Quality
Quality means satisfaction of the customer.
To define good quality of software, the company people will concentrate
on two (2) factors such as 1) Technical factor and 2) Non-technical factor.
1) Technical factor
a. Customer requirements in terms of functionalities.
b. Customer expectations (Look and feel, Ease of use, right output,
speed of processing, security)
2) Non-technical factor
a. Low cost to purchase
b. Time to market.
S.Q.A (Software Quality Assurance)
It means monitoring and measuring the strength of development process.
REQUIREMENTS GATHERINGS
Business Development People / Business Analyst
Business Requirement Specification (BRS) / User Requirement Specification (URS) /
Customer Requirement Specification (CRS)
ANALYSIS
Analyst
Software Requirement Specification (S/W RS)

DESIGN
Designers
Design Document
CODING
Programmers

FRS
Functional Requirement
Specification
SRS
System Requirement
Specification
HLD
High Level Design Document
LLD
Low Level Design Document

TESTING
Testers
PROJECT MANAGEMENT
Release and Maintenance

Manual Testing

suresh_240878@yahoo.com

Suresh.B 9440163282

1) REQUIREMENT GATHERINGS:
In general software development starts with requirement gathering. In
this stage Business Development People (BDP) / Business Analyst People (BA)
are preparing Business Requirement Specification Document (BRS) / User
Requirement Specification Document (URS) / Customer Requirement
Specification Document (CRS), after gathering all required requirements from
the user / customer.
Business Requirement Specification Document defines the requirement
of the customer.
2) ANALYSIS:
After completion of Business Requirement Specification Document,
Analyst People are preparing Analysis Document. This document is also
called as Software Requirement Specification Document (S/w RS). The
document consists of (2) Sub documents such as FRS & SRS
(i)
FRS
It means Function Requirement Specification. It defines
the required functionality to be used in the project.
(ii) SRS
It means System Requirement Specification. It defines the
required Hardware to develop that functionality.
3) DESIGN
After completion of Analysis Document, Designers are preparing Design
Document. It consists of (2) sub documents, such as (i) HLD & (ii) LLD
(i)
HLD (High Level Design Document)
It is also called as External Design Document. It defines the
hierarchy of over all application functionalities in terms of modules
from root level to leaf level.
Ex:

Login
Mail

Chat

Logout

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

(ii)

LLD (Low Level Design Document)


It is also known as Internal Design Document. It defines the
internal logic of every functionality or module in terms of ER
Diagrams, Data Flow Diagrams.
V - Valid
LOGIN
User Name
Password

V IV IV

IV V IV

CANCEL

OK

MESSAGE BOX

IV - Invalid

Please Try Again

OK
DATA
BASE

INBOX
Note:

A Project will have one HLD and Multiple LLDs.

4) CODING:
A Physical construction of Software is called as Coding.
System

SS1
P1

P2

M1

M2

S1

S2

S3

SS2

SS3

M3

BUILD

P3

Build: An executable form of all integrated module set is called Build.


5) TESTING
In this stage, the testers are validating that developed Build with
respective Customer requirements and customer expectations.
6) RELEASE AND MAINTENANCE
After completion of software testing the Project Management will
deliver that software to customer for usage.
During utilization of the software, if customer get any problem or
if customer want to enhance the application, that can be handled by the
company people.
Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

What is the difference between Software Product and Software


Application?
Software Application
If the Software developed with respective particular client requirements
or single client requirements that can be called as Software Application.
Ex: Bank Applications, Hospital Applications.
Software Product
If the Software developed with respective multiple clients requirements,
that can be called as Software Product.
Ex: MS Office, VB, Operating System etc.,

What is Error, Defect, Bug?


Error:
Any mistake in a programme is called Error.
Defect:
Any mistake found by the tester during Testing can be called as Defect.
Bug:
The reported defect is accepted by developer to resolve can be called as
Bug.
SQC (Software Quality Control)
It is a process of validating the Software.

Why Software has Bugs?

(i)
Poor requirements
(ii) Futurities (Customers requirements are frequently changing)
(iii) Miscellaneous Communication.
(iv) Unrealistic schedule
(v) Inadequate testing.
Solutions
(i)
Solid requirements
(ii) Good communication
(iii) Realistic schedule
(iv) Adequate testing
(v) Gather / Stick to initial requirements as much as possible.

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

TESTING MODELS
FISH MODEL
Fish model defines the mapping between development stages and Testing
stages.
S/W RS (FRS & SRS)
Analysis

Design
(HLD & LLD)

Requirements
Gathering
BRS / CRS /
URS

Verification

Reviews in
Analysis

Reviews in
Design

Coding

Release &
Black Box Maintenance
Testing /
Functional &
System Testing
/ Close Box
Testing

Validation

White Box Testing /


Glass Box Testing /
Programe Phase
Testing / Open Box
Testing

Test Software
Changes

Reviews in Analysis
In general Software Development process starts with requirements
gathering and analysis. In this, Business Development People are preparing
Business Requirement Specification Document and Analyst people are
preparing Analysis Document with respective to Business Requirement
Specification.
After completion of analysis document, the same category people
conducting reviews in Analysis Document for completeness and correctness.
During the review they are concentrate on the below factors.
i) Are they complete?
ii) Are they right requirement?
iii) Are they achievable?
iv) Are they reasonable?
v) Are they testable?
Reviews in Design Document
After completion of Analysis document and corresponding reviews,
designers are preparing design document which includes Functional
Requirement Specifications and System Requirement Specifications.
After completion of design document the same category people are
conducting reviews in design document for completeness and correctness.
During the review they concentrate on below factors.
Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

i) Are they complete/


ii) Are they met right requirements?
iii) Are they understandable?
iv) Does they handle Errors or not?
White Box Testing
After completion of deign document and correspondence reviews,
programs with concentrate on coding to construct a Software Build.
After completion of preparing all programs, Programmers are
interconnecting them to a system. In this interconnection of programs to verify
the programs and interface between programs or modules, programmers are
conducting White Box Testing
White Box Testing classified as Two Types such as (I) Unit Testing
(II) Integration Testing.
(I) Unit Testing
It is also called as Program Testing or Micro Testing. Unit testing
means Single Program Testing or Component Testing. Unit testing
consists of below factors.
a) Basic Path Testing.
During this testing programmers are checking that whether
the program is running or not?
To perform this test they will follow below approach.
1) Draw flow diagram of that program.
2) Calculate number of independent paths in that program
(Cyclometic Complexity) (The number of independent
paths in the program)
3) Execute the program more that one time to cover all
independent paths in that program.
b) Control Structure Testing
In this testing the programmers will concentrate on
corresponding program output.
In this programmers will concentrate on every statement
including, If conditions, For loops, Memory allocation etc.,
c) Program Technique Testing
In this testing the programmers are checking the execution
speed of the program.
If the execution speed of the program is not good, then
programmers are performing changes in the structure of the
program without disturbing functionality.
d) Mutation Testing
Mutation means changes in a program. In this testing
programmers are performing wanted changes in the program and
executing the program repeatedly.
In this Test repetition,
6

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

Programmers are checking the completeness and correctness of the


Test.
A=10
B=20
C=A+B
msgbox I

Passed
(II)

A=10
B=20
I=A+B
C=I
msgbox I

Perform change

Passed
Failed
(In-compete (Complete
Testing) Testing)

Integration Testing
After completion of dependent program development and
corresponding Unit Testing, Programmers are interconnecting to form
a system. To estimate the interface between programs or modules
programmers are conducting Integration Testing. They are (4) Types
of approaches.
a) Top-Down Approach.
The verification of main module without coming to some of
the Sub-Modules is called as Top-Down Approach.
Conduct test on Main module without conducting test on
some of the Sub-Modules is called Top-Down Approach.
Main Module
STUB

Sub-Module-1

Sub-Module-2

Temporary Program
/ Called Program

Sub-Module-3

In the above approach STUB is a Temporary Program, it


works like as under constructive Sub Module, it is also called as
Called Program.
b) Bottom-Up Approach.
The verification of Sub-Modules without coming from Main
Module is called Bottom-Up Approach.
Conducting test on Sub-Modules without testing on Main
Module is called Bottom-up Approach.
Main Module
Driver / Calling Program
Sub-Module-1

Sub-Module-2

Sub-Module-3

In the above approach Driver is temporary program, it


works like as under constructive Main Module. Driver is also
known as Calling Program.
Manual Testing

suresh_240878@yahoo.com

Suresh.B 9440163282

c) Hybrid Approach / Sand-witch Approach


The combination of Top-down Approach and Bottom-Up
Approach is called as Hybrid Approach / Sand-witch approach.
Main Module
Driver / Calling Program
Sub-Module-1

Bottom-Up
Approach
Sub-Module-3

Sub-Module-2

STUB
Sub-Sub-Module-1

Sub-Sub-Module-2

Top-Down
Approach

Sub-Sub-Module-3

d) Bigbang Approach.
The verification of all modules after completion of all
Modules development and corresponding unit testing is called as
Bigbang Approach.
This approach is not suitable for large modules.
CASE STUDY
Case 1:

Top-down

approach

is

followable,

when

the

customers

when

the

customers

requirements are constituent of clear.


Case 2:

Bottom-up

approach

is

followable,

requirements are not clear or frequently changing.


Case 3:

Hybrid Approach is followable, when the customers requirements


are clear and the architecture structure of the system is changing.

Case 4:

Bigbang Approach is followable, when the application build


consists

less

number

of

modules

or

less

number

of

interconnections.

