You are on page 1of 1

EQUIPMENT START-UP PROCEDURE

2) On line Voltage, Water Pump


and Cooling System.

1) Switch on UPS and CPU system.

( Tank A, Middle Valve,Three-Way Valve)

4) Switch on Blower, Coolant and AVL

5) Check Engine Conditions

3) Open Oil Valve

(Switch at the Wall)

Engine Oil Level


Connect Engine Battery
Check Dynamometer
Fill the Oil Tank

5) Engine Warm Up

Open DataQ

UiTM Test Bed

Start test

Choose and Fill the details

1.1
Press Stop for Emergency
Emergency

STOP

Make Sure:
Set:

Ignition and Crank

Dyno ( Speed ,2000)


Trottle ( Direct, 15)
Wait Until Coolant
Temperature reach 80
C

Reset

Dyno ( Direct, 0.00)


Trottle (Direct, 0.00)

Ready to Start Experiment

You might also like