anchors in tension) 21 Stoo Strength Nu =ESRvaue fer to COES ESR 1017 Mem? Ne ‘AC1316.08 Eq, (0-1) Variables A i'l fax 05) “tos out Ma) NP ott as 00 ‘32 Pullout Strongth Nae *Naee Veg ler to ICC-ESESR 1917 ACI318-08 9 (0-1) ae Nagel Na) B88 Bie a ‘casa cs maton ond cone wih ‘heii crs) 50 ses an AF ese Sn % Ca semana Prois Anchor 23.5 conga TA Greg Eran. ae 3 Soom Poet tome See SSFrpaivo na: Helge ace tore 1 Bre irs Paar 33 Gonna! Sgth fos 4) He = (BS) van rr vente no1st80864.0-4 gherte nciai9084 0-9 iv eoic anon. pan0521, Pa ROS210) Aaa = 9 his AC! 318-08 Eq, (0-6) ncist9089 09 ciat008e9 0-19 craton 0-19 ncist908e9 0-7 sata) - "a8" ‘fol , Ti —t catettons Ave 3] Aas in?) mm 8 _ a Ne Do) Sai ——38 185-38 1B se reese Hatt _ Nol ng e888 i a dea aa eked aeeran ihe ig craions wa pansy ‘eons oar sq GO Coal] net : _ Profs Anchor 2.3.6 pany TA Conse Ere = rs Sposa oa Some ee Spt iPon Ne: Petpet dtcor eax 1 Sue wee Peak 4 Shear load Load Va capetygvah) _Uton p= Vain Status aa 08 ae on tae oho wa WA wn wa Pry Soe 200 vo rf ox Canoe ge tun eton 20 ma ‘ ox ) FEVIEWED BY ‘ocowerr oni conn nu nr Be peenooeeee On oscLoea Ta CvENs WOT ve P08 ‘MITER CONSE OF CMSUWG ABNER, GL RESERVED, Paovecr _ Joo No 24p.¢1e DATE 3h cuent _ wv kk Duct Gaon _Svepatry RS St ee, Shorma— fe Prone Ne 34 perwooo st we te ERR cia 2" Leap = Popo \ Goutteo Pay = TRF Met Su ad 26 Pe CPSPHFICT/) (2.0.6. ah) = dot Te vert too = 46 9 = 2204. o4 Cal=ral] “we ilt.us Profis Anchor 2.3.5 Company: KNA Consulting Engineers, inc. Page: 1 oer oie Tea aa PS mimate: Sawn oe Sa Bast ae ‘Specifier's comments: 4 Input data ancocypasnddaner Kutt 72-08 38 eos eeeeeertetn oF Shementeonesdem ‘Ren 2000 han? 989m vo comme Enon ee Ra sear sata sna ens noe Senn to A 98740989 Senden vtpocrnnan peters one wore oan cart tence st 2009p n= 2000 feoconr tout conto, her eaten i ppm pig rene at ‘Seismic loads (cat. C.D, E, or) Goometry fin] & Loading fb, nb] ledge reinforcement: none or< No. 4 bar CS Cail wor i. us _ Profis Anchor 2.3.5 Company KNA Consulting Engineers, nc. Page: 2 Specier: Project: ueime ‘asress: ‘Sub-Project| Pos. No. Duct Shielding Support Phone | Fax 1 Date: anes eal 2 Load case/Resulting anchor forces Load case: Design loads ‘Anchor reactions (1b) “Tension free: (Tension, Compression) Ancnor___Tension force Snearforce Shear force x _ shear forcey + 400 400 v 00 max. concrete compressive sta ‘rx conrete compressive sess: ‘esutig tension fore in Gu} =(.000/0.000: ‘esuling compression force (0.0000 00}: 0 1] 3 Tension load Load Nu 6) Capacty 6X fb] __Utilzation p= Mulia Status Saat SAG - 05 nasi ° OK ute Seng 400 116 25 ok ‘Concrete Breakout Sength™ 400 wz 2 ok + anchor having the highest oaing “anchor group (anchor in enon) 2.1 Stee! Strength Ng =ESRvakle —_refertoIOC-ES ESR 1917 Rant Na ‘ACI 316-08 Ea, (0-1) Variables fn Aan?) {ayo — ts ¢ Calculations Naf} 00 Rosuts Naf} . Na Naf 800 oi — 5 ‘ito 2.2 Pullout Strength Nac *Noaee Velig reer to ICC-ESESR 1917 Nac? No ‘AG! 318-08 Eq (0-1) Variables fs) Ngo (OL eae Nal Nig OL Naf) “bz Se fe a ing ao a pa Shaw Wha asses rasan 20, sean pu da srt rant cise er oenro wi. PRE dross stan Peon annie ot Company TeRA Gonsng Engineers, me Page Specter Proect ‘esrens SubProjct Pos. No. Prove Fax \ Date Eat 3.3 Concrete Breakout Strength: i No = (BS) voarvon ven Ne ACI318-08 9, (04) Noe Nae ACI31€08 9 (01) Aue See 918.08, Pa .82.1, Fy. RO52.10) 201318099, 0-6 201316089, (-9 ACI31008 4, O11) ACI31806 4, ©-19) Aci 31008 4,7) eau in] cape) ~ “G00 HB boo a on + + 3000 Cateuations Aretn’y n rey =a 785 tt 185 Resuts Nett) - Ne Nf) —ai ——_ 8 i Go Ca Profis Anchor 2.3.5 3 ome Duct Shielding Support ari2013 Ne) 264 ‘i ana wrens ats cheese ae wih a erg onazora ma pat ROSS icone) sssots AG Fae Son ae arene atom ce A, Staan wl Coal we his Profis Anchor 2.3.5 Company: KNA Consulting Engineers, ne. Page: 7 Specter: Project: ome ‘ares ‘Sub-Project| Pos. No. uct Shieleing Support Phone | Fax: I Date amis Ea 4 Shear load Load Vou tb) Capacity gVq (Mb) Utilization py= VulgVe Status ‘Steal Siena 00 37 % OK ‘Stee falure (with lever arm)* NA NA NA NA Pryout Strength" 400 1044 22 0K Concrete edge falar in rection y 400 6728 7 ox anchor having the highest loading “anchor group (elevant anchors) 444 Stool Strongth iq SESRae — rlerto CC-ESESR 1017 Mana netstoooes Variables 8 aay tin’) fa aS eatesasone Vat ‘85. — enue Vou} et Vos (Ib) Ma tb} $38) fs 42 Prout Sant Vo she [(E) von ven von] ACI 318-08 Ea, (30) eNe2 Va Aci3i008e4 02 Lo Leche a1¢.09, 0 0.52:, Fin ROS210) Area = 8h ACI 318-08 Eq. (0-6) won (7228) #19 Acis10.08€9.09) The: +03 (Sgt) «10 013190964. (0-79 ‘AC 318-08 Eq, (0-13) ACI 318-08 Eg. (0-7) ke stn) easy) ean] Cag) —F — F000 “to B00 F000 Sf} he a {psa 0 F000 9 — 3000 Calculations Au 3] AuvaliM3] ean eo 38.00 38 18 18 io — Results Ves) ve Veg Ves aS $e “an pada ns mb Pinder apearen win te wining atone mae paaeyy PROSE Ace e} tna sta oe A, Fees Schama roared Taso eh AG Soman (Ce) Ca] wel. _ Profis Anchor 2.3.6 Company KNA Consutng Engineer, ne Page: 3 Spectr Project ome asress ‘Sub: Project | Pos. No Dutt Shilding Support Phone | Fax ' Date: azo E-Mal “43 Concrete edge falure indirection y Va = (fi) vats ver yay yom Yo ACI 918-004 (021) eve2Ve Aciatea8es. 2 Ao sear 0.08,pan 6.24, Fi. RO82.10) hea 845 ch Ao131808 69, 0-2) ‘ACI 318-08 4. (026) ‘ACI318-08 Eq. (028) C1 318-08 Eq. (020) ACI 318-08 9. (024) Say fin] xg fi) Seu fin) wav naling — 43h ‘300 8 Boob tein] aR 4, fin} .Ipsil oa $609} srs —— too — "88 Catetaona Ave in} Aveo fi] vy 1 wv Me fib) “tc ——“sitos- ds 888) 180 ‘Saat ests Yes) se Bias Sr Ve) ae 5 Combined tension and shear loads . tization uo PA siaus —ohir —hir— os es ox fore phe pet 6 Warnings + To avoid falure ofthe anchor pat the required thickness canbe caleted in PROFIS Anchor. Load r-distibutons onthe anchors due to Casts deformations of the anchor pate ae not considered. The anchor pais assumed toe suiier sfn order not tobe deformed when ‘Subjected to he lading! + Condon A appties when supplementary reiforcement is used. The © factors increase fr non-stee! Design Strengths except Pullout Strength {and Pryout stengin. Condon ® applies when supplementary reinforcement is no used and for Pulout Svength and Pryout Strength, Refer to your local stanaar + Refer to the manufacture’ product erature for cleaning and instalation instructions. + Checking the transfer of loads int the base material and the shear resistance are requed in accordance with ACIS or the relevant standard! Fastening meets the design criteria! ‘rps aroun abe Sed agearnt hha wing iow arpa PRGA knee) unc savun nes FU SaSchaan ise aja Temata fo, ean 4 Cail eit — Profis Anchor 2.3.5 Compary: KNA Consuling Engineers, re Page: e Speotien Project: voime Adare: ‘Sub-Project| Pos. No Duct Shislang Suppor Phone | Fax: 1 Date: ari2013 EMat 7 Installation data ‘Anchor plato, too: ‘Anchor type and ameter: Kwik Bolt TZ - CS, 38 2) Prof instalation torque: 300.000 in fb Hole clamator in the base materia: 0.375 in Plate thickness (nput: Hole depth in tie base material 2.625 in Recommended plate