along the lines of product design, product variety, product volume per period, product mix
changes, and delivery schedule changes. (Points : 25)
10. (TCO 10) Manufacturing strategy also drives the choice of shop floor system. Describe and
explain the strategies that lend themselves to a JIT-based system, from the perspective of WIP,
changeover cost, and process choice. (Points : 25)
Page 1
1. (TCO 4) The two different approaches to load work centers in job-shop scheduling are (Points
: 5)
2. (TCO 2) The priority rule where jobs are processed according to the smallest ratio of due date
to processing time is (Points : 5)
3. (TCO 2) A scheduling rule used for sequencing jobs through two work centers is (Points : 5)
4. (TCO 3) The owner and operator of the local franchise of Handyman, Inc., has four jobs to do
today, shown in the order they were received:.If he uses the first-come, firstserved (FCFS) priority rule to schedule these jobs, what will be the average completion time?
(Points : 5)
5. (TCO 5) The ultimate goal of JIT operations is to have (Points : 5)
6. (TCO 6) Building up an inventory of standard parts or modules instead of immediately
producing the finished end items is the essence of (Points : 5)
7. (TCO 7) A kanban card is used to signal that (Points : 5)
8. (TCO 10) The type of processing system that is used for highly standardized products is
(Points : 5)
Page 2
9. (TCO 6) Market requirements drive the choice of the shop floor system approach. Describe
and explain the type of market requirements that would be suitable for an MRP-based system,
along the lines of product design, product variety, and product volume per period, product mix
changes, and delivery schedule changes. (Points : 25)
10. (TCO 10) Manufacturing strategy also drives the choice of shop floor system. Describe and
explain the strategies that lend themselves to a JIT-based system, from the perspective of WIP,
changeover cost, and process choice. (Points : 25)
1. BSOP 330 Master Planning Week 7 JIT in Services Discussion Question 2 Answer
BSOP 330 Master Planning Week 7 Why Lean Discussion Question 1 Answer
2. Profits (Y, in hundreds of thousands of dollars) by the regression equation Y = 6.321 +
0.65X. What is your forecast of profit for a store with sales of $25 million? $65 million?
(Points : 30)
3. (TCO 6 and 7) A product is currently made in a job shop, where fixed costs are $4,500
per year and variable cost is $10 per unit. The firm sells the product for $70 per unit.
What is the break-even point for this operation? What is the profit (or loss) on a demand
of 220 units per year? (Points : 30)
4. (TCO 13, 14) XYZ coating company has reviewed four new processes for improving
their coating line. The four processes, labeled A, B, C, and D use different technology
and have different capacities. All the processes have the same level of production and the
lifetime. The four states of nature represent four levels of consumer acceptance of the
firm's products. Values in the table are net present value of future profits in millions of
dollars. Forecasts indicate that there is a 0.4 probability of acceptance level 1, 0.3 chance
of acceptance level 2, 0.6 chance of acceptance level 3, and 0.5 change of acceptance
level 4..Using the criterion of expected monetary value, which production
alternative should be chosen? (Points : 30)