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

BLACK BOX TESTING


After completion integration of all modules to form a system, developers
are sending that build to the separate Testing team. This separate testing team
validates the Software build with respective customers requirements and
expectations through Black Box Testing techniques.
It is also known as Close Box Testing / Functional & System Testing
It is classified as (3) types such as
1) Usability Testing.
a. User Interface Testing.
b. Manual Support Testing.
2) Functional Testing.
a. Functionality Testing.
b. Sanitation Testing.
3) Non-Functional Testing.
a. Recovery Testing.
b. Compatibility Testing
c. Configuration Testing.
d. Intersystem Testing
e. Comparative Testing
f. Security Testing.
g. Installation Testing.
h. Load Testing.
i. Stress Testing
j. Data Volume Testing.
k. Storage Testing.
1) Usability Testing
After receiving build from the development people, testers are conducting
usability testing to check whether the application build is providing user
friendly screens or not.
Usability Testing is classified into (2) Types such as (a) User Interface
Testing (2) Manual Support Testing.
a. User Interface Testing
During this testing testers are checking the Look and Feel, Ease of
use of application of build screen.
Ex: The Microsoft (6) Rules for testing
1) Controls are initcaps.
2) Ok, Cancel existence.
3) System Menu existence.
4) Controls are not overlapped.
5) Controls should be visible.
6) Controls must be aligned.
Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

b. Manual Support Testing


It is also known as Help document Testing. During this testing
Testers are checking the context sensitiveness testing.
Ex: Spelling Mistakes, Grammar mistakes, Word Missing, Line
Missing etc.,
Case 1:
Receive build from the developers.
User interface testing.
Usability
Functional & Non-Functional Testing
Testing
Manual Support Testing.
2) Functional Testing
After completion of User Interface testing, Testers are conducting
Functional Testing to validate customer requirements.
Functional Testing classified into (2) Types (a) Functionality
Testing (b) Sanitation Testing.
a) Functionality Testing
During this Testing Testers are validating customers
requirement in terms of (6) coverage.
1) Behavioural Coverage.
2) Input Domain Coverage.
3) Error-Handling Coverage.
4) Calculation Coverage.
5) Back-end Coverage.
6) Service level Coverage.
1) Behavioural Coverage.
In this testing Testers are checking whether the objects are properly
responding of not, with respective to Business Operation.
2) Input Domain Coverage
In this testing Testers are checking whether the input objects /
Input fields are taking right type and range of value or not.
To perform this test we (Testers) are using (2) Types of Testing.
(i) BVA (Boundary Value Analysis
(ii) ECP (Equivalence Class Partitioning)
BVA
ECP
(Range of Object)
(Defines Type of Object)
Range Expected Actual Result
Valid
Invalid
Pass
Min=
Min-1= Fail
Min+1= Pass
Pass
fail
Pass
Max=
Max-1= Pass
Max+1= Fail

10

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

Ex:

A Login process allows User Name and Password from a User. In this
User Name object allows Alphabets lower case Range from 4 to 8
Characters long and Password object allows Alphabets lower case
range from 6 to 10 Characters long.
Prepare BVA and ECP for the above expected.

Range
Min= 4 Char
Min-1= 3 Char
Min+1= 5 Char
Max= 8 Char
Max-1= 7 Char
Max+1= 9 Char

BVA & ECP for User Name


BVA
Expected Actual
Result
Pass
Fail
Pass
Pass
Pass
Fail

BVA & ECP for Password


BVA
Range
Expected Actual
Result
Pass
Min= 6 Char
Min-1= 5 Char Fail
Min+1= 7 Char Pass
Pass
Max= 10 Char
Max-1= 9 Char Pass
Max+1= 11 Char Fail

Ex:

ECP
Valid
[a-z]

Invalid
[A-Z]
[0-9]
All
Special
characters

ECP
Valid
[a-z]

Invalid
[A-Z]
[0-9]
All
Special
characters

Age object allows numeric range from 16 to 60.


Prepare BVA and ECP for the above expected.
BVA & ECP for Age

Range
Min= 16
Min-1= 15
Min+1= 17
Max= 60
Max-1= 59
Max+1= 61
Manual Testing

BVA
Expected Actual
Pass
Fail
Pass
Pass
Pass
Fail

ECP
Result

Valid
[0-9]

Invalid
[A-Z]
[a-z]
All
Special
characters
11

suresh_240878@yahoo.com

Suresh.B 9440163282

Ex:

Mobile No. object allows numeric 10


digits only. Prepare BVA and ECP for
the above expected.

Range
Max= 10
Max-1= 9
Max+1= 11

BVA & ECP for Mobile No.


BVA
Expected Actual Result
Valid
Pass
[0-9]
Fail
Fail

ECP
Invalid
[A-Z]
[a-z]
All Special characters

3) Error-Handling Coverage.
In this we are checking whether the objects are preventing
Negative Operations or not.
4) Calculation Coverage.
In this we are checking whether the
functionality output is right or wrong.

5) Back-End Coverage.
ODBC
JDBC

In this testing we are checking whether the insert of front end


operations on back end table context.
6) Service level coverage.
The order functionality.

12

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

b) Sanitation Testing
It is also known as Garbage Testing. During this testing,
testers are finding extra functionalities in the build with respect to
customer requirements.

3) Non-Functional Testing
After completion of Functional Testing, testers are concentrating
on Non-Functional Testing to validate extra characteristics of that build.
They are divided into (11) Types.
a) Recovery Testing
During this testing we are checking that whether the application
Build is changing from Abnormal State (Crash / Hang) to Normal State or
not.
Abnormal State to Normal State
Normal State
Abnormal State
b) Compatibility Testing
They are (2) types of Compatibility Testing.

Build

V.B

O.S

Unix

Build

VC++

O.S

Win98

Win98 is supporting VC++


But Build is not working
Properly due to defects
During this testing we are checking whether the application build is
able to run on different platforms or not.
Platform means Operating System, Browsers, compilers and other
System softwares.

Ex: Unix does not support VB


Techniques

Manual Testing

13

suresh_240878@yahoo.com

Suresh.B 9440163282

c) Configuration Testing
It is also known as Hardware Compatibility Testing. During this
testing we are validating whether the application build is supporting
different technologies input / Output devises or not.
d) Intersystem Testing.
It is also known as Inter operability Testing. During this testing
we are checking whether the application build is coexistence with other
existence to share common resource or not.
Ex.: E-Seva.
Elec. Bill

Server

Telephone Bill

Server

Water Tax Bill

Common Data
Base

Server

Income Tax Bill

Server

Municipal Bill

Server

e) Comparative Testing.
It is also known as Competitive Testing. During this testing we
are comparing the features of produce with some like previous produce
(or) Existing produce in the market to estimate competitiveness.
Note:
Comparative Testing is applicable for Software Produces only
not for applications, because Software application is developed
for a single client requirement, but product can be developed with
respect to multiple clients requirements.
f) Security Testing.
It is also known as Penetration Testing. During this testing we
are validating (3) types of factors such as
(i)
Authorization.
(ii) Access Control.
(iii) Encrypt / Decrypt Data Testing.
(i)
Authorization.
In this testers are checking whether a valid user is accessible
or not, invalid user is preventable or not.
(ii) Access Control
In this we are checking whether a valid user have permission
to use specific features / Services or not.

14

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

(iii)

Encrypt / Decrypt Data Testing.


The code conversion in between client process and server
process to avoid third party accessing.

CLIENT
User Name

SERVER

Password

Request
Encrypt

Decrypt
Cipher Text

Decrypt

Request

Encrypt
Cipher Text
g) Installation Testing
It is also known as Deploying Testing. During this testing we
are validating below factors.
Build
& Supported
Software

Customer
expected
configure
Computer

Setup Program.
Easy Navigation.
Occupied Disk Space.
Check Un-installation.

h) Load Testing.
Run the application under customer expected configuration under
customer load to estimate the speed of processing is called Load
Testing.
i) Stress Testing.
Run the application under customer expected configuration under
various loads from low to peak to estimate Stress capacity of the
application build is called Stress Testing.
j) Storage Testing.
The execution of application build under customer expected
configuration under huge amount of resources to estimate the storage
capacity of the application database is called Storage Testing.
k) Data Volume Testing.
During this testing Testers are calculating the number of records to
be stored into application database.
Note:

Storage Testing, Data volume Testing coverages same, but Storage


Testing is representing in Number of bytes and Data Volume Testing
is representing number of Records.

Manual Testing

15

suresh_240878@yahoo.com

Suresh.B 9440163282

GRAY BOX TESTING


Gray Box Testing is a combination of White Box Testing and
Black Box Testing.
UAT (User Acceptance Test)
After completion of Software Testing, the Project Management / Project
Manager will invite customer to collect feedback on one developed software.
They are (2) types such as

Test

(Alfa Test)
Software Application.
By Real customer.
At development site.

Test
(Beta Test)
Software Product.
By Model customer.
At customer site.

Release Testing
It is also known as Port Testing. After completion of User Acceptance
Test and corresponding modifications, the Project Management will establish
Release Team with few Developers, few Testers and One (or) two Hardware
Engineers. This release team will go to customers site to install the software
ion the customers environment.
During this they will concentrate on below factors.
Compact Installation.
Overall functionality.
Input device handling.
Output device handling.
OS Error handling.
Secondary storage handling.
Coexistence with other existence software.
After completion of above like factor observation the release team is
providing required training sessions to the customers to understand about the
project.

16

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

Maintenance
During utilization of Software by customers, the company people are
receiving change request from them.
To receive change request from the customers the Project Management
establish CCB (Change Control Board) with few Developers, few testers and
Project Manager.
CCB
Receive change

Missed Defect

Enhancement

Impact Analysis
Impact Analysis
Perform changes
Perform changes

Test S/w changes

Test S/w changes

Increase Testing
process Capability

CASE STUDY
TESTING STAGES
Review in Analysis
Review in Design
Unit Testing
Integration Testing
Functional & System Testing
User Acceptance Testing
Release Testing / Port Testing

RESPONSIBLE PERSONS
Analyst
Designer
Programmers
Programmers
Test Engineers / Testers
Users / Customers
CCB

TERMINOLOGY
DEVELOPERS

TESTERS

Input
Test Data
Output
Test Log
Program
Test Script
Challenges in Testing
Generally organizations are maintaining separate Testing for Functional
and System Testing. This separate Testing team is also involving in Release
Team and CCB. Some time this separate Testing team is also not able to
conduct planned Testing or good testing due to some risks.
Manual Testing

17

Suresh.B 9440163282

suresh_240878@yahoo.com

The risks are


Lack of knowledge on project domain.
Lack of communication.
Lack of resources.
Lack of time.
Lack of Test Data.
To overcome above like risks, the people are following Ad-hoc
Testing.
Planned Testing
A Tester conduct Test on application build with pre-planned procedure is
called Planned Testing.
(or)
A Tester conduct Test on application build by following formal methods
are called Planned Testing.
Ad-hoc Testing
A Tester conduct test on application build without Pre-planed is called
Ad-hoc Testing.
(or)
A Tester conduct test on application build by following Informal
Methods is called Ad-hoc Testing.
They are classified as (4) Types.
(a) Monkey Testing.
Due to lack of time, Testers are conducting test on major
functionalities of the application build. This style of testing is called
Monkey Testing. It is also known as Cheapening Testing.
(b) Buddy Testing.
Due lack of time, Testers are grouping with programmers to
conduct Test on application as early as possible. This style of Testing is
called as Buddy Testing.
Buddy means a group of Programmers and Testers.
(c) Pair Testing.
Due to lack of knowledge on domain Junior Testers grouped with
Senior Testers to share their knowledge. This style of testing is called
Pair Testing.
(d) Exploratory Testing.
Due to lack of Test Data, Testers are conducting Test on
application depending on available documents, discussions with other and
get the requirements from customers. This style of testing called
Exploratory Testing.