thickness: = Miriam thickness ofthe base materia: 6.000 in Cleaning: Manual cleaning ofthe dried hole according to instructions for use is requres Coordinates Anchor In, Anchor xy eats T—O0e0 Tova 7280072000 20007 000 Hole diameter inthe four: - 8 Remarks; Your Cooperation Duties + Any and alnformaton and data contained in the Sofware concern solely the use of Hit products and are based onthe principes, formulas and ‘secury requatons In acordance wih Hits technical rections and operaing, mounting and assemaly instructions, lc, that must be sity ‘ompied wth by the user. All fgures cortaned herein ae average fgures, and therefore use-specc fests are tobe conducted prior o sing {he relevant Hit product. The resus of te calculations caried out by mean ofthe Sofware are based essentially onthe data you putin. ‘Therefore, you bear the sole respansiaity forthe absence of eres, the completeness ana the reevance ofthe data to De pu by you Moreover, you bear sole responsibly or having the resus of he calculation checked and cleared by an expert, particularly wit regard to ‘omplance wih appeable norms and permit, prior o using them Tor your spect acy. The Sofware serves only as an ald interpret noms land permits without any guarantee.a8f the absence of erors, the correcness and the relevance of the resus or suitably fer a spectic ‘application. + You must ake all necessary and reasonable steps to prevent or mit damage caused by the Sofware. In particular, you must arange forthe regular backup of programs and data and, if applicable, cary out the updates ofthe Sofware offered by Hilt ona regular basis. you donot use the AutoUpdate function ofthe Software, you must enure thal you are using the crrent and ths Up to-date version ofthe Sofware io each case by carrying ut manual updates via the Hat Website, Hil wil ot be liable for consequences, such as the recovery fost or damaged Sata or programs, asing Wom a culpable breach of duty by you. Provide (1)3/8" dia. Hilti KB-TZ (ICC-ES ESR-1917) at end of diag, brace. 2° embed aaa mt chants geen win i ocaing canons expe ‘ROE vcr) 208 ae Ko Fe BSt Stans arog roman NG, Sehan CLIENTNO, REVIEWED BY. Dare. ‘est cucuumovs commun ronan pore Toran cours cranes. eras (>) ‘ocument nr cones wa nr RenDaBEE On OSCLSED To The wo Pon ‘WRITE cose oF MSU ENN, ME AL RGAE RESERED. sHeet TO of prosect Weim us. pec: — _ JOBNO Bape 612 A LBD Bitch Whee Sypyomet cate B/D _ cunt Leeks By Me Leto bhick WHA SVppeht Col Fp = 24Ses Dip = ode afi dCls) We w = 0599. « 0.340% MM 4 ny, MW oF LAO eter Co. gotd (nt LH) (Mer) = 2s PSE coe @ I'-3"oc. MAR, We 245%K lo) = IT MK Mear= Curly 2 psp 4 < 29704 é ee 04 we Crue) & 16304 Vee WSS 24x 24X% CI '-o"0.6 Mak CLIENT NO, REVIEWED BY. DATE. ‘Net LEUATONS Con MFOBNATON PROPRIETARY oem cOABUG ENGEES. Nas >) ‘Ocome nT COMERS Ha oT 5 RPuaDUCD OR SCE Te THER WIE POR KIND consuteing engineers, inc. sHeeT JL or PROJECT cueNT - yosno 240.215 vare | A/D By be ETK “Tobey SCHE EA ISTER Roe yb at v socom crest) mm 348mm Voricalpars Arm weight tached wight weight Me @ ~ Coals") + C265 4)L715") = goog "4 Tee > 22st aw Ca] vo Profis Anchor 2.3.8 O Se TH Cag EE mae : Sooc ° Pee thc tin ace come SoBe iPoe no: Eau Seen Sra ' Bae wnat enh ‘Species comments: 1 Input data Anchortypeand ameter, Kwik Bolt 12-¢8 38 @ SSS aaa Ech onbetmertepy Ret 2000 tan 231, vo Conse! Evmuaton Seve Repo: sn ioi7 iced ai ‘vor evans Prat design mad Act 38) ACT Sunt often: f+ 0000 roan 1= 02508 peer [oxxt= 20.000 n+ 200i, 0.280 in (ecormended peter alate) Profle: Round HSS, Steel pipe (AISC); (Lx Wx T) = 4.000 in, x 4,000 in, x 0.226 in. ee nett crated conte, 0300p n= 240001 noc ‘eso: conn shear enon oslo sing neces ‘Seismic loads (at C, , E, or) Geometry [in] & Loading [lb nb) O edge reinforcement: none or < No.4 bar it ago na raed eam ihe ovig cartons we ai Phosgene) isis ie Fats San sapere rosea NG, Sek 17 Gaal ew its ____Profis Anchor 2.3.5 ‘Compary: ENA Gonsultng Engineer, ne Pane: z Specter aL Propet otc tin Acs ‘acess: Sub-Projet Pes. No. ETX Touch Screen Phone | Fox \ Date: anioz0%3 EM 2 Load case/Resulting anchor forces = Load case: Design loads °3 y om ‘Anchor reactions [1] ‘Tenson foes (+ Tension, Compression) frchor —Tenoon foe Steafoe —_Shearocex sherorey 88 o 0 | © 2 28 6 6 ° —* 3 = 2 be ° Tersion Compression 4 28 66 6 ° ‘max. concrete compressive stain: 1202163057 imax concrete compressive sess: 295214 fps Fesuting tension force in 9030,000%, 454) o4 3 Fesuting compression force oy)(8.3820 000); 188] 3 Tension load Load Na [Capacity 4M 1 Utilization pu No status ‘Stet Sven - ar - pen Mais See Putt Stength* 199 1816 3 oK Concrete Breakout Sirength* 454 2500 8 ok + anchor having the highest loading “anchor group (anchors in tension) 21 Stoo trongth Ng TESR valve refer ICC-ES ESR 1917 Mane? Na elane09 9 (0-) Variables a Asay fi9.3} fa Ibs — 005 4125000 Catetatons Nu) (th Results Naf Naf Nt i —— fis he es 3:2 Pullout Stongth Nyog, = Nese fe refer to ICC-ES ESR 1917 Mac Ma ci 316-08 Eq. (1) Varaboe fipsi]_ Nga fO) — Seo "Ee Nya soe Nae 8) Nas ‘Sher ‘sa ——“ad a PRS Sac elas ne Fas Stan as carogemed Waterco A, Stan 7 Ea vets Profs Anchor 23.5 = TRA consirg Encore Fae 7 Soler a Pres donna roe Sis os nos Eun Seen Se oe 1 Es shots am 73 cena erento Soro Ie Non = (BE) wen yen va acioteone9 05) pian pcisi608e the lcisteos ron052.. Fe. 2052.0 rae pcist0.0865, 06 ven = (GES pcisi0.865, 08 wu #07 +03 (S32) 51.0 Act 318.089, 0-11) wan =Max( S81) 51.0 Aci 31808 €4,0-19) Ne hea VenoE ACI 318-08 Eq. (0-7) varie hatin) alin eantin} Sap) _—— — i "a8 sale ‘eu +b a fei ; su “regio te se es sy ¢ Ste 3385 1 ‘i 18 ‘oi “ NogQbl Nag Sa at a pian tras rnb rer Searaniwin tang ono na pay PRESS cr} state ab AG, Fe btor Stan Ne earegeon Faso of Ne Soman 5 CIS wre tus Profis Anchor 2.3.5 Comper TNA ConsatingErginees re Page 7 Specter a Project: oie un ee ‘aes Sub-Projet Pos No. EX Touch Screen Phone Fax \ Date: anoners EMal: 4 Shear load Load Vas [1b] Capacity gVaflb] Utilization py = Vale, Status Seer S 27 § oF ‘Stet are (vith ever army* NA NA NWA Na Pryout Seng 265 1374 4 oK Conroe 2698 falie i recon x+* 205 e524 4 o« * anchor having he highest leading “anchor group relevant anchors) 44 Ste! Strongth Va =ESRvaue refer tolOC-ES ESR 1917 a2 Van peraie-a8 Eq (02) Varabies 1 Aylin} fuss +o #85600 — Ceateulations y, ke Results Vea = $Me Ve) — ss oes zr - 4.2 PryoutStongth Vin ko [(AS) var ven verve acl o1B0968, 099 $Me? Von Ac} 318-08 4.0.2) Ao seo ct 916.08, pan 0.82.1, Fg. 2052.10) eo #98, 013180669. 0-6) 1 ves = (228) 219 Ac1 31900 £9, 0-9) a yan =07+03 (S44) 10 C1 918-089, (41) won = Max(Se28, 5H) 5 4.0 ACL 318-08 Ea. (0-19) Ne mh vent Ac 3180869, ©-7) Variables Ks - he fin] ean fin] ea fin Sagem fi.) 4 F000 ‘B00 too ‘e200 1 cat] bs ft =F "00 Calculations Aci? Arcot’) va ss ve Nf) ti Boo cs) ti 185 ese Rosurs Vogl) geen Vg ths ig we inp awa mine ested or ayeonan wih beng a POSS arom) Bato NAG Fed Sten ae stot ne St ab Coal] wee tus Profis Anchor 2.3.5 Company: NA Consulting Engineers, Ine Page: 3 Spector aL Projet: UCIMC Un Ace Asress: Sub-Project| Pos. No ETX Touch Sereen Phone | Fax: 1 Date! aniaz013 EMal 43 Concrete edge fallure indirection xe Vex = (RS) veev aay Wav Yay Wana ‘ACI 318-08 9, (022) Wou2¥e Act at808 Ea (0-2) At her ste, pat 09.21. 