Professional Documents
Culture Documents
Region-East java
Branch-Surabaya Inner
40
35
30
25
20
15
10
5
0
12
15
16
14
14
14
10
CW49
CW50
CW51
CW52
Problem Resolved
5
4
3
2
1
11
18
22
1; 10%
CW02
CW03
3; 30%
CW04
Problem Open
BOWireless
<= 1 week
Planning
Capacity
BO-TX
BO-Wireless
26
Capacity
FM
2; 20%
1; 10%
3; 30%
7
6
CW01
13
12
FM
1
1; 33%
1; 33%
NPM
BO-TX
1
1
1-2 week
2-3 week
FM
3-4 week
5-6 week
> 6 week
BO-TX
1; 33%
99
98
%
97
96
95
1000
400
800
300
600
200
200
100
500
400
#Cells
400
200
0
MTLT
LTLT
CSSR PS :
-8 Jan 2016 until 19 Jan 2016 CSSR PS Degraded at SBY7 due to RNC Failure (all site increase except 26 Not Increase)
-16 Jan 2016 until 19 jan 2016 CSSR PS degraded at SBY5 due to RNC Failure contributor from 5 site (High Frame Loss (130038_PERAKBARATPACA
134063_BTS_Benteng_Surabaya 132871_DCI_BULAK_BANTENG_LOR 131385_Telcoindo_-_Setro_VIP 131383_TELCOINDO_-_PERAK_BARAT)
Number Of Cells
800
700
600
500
400
300
200
100
0
LTC No.
96
94
92
90
88
86
84
100
80
60
40
20
0
Description
Targe Statu
t
s
Action Plan
2G
CSSR Improvement
3G
Special
Program
W03 Close
d
Microsoft Excel
Worksheet
THANK YOU