18

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

SOFTWARE DEVELOPMENT LIFE CYCLE (SDLC)


1) WATERFALL MODEL
Requirement Gathering
Analysis
Design
Coding
Testing
Release &
Maintenance
In this Model next stage starts after completion of previous stage.
There is no overlapping between two stages.
ADVANTAGES
i) It is less expensive.
ii) It works well for small applications.
iii) It is flexible when the customer requirements are constant.
DISADVANTAGES
i) Testing is a single stage starts after coding.
ii) If any defect is found during Testing, the rectification of that defect
would be difficult.
iii) It is not flexible to have changes in the customer requirements during
developing the software.
2) INCREMENTAL WATERFALL MODEL
To overcome some of the limitations of Waterfall we can use Incremental
Waterfall model.
Incremental Waterfall Model can be used Software Produce
Development.
In this Model a set of requirements they would be one working product.
1.0
Analysis
Coding
Testing
R&M
R.G
Design
R.G

Analysis

Design

Coding

Testing

R&M

R.G

Analysis

Design

Coding

Testing

R&M

Manual Testing

2.0
3.0

19

suresh_240878@yahoo.com

Suresh.B 9440163282

3) PROTOTYPE MODEL
It is followable when the customer requirements are not clear.
Prototype means a sample Model of application without
functionality.
Not Clear
Hardware Prototype

Software Prototype
Demo to Client

Finalize Environment

Requirements refined

SRS Base lined

BRS Base lined

ADVANTAGES
i) It is flexible when the customer requirements are not clear.
DISADVANTAGES
i) It is expensive
4) Spiral Model
Spiral Model is followable when the customer requirements are
enhanceble in terms of versions.
In this Model we will start the process within complete requirements.
Planning

Risk Analysis

Requirement
Gathering
5.0 4.0 3.0 2.0 1.0

Customer
Evaluation
Evaluation

ADVANTAGES
It is flexible for high risk based projects.
DISADVANTAGES
It is expensive.
20

Coding and
Testing
Engineers

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

5) V-MODEL
Like as Fish Model V-Model is also defines the mapping
between Development stages and Testing stages.
In V-Model V stands for Verification and Validation.
Verification
To check whether the people are developing right product or not.
Validation
To check whether the developed product is right or not.
Software Testing
The Verification and Validation of a Software is called Software
Testing.
BRS

User Acceptance
Testing

Requirement
Gathering

System Testing

FRS

Black Box
Testing

Analysis
HLD
Design

Integration
Testing

LLD

White Box
Testing

Unit Testing

Coding

Manual Testing

21

Suresh.B 9440163282

suresh_240878@yahoo.com

6) Agile Model
It is a latest model which is used in Software produce development.
In this model we can get build from the developers in very short time (1
to 4 Weeks)
In this model development process, testing process will be carried out
parallelly.
They are (2) methods such as
(a) X-Tream Programming.
(b) Scrum
ADVANTAGES
i) Any defect identified early, so that he rectification of the defect cost
and time would be very less.
ii) As the defect is identified early, the impact of the same defect is very
less on subsequent features.
DISADVANTAGES
i) Documentation is very less.

Sanity Testing
After receiving the build from the developers we people are conducting
Sanity Testing to estimate stability of that build before start real testing.
During this testing we will be concentrate on below factors.
a) Understandable.
b) Operatable.
c) Observable.
d) Controllable.
e) Consistency.
f) Automatable.
g) Maintainable
h) Simplicity.
From the above (8) factors, Sanity Testing is also known as Build
Verification Testing (BVT) or Tester Acceptance Testing (TAT) or Testability
Testing or Oct-angle Testing.
Smoke Testing
Like as Sanity Testing, Smoke Testing is also used to estimate the
stability of the Build.

22

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

Re-Testing.
Case 1:
The repeating of same test for more than one time with multiple
data is called as Re-Testing.
Case 2:
The re-execution of failed tests on modified build to ensure bug
fixing work is called Re-Testing
Regression Testing.
The Re-execution of selected test or modified build, to check is there any
side effects occurred or not on dependent functionalities by modifying reported
defects or by adding new requirements.
Types of Build
They are (7) types of Build. They are
(1) Initial Build

Initial Build

Development

Stable Build

Sanity
Testing

Defect Effected Build


Comprehensi
ve Testing
Modified Build

Bug
Fixing

(2) Stable Build


(3) Defect effected Build
(4) Modified Build
(5) Complete Build

Re-Testing
Regression
Testing

(6) Master Build


(7) Golden Build

Complete Build
Master Build

Test Closer
(Test Lead)

U.A.T
Golden Build

Sign off

Types of Projects
Mainly there are (3) Types of projects. They are (1) Traditional Project
(2) Outsourcing Project (3) Maintenance Project
Type of Project
R/G Analysis Design Coding Testing R&M
Traditional
9
9
9
9
9
9
Outsourcing
Maintenance

Manual Testing

8
8

8
8

8
8

8
8

9
8

9
9
23

suresh_240878@yahoo.com

Suresh.B 9440163282

MANUAL TESTING
Testing Process
Test Initiation
(Project Management /
Quality Analyst

Test Plan Document


(Test Lead)

T.R.M
(Test Responsibility
Matrix)

1) Scope of the Project


2) Type of the Project
3) Risk involved in that Project

1) What to Test?
2) How to Test?
3) Who to Test?
4) Whom to Test?

Test Scenarios &


Test Cases with
Step by step
procedure
(Test Engineer /
Tester)

Re-testing &
Regression Testing

Test Case execution as


Batches

Defect Report
Bug fixing

Final Summary
Report

Test Closer (Test Lead)


UAT
Sign Off

24

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

PETT Process (Process Expert Tolls and Techniques)


Requirement Gathering
Analysis

Design

Test initiation

Coding

Test Plan Document


Test Scenarios & Test Case
with Step by step process
(1) Initial Build
Level 0 Testing / Sanity Testing

Level 2 Testing
Re-Testing / Regression
Testing
(4) Modified
Build

(2) Stable Build


Level 1 Testing / Comprehensive
Testing / Batch Testing

Defect Report

Bug
Fixing

(3) Defect Effected


Build

(5) Complete Build

Level 3 Testing / Test Closure / Postmortem


Testing / Pre-acceptance Testing
(6) Master Build
User Acceptance Testing
(7) Golden Build
Sign Off

Manual Testing

25

suresh_240878@yahoo.com

Suresh.B 9440163282

Testing Initiation:
In general testing process start with Test initiation. In this, Project
Manager / Quality Analyst develop Test starting Document. This document
defines the required testing approach to be followed by the testing team.
During this document preparation they will concentrate on below (12)
components.
1)
2)
3)
4)
5)
6)

Scope & Objective.


Budget Control.
Test approach.
Roles & Responsibilities
Communication & Status Reporting
Test deliverables

7)
8)
9)
10)
11)
12)

Test Automation
Defect Tracing & Reporting
Measurements & Matrix.
Change & Configuration Management
Risks & Mitigations
Training Plan.

1) Scope & Objective:


The need of testing in the project.
2) Budget Control.
Time & Cost allocation to the project.
Ex: As per U.S. Norms
100%

64% Development
Department

36% Testing
Department

# 3) Test approach
##
In this they will specify a list of selected quality factors to be
applied by the Tester.
T.R.M (Test Responsibility Matrix) can be finalized by Project
Manager / Quality Analyst based on scope of the project, type of the
project and Risks involved in that project.
TRM :

It defines the mapping between Test factors and Development


Stages.

26

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

Quality Factors / Test


Factors
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)

Design

Function &
Coding
System
R&M
Testing

Authorization
Access Control
Ease of use
Ease of operation
Correctness
Continuity &
Processing
Coupling
Data integrity
Recovery
Portable
Service Level
Performance
Maintainable
Methodology
Audit trail.
Authorization: Whether a valid user is accessible or not and Invalid
User is preventable or not.
Access control: Whether a valid user have permission to user specific
service of not
Ease of Use:
Whether the application build is providing user
friendly screens or not.
Ease of operate: Easy to installation, downloading, uploading,
dumping, un-installing.
Correctness:
Whether the functionality output is right or wrong.
Continuity & processing:
The integration of modules.
Coupling:
Co-existence with other Software.
Data Integrity: Whether the input objects are taking right type and
range of values or not.
Recovery:
Whether the application build is changing from
abnormal state to normal state or not.
Portable:
Whether the application build is able to run on
different platforms or not.
Service Level:
The order of functionality.
Performance:
The speed of processing.
Maintainable:
Whether the application build is longtime serviceable
in customers site or not.

Manual Testing

RG &
Analysis

27

suresh_240878@yahoo.com

Suresh.B 9440163282

14) Methodology:

Whether the people (Tester) are following right


process of not. If not he will be punishable.

