Flow Process chart-Material

Department:
Activity:
Location
Operatives
Date:
Time:
Charted by:
Approved by:
Any other information:

Description of work
Fabric unloaded at mill gate
Fabric taken to fabric go-down
door by trolley
Fabric taken in side go-down
by small trolley
Fabric stacked
Fabric brought in to inspection
table
Inspected
Brought to fab checking
machine
Inspected
Fabric Brought back to store
Ok fabric taken to Cutting
Input room
Stored at cutting
Taken to cutting table
Spread
Mark
Made cutting rough cutting
Taken to band knife cutting for
final cutting
Band knife cutting made
Taken to bundling and sticker
table
stickering
Bundling
Taken to rack to store
Store at rack

Summary
Activity Present
operati 7
on
Transp. 11
delay
04
inspecti 02
storage 00
Distanc 277
(m
Timemin
Distanc Time
e
100
20

10

05

15
70

10

10

02

Proposed

savings

Through trolly taken to sewing


input table
Unloaded on the sewing input
table
Total

30

277 m