082.10) Ao #450) ACI 318-08 Eq. (0-23) H ww = (SZ) =19 Ac 31008 9 0-26 yy my =07+09(;§2-) 10 Aci 38.08 £9,028) wv 2B 10 Act 31808 £9,029 we #(7(B)) eat AO1318-08 £9. (0-24) Variables eat en) eer] 7 7 ‘0000 7600 tng Suir) ps a $ tare ‘too 1388 Cateaaions Ave fin’) Avs IF ve v vo Me fib Ba 75 “H8815 600 ———ds2 1680 165 Reouts Vey 1 te Mang Mu “Se 388 ae “ae 5 Combined tension and shear loads lhe obts & Lotto a8 Staus fv phe sheet 6 Warnings + To avoid faire ofthe anchor pate th required thickness can be calcated in PROFIS Anchor. Lose re-istibutins onthe anchors due to elastic deformations ofthe anchor plate ae not considered. The anchor plate is assumed o be sufcenty st, n order not 0 be deformed when Subjected tote loading! + Condition A applies when eupplementary reinforcement is used. The © factors increased for nonsteel Design Srengihs except Pulout Srength {and Pryout strength. Condition B apples when supplementary reinforcement isnot used and for Pullout Stengih and Pryout Stength, Refer 0 your local standac + Refer tothe manufacturer's product Iteratue for cleaning and instalation instructions. + Checking the transfer of loads ito the base material and the shear resistance are required in accordance wth ACIS18 or the relevant standard! Fastening meets the design criteria! inp oma arenss uo cheaac er agoonan wine oir ans er piiny DROSS atone usa ate nA Fas Stun Tas eta Vcer nA, Sean n Ca ew hits Profis Anchor 2.3.5 Company: KNA Cansuting Engineers, ne Page: € ‘Specter AL Project UciMe Lin Rec Adaress: ‘Sub-Projct | Pos. No ETX Touch Sereen Phone | Fax 1 Date: anvoror3 Mai: 7 Installation data [Anchor plate, seo: ‘Anchor type and ameter: Kwik Bolt TZ -CS, 978 (2) Profi Round HSS, Stee pipe (AISC): 4.000 x 4.000 x 0.228 in. Installation torque: 300.009 in. o Hole ameter inthe four: = 0.438 in Hole diameter in the base materia: 0:95 in Plate thickness (nput: 0.250 in. Hole depth inthe base material: 2.625 in Recommended pat thickness: not calculated Minima thickness ofthe base material .000 in, (Gearing: Manual Gearing ofthe cred hole according to instructions for use is required, wy 3500 Coordinates Anchor in Anchor xy T5005 500080025 $0 12:b00~25Soo- 26500 ‘8500 20500 10500 12000 25.000 3 so S500 oso 2500 25000 12000 G50 S00 23800 0500 25000 12000 Sama ae ese een at Cail weet. us Profis Anchor 2.3.5 Company: NA Gonsuting Engineers, ne Page: 7 Spector AL Project LUOIMC Lin Ace Assress Sub-Projct | Pos. No, ETX Touch Sreen Phone | Fax: 1 Date: anian013 Mal 8 Remarks; Your Cooperation Duties + Any and all information and data contained inthe Sofware concer solly the use of Hit products and are based on the principles, formulas and secur reguiations in accordance wth Hits technical cretons end operating, mounting and assembly instructions, et. that mus be sity ‘complied wih by the ute. Al fgures contained herein are average fgures, and therefore use-specifc tests are tobe conductes porto using {he relevant Hit product. The results ofthe calculations carted out by means ofthe Sofware are based essentally onthe data you put in ‘Therefor, you bear the sole responsiity forthe absence of ers, te completeness andthe relevance of te dala to De putin by you. Moreover, you bear sole responsi for having the resus of the calculation checked and cleared by an expert paula wih regard to compliance with appeable norms ard permit, prior to using them for your speci Taclty. The Software serves only as an ald f interpret norms fd permits without any guarantee as fo the absence of er, the corectress and the relevance af the resus o stably for aspectic applicaton. ‘You must ake all necessary and reasonabie steps to prevent or limit damage caused bythe Sofware. In pacar, you must arange forthe ‘eqular backup of programs and data and, appicabe, carry out the updates ofthe Software oflered by Hit on a regular basis. you do not use the AutoUpdate function ofthe Software, you must ensure tat you are using the curent and thus up-to-date version ofthe Sofware in each case by carrying oud manual updates via the Hist Webeite, Hil wil not be lable fr consequences, suchas the recovery of lest or damaged data or programs, arising fom a culpable breach of duty by you, Provide (4)3/8" dia Hilti KB-TZ (ICC-ES ESR-1917). 2" embed PREG knoe (c) at Os AG FL Sebe Sanam ves ojomed Tedaroke i AO, Sem CLIENTNO. REVIEWED BY. DATE sheet 29 oF UCIMC Lin Ace sosno 240.072 Generator Cabinet pare 4/13 Liebke: ey AL EQUIPMENT ANCHORAGE EQUIPMENT OVERTURNING CALCULATIONS ARE BASED ON A SEISMIC. LOAD APPLIED AT A CRITICAL ANGLE EQUIPMENT DESCRIPTION : Power Conditioner OPERATING WEIGHT, W,, :200 # 0.4(a, (Sy5 SEISMIC HORIZONTAL FORCE, See +2 WHERE: a, = COMPONENT AMPLIFICATION FACTOR : 1.0 R, = COMPONENT RESPONSE FACTOR 25 Sps = SEISMIC COEFFICIENT (ASSUME SITE CLASS D) : 0.911 |, = IMPORTANCE FACTOR + 1.50 HEIGHT OF COMPONENT ATTACHMENT VS. GRADE : Oft HEIGHT OF ROOF VS. GRADE : 15 ft h F, SHALL NOT BE LESS THAN 0.3(Spa)\,)(W,) F, NEED NOT EXCEED | .6(Sp5)(I,)(W,) F, = 0219W, = 444 0.410 W, e2# GOVERNS F, MIN F, MAX 2.166 W, 437 # VERTICAL COMPONENT, Fr = 0.2(Sps(W,) Fe = 0.162W, = 368 MULTIPLY ABOVE VALUES BY 0.7 FOR WORKING STRESS DESIGN ‘THe CACALATONS CONTIN FORLATONPROPRETY TOU COLSTON CHOKES, Me TS ‘GIMENO Ts COTETS a Re REPODIDED Ge LOSED THES MH HE PER, ‘WRTTE CONSENT FX CORSOTNE ELEMENTS ESV Fp = 57# 26# CLIENTNO. a a KEP consulting Engineers, Inc. ‘Soneuitieg Engtieers, Wee sweet _§2__ oF PROVECT ‘CuENT DATE UCIMC Lin Ace: oBno 240.072 Generator Cabinet pare 04/13 Liebke py AL EQUIPMENT ANCHORAGE (CONTD) ELEVATION ELEVATION LENGTH BETWEEN SUPPORTS, b; : 34.5" WIDTH BETWEEN SUPPORTS, b, : 35.5" HEIGHT OF CENTER OF GRAVITY, he, 51.0" NUMBER OF MOUNTS, N : 4 CONSIDER LOAD APPLIED IN ANY HORIZONTAL DIRECTION TRANSVERSE COMPONENT = F,cos6 LONGITUDINAL COMPONENT = F,sin@ UPLIFT ON ATTACHMENT 2: COMPRESSIVE LOAD ON ATTACHMENT 4: (W, + Fv). (F,.