15) Audit Trail:

Whether the system is maintains data for the user


operation (Ex. Bank Application, Withdrawal time,
ATM Centre Code etc.,)

1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)

Authorization
Access Control
Ease of use
Ease of operation
Correctness
Continuity & Processing
Coupling
Data integrity
Recovery
Portable
Service Level
Performance
Maintainable
Methodology
Audit trail.

Security Testing
Security Testing
User interface Testing
Installation Testing
Functionality Testing
Integration Testing
Intersystem Testing
Input domain Testing
Recovery Testing
Compatibility Testing
Functionality Testing
Load, Stress, Storage, Data volume Testing
Stress Testing
Compliance Testing
Functionality Testing

4) Roles and Responsibilities


Name of the jobs and his / her responsibilities.
5) Communication n& Status reporting
The required communication between two consecutive jobs.
Ex: Project Management
Test Lead
Test Engineer
When do report? Weekly Once, twice, daily etc.,
6) Test deliverables
The required documents to be prepared by the testing team. The
following documents were prepared by the Test lead and Test engineers.
Test Plan, Test Scenario, Test Cases, Test Data, Test log, Defect
report, Final Summery Report etc.,
7) Test automation
The purpose of Automation testing in the project and available
tools in the organization.
28

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

8) Defect tracing & Reporting.


The required communication between Programmers and Testers
when Test Engineer / Tester got a mismatch.
Large Scale
Small Scale
Project Management

Test Lead

Project Lead

Project Management

Test Lead

Team Lead

Test Engineer

Programmer

Team Lead
Test Engineer

Programmer

Transmittal Report
9) Measurement & Matrix:
The required measurement to estimate the status of the project. In
measurements there are (3) types such as (1) Quality Assessment
Measurement (2) Test Management Measurement (3) Process Capability
Measurement.
10) Change & Configuration Management
How to handle change request from the customer and how to store
the documents for future reference.
11) Risk & Mitigations:
The possible risks and solutions to overcome them.
12) Training Plan:
The required training secession to the Testing team to understand
about the project.

Manual Testing

29

suresh_240878@yahoo.com

Suresh.B 9440163282

TEST PLAN
After completion of Test Strategy Document, the strategy of the Project
implemented by Test Lead in the Project through Test Plan.
During Test Plan Document preparation, Test Lead category people
follows below approach.
BRS

a) Team formation
b) Identify risks

TRM
Development Plan

c) Prepare Test Plan


d) Review Test Plan

System Test Plan


Module Test Plan
(if project is big then only Module
Test Plan is to be prepared)

a) Team Formation:
In general Test Plan Document preparation starts with Team
formation. In this Test Lead category people form the Testing Team
depending on below factors.
i.
ii.
iii.
iv.

Project size.
Project duration.
Availability of domain testers.
Resources (Automation Tools)

b) Identify Risks
After completion of Team Formation the Test Lead identifies risks
with respect to that formed testing team in Testing.
i.
ii.
iii.
iv.
v.
vi.
vii.

30

Lack of time.
Lack of resources.
Lack of communication.
Lack of knowledge on project domain.
Lack of test data.
Lack of development process rigor.
Delays in delivery.

Manual Testing

suresh_240878@yahoo.com

1)
2)
3)
4)
5)
6)
7)
8)

Suresh.B 9440163282

c) Prepare Test Plan


After completion of Team formation and Risk Analysis, Team
Lead will prepare Test Plan Document in IEEE (Institute of Electrical &
Electronic Engineer) Format (829)
Test Plan ID
9) Exit Criteria
Introduction
10) Test deliverables
Test items
11) Test environment
Features to be tested
12) Staff & Training needs
Features not to be tested
13) Responsibilities
Test approach
14) Schedule
Entry criteria
15) Risks & Mitigations
Suspension Criteria
16) Approved by

1)

Test Plan ID:


Unique number for feature reference.

2)

Introduction
Introduction about the project or module.

3)

Test items
The name of the requirements or features.

4)

Features to be tested
The name of the requirements or features to be test.

5)

Features not to be tested


The name of the requirements or features not to be test

6)

Test approach
The list of selected quality factors to be applied by the Tester.

7)

Entry criteria
When to start Testing
Take complete and correct Test cases.
Create Test Environment.
Receive Stable Build from the developers.

8)

Suspension criteria
When to suspend testing temporarily
When we have network problem.
If pending defects are more
(Pending defects = No. of reported defects No. of resolved defects)

Manual Testing

31

Suresh.B 9440163282

9)

suresh_240878@yahoo.com

Exit criteria
When to stop testing
After completion of all module testing.
After completion of all Major bugs resolved.

10)

Test deliverables
The required documents to be prepared by the Testers.
Ex.: Test Scenarios, Test Cases, Test Scripts, Test Data, Test log, Defect
Report, FSR etc.,
11)

Test environment
The required Software and Hardware to conduct Testing.

12)

Staff and Training needs


The names of selected testers and their training needs.

13)

Responsibilities
Work allocation to the testers.
Ex. Modules Vs. Testers.

14)

Schedule
Time duration to the testers.

15)

Risks and Mitigations


The required solutions for the previously analyzed risks.

16)

Approved by
Who approved the document, the signature of the Project Manager.
Name of the Test Lead.

d) Review Test Plan:


Completion of Test Plan Document preparation, Test Lead is conducting
Review Meeting to estimate completeness and correctness of that document.
During this review they will concentrate on below coverages.
(i)
Requirements Based Coverage (What to Test?)
(ii) Risk Based Coverage (Who to Test & When to Test?)
(iii) TRM Based Coverage (How to test?)

32

Manual Testing

suresh_240878@yahoo.com

Suresh.B 9440163282

TEST SCENARIOS & TEST CASE DESIGN


After completion of Test Plan Document and corresponding Reviews
Test Lad allocate the work to the Testers.
Testers are preparing corresponding Test Scenarios and Test Caes based
on Requirement Specifications.
USE CASE
Use Case is a required document which maintenance the detail
information about one low level requirement.
If you want to design Test Cases based on Use Cases, we can study the
Use Case below approach.
USE CASE FORMAT:
Title
Requirement Description
Actors / Users
Pre-operation
Action
Positive Flows
Exceptions / Negative flows
Alternative flows / Alternative Positive flows
1) Collect all Use Cases.
2) Take one Use Case and Study.
2.1) Identity Entry Point.
2.2) Identity Input Requirement
2.3) Identity Outputs
2.4) Identity Alternative flows and exceptions.
2.5) Identity exit point.
3) Prepare scenarios.
4) Review scenarios.
5) Prepare Test Cass with step by step procedure.
6) Continue from step (2) to (6) until completion of all Use Cases.
TEST SCENARIOS
Test Scenarios means Test situations.
Test Scenario Template
These templates are created in MS Excel.
Project Name:
Reviewed by
Module Name:
Created by:
Reviewed by
Created on:
Sl. No.
Requirement Name
Test Scenario
Test Cases

Manual Testing

33

Suresh.B 9440163282

suresh_240878@yahoo.com

TEST CASES
A set of Test steps documented along with required inputs and expected
results in order to test one low level requirement.
Thinks to remember while designing the Test Cases.
1) Test Case should be simple and clear.
2) Test Case should be complete.
3) No duplicate Test Case should b written.
TEST CASE TYPE
1) User Interface Test Cases.
2) Usability Test Cases.
3) Validation Test Cases.
4) Functional Test Cases.
1) User Interface Test Cases
To verify the look and Feel of application build screens.
Ex: Font Size, Text alignment, Images etc.,
2) Usability Test Cases
To verify ease of use of application build screens.
Ex:
a) Default cursor should be present at the first field.
b) Tab keys should be implemented for all input objects from left to right
in downward direction.
c) Shortcut keys should be implemented for all menu operation.
d) Tool tips (Whenever we place the cursor on particular object, it should
return meaningful message)
3) Validation Test Cases:
Test Cases that are required to validate business rules or field
validation.
4) Functional Test Cases:
Test Cases that are required to validate the functionality.
TEST DESIGN TECHNIQUES
They are mainly (5) types of design techniques.
(1) Boundary Value Analysis (BVA)
(2) ECP (Equal Class Partition)
(3) Error Guessing
(4) Decision Tables
(5) State transition.
34

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

(1)

BVA:
It is used to validate the range of input objects.

(2)

ECP:
Splitting the inputs into equal parts and randomly checking them.
To verify the type of input objects.

(3)

Error Guessing
It is a technique which can be used by the people, who have prior
knowledge on that application (Ex. This can be used by experts)

(4)

Decision Tables
A Black Box Test Design testing in which test cases are designed
to execute the combination of inputs.

(5)

Valid Invalid

Valid

Invalid

Valid Valid

Invalid

Valid

State Transition
A Black Box Test design techniques, in which test cases are
designed to execute valid, invalid state transition.

Insert
card
Block
Card

Wait for
PIN Entry

PIN Wrong
PIN Wrong

nd

PIN Wrong

Entry

1st Entry

3rd Entry
PIN Ok
PIN Ok

PIN Ok
Access
Account

Manual Testing

35

suresh_240878@yahoo.com

Suresh.B 9440163282

TEST CASE TEMPLATE


Test Case Test Case
Step
Step
Priority
Name / ID Description
Name Description
1
2
3
4
5
Expected
Results
7

Actual
Created Created
Status
Comments
Results
By
on
8
9
10
11
12

QC Path
13

Test
Data
6

Reviewed
By
14

Reviewed
On
15

Reviewers
Comments
16

1)

Test Case Name / ID:


Unique Number for future reference
Ex: TC001_Project Name_Module Name_Functionality Name

2)

Test Case Description:


The description about that Test case.
Pre-requisites
Documents referred.

3)

Priority
Importance of the Test Case. They are classified into (3) Types
such as
(1) High Priority (Basic functionality Test Cases)
(2) Medium Priority (General functionality Test Cases Recovery,
Compatibility Testing etc.,)
(3) Low Priority (Cosmetic Test Cases User Interface Testing)

4)

Step Name
Every Test Case divided into multiple steps, every step in the test
case will have unique number.
Ex: Step1; Step2; Step3 etc.,

5)

Step Description
The required action to be performed by the user.

