Professional Documents
Culture Documents
Page 1 of 1
Overview
z
z
Area of application
The Sync module is required for connecting the two CPU 41xH in the S7-400H subunits.
Design
The Sync module is plugged directly into the slot of the CPU 41xH reserved for it. Two Sync modules are
required for each CPU. Modules in the subunits are connected by means of fiber-optic connecting cables.
With CPU 414-4H (6ES7414-4HM14-0AB0) and CPU 417-4H (6ES7417-4HT14-0AB0) only the following
Sync modules and fiber-optic Sync cables can be used:
z
z
Sync module 6ES7 960-1AA04-0XA0 for fiber-optic cables up to 10m in length (patch cable).
Sync module 6ES7 960-1AB04-0XA0 for fiber-optic cables up to 10 km in length (patch cable or
installation cable).
With CPU 412-3H (6ES7 412-3HJ14-0AB0) only the following Sync module and fiber-optic Sync cable can
be used:
z
Sync module 6ES7 960-1AA04-0XA0 for fiber-optic cables up to 10m in length (patch cable).
Technical specifications
6ES7 960-1AA04-0XA0
6ES7 960-1AB04-0XA0
Current consumption
210mA
250mA
1.1mW
1.3mW
Dimensions
Dimensions
z Width
25mm
25mm
z Height
53mm
53mm
z Depth
140mm
140mm
65g
65g
Weights
z Weight, approx.
Guest catalogue
https://mall.automation.siemens.com/BE/guest/guiPrintPreview.asp?chkPrintAll=yes...
09/01/2009