€0s8)(h., )(b2/2) ) (F210) (hea)(b/2) N P CLIENT NO. a a a 5 @ KNA Consulting Engineers, Inc. sneer 61 oF PROJECT cuENT DATE UCIMC Lin Ace sosno 240.072 Generator Cabinet pare 04/13 Liebke ey AL EQUIPMENT ANCHORAGE (CONT'D) FOR MAXIMUM P; OR Pe: a 40 ag 0 HENCE: (r,sme)(ha)tes!2) _(F,2088)(h4) 6/2) _ \, et) (be)(le) Leone Ma Mil 0 tan0 = (N)(N+2) v2 _ 2 r2(n=2y = 1190 wi N(bs) = 1260 in? MAXIMUM UPLIFT LOAD ON ATTACHMENT 2 PL = -36 MAXIMUM COMPRESSIVE LOAD ON ATTACHMENT 4 Pe = 116 MAXIMUM SHEAR PER ATTACHMENT P= 14 Be Coal] yew bilt.us Profis Anchor 2.3.5 Son aa Sona ean oe ; sexe ® om Teme mee oe a i x Bos oats ‘Specifier's comments: 4 Input data pochorypeand damoter, Kw Bat 72-68 9802 Say Ctonecounaiem —— henotion hewastin ve cromsne on see ei centr wooatvat set 5201 mo Seagrass A80 Sutin “Tremenda tenes tase mame wrote onto Caradon, 00 {= SnD N= 00H wenn shuts ranov near aon no lene eigenen west Seismic loads (eat.C,D,E, °F) Geometry fin] & Loading [bith] ‘edge reinforcement: none of < No.4 bar Fejaea wer ma med pene ith gsr a ple) PROS hee) 8d asst Ac Psu Seay ares arma TFWM, Seoan b> Ca] orbits Profis Anchor 2.3.5 Company KNA Consulting Engineers, Ine Page: z Speatier AL Project bcme Ares. ‘Sub-Project | Pos. No: Power Condtioner Phone | Fax 1 Date nears EMal 2 Load case/Resulting anchor forces Load case: Design loads Anchor reactions {1b} Tension force: (+Tension, Compression) ‘Anchor Tension force __Shearforce _Shear force x_ Shear force y TB T % ‘max. concrete compressive stan: =D ‘max. concrete compressive tess: + Ipsi Fesuling tension foes in G29)=(0.0000.000): of). resulting compression force In (dy}=(0.00000.00): 0b) 3 Tension load {Lod Nu 16) apa a b)_Utzton p= Nal, Staton “Steet Sengih™ BFE oR Pullout Stengts* er 1616 5 o« Concrete Breakout Strength" 6 me 4 oK * anchor having the highest loading "anchor group (anchors in tension) 34 Stoel Strength Nu =ESRvalue refer tolCC-ES ESR 1917 Naa? Naa ‘ACI 318-08 Ea, (0-1) Variables San st a 1800 Calculations Naf) 600 Rosutts gb] et Next] Nag) — a i a 132 Pullout Strength =Nssc0 Veli eferto Nex = Neate Vast fer to ICC-ES ESR 1917 Nang = New ACI 318-08 Eq. (0-1) Vanabies ——felps|___NezoO) ‘00 Bie Calculation Ng] Nu ‘80 76 a7 ia ot ead ptt choaed genet wih Up wisrg neous mayo PRESS Dr sues nh Fad Stam ass ajo se 2, Stan 64 C*.ai] we hus _ Profis Anchor 2.3.5 Company: KNA Conadtng Engineer, ne Page 3 Spector aL Project uoime ‘Asoress: ‘SusProject | Pos. No Power Conditioner Phone | Fax: ' Date: arvareors. 3.3 Concrote Broakout Strength (RE) vec vn wen No Aci1608 9. (0-4 No? Na ‘ACI 318-08 £9, (0-1) ‘ee’ 800 ACI 318-08, Part D521, Fig. RDS.2.10) ‘ACI318-08 £4. (0-6) ‘ACI 316-08 £9. (0-9) ‘ACI318-08 £9, (0-11) ACI 316-08 £9. (0-13) ‘ACI 318-08 E9. (0-7) etn) ey) win] eae i 1 F000 tbo — i000 0 ain) ke 4 fst $$} +t Catetatons Aun’) Ayan sou an . a fe) 00 ‘S00 806 +865 8 a Results Nett) Ng (O) we PRON Anan o|asos sca ine Pe sabeSonan aster NG Se 85 Coa] worms Profis Anchor 2.3.5 Company RNA Consulting Engineers, ne Pat 7 Specter A Project: ome Adress: ‘Sub-Project | Pos. No Power Conditioner Phone | Fax: 1 Date: artarzot3 EMal 4 Shear load Lod 8) Capacity 9 18]__Utizaton py Val “ar swenge7 “St je Bt__Seonor ga to)_ ett po Vai, _ Set ‘Stee fate (wth over arm) Pryout Strengths CConerete edge fare in rection ys * anchor having the highest loading 4.1 Stoo! Strongth Vg ESR value Mana? Vor refer IOC-ES ESR 1917 ‘ACI 318-08 Eq. (0-2) Variables a Paws ti} — Caleulations Yaa 5 fun psi Results Vea ses 4 Meat) 42 Prout strength Ms ha (AE) van vn 4%? Va Aue” see ACI318-08, Par 0.521. Fig. RD.S2.1(0) Reo = 9th ss ah ya 207 +03 (S92) s10 von =n S28, SB) 54.0 Nestea vont Status NA NA NA NA 26 1048 2 0K 25 3001 1 0K. “anchor group (relevant anchors) Meg] 36 ‘AC 318-08 Eq. (0-30) ‘AC! 318-08 Eq. (0-2) AC} 318-08 Eq. 0-8) AC1318-08 4. (0-9) ACL 318-08 Eg. 0-11) ‘ACL310-08 Eg. (0-19) ACL 318-08 Eg. (0-7) fing ‘3.000 Ceateuations Avatn’ Aol? " —*sit0' “Sato i Results Vel a Ve) st S88 ie Natl 70 Vis) Peis rac) ate ae AG Fess Sten Tacs ajeene Tce Ne, Stan Cael Profis Anchor 2.3.5 vets __ Company TENA Consuing Engineer, ne Page 3 Specter a Projet: deme Adres Subs Project Pos. No Power Conditioner Phone Fax \ Date: aro eMat “43 Concrete edge fallen rection y+ ve =(B8) y 0131.08 £9, 0-21) fa. = (2) wesw wav vw pean Vo $a? Ve C1 318-08 9, ©-2) J seothci 310-08, Part 06.2.1, Fig. RO6.210) e245) C1 918.08 Ea. (0-23) ‘ w(5E s10 ‘ACI 318.08 €9, (028) Bn +03(g)5 3 7+03(92-)=19 01310009026 wow VB 10 Aci 180889, 29 ve =(7(f) @) hat ACI 318.08 Eg. (0-24) Variables caf] eatin} Ot hing $000 ‘2000 “ton do 000 tn detin) ps pana — tar O37 ‘3000 "Soto Ceateuations Ati’) Avan’ sy " a Yetta 3500 288.00 toto tr 728 Resuts Veg io} demain Nea to] Mus tb) esr S88 — 1 5 Combined tension and shear loads bo» i ‘ ___ttzavon gus Stats “abe oot cs eee OK fav" phe bet 6 Warnings + To avid fare of the anchor pat the required thickness canbe calculated in PROFIS Anchor. Load re-istbutions onthe anchors due to laste deformations ofthe anchor plate are not considered, The anchor plate is assimed tobe suifcleny sb n order not tobe deformed when subjected tothe loading! + Condon applies when supplementary reinforcement is used. The © factors increased for non stee! Design Strengths except Pulout Strength land Prout strength, Conciton E aprlies when supplementary reinforcement isnot uted and for Pulou Strength and Pryout Strength. Refer fo your local standard + Refer othe manufacturer's product erature for cleaning and instalation instructions. + Checking the vansfer of oads into the base material and the shear resistance are required in accordance with ACIS1S or the relevant standard! Fastening meets the design criteria! ifpkaaa wa ola matte acedie ogeeran inthe arg andi mapa Ro aca ano sat ns FeaseScaey ana eae oa, sean & ¢ 61 Coie] woe tus Profis Anchor 2.3.5 Company: NA Consulting Engineers, nc. Page: 3 ‘Specter aA Propet: oie ‘ares: ‘SubsProject | Pos. No Powe Condtioner Phone | Fax: 1 Date’ ariarzor3 Mat 7 Installation data Anchor pale, steak - Profle: © Hole ameter inthe itu: - ‘Anchor ype and diameter: Kwik Bol TZ -CS, 18 (2) Instalation torque: 300.000 ine Hole diameter inthe base materia 0.375 in Plate thickness ¢nput) = Hoe dept in tre base materia: 2.626 in Recommended pate thickness: = Minimum tvexnees ofthe base materi 4.000, Cleaning: Manual leaning ofthe cried hole according to instructions for use is quite Coordinates Anchor in Anchor x yaa ey Toe 0.000 12.800 7200 8 Remarks; Your Cooperation Duties + Any and allnfomation and data contained in the Software concern sole the use of Hit products and are based onthe princes, formulas and ‘seurty equitons in scordance wih Hits technical drectone and operating, mounting and assembly instructions etc, iat must be sity ‘complied wth by the user. Al fgures contained therein ae average RgLzes, and therefore use-spectc tests are tobe conducted pros to sing the relevent rit product The rests of he caleuatons cared out by means ofthe Sofware are based essentially on the dala you putin. ‘Therefore you bear the sole respansibiy for the absence of eres, Ihe completeness and the relevance of the data tobe putin by you. Moreover You bear sole responsibly for having the results ofthe calculation checked and cleared by an expe, particulary with gars to ‘compliance with appllable norms and pert, prior to using them for your spect tacit. The Sofware serves only as an ad lo intexpet norms ‘nd permits without ary guarantee as fo te absence of errors, te coreciness and ie relevance ofthe esulso: sia for 2 spectc ‘pplication, + You must take al necessary and reasonable steps to prevent or it damage caused bythe Sofware. in patcuar, you must arange or the ‘eqiuar backup of programs and data and, if applicable, cary out the updates ofthe Software offered by Hi ona regular bass. I you donot use the AutoUpdate function ofthe Software, you must ensure that you ae using the curent and thus up-o-dote version ofthe Sofware in each case by canying ou manual updates via the Fit Website. HIM wil not be labe for Consequences, suchas the recover of fst or damaged data or pograms, arising fom a culpable breach of duty by you Provide (1)3/8" dia Hilti KB-TZ at each corner of, unit (ICC-ES ESR-1917). 