6)

Test Data
Set of inputs that are required to execute steps.

36

Manual Testing

suresh_240878@yahoo.com

Suresh.B 9440163282

7)

Expected Results
The required expected output from the system for the
corresponding user action.

8)

Actual Results
The actual output of the system after performing user action.

9)

Status
The current position of the Test Case. They are classified into (4)
types, such as
(a) No Run:
Test Case not executed atleast for once.
(b) Not complied:
A partially executed test case.
(c) Passed:
Test Case executed and the expected value and
Actual value is same, Test is passed.
(d) Failed:
Test Case any step(s) expected values
mismatched with actual value, Test is failed.

10)

Created By
The name of the Test Engineer, who created the Test Cases.

11)

Created on
Date and Time of the created Test Case.

12)

Comments
A set of comments given by Tester for the Step or Test Cases.

13)

QC Path
The path of Quality Control.

14)

Reviewed By
Name of the Reviewer.

15)

Reviewed on
When (Date & Time) the document was reviewed by reviewer.

16)

Reviewers Comments
A set of comments given by reviewer.

Manual Testing

37

Suresh.B 9440163282

suresh_240878@yahoo.com

CASE STUDY

38

Manual Testing

suresh_240878@yahoo.com

Suresh.B 9440163282

User Name
User Name object allows alphabets lower case range from 4 to 8
characters.
Password
Password object allows alphabets lower case range from 6 to 10
characters.
Customer Name

Customer Name object allows alphabets.

Range from 4 to 12 characters.

First letter should be Upper Case.

Mandatory.
Customer Address

Customer Address object allows alpha-numeric and some special


Characters ( / # , .)

Maximum of 20 Characters.

Mandatory.
Customer DOB

Customer DOB object allows Numeric Only.

The format is MM/DD/YYYY.

Date should be less than current system date.

Mandatory.
Customer Ph.No.

Customer Ph.No. object allows Numeric Only.

Allows 10 digits only.

Phone number is unique.

Mandatory.
EMail

E-Mail object allows alpha-numeric and special Characters.


Format is suresh_240878@yahoo.com.
It is not mandatory.

Manual Testing

39

suresh_240878@yahoo.com

Suresh.B 9440163282

TEST SCENARIO DOCUMENT


Project Name:
Module Name:
Created by:
Created on:
Sl. No.
1

Customer Info
Admin
Suresh
18/10/2008
Requirement
Name

Reviewed by
Reviewed by
Test
Scenario
Ok

Login
Cancel
Insert

Add

Cancel
Search
3

Search
Cancel
Update

5
6
7
8

Edit

Delete
Cancel
Home
Logout

Cancel
Home
Delete
Cancel
Home
Logout

Test Cases
1)
2)
3)
1)
2)

Verify Ok with valid data.


Verify Ok with invalid data.
Verify Cancel
Verify Insert with valid data.
Verify Insert with invalid
data.
3) Verify Insert with duplicate
data.
4) Verify Insert with missing
mandatory fields.
5) Verify Cancel
1) Verify Search with valid
data.
2) Verify Search with invalid
data.
3) Verify Cancel
1) Verify Update with valid
data.
2) Verify Update with invalid
data.
3) Verify Update with duplicate
data.
4) Verify Update with missing
mandatory fields.
5) Verify Cancel
6) Verify Home
Verify Delete
Verify Cancel
Verify Home
Verify Logout

Note:

RCN (Requirement Clarification Note)


Any doubt in FRS / BRS Document, we people design RCN Document and
the same will be sent to BDP for clarification.
40

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

TEST CASE DOCUMENT


Test Case
Test Case
Step
Step
name
description Name Description
This
Test Step-1 Open Brower,
TC01_
enter
Url.
case
Customer
Address, click
Info_Admin_ validates
on Go
Verify
Ok Ok
with
Valid functionality Step-2 Enter
valid
with valid
data
User Name
data
and Password
click on Ok
This
Test Step-1 Open Brower,
TC02_
enter
Url.
case
Customer
Address, click
Info_Admin_ validates
on Go
Verify
Ok Ok
with invalid functionality Step-2 Enter invalid
with invalid
data
User Name
data
and Password
click on Ok
TC03_
This
Test Step-1 Open Brower,
Customer
case
enter
Url.
Info_Admin_ validates
Address, click
Verify Cancel Cancel
on Go
User
functionality Step-2 Enter

Test
Data
Url

User
Name
& Pass
word

Url

User
Name
& Pass

Expected Result
It should display Login
Page with User Name,
Password objects and Ok,
Cancel functionalities.
It
should
display
Customer
Information
page with Add, Search,
Logout functionalities.
It should display Login
Page with User Name,
Password objects and Ok,
Cancel functionalities.
It
should
display
meaningful
error
message.

word

It should display Login


Page with User Name,
Password objects and Ok,
Cancel functionalities.
User It should clear all fields
Name
and Name and cursor should be
Password click & Pass present in the first field.
on Cancel

TC04_
Customer
Info_Admin_
Verify Insert
with
Valid
data

word

Url
It should display Login
This
Test Step-1 Open Brower,
enter
Url.
Page with User Name,
case
Address, click
Password objects and Ok,
validates
on Go
Cancel functionalities.
Insert
functionality Step-2 Enter
should
display
valid User It
with valid
Information
User Name Name Customer
data
and Password & Pass page with Add, Search,
word Logout functionalities.
click on Ok
Step-3 Click on Add
-It should display Add
Customer page with
C.Name,
C.Addr.,
C.DOB, C.Ph.No., Email objects and Insert,
Reset,
Cancel
functionalities.

Manual Testing

Url

41

suresh_240878@yahoo.com

Suresh.B 9440163282

Test Case
name

Test Case
description

Step
Step
Name Description
Step-4 Enter data in
corresponding
fields
and
click on Reset

Test
Data
C.Name
C.Addr.
C.DOB
C.PhNo
E-mail
C.Name
C.Addr.
C.DOB
C.PhNo
E-mail

Expected Result
It should clear all fields
and cursor should be
present in the first field.

Step-5 Enter
valid
It should display a
data
in
meaningful
Message
corresponding
such as Customer Data
fields
and
created with Customer
click on Insert
ID
Url
It should display Login
This
Test Step-1 Open Brower,
TC05_
enter
Url.
Page with User Name,
case
Customer
Address, click
Password objects and Ok,
Info_Admin_ validates
on Go
Cancel functionalities.
Verify Insert Insert
with invalid functionality Step-2 Enter
should
display
valid User It
with invalid
data
Information
User Name Name Customer
data
and Password & Pass page with Add, Search,
word Logout functionalities.
click on Ok
Step-3 Click on Add
-It should display Add
Customer page with
C.Name,
C.Addr.,
C.DOB, C.Ph.No., Email objects and Insert,
Reset,
Cancel
functionalities.
Step-4 Enter invalid C.Name It should display a
data
in C.Addr. meaningful
Error
C.DOB
corresponding
Message.
C.PhNo
fields
and E-mail
click on Insert
Url
It should display Login
This
Test Step-1 Open Brower,
TC06_
enter
Url.
Page with User Name,
case
Customer
Address, click
Password objects and Ok,
Info_Admin_ validates
on Go
Cancel functionalities.
Verify Insert Insert
functionality Step-2 Enter
with
should
display
valid User It
duplicate data with
Information
User Name Name Customer
duplicate
and Password & Pass page with Add, Search,
word Logout functionalities.
data
click on Ok
Step-3 Click on Add
-It should display Add
Customer page with
C.Name,
C.Addr.,
42

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

Test Case
name

Test Case
description

Step
Name

Step-4

TC07_
Customer
Info_Admin_
Verify Insert
with missing
mandatory
fields

This
Test Step-1
case
validates
Insert
functionality Step-2
with
missing
mandatory
fields
Step-3

Step-4

TC08_
Customer
Info_Admin_
Verify Cancel

This
Test Step-1
case
validates
Cancel
functionality Step-2

Manual Testing

Step
Description

Test
Data

Expected Result

C.DOB, C.Ph.No., Email objects and Insert,


Reset,
Cancel
functionalities.
C.Name It should display a
Enter
duplicate data C.Addr. meaningful
Error
C.DOB
in
Message.
C.PhNo
corresponding E-mail
fields
and
click on Insert
Open Brower,
Url
It should display Login
enter
Url.
Page with User Name,
Address, click
Password objects and Ok,
on Go
Cancel functionalities.
should
display
Enter
valid User It
Information
User Name Name Customer
and Password & Pass page with Add, Search,
word Logout functionalities.
click on Ok
Click on Add
-It should display Add
Customer page with
C.Name,
C.Addr.,
C.DOB, C.Ph.No., Email objects and Insert,
Reset,
Cancel
functionalities.
Enter data in C.Name It should display a
corresponding C.Addr. meaningful
Error
C.DOB
fields
by
Message.
C.PhNo
missing some E-mail
mandatory
fields
and
click on Insert
Open Brower,
Url
It should display Login
enter
Url.
Page with User Name,
Address, click
Password objects and Ok,
on Go
Cancel functionalities.
should
display
Enter
valid User It
Information
User Name Name Customer
and Password & Pass page with Add, Search,
word Logout functionalities.
click on Ok
43

suresh_240878@yahoo.com

Suresh.B 9440163282

Test Case
name

Test Case
description

Step
Step
Name Description
Step-3 Click on Add

Test
Data
--

Expected Result

It should display Add


Customer page with
C.Name,
C.Addr.,
C.DOB, C.Ph.No., Email objects and Insert,
Reset,
Cancel
functionalities.
Step-4 Enter data in C.Name It should close current
corresponding C.Addr. page
and
display
C.DOB
fields and click
previous page.
on Cancel

