DYWIDAG Post-Tensioning Systems
and Stay Cable Systems are world
renowned for reliability and performance; they are perfectly suitable
for all applications in post-tensioned
construction. They embrace the whole
spectrum from bridge construction and
buildings to civil applications both
above and below ground.
The first ever structure built with a
prototype DYWIDAG Post-Tensioning
System using Bars was the arch bridge
Alsleben (Germany) in 1927. From that
time on, DYWIDAG has continuously
improved its systems to keep up

with the growing demand of modern


construction technology.
In addition to traditional post-tensioning
systems with bars, DSI offers a
complete product line in strand posttensioning (bonded, unbonded and
external) as well as stay-cable systems
to fulfill the changing requirements in
the industry today and tomorrow.

Dependable corrosion protection


methods, damper design, fire protection, vibration measurements and
the recently developed DYNAForce
monitoring system significantly con
tribute to the longevity of modern
construction.

Our stay cable systems have always


combined the highest safety and
reliability standards with excellent
economical efficiency in their research
and development.

1972: 2. Main Bridge, Hoechst


Chemicals, Frankfurt, Germany

1995: Kap Shui Mun Bridge, Hongkong, China


DYNA Bond Stay Cable Bridge with 176cables