2" embed aes rao mina acid or gpona wn hens onions steeping ERocg aioe cy sraates ane Feawed chan is ested acolo A, Sn CLIENT No. REVIEWED BY. ‘est cucuuriosconra nronuaTioN RarRnr ou constr ENGMEES ne, HS (>) ‘cow nT conens war aot MPanaves oe Oc.OGE0 Te THES WNDU He PHO ‘MITE COvSEN oF MSV REE, AL OTS RESEES, DATE: KINP esnsiing trners, te: her oe we PROJECT - yosno 240, 07D pare | 4A CUENT By he cued 4" tHe FT 0) CE) iT = 260004 > CA) UNIT = 2364 - 2B5R | 34 =e = sab ral 4 = : a . glee ST pisot 71634. 14forge Ok foun aE CE) Gk FTG -dle POR CR) DST J BRAINLAB UNCONTROLLED INFORMATION IF NOT READONLNE SEISMIC CALCULATIONS ET 6.X + VERO SERVICE MANUAL LASTRELEASED: November 16,2011 Seismic Caluations ET6x+ Vero 3x $M 09-092 Rev.0t PAGE 1 OF 14 ¥ BRAINLAB UNCONTROLLED INFORMATION IF NOT READONLINE TABLE OF CONTENTS 1 14 12 13 2 24 22 23 24 25 26 27 3 DOCUMENT OVERVIEW. Purpose. Scope so Definitions and Abbreviations. SEISMIC CALCULATIONS... ET Coiling Mount (483608) Flat Panel Assembly (49370 + 49553 + 493648 + 49377 or 49378): Camera Assembly (49370 + 49379 or 49365A or 49366A or 49369A + 493648): ET Ceiling Arm for Monitor (49356-01 or 49356-02 or 49356-03) Dual X-Ray Generator: 8 Single X-Ray Generator... sn " ‘Computer Cabinet... APPENDIX LAST RELEASED: November 16,2011 Seisme Caleatons ET8x+ Voro3x SM 09-092 Rov Ot PAGE 20F 14 cs BRAINLAB UNCONTROLLED INFORMATIONIF NOT READONUINE 1 DOCUMENT OVERVIEW 44 Purpose “The purpose of the Service Manual isto serve as a basis for seismic calculations ofthe ExacTrac 6x and the Vero 3x System 4.2 Scope This Service Manual is applicable for everybody who wants to calculate seismic bulding codes. Itis only applicable for the ExacTrac 6.x and the Vero 3.x System ‘The calculations are model based, 4.3 Definitions and Abbreviations Definitions ‘Symbol Definition Unit ‘Mace Mass of Assembly kg m Mass of single component. kg | L Variable length of bar or tube mm or inch K Variable length of flange tube mm or inch CG. ‘Center of Gravity : _ z Direction Vector (x, y, 2) of C.G. Tam or inch EQ = Formula to calculate the Center of Gravity of an assembly: Dl) Meee LAST RELEASED: November 16,2011 Seismic Caelatons ET 5x+Vero3x SM 02.092 Rex. 01 PAGE 30F 14 # BRAINLAB UNCONTROLLED NFORMATIONIF HT READOMLNE 2 SEISMIC CALCULATIONS The seismic calculations have to be done according to the effective seismic building code The data for the center of gravity and the mass of the several assemblies can be calculated as follows: 24 ET Cei g Mount (49360B) aq cs 4 L: Length of shortened bas) roleo - am inch Only upper bar mounted: COny upper bar mounted ye = 889K +L 3.110% pe = 683 Kg +L 7.85107 kg [ett 8 1° Both bars mounted (L> 900 mm © Both bats mounted (> 11.8 ine) ye 272 KG 4b 8.1110" kg Me = 74 kg'# L740" kg (nest Lets6 407+ Ja 2 (a2 L236 107) nen LAST RELEASED: November 16,2011 Selsmic Calculations ET6x+ Vero3x SM 08-092 Revot PAGE 40F 14 BRAINLAB UNOONTROLLED INFORMATION IF NOT READONUINE 2.2 Flat Panel Assembly (49370 + 49553 + 49364B + 49377 or 49378) 50. ca) £0 r LL: Length of shortened bar inch 2.34-41.98-10"*)g "he 2-(24 195012 49.10 pe ee rast? 48-10 Jee Moes ‘ons. LAST RELEASED: November 16,2011 Seismic Caluaions ET6x + Vero3x SM 09-082 Rev0t PAGE 5 OF 14 ¥ BRAINLAB UNCONTROLLED NFORMATIONF NOT READONLINE 2.3 Camera Assembly (49370 + 49379 or 49365A or 49366A or 49369A + 49364B) Vertical Cover is included in the celeulations but not shown in the drawings. of LL: Length of shortened bar inch mya = (0481-378: 10-)kg 0.43+1-26-10-)kg = {21 pam 437 linch Yl ose iY limes z= Ens L1210 ag | (Petes euzas0es) m, Mes LAST RELEASED: Novenber 16,2011 Seismic Calculations ET8x+ Vero 3x SM 09-082 RevOt PAGE 6 OF 14 ¥ BRAINLAB UNCONTROLLED INFORMATION F NOT READONLNE 2.4 ET Ceiling Arm for Monitor (49356-01 or 49356-02 or 49356-03) y £0. | EO L t t it L Length of shortened tubes K; Length of shortened flange tube yes =863+16-10*-L+001-K}g (:22}pm (qosgn use to coor ncsTane8 197.87 ag Maes Mes = (86.3-+0.41-L+0.25-K)kg 1-(‘2 a Mages zo [2seun enonso eases KesT2 e127 10" lo LASTRELEASED: November 16,2011 Sesmic Calculstions ET8.x+ Vero 3x $M 09-082 Revot PAGE 7 OF 18 J BRAINLAB UNCONTROLLED INFORMATION IF NOT READONLINE 2.5 Dual X-Ray Generator Due to inhomogeneous devices and a model based calculation the calculation of the center of gravity has a tolerance of #100 mm, EQ. EQ. EQ | EQ tecrone bh Cabiet Converter CG. “— igh votage ‘ransiomer co. camsoea br GENERATOR 1 WITHOUT PRE-TRANSFORMER {STORED CABLES ARE NOT INCLUDED) pu = 163 kg 2732.8 inch LAST RELEASED: November 16,2011 Seismic Calouistions ET 6+ Vero3x SM 06-082 Rev ot PAGE 8 OF 14 & BRAINLAB UNCONTROLLED INFORMATION F NOT READONLINE EQ, EQ. £Q. | FQ Becton Cainet Comer o— CG, High voltage |~* toon CG. evar Conecton bond GENERATOR 1 WITH PRE-TRANSFORMER 208V ~ 400V mm Inch Mg = 293 kg z=640mm | 22252inch GENERATOR 1 WITH PRE-TRANSFORMER 420/440/480V - 400V mm inch Me = 213 kg 22 26.incn Fg = 218 kg = 682mm GENERATOR 1 WITH PRE-TRANSFORMER DELTA 200/210/220/208V - STAR 400V inch gus = 9308 kg 22538 mm iz2212Inch LAST RELEASED: November 16,2011 Seismic Calculations ET8x+ Vero3x SM08-092 Rev. 01 PAGE 9OF 14 jo F BRAINLAB UNCONTROLLED INFORMATION IF NOT READONLNE EQ. EQ. EQ | EQ) Electronic i Cabinet Converter CG. “ ‘High voltage vranstomet co. ‘Storage room fo abies GENERATOR 2 (STORED CABLES ARE NOT INCLUDED) mm inch 22327 inch LAST RELEASED: November 16,2011 Seismic Cleulatons ET 6x + Vero3x SM 08-092 Rev 01 PAGE 100F 18 il} ¥ BRAINLAB UNCONTROLLED FORMATION IF NOT READONLNE 2.6 Single X-Ray Generator Due to inhomogeneous devices and a model based calculation the calculation of the center of gravity has a tolerance of 1100 mm. EQ. £Q. FQ. | EQ Becrone Saar Cowen $< CG. ‘High voltage | tame poo CG. Prenat [2224.88 inch LAST RELEASED: November 16,2011 Seismic Calcutions ET6x+ Vero3x SM 08-082 Revot PAGE 11 OF 14 ju # BRAINLAB UNCONTROLLED NFORMATION IF NOT READONLINE EQ EQ. FQ. | £0.) ‘Becrone Cabinet ‘Converter CG. “ High votage tensormer co. ‘Storage room for cables SINGLE GENERATOR WITHOUT PRE-TRANSFORMER (STORED CABLES ARE NOT INCLUDED) mm. L inch ge = 162 kG 2S b28 mm Mga = 162 kg '52.60 Inch LASTRELEASED: November 16,2011 Sleic Calcuaions ET6x+ Vero'3x SM 09-092 Rev.ot PAGE 120F 14 ie) ¥ BRAINLAB UNCONTROLLED NFORMATION F NOT READONLNE 27 Computer Cabinet Due to inhomogeneous devices and a model based calculation the calculation of the center of gravity has a tolerance of 100 mm. 5 E Q Q vO aon Tac ac 4 8 CG : ace a + i ca. iets ws) ettne unt front door side EXACTRAC (STORED CABLES ARE NOT INCLUDED) mom i inch mune 870 KG 72868 mm 22868 mm VERO (STORED CABLES ARE NOT INCLUDED) “4.4 inch 5.2 inch LASTRELEASED: November 18,2011 Seismic Calculations ET6x+ Vero3x SM 06-092 Revot PAGE 13 0F 18 # BRAINLAB UNCONTROLLED INFORMATION IF NOT READONLINE 3 APPENDIX NA LAST RELEASED: November 16,2011 Seismic Caluations ET 8x+ Vero 3x $MO09-092 Revit PAGE 18 0F 14 ‘$M 09-090 Revision 6 page 59 of 97 Service Manual eee eee ey ocaue Li) fo | 4150mm, 3315mm 285mm, | } 200mm \ / \4 , Vertical parts Arm weight Attached weight weight Figure 89 Celling Arm Dimension and Weight - Setup for minimum clearance of 2.0 m, Note: '+ Ceiling plate and upper tubes between celling plate and interface plate are only applicable for concrete ceiling height > 400mm, ore e Information Service Manual holes (6x) or thread’ ‘ods to ntrtacs plate holes (x) fo atton _of plat othe oeling Figure 40 Dimensions of Ceiling Plate (red colored, top position) - thickness of plate: 15mm. hols (6) fr threaded rode to ealing plata holes (6x) for reades ‘ods rainab (estallaton of lower part) Figure 41 Dimensions of Interface Plate (black colored, bottom position) - thickness of plate: 12mm 16 be se UAL TrueBeam STx Edition ‘Major System Components - Modulator Cabinet 3.3 Major System Components — Modulator Cabinet 2-0" (1219) Pie amie, Een ine Most Sate vr. Fished Wa Fault “FT Seaaex i IGeausn thecenacasctone = 3'—6" rah enero Baaipmeten toda Ereslanecabonecos Ons, (1067) ‘Veen Planing Depeamot or ‘ge sbucuraleaclaions A ‘come mearng kts avalatle {Geta he gional inaiton Projet Man oeea “The Moir Cabinet ets on ‘emotive, scouts, (Gnndered The Mout Codie! hs ures pars bath ies and ont Prose 11:0" 352) dear space soto se: Fornon © ate, very cea! faupmer sence cos'anceequrmers wih eps ocal ode, Bo not ‘tate tis ebinet i the primary beam path Figure 3-7 Modulator Cabinet, Plan View Chapter3 Facilities Requirements 3-15 5 r MASA sie cat Pus 202 Wawe Major System Components - Modulator Cabinet TrueBeam STx Edition “The Modulator Cabinet may be located either inthe TrueBieam STx ‘oom or remotely. Venton, acoustics, service provisions, and cable length musi be considered. The Modulator Cabinet has ‘Service panels both sides and front, Provide 11-0" (9353) clear ‘Space, ide 10 side, For non-U.S, sites, very electrical equipment Service learance requirements wih applicable local code. Do nat locate this cabinet in the primary beam path. 41'-0" (3353) Minimum 4’-0' (i219) Modulator Cabinet i i i i i 1 Ta | sis" I i i i i i ‘The Modulator pul box is recessed ory into the floor stab and shall be 18" x ) | 24" x 10" doep (450 x 600 x 250). // Refer tothe "Modulator Cabinet ay g z : 36 Paver socxers itn Sten Rapes (CENTRE OF MOUNT WIDE BORE CT ‘0001-0008 | 14 Nov2010 visignrt ‘ af . aR © SHEE fe 2s Pre-nsallation Customer Requirements . : visiénrt rU 2 BEFORE INSTALLATION Before installation, Vision RT will contact the customer to arrange a convenient time to carry out a survey of the room where the system is to be installed, 2.1. Site Survey 21 Customer Responsibilities ‘The customer is required to make the following arrangements for the site survey: '* Access to the room where the system is to be installed out of clinical hours. The survey will take approximately one hour for each room being surveyed. ‘= Access to the false and structural ceilings to determine if there are any obstructions affecting system installation. 2.2 Camera Positioning. The Vision RT representative will take measurements to determine the optimum position of the ‘cameras to give maximum coverage given the room geometry. Standard positions of the cameras are detalled in [1] this is also dependent on room geometry. 2.1.3 Central camera position ina Varian TrueBeam™ treatment room ‘When AligaRT is installed in a TrueBeam"™ treatment room, the central camera is mounted from the bracket used to mount the Varian Optical Guidance camera. The Varian camera is located 183cm +/- 10cm forward ofsocenter on the midline ofthe couch. The AlignRT camera will be hung from its ‘own mount above the Varian camera as shown in attached slides. Vision RT part number VDO419 (supplied by Vision RT with Align). Figure 2-1 AlgnRt TruebeSm™tount The false ceiling height recommended by Varian for TrueBeam™ installations is 2743mm. This should be considered as a minimum height in order to achieve a good central camera viewing angle when the Varian camera bracket is located 193cm (183cm + 10cm) forward of isocenter. In the current version there will be no interaction between the AlignRT camera and the linac and no Gate Controller will be included in the installation. 001-0008 | 11 Nov 2010 ° Series 700 AV/T-S Power Conditioner Designed for Varian Novalis” TX, Trilogy” IX with ExacTRAC” and OBI or Truebeam™ STX, Truebeam” with ExacTRAC™ and OBI or any system with a high energy accelerator, Exactrac” and OBI Input Voltages: 208 VAC, 240 VAC, 480 VAC or 600 VAC (60 Hz) (Output Voltages: 208/120 VAC, 480/277 VAC and 120 VAC * Integrated Input and Output Breakers + One Input Breaker - Four Output Breakers Intelligent Voltage Regulation (+ 2.5% Output Typical) ‘Output Voltage Monitoring Internal Bypass Switch Triple Shielded Isolation Transformer Internal TVSS + Front Access “Zero Clearance” Cabinet feu Quadruple Output Power t Re Conditioner with Voltage Regulation ‘Submittal Package and Specifications 112283 _Quacruple Output Pover Conditioner | ABE Specs/Submital Package TRANSTECTOR SERIES 700 AV/T-S ‘Specifications for Quadruple Output 60 Hz Power Conditioner, designed for Varian Novalis™ TX, Trilogy” IX with ExacTRAC™ and OBI or Truebeam™ STX, Truebeam” with ExacTRAC™ and OBI or any system with a high energy accelerator, Exactrac™ and OB}. 1.0 SCOPE This specification covers the electrical characteristics of the Transtector Power Conditioner which provides clean regulated power for the entire Novalis™ TX, Trilogy" IX with ExacTRAC™ and OBI or Truebeam™ STX, Truebeam™ with ExacTRAC™ and OBI or any system with a high energy accelerator, Exactrac™ and OBI. 2.0 GENERAL ‘The Power Line Conditioner consists of a front access power cabinet incorporating an all copper, multiple tapped, triple shield isolation/regulation transformer. The ultra low output impedance of the transformer in conjunction with the electrostatic shields assures precision hospital grade performance with excellent noise and transient attenuation, Independently controlled inverse parallel electronic switches for each of the 7 taps per phase provide tight regulation over a wide input range. Linear devices are used for line synchronization to prevent phase shift errors normally associated with simple CT zero current crossing acquisition. The microprocessor control accurately selects the correct tap to maintain the output no greater than + 2.6% of nominal in a typical installation, correcting for voltage disturbances within one cycle. Digital processing technique provides fast and accurate regulation without output voltage over or undershoots. 