C.PhNo
E-mail

Url
It should display Login
This
Test Step-1 Open Brower,
enter
Url.
Page with User Name,
case
Address, click
Password objects and Ok,
validates
on Go
Cancel functionalities.
Search
functionality Step-2 Enter
valid User It
should
display
with valid
User Name Name Customer
Information
data
and Password & Pass page with Add, Search,
word Logout functionalities.
click on Ok
Step-3 Click
on
-It should display Search
Search
Page with C.ID, C.Name,
C.DOB,
C.Ph.No.,
objects
and
Search,
Reset,
Cancel
functionalities.
Step-4 Enter data in C.ID It should clear all fields
corresponding C.Name and cursor should be
fields click on C.DOB present in the first field.
C.PhNo
Reset
valid C.ID It should display Search
Step-5 Enter
data
in C.Name Results
Page
with
corresponding C.DOB Customers Information
fields and click C.PhNo and Edit, Delete, Cancel,
on Search
Home functionalities.
Url
It should display Login
This
Test Step-1 Open Brower,
TC10_
enter
Url.
Page with User Name,
case
Customer
Address, click
Password objects and Ok,
Info_Admin_ validates
on Go
Cancel functionalities.
Verify Search Search
with invalid functionality Step-2 Enter
valid User It
should
display
with invalid
data
User Name Name Customer
Information
TC09_
Customer
Info_Admin_
Verify Search
with
valid
data

44

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

Test Case
name

Test Case
description
data

Step
Name

Step
Test
Description
Data
and Password & Pass
word
click on Ok
Step-3 Click
on
-Search

Expected Result

page with Add, Search,


Logout functionalities.
It should display Search
Page with C.ID, C.Name,
C.DOB,
C.Ph.No.,
objects
and
Search,
Reset,
Cancel
functionalities.
Step-4 Enter invalid C.ID It
should
display
C.Name
data
in
meaningful
error
C.DOB
corresponding
message.
fields and click C.PhNo
on Search

TC11_
Customer
Info_Admin_
Verify Cancel

This
Test Step-1 Open Brower,
Url
It should display Login
case
enter
Url.
Page with User Name,
validates
Address, click
Password objects and Ok,
Cancel
on Go
Cancel functionalities.
functionality Step-2 Enter
valid User It
should
display
User Name Name Customer
Information
and Password & Pass page with Add, Search,
word Logout functionalities.
click on Ok
Step-3 Click
on
-It should display Search
Search
Page with C.ID, C.Name,
C.DOB,
C.Ph.No.,
objects
and
Search,
Reset,
Cancel
functionalities.
Step-4 Enter data in C.ID It should close current
corresponding C.Name page
and
display
fields and click C.DOB previous page.
on Cancel

TC12_
Customer
Info_Admin_
Verify
Update with
valid data

Url
It should display Login
This
Test Step-1 Open Brower,
enter
Url.
Page with User Name,
case
Address, click
Password objects and Ok,
validates
on Go
Cancel functionalities.
Update
functionality
Step-2 Enter
valid User It
should
display
User Name Name Customer
Information
and Password & Pass page with Add, Search,
word Logout functionalities.
click on Ok

Manual Testing

C.PhNo

45

suresh_240878@yahoo.com

Suresh.B 9440163282

Test Case
name

Test Case
description

Step
Step
Name Description
Step-3 Click
on
Search

Test
Data
--

valid C.ID
data
in C.Name
corresponding C.DOB
fields and click C.PhNo
on Search

Step-4 Enter

Step-5 Select
a
Customer
data click on
Edit

Step-6 Enter data in


corresponding
fields click on
Reset

Expected Result
It should display Search
Page with C.ID, C.Name,
C.DOB,
C.Ph.No.,
objects
and
Search,
Reset,
Cancel
functionalities.
It should display Search
Results
Page
with
Customers Information
and Edit, Delete, Cancel,
Home functionalities.
It should display Edit
Page with C.ID, C.Name,
C.Addr.,
C.DOB,
C.Ph.No., E-mail objects
and
Update,
Reset,
Cancel,
Home
functionalities.
It should clear all fields
and cursor should be
present in the first field.

C.ID
C.Name
C.DOB
C.Addr.
C.PhNo
E-mail
C.ID
It should display Update
C.Name done message.
C.DOB
C.Addr.
C.PhNo
E-mail

Step-7 Enter
valid
data
in
corresponding
fields click on
update
Url
It should display Login
This
Test Step-1 Open Brower,
TC13_
enter
Url.
Page with User Name,
case
Customer
Address, click
Password objects and Ok,
Info_Admin_ validates
on Go
Cancel functionalities.
Update
Verify
Update with functionality Step-2 Enter
valid User It
should
display
with invalid
invalid data
User Name Name Customer
Information
data
and Password & Pass page with Add, Search,
word Logout functionalities.
click on Ok
Step-3 Click
on
-It should display Search
Search
Page with C.ID, C.Name,
C.DOB,
C.Ph.No.,
objects
and
Search,
46

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

Test Case
name

Test Case
description

Step
Name

Step
Description

Test
Data

valid C.ID
data
in C.Name
corresponding C.DOB
fields and click C.PhNo
on Search

Step-4 Enter

Step-5 Select
a
Customer
data click on
Edit

Step-6 Enter invalid


data
in
corresponding
fields click on
update
This
Test Step-1 Open Brower,
TC14_
enter
Url.
case
Customer
Address, click
Info_Admin_ validates
on Go
Update
Verify
Update with functionality Step-2 Enter
valid
duplicate data with
User Name
duplicate
and Password
data
click on Ok
Step-3 Click
on
Search

C.ID
C.Name
C.DOB
C.Addr.
C.PhNo
E-mail

Url

User
Name
& Pass
word

--

valid C.ID
data
in C.Name
corresponding C.DOB
fields and click C.PhNo
on Search

Step-4 Enter

Manual Testing

Expected Result
Reset,
Cancel
functionalities.
It should display Search
Results
Page
with
Customers Information
and Edit, Delete, Cancel,
Home functionalities.
It should display Edit
Page with C.ID, C.Name,
C.Addr.,
C.DOB,
C.Ph.No., E-mail objects
and
Update,
Reset,
Cancel,
Home
functionalities.
It
should
display
meaningful
error
message.

It should display Login


Page with User Name,
Password objects and Ok,
Cancel functionalities.
It
should
display
Customer
Information
page with Add, Search,
Logout functionalities.
It should display Search
Page with C.ID, C.Name,
C.DOB,
C.Ph.No.,
objects
and
Search,
Reset,
Cancel
functionalities.
It should display Search
Results
Page
with
Customers Information
and Edit, Delete, Cancel,
Home functionalities.
47

suresh_240878@yahoo.com

Suresh.B 9440163282

Test Case
name

Test Case
description

Step
Step
Name Description
Step-5 Select
a
Customer
data click on
Edit

Step-6

TC15_
Customer
Info_Admin_
Verify
Update with
missing
mandatory
fields

This
Test Step-1
case
validates
Update
functionality Step-2
with
missing
mandatory
fields
Step-3

Step-4

Expected Result

It should display Edit


Page with C.ID, C.Name,
C.Addr.,
C.DOB,
C.Ph.No., E-mail objects
and
Update,
Reset,
Cancel,
Home
functionalities.
C.ID
Enter
It
should
display
C.Name
duplicate data
meaningful
error
C.DOB
in
message.
C.Addr.
corresponding C.PhNo
fields click on E-mail
update
Open Brower,
Url
It should display Login
enter
Url.
Page with User Name,
Address, click
Password objects and Ok,
on Go
Cancel functionalities.
Enter
valid User It
should
display
User Name Name Customer
Information
and Password & Pass page with Add, Search,
word Logout functionalities.
click on Ok
Click
on
-It should display Search
Search
Page with C.ID, C.Name,
C.DOB,
C.Ph.No.,
objects
and
Search,
Reset,
Cancel
functionalities.
Enter
valid C.ID It should display Search
data
in C.Name Results
Page
with
C.DOB
corresponding
Customers Information
fields and click C.PhNo and Edit, Delete, Cancel,
on Search
Home functionalities.

Step-5 Select
a
Customer
data click on
Edit

48

Test
Data

It should display Edit


Page with C.ID, C.Name,
C.Addr.,
C.DOB,
C.Ph.No., E-mail objects
and
Update,
Reset,
Cancel,
Home
functionalities.
Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

Test Case
name

Test Case
description

Step
Step
Name Description
Step-6 Enter data in
corresponding
fields
by
missing some
mandatory
fields
and
click
on
update
TC16_
This
Test Step-1 Open Brower,
Customer
case
enter
Url.
Info_Admin_ validates
Address, click
Verify Cancel Cancel
on Go
functionality Step-2 Enter
valid
User Name
and Password
click on Ok
Step-3 Click
on
Search

Test
Data

C.ID
It
should
C.Name meaningful
C.DOB
message.
C.Addr.
C.PhNo
E-mail

Url

User
Name
& Pass
word

--

valid C.ID
data
in C.Name
corresponding C.DOB
fields and click C.PhNo
on Search

Step-4 Enter

Step-5 Select
a
Customer
data click on
Edit

Expected Result

display
error

It should display Login


Page with User Name,
Password objects and Ok,
Cancel functionalities.
It
should
display
Customer
Information
page with Add, Search,
Logout functionalities.
It should display Search
Page with C.ID, C.Name,
C.DOB,
C.Ph.No.,
objects
and
Search,
Reset,
Cancel
functionalities.
It should display Search
Results
Page
with
Customers Information
and Edit, Delete, Cancel,
Home functionalities.
It should display Edit
Page with C.ID, C.Name,
C.Addr.,
C.DOB,
C.Ph.No., E-mail objects
and Update, Reset, Cancel,
Home functionalities.

Step-6 Enter data in


corresponding
fields
and
click
on
Cancel
Manual Testing

C.ID
It should close current
C.Name page
and
display
C.DOB
Previous Page.
C.Addr.
C.PhNo
E-mail

49

suresh_240878@yahoo.com

Suresh.B 9440163282

Test Case
name
TC17_
Customer
Info_Admin_
Verify Home

Test Case
Step
Step
Test
Expected Result
description Name Description
Data
This
Test Step-1 Open Brower,
Url
It should display Login
case
enter
Url.
Page with User Name,
validates
Address, click
Password objects and Ok,
Cancel
on Go
Cancel functionalities.
functionality
Step-2 Enter
valid User It
should
display
User Name Name Customer
Information
and Password & Pass page with Add, Search,
word Logout functionalities.
click on Ok
Step-3 Click
on
-It should display Search
Search
Page with C.ID, C.Name,
C.DOB,
C.Ph.No.,
objects
and
Search,
Reset,
Cancel
functionalities.
C.ID
valid
Step-4 Enter
It should display Search
data
in C.Name Results
Page
with
corresponding C.DOB Customers Information
fields and click C.PhNo and Edit, Delete, Cancel,
on Search
Home functionalities.
Step-5 Select
a
Customer
data click on
Edit

It should display Edit


Page with C.ID, C.Name,
C.Addr.,
C.DOB,
C.Ph.No., E-mail objects
and Update, Reset, Cancel,
Home functionalities.