2.01 MODEL NUMBERS MODEL INPUT VOLTAGE OUTPUT VOLTAGES Standard Model ter configuration ave avatabe tung 80 #2 Model Input Voltage Output Voltages 8BLNX-160 K (i) 7O0AV/T-S 208 VAC nominal 208/120 VAC, 480/277 VAC and 120 VAC. BCLNX-160 K (i) -700AVIT-S. 240 VAC nominal 208/120 VAC, 480/277 VAC and 120 VAC 8DLNX-160 K (i) -700AVIT-S 480 VAC nominal 208/120 VAC, 480/277 VAC and 120 VAC BELNX-160 K (i) -7O0AV/T-S-C 600 VAC nominal 208/120 VAC, 480/277 VAC and 120 VAC. 2.4 AGENCIES 2.4.4 STANDARDS: ‘The systems shall be designed in accordance with: + American National Standards Institute + Institute of Electrical and Electronic Engineers National Electric Code (NEC) National Fire Protection Association (NFPA Article 70) + Underwriters Laboratories (UL) 1449, 1012 FCC Arlicle 15, Section J, Class A 180 9001 ‘eww pneangup sm [Ar iSO 300-298 and 60 14008200 carted company. mw 2.1.2 LISTINGS + The system shall be listed to C-UL, UL standard UL1012. + The system shall comply to: FCC Article 15, Section J, Class A and ANSI 082.14 (electromagnetic, compatibility). + The SPD shall be UL 1449 3rd Euition listed/recognized, 3.0 DYNAMIC ELECTRICAL CHARACTERISTICS 3.1 OPERATING VOLTAGE AND OUTPUTS: ‘The input voltage shall be 208 VAC, 240 VAC or 480 VAC, Delta, three phase, 60Hz. Each unit will be pre-wired at the factory to accommodate the nominal input voltage selected. Units with other input voltages (i.e. 380, 400, 415, {600 VAC) andlor frequencies (50 Hz) are produced upon request. 3.2 LINE VOLTAGE REGULATION Usable Input Line Voltage +15%, -23%. Nominal Input Line Voltage +10% to -15% 3.2.1 OUTPUT VOLTAGE REGULATION + 2.0% to + 2.5% typical. ‘The design of the system shall indicate that with an input voltage of 10% of nominal, increasing the load to 1000% shall cause the output voltage to fall no lower than -6%, 3.3 OUTPUT VOLTAGES ‘Two (2) separate WYE configured, 3 phase voltage outputs shall be provided as follows: Output #1 shall be 208/120 VAC. Output #2 shall be 208/120 VAC or 480/277 VAC. Output #3 shall be 480/277 VAC. Asingle (1) phase voltage output shall be provided as follows: Output #4 shall be 120 VAC. 3.4 OUTPUT CONNECTIONS Output #1: 150 Amp, three (3) pole circuit breaker for Linear Accelerator or a 175 Amp three (3) pole circuit breaker for TrueBeamn™. (Output #2: 100 Amp, three (3) pole circuit breaker if 208 VAC, or a 70 Amp three (3) pole 480 VAC circuit breaker for the BrainLAB ExacTRAC™ generator. Output #3: 60 Amp, three (3) pole circuit breaker for OBI or a 90 Amp three (3) pole circuit breaker for TrueBeam™. (Output #4: 30 Amp, single (1) pole circuit breaker for power peripherals, “The TrueBeam"™ STx will use either the 175 Amp 208 VAC output or the 90 Amp 480 VAC output. Refer to chart on page #8 for output configurations. @ainanstector ad Quadruple Output Power Conditioner | ABE Specs/Submital Package 4 3.8 INPUT/OUTPUT WIRING ‘The input/output wiring sizes are dependant upon the terminals provided by the circuit breakers. Input wiring sizes: 208 VAC 300,Amp breaker #1 AWG to #600 KCMIL. 240 VAC. 250Amp breaker ——-#3/0 AWG to #350 KCMIL 480 VAC. 150,Amp breaker «#14 AWG to #3/0 AWG 600 VAC. 100Amp breaker #14 AWG to #3/0 AWG Output wiring sizes: 208/120VAC 175 Amp breaker #4 AWG to #4/0 AWG 208/120 VAC 150 Ampbreaker #14 AWG to #3/0 AWG 208/120 VAC 100 Amp breaker #14 AWG to #3/0 AWG 480/277 VAC 90.Amp breaker #14 AWG to #3/0 AWG 480/277 VAC 70 Amp breaker #14 AWG to #3/0 AWG 480/277 VAC 60 Amp breaker #14 AWG to #3/0 AWG 120 VAC 30 Amp breaker #14 AWG to #2 AWG. Refer to chart on page #8 for output configurations, ‘The ILSCO TA-20 terminal allows wire sizes from #14 to 2/0 to be connected to the ground. 3.6 RESPONSE TIME Response time is less than 1/2 cycle. 3.7 CORRECTION TIME. ‘The output voltage is corrected within 1 cycle, 3.8 LOAD REGULATION ‘The output is maintained to within 2% of nominal or less, from no load to full oad. 3.9 IMPEDANCE, ‘Output #1 and Output #2: impedance shall be less than 2.33% (Measured with the linear accelerator in beam on state @45 KVA with the OBI and ExacTrac™ @ 5 KVA continuous) ‘Output #3: impedance shall be less than 1.45% (45.9 mOhms) (Measured with the linear accelerator in ready state @ 20 KVA, ExacTrac™ in standby state @ 5 KVA and OBI @ 45.7 KVA (5A) momentary) 3.10 OPERATING FREQUENCY 60 Hertz + 3 Hertz. 3.11 HARMONIC DISTORTION Less than 1% THD added to the output waveform under any dynamic linear loading conditions presented to the line regulator. 3.12 TURN-ON CHARACTERISTICS When energized the voltage overshoot is 5% or less of the nominal voltage for less than 1 cycle. 3.13 OVERLOAD RATING 200% for ten seconds. 100% for one cycle. a” 3.14 NOISE ATTENUATION ‘Common mode noise attenuation is typically 140 dB or greater. Transverse mode noise attenuation is 3 dB down at 1000 Hertz, 40 dB down per decade to below 50 dB with a resistive load 3.15 AUDIBLE NOISE Not to exceed §5dB measured @1 meter. 3.16 EFFICIENCY Efficiency shall be > 96% typical at full load, Excitation losses shall be less than 1.5% of KVA rating, 3.47 BTU ‘The Power Line Conditioner shall generate no more than 10,230 BTU/Hour in typical use. 3.18 POWER FACTOR Input power factor shall be greater than .95 with a resistive load and reflect no triplen harmonics to the utility under non-linear loads. 3.19 LINE TO LINE BALANCE ‘The Power Line Conditioner shall not produce more than a 2% phase to phase unbalance. 3.20 MTBF The system shall exhibit a MTBF > 10,000Hr. 3.21 ENHANCED TRANSIENT OVER VOLTAGE SURGE SUPPRESSION ‘An enhanced surge protection device (SPD) shall be intalled paral othe secondary output of the powerline conditioner o provide ell mode, bidirectional ad bi-polar surge protection. The SPD is rated for 100 KA per phase, ©) 50 kA per mode capacity, (L-L, LAN, L-G, N-G) The surge suppressor shall be listed fo UL 1449 3+ editon ratings when subjected to ANSMIEEE 62.41-1991 category 3 waveforms. Uni shall conform to UL. 1283 requirements for electromagnetic interference. Unit shall provide attenuation against EMIRFI noise up to 50dB at 1MH2, The surge Suppressor is installed onthe loa side ofthe transformer, connected in paral 4,0 MAIN TRANSFORMER 4.1 BASIC CONSTRUCTION ‘The transformer windings are of all copper conductor construction with separate primary and secondary isolated windings. 4.2 MAGNETIC Grain oriented, stress relieved silicon transformer steels utilized to minimize losses and provide maximum efficiency. Flux density will not exceed 14k gauss. 4.3 INSULATION Class N (200° C) insulation is utilized throughout, 4.4 SHIELDING ‘The transformer has multiple (three) copper shields to minimize inner winding capacitance, transient and noise ‘coupling between primary and secondary windings. Inner winding capacitance is limited to .001 pf or less. 4.5 COOLING ‘The transformer is designed for natural convection cooling, Fans are inside the unt. @2D TRANSTECTOR Quadruple Output Power Conditioner | ABE Specs/Submital Package 6 4.6 OPERATING TEMPERATURE The system operating range: 0 to 40 degrees Celsius, 32 to 104 degrees Fahrenheit. 4.7 OPERATING HUMIDITY 0-95% relative humidity, non-condensing. 