Step-6 Enter data in


corresponding
fields
and
click
on
Home
TC18_
This
Test Step-1 Open Brower,
Customer
case
enter
Url.
Info_Admin_ validates
Address, click
Verify Delete Delete
on Go
functionality Step-2 Enter
valid
User Name
and Password
click on Ok
50

C.ID
It should close current
C.Name page
and
display
C.DOB
Customer Info Page.
C.Addr.
C.PhNo
E-mail

Url

It should display Login


Page with User Name,
Password objects and Ok,
Cancel functionalities.
User It
should
display
Name Customer
Information
& Pass page with Add, Search,
word Logout functionalities.
Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

Test Case
name

Test Case
description

Step
Step
Name Description
Step-3 Click
on
Search

Test
Data
--

valid C.ID
data
in C.Name
corresponding C.DOB
fields and click C.PhNo
on Search

Step-4 Enter

Step-5 Select
a
Customer
data click on
Delete
TC19_
Customer
Info_Admin_
Verify Cancel

Url
This
Test Step-1 Open Brower,
enter
Url.
case
Address, click
validates
on Go
Cancel
functionality Step-2 Enter
valid User
User Name Name
and Password & Pass
word
click on Ok
Step-3 Click
on
-Search

valid C.ID
data
in C.Name
corresponding C.DOB
fields and click C.PhNo
on Search

Step-4 Enter

Step-5 Select
a
Customer
data click on
Cancel
Manual Testing

Expected Result
It should display Search
Page with C.ID, C.Name,
C.DOB,
C.Ph.No.,
objects
and
Search,
Reset,
Cancel
functionalities.
It should display Search
Results
Page
with
Customers Information
and Edit, Delete, Cancel,
Home functionalities.
It
should
remove
customers information
with
Customers
Information
was
successfully deleted.
It should display Login
Page with User Name,
Password objects and Ok,
Cancel functionalities.
It
should
display
Customer
Information
page with Add, Search,
Logout functionalities.
It should display Search
Page with C.ID, C.Name,
C.DOB,
C.Ph.No.,
objects
and
Search,
Reset,
Cancel
functionalities.
It should display Search
Results
Page
with
Customers Information
and Edit, Delete, Cancel,
Home functionalities.
It should close current
page
and
display
previous page.
51

Suresh.B 9440163282

suresh_240878@yahoo.com

Test Case
name
TC20_
Customer
Info_Admin_
Verify Home

Test Case
Step
Step
Test
Expected Result
description Name Description
Data
This
Test Step-1 Open Brower,
Url
It should display Login
case
enter
Url.
Page with User Name,
validates
Address, click
Password objects and Ok,
Home
on Go
Cancel functionalities.
functionality Step-2 Enter
valid User It
should
display
User Name Name Customer
Information
and Password & Pass page with Add, Search,
word Logout functionalities.
click on Ok
Step-3 Click
on
-It should display Search
Search
Page with C.ID, C.Name,
C.DOB,
C.Ph.No.,
objects
and
Search,
Reset,
Cancel
functionalities.
C.ID
valid
Step-4 Enter
It should display Search
data
in C.Name Results
Page
with
corresponding C.DOB Customers Information
fields and click C.PhNo and Edit, Delete, Cancel,
on Search
Home functionalities.
Step-5 Select
a
It should close current
Customer
page
and
display
data click on
Customer Info Page.
Home
TC21_
This
Test Step-1 Open Brower,
Url
It should display Login
Customer
case
enter
Url.
Page with User Name,
Info_Admin_ validates
Address, click
Password objects and Ok,
Verify
Logout
on Go
Cancel functionalities.
Logout
functionality Step-2 Enter
valid User It
should
display
User Name Name Customer
Information
and Password & Pass page with Add, Search,
word Logout functionalities.
click on Ok
Step-3 Click
on
It should close current
Logout
page and display Login
Page

52

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

User Name
User Name object allows alphabets lower case range from 4 to 8
characters.

Range
Min= 4 Char
Min-1= 3 Char
Min+1= 5 Char
Max= 8 Char
Max-1= 7 Char
Max+1= 9 Char

BVA & ECP for User Name


BVA
Expected Actual
Result
Pass
Fail
Pass
Pass
Pass
Fail

ECP
Valid
[a-z]

Invalid
[A-Z]
[0-9]
All
Special
characters

Password
Password object allows alphabets lower case range from 6 to 10
characters.
BVA & ECP for Password
BVA
ECP
Range
Expected Actual
Result
Valid
Invalid
[a-z]
[A-Z]
Pass
Min= 6 Char
[0-9]
Min-1= 5 Char Fail
All
Min+1= 7 Char Pass
Special
Pass
Max= 10 Char
characters
Max-1= 9 Char Pass
Max+1= 11 Char Fail
Customer Name

Customer Name object allows alphabets.

Range from 4 to 12 characters.

First letter should be Upper Case.

Mandatory.
BVA & ECP for Customer Name
BVA
Range
Expected Actual Result
Pass
Min= 4 Char
Fail
Min-1= 3 Char
Pass
Min+1= 5 Char
Pass
Max= 12 Char
Max-1= 11 Char Pass
Max+1= 13 Char Fail
Manual Testing

ECP
Valid
[a-z]
[A-Z]

Invalid
[0-9]
All
Special
characters

53

Suresh.B 9440163282

suresh_240878@yahoo.com

Customer Address

Customer Address object allows alpha-numeric and some special


Characters ( / # , .)

Maximum of 20 Characters.

Mandatory.
BVA & ECP for Customer Address
BVA
ECP
Range
Expected Actual Result
Valid
Invalid
All
Max= 20 Char
Pass
[a-z]
Special
Max-1= 19 Char
Pass
[A-Z]
characters
Max+1= 21 Char
Fail
[0-9]
Except
Some Spl.
Characters mentioned
/#,.
Customer DOB

Customer DOB object allows Numeric Only.

The format is MM/DD/YYYY.

Date should be less than current system date.

Mandatory.
BVA & ECP for Customer DOB
BVA
ECP
Range
Expected Actual Result
Valid
Invalid
All
Max= 20 Char
Pass
[a-z]
Special
Max-1= 19 Char
Fail
[A-Z]
characters
Max+1= 21 Char
Pass
[0-9]
Except
Some Spl.
Characters mentioned
/#,.
Customer Ph.No.

Customer Ph.No. object allows Numeric Only.

Allows 10 digits only.

Phone number is unique.

Mandatory.
BVA & ECP for Customer Ph.No.
BVA
ECP
Range
Expected Actual Result
Valid
Invalid
Max= 10 Digits
Pass
[0-9]
[a-z]
Max-1= 19 Digits
Fail
[A-Z]
Max+1= 21 Digits Pass
All Spl.
Characters
54

Manual Testing

suresh_240878@yahoo.com

Suresh.B 9440163282

TEST DATA DOCUMENT


Project Name
Reviewed by
Module Name
Created By
Reviewed on
Created on
Sl.
Test Case
Step
Data
Data generated
Comments
No.
Name
Name required
Stephttp://192.168.1.0
Url
1
/Customer Info 1.0
1) rama
TC01_
User
2) rames
Customer
Name
3) gahesha
1 Info_Admin_
4) reliance
StepVerify Ok with
2
1) suresh
Valid data
2) sureshb
Password
3) sureshbug
4) sureshbuga
Stephttp://192.168.1.0
Url
1
/Customer Info 1.0
1) ram
TC02_
User
2) sureshbug
Customer
Name
3) ga*1
2 Info_Admin_
4) ram@123
StepVerify Ok with
2
1) sures
invalid data
2) sureshbugat
Password
3) SURESH
4) sarvani@bu
Stephttp://192.168.1.0
TC03_
Url
1
/Customer Info 1.0
Customer
3
Info_Admin_
Step- U.Name pava
Verify Cancel
2
Password ganesh
Stephttp://192.168.1.0
Url
1
/Customer Info 1.0
Step- U.Name pava
TC04_
2
Password ganesh
Customer
Ramu
4 Info_Admin_
Sita
Verify Insert
C.Name
Ramakrishna
Stepwith Valid data
Koteswararao
5
Koti,D.No.-5/G
C.Addr.
Brundavancolony7/G-3

Manual Testing

55

suresh_240878@yahoo.com

Suresh.B 9440163282

Sl.
No.

Test Case
Name

TC05_
Customer
Info_Admin_
Verify Insert
with invalid
data

TC06_
Customer
Info_Admin_
Verify Insert
with duplicate
data

TC07_
Customer
Info_Admin_
Verify Insert
with missing
mandatory
fields

TC08_
Customer
Info_Admin_

56

Step
Data
Data generated
Comments
Name required
C.DOB
05/25/1976
C.Ph.No. 9440163282
suresh_240878@
E-mail
yahoo.com
Stephttp://192.168.1.0
Url
1
/Customer Info 1.0
Step- U.Name pava
2
Password ganesh
Sai
C.Name
Saisarvanibug
Brundavancolony7/G*3
C.Addr.
Brundavanacolony
Step7/G-3
4
C.DOB
25/10/1976
C.Ph.No. +91-9440163282
suresh_240878#
E-mail
yahoo.com
Stephttp://192.168.1.0
Url
1
/Customer Info 1.0
Step- U.Name pava
2
Password ganesh
C.Name
Koteswararao
C.Addr.
Brundavancolony7/G-3
Step- C.DOB
05/25/1976
4
C.Ph.No. 9440163282
suresh_240878@
E-mail
yahoo.com
Stephttp://192.168.1.0
Url
1
/Customer Info 1.0
Step- U.Name pava
2
Password ganesh
C.Name
Koteswararao
C.Addr.
Brundavancolony7/G-3
Step- C.DOB
05/25/1976
4
C.Ph.No. 9440163282
suresh_240878@
E-mail
yahoo.com
Step1

Url

http://192.168.1.0
/Customer Info 1.0
Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

Sl.
No.