5.0 MAIN INPUT BREAKER ‘Amain input molded case thermal magnetic circuit breaker, rated at 125 % of the full load input current, is fumished as an integral part of the unit. For example, a 300 Amp input breaker will be provided for 208 VAC input, a 250 Amp input breaker will be provided for a 240 VAC input, or a 150 Amp input breaker will be provided for 480 VAC input. A 100 Amp input breaker will be provided for 600 VAC input. 6.0 BY-PASS SWITCH ‘Amanually operated rotary bypass switch provides bypassing of the SCR controlled voltage regulator portion of the Power Line Conditioner. The Power Line Conditioner can be operated in either the on-line or bypassed mode with cone turn of the switch, The transformer and surge suppression circuitry remains in the circuit when in the bypass mode. All nominal output voltages, 208/120 and 480/277 VAC three (3) phase 4 wire, and 120 VAC single (1) phase wil remain available in the bypass mode. The bypass switch is located on the front of the unit 7.0 MONITORING 7A ALERT LIGHT An indicator light shall annunciate that the output has been disabled by one of the following conditions. (1) Transformer over-temperature, 2) SCR thermal over-temperature. 7.2 INPUT OUT OF RANGE LEDs Input “Out of Range’ red indicating LEDs shall be provided for each phase. If any phase of the input voltage source exceeds the specified +10%, -15% from nominal, the appropriate phase LED shall be illuminated. 7.3 INDICATING LAMPS Output "ON" indicating lamps shall provided for each phase. 7.4 OUTPUT VOLTAGE METERS Two (2) digital output meters shall be provided. One shall monitor the 208/120 VAC outout and the other shall monitor the 480/277 VAC output. Each meter shall monitor and display Line-to-Line and Line-to-Neutral voltages. Minimum and maximum voltage values shall be recorded in EPROM. High and low output voltage limit alarms shall be programmable and a visual indication given if limits are exceeded. 8.0 CABINET 8.4 TERMINATION Terminations is front access with input and output connections to the input and output circuit breakers. A ground terminal will also be provided, lisco TA-2I0. ‘The unit is constructed using an isolation transformer and is considered to be a ‘separately derived system”. It should be grounded in accordance with the NFPA 70 article 250.20 “Alternating-Current Circuits and Systems to be Grounded’, article 250.20 (D) ‘Separately Derived Systems” and article 250.30 "Grounding Separately Derived Alternating-Current Systems” ‘The Output Neutral and Ground connection points are common to both WYE outputs (208/120 VAC & 480/277 VAC). ‘Therefore, itis considered a single, separately derived, power source and should be wired accordingly. 8.2 VENTILATION Ventilation originates from the front of the cabinet, exiting through the top and/or sides. 8.3 MOBILITY ‘The Power Line Conditioner cabinets are equipped with angle iron supports that allow for transport by pallet jack or fork lf, These can be used for mounting unit tothe floor in seismic zones. 8.4 ACCESSIBILITY ‘The Power Line Conditioner will have front access. Access to all wiring inputs, outputs, and breakers will be accessible through the front access door or panels. The output meters and bypass switch will be located on the front of the unit. The back of the unit may be set next to a wall without impeding access. It will also incorporate lit off side panels. 8.5 WEIGHT Unit weight: Approximately 2,194 Ibs. (995.18 kg.). 8.6 DIMENSIONS 76" Height x 34.5" Wide x 35.875" Deep (193.04 om. x 87.63 em. x 91.12 em.) 9.0 CONTROLS ‘The control portion of the cabinet containing the circuit boards and connection to the semi-conductor devices is ‘separate from the transformer section and apart from the input/output power connections, 10.0 WARRANTY Units shall include a comprehensive warranty for the first year, covering all parts and workmanship, inclusive of on site labor and travel expenses in geographical areas covered. Consult factory for details. All units are provided with a standard two (2) year warranty covering parts and workmanship. 11.0 SERVICE ‘Transtector shall provide immediate phone support/consuttation and if possible, same day parts shipment. (contact must be prior to 12:00 PM PST). If necessary, on site service shall be scheduled the same day for service to be conducted within 24 to 48 hours, based on customer requirements. Typical service hours are 6 AM to 5 PM Monday through Friday. 12.0 CONTACT Rick Ribbeck Phone: +1 208.762.6112 or 1.800.882.9110 extension 6112 Transtector Systems Cell: +1 208.755.2072 10701 Aiport Or Fax: +1 208.762.6133 Hayden Lake ID 83835 USA E-mail rridbeck@transtector.com @ TRANsTEcTOR {Quadruple Output Power Conditioner | ABE Specs/Submital Package INPUT AND OUTPUT CONFIGURATION INPUT QUTPUTKVA INPUT BREAKER SIZE 300 @ 208 VAC 160K() 250A @ 240 VAC 450 @ 480 VAC 4100 @ 600 VAC ouTPUT Novalis” TX - Trilogy” with ExacTRAC™ Output Breaker Configurations BRL#I BRL #2 (Varian preferred breakers) | BRL #6 _ 150. 208 VAGO8 forthe Linear Acar | 10 A208 VAG O8 forth Linear ccrlertor | 10 A208 VAG forthe Linear Acslrir [ 100 A 208 VAC CB forthe BL Generator | 70.A 480 VAC CB for the BL Generator 70 A 480 VAC CB for the BL Generator (0A 480 VAC CB forthe OBI {60 A 480 VAC CB forthe OBI {0,4 480 VAC CB fr the OB! 30 120 VAC CB forthe BL Computers| 30/A 120 VAC CB forthe BL Computers ‘30/120 VAC CB forthe BL Computers '30/A 120 VAC CB forthe VIS Computers ( [BRL ‘TrueBeam™ STx - TrueBeam™ v BRL#S ith ExacTRAC™ Output Breaker Configurations 150 A 208 VAC CB (Not Used) 175A 208 VAC CB forthe TrueBeam™ 70.480 VAC CB forthe BL Generator 70,A 480 VAC CB for the BL Generator 90, 480 VAC CB forthe TrueBeam™ 80 A 480 VAC CB (Not Used) 30,8120 VAC CB forthe BL Computers 380A 120 VAC CB for the BL Computers WEIGHTS, BTU AND DIMENSIONS UNIT SIZE IN WEIGHT KVA (I) 160K() 2,194 bs. 995.18 kg. OPERATIONAL MAXIMUM. BTUIHR TYPICAL BTU/HR Bats 10,230 DIMENSIONS 76" Hx 34.8" W x 35875'D (193.04 om. x 8763 om. x91.12 om2) 31 * Stated BTU's / Hr is at 100% rated load, 100% duty cycle. Operational BTU's / Hr is typically at 50% of rated load. Input over current protection provided by others. ‘epaectonpeupcon an S080 % SEISMIC CALCULATIONS Coastal California, Zone 4 Equipment Anchorage Uniform Building Code, Table 160 Cabinet Weight Center of Gravity Height Vertical Force Moment C7 Z=04 1-45 cp=075 2400 is, 33in Wp (max) 2,415.0 bs. Wp (rin) 1,785.0 tbs. Fp = 0.45 x 2415 = 1,086.8 ls, Fp=0.15 x 2415 = 1,086.8 Is. Mo = 33 x 1086 = 35,863 in. Is. Corners (a,b) 43.1 in Vie V4= 216 Tension = Fp x Cg /V4=3,213.6 bs, Shear = Wp(max)Fp/4Ibs., each anchor = 603.8 EXAMPLE: 3/8" embedded 2.5'in minimum 2000 psi concrete Tension rating of bolt 6,200 ibs. ‘Shear rating of bol: 7,270 Ibs Interaction = (T/Tbott + (S/Sbolt) Interaction = 0.70 Interaction = <1 (OK) @amansrector Quadruple Output Power Conditioner | ABE Specs/Submital Package 10 CABINET OUTLINE " Ayal nt thes She CABINET OUTLINE Quadruple Output Power Condtioner | ABE Specs/Submital Package CABINET OUTLINE — roe view he a “W130 SOVYOHONV HSNOILIGNOD YSMOd | qe] VEeS-T-M_STIVM HIVE SONS yos Sha 1s dais 7n

You might also like