Test Case
Name
Verify Cancel

Step
Data
Name required
Step2
Step4

TC09_
Customer
Info_Admin_
Verify Search
with valid data

Manual Testing

Step1
Step2
Step5

Data generated

Comments

U.Name
Password
C.Name
C.Addr.
C.DOB
C.Ph.No.

pava
ganesh
Koteswararao
Brundavancolony7/G-3
05/25/1976
9440163282
suresh_240878@
E-mail
yahoo.com
http://192.168.1.0
Url
/Customer Info 1.0
U.Name pava
Password ganesh
C.Name
Koteswararao
C.DOB
05/25/1976
C.Ph.No. 9440163282

57

suresh_240878@yahoo.com

Suresh.B 9440163282

Review on Test Cases


After completion of Test Case preparation, Test Engineer is conducting
Peer Review and Test Lead is conducting Lead Review to estimate
Completeness and Correctness of that document
PM

TE-1

PL

TE-2

Peer Review
After completion of review on Test Cases, Test lead is mapping Test
Cases with Requirement Traceability Matrix Document. (RTM)
RTM defines the mapping between requirements and Test Cases.
Traceability Matrix Template
Project Name
Prepared By
Prepared on
Sl. No.

Requirement
Description

Use Case
Reference

Project Manager
Reviewed By
Reviewed on
Last Updated on
Test Scenario

Test Case
Reference

TEST CASE EXECUTION


After completion of Test Cases preparation and corresponding reviews,
Testers are receiving initial build from the development people.
During Test Case execution Testers are receiving modified build from the
developers. To receive any type of build from the developers, Testers required
a valid negotiation / communications with developers like as below.

58

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

Developers

COMMON REPOSITORY / SOFT BASE


1.0

2.0

3.0

Client

VSS (Visual Source Safe)


The versions have been maintained
by these VSS

FTP (File Transfer Protocol)


Deploy / Install Build
Sanity Testing

Testers

EXECUTION LEVELS:
Initial Build
Stable Build
Level 1
Comprehensive
Testing

Level 0
Sanity Testing

Defect Effected Build

Modified Build
Level 2
Re-Testing
Regression Testing

Bug Fixing

Complete Build
Master Build

Level 3
Test Closer
(Test Lead)

U.A.T
Manual Testing

Golden Build

Sign off

59

suresh_240878@yahoo.com

Suresh.B 9440163282

TEST HARNESS:
Test Harness means ready to start testing.
Test Harness = Test Environment + List of Test Cases.
LEVEL 0 TESTING
After receiving initial build from the development people, Testers are
conducting Level 0 Testing to estimate stability of that build before start real
testing.
In this testing, Testers are concentrates on Core (Basic) functionalities.
During this Testing they will concentrates on below factors.
1) Under standable.
2) Operatable
3) Observable
4) Controllable.
5) Consistency.
6) Automatable.
7) Maintainable.
8) Simplicity.
From the above factors Level 0 Testing is also known as Oct-Angle
Testing or Sanity Testing or Build Verification Testing or Tester Acceptance
Testing or Testability Testing.
LEVEL 1 TESTING
It is also known as Comprehensive Testing. During this testing Testers
are executing all P0, P1, P2, Test Cases (P0High Priority, P1Medium Priority,
P2Low Priority) to validate functionality. In this every Test Case has to be
executed by Tester either in Manual or in Automation.
Build

Test Cases
Test Engineer

Build
Test Cases
Automation
Testing

Manual Testing
Test Engineer
Automation Testing

60

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

Execution Process
Skip

Pass

Take all the Test


Cases

Fail

Test Case
Execution

Blocked Test Cases

Close

Partial Pass or Fail

Defect Report
During test execution, Testers are reporting mis-matches to development
Teas as Defect in Defect Report Document.
Defect Report Format
1)
Defect ID
Unique for future reference.
2)

Summary
Brief description of the defect.

3)

Features
The name of the feature / functionality in which defect.

4)

Test Case Name


Name of the Test Case (in which Test Case execution the defect is
raised)

5)

Reproducible
The defect is repeatable in every time execution.
a. If Yes: It is reproducible, attach test procedure.
b. If No: It is not reproducible, attach test procedure along with snap
shots.

6)

Status
Status of the defect. They are (2) types
(i)
NewReporting for first time.
(ii) Re-openFor re-reporting defects.

Manual Testing

61

Suresh.B 9440163282

7)

suresh_240878@yahoo.com

Severity (Seriousness with respect to Testers)


It means seriousness of the defect with respect to Tester or
seriousness of the functionality. They are classified into (3) Types such
as
(i)
(ii)
(iii)

High severity Urgent to solve


Medium severity Mandatory to solve
Low severity Compulsory to solve

8)

Priority
Importance of the defect with respect to customer or importance of
the functionality. It is classified into (3) types such as
(i)
High Priority
(ii) Medium Priority
(iii) Low Priority

9)

Assigned to
Name of the Developer

10)

Detected By
Name of the Tester (Who detected the defect)

11)

Reported on
Date and Time

12)

Build Version ID
In which version of the build the defect is raised.

13)

Suggested to fix
Suggestions to developer to fix the defects
By Developers
Fixed By:
Name of the Programmer who fixed the defect.
Resolved on
Date and Time
Resolution Type:
Acknowledgment from the developers for the reported
defect.
Approved by
Signature of the Team Lead / Project Lead.

62

Manual Testing

suresh_240878@yahoo.com

Suresh.B 9440163282

Types of defects
1) User interface defects (Low Severity)
Spelling mistakes (High Priority)
Improper alignment (Low Priority)
2) Input domain defect (Medium Severity)
Input type is not taking valid type ((High Priority)
Input type is taking invalid type also (Low Priority)
3) Error handling defect (Medium Severity)
No error message for wrong operation (High Priority)
Complex message in error message (Low Priority)
4) Calculation defect (High Severity)
Wrong outputs (High Priority)
5) Load conditional defect (High Severity)
Build is not supporting more than one user (High Priority)
Build is not supporting customer expected load (Low/Medium Priority)
6) Hardware defect (High Severity)
Build is not supporting any hardware devices (High Priority)
Build is supporting hardware and wrong output coming from hardware
(Low Priority)
7) Role conditional defect (High Severity)
System crash, Showstoppers, Dead lock etc.,
8) Version control system (High Severity)
Mistake in version control
9) Source defects (Medium Severity)
Mistake in Help Document (High Priority)
What is defect Age?
The time gap between defect reported on and defect resolved on.
What is Build Internal period?
The time gap between two consequent builds is called as Build Internal
period.

Manual Testing

63

suresh_240878@yahoo.com

Suresh.B 9440163282

BUG LIFE CYCLE / DEFECT LIFE CYCLE

New
Review the defect
Reopen

Open

Rejected

Hold

Duplicate

Deferred

Fixed

Defect
If defect is
not fixed
Close
Hold:

The defect is not accepted, not rejected due to developer need more
information about that defect.

Duplicate: The defect is rejected due to defect is previously accepted defect.


Deferred: The defect is postponed to next version / release.
LEVEL 2 TESTING
After receiving the modified build from the developers, Testers are
performing Re-testing / Regression Testing to ensure whether the reported
defects are properly rectified by the developers or not and to check whether
there is any side effects occurred or not on dependent functionalities by solving
the reported defects or by adding new requirements.
Case Study
Modified Build

High Severity
All P0, P1, P2
Test Cases

64

Medium Severity
All P0, some P1, &
Selected P2 Test
Cases

Low Severity
Some P0 &
Selected P1, P2
Test Cases

Enhancement
All P0, P1, P2
Test Cases

Manual Testing

Suresh.B 9440163282

suresh_240878@yahoo.com

Case 1:
Case 2:
Case 3:
Case 4:

If the development team resolved bug severity is high, then Testers


are re-executing all P0, P1, P2 Test Cases on that modified build.
If the development team resolved bug severity is medium then,
Testers are re-executing all P0, some P1 and selected P2 Tests cases
on that modified Build.
If the development team resolved bug severity is low, then Testers
are re-executing some P0 and selected P1 and P2 Test cases on that
modified build.
If the development team released modified build due to some
change request then the Testers are re-executing all P0, P1, P2 Test
Cases on that modified build.

LEVEL 3 TESTING
After completion of all test cases execution and corresponding bugs
resolving, Testers are sending complete build to the Test lead along with FSR
(Final Summary Report)
After receiving Final Summary Report from the Testers, Test lead is
conducting Test Closure to estimate that whether the Test Engineer meets exit
criteria or not.
In this Test lead category people will concentrate on below coverages.
1) Requirements Coverage:
All the requirements with respect to functionality.
2) Bug density
No. of defects in Module . X 100
No of defects in the Project
3) Analysis of deferred bugs:
Whether the deferred bugs are reasonable or not to postpone.
After completion of above like coverages Test lead is conducting Test
Closure in below approach.
Take High Bug density Module
Effort Estimation

Do Regression

Do Regression

Plan Regression

Do Regression
Manual Testing

65

Suresh.B 9440163282

suresh_240878@yahoo.com

User Acceptance Testing


After completion of Test Closure the Project Manager collects
feedback from the customers on developed software through User Acceptance
Testing. They are two types such as
Test
Test
(Beta Test)
(Alfa Test)
Software Application.
Software Product.
By Real customer.
By Model customer.
At development site.
At customer site.
Signoff
After completion of User Acceptance Testing and corresponding
modifications, the Project Management deliver that software / build to the client
along with Software Delivery Note (S/w DN). It consists of (2) issues such as
(i)
User Manual.
(ii) Known issues

66

Manual Testing