Conversion of Waste Plastics

into Fuel

Nakonrachasima Municipality

Waste Disposal

Solid waste from city were collected and transported to Landfills site about 15
kilometer far
from the city. Recycling waste were decreased because of the Recycling
policy and campaign
. Amount of solid waste was decreased about 10 %

Problem of Waste Management


public protest againstfor new landfill, site rehabitation is an answer

Bag
Opener

Thommel
Plastic

Landfil
l
Cover
materi
al

RDF

www.themegallery.com

Cover
material

LOGO

Waste Treatment Plant : phase


I
Phase I : Under
construction

Manual sort

MSW
Thom
mel

Bag Opener

SSOW

Landfill

Magnetic
separator
Organic waste

Wet separator

RDF
Metal Recycle
Light reject material

biogas
Sand
bed

Landfill
(Sand,
Stone)

Bioreactor
#1

Bioreac
tor
#2

Gas
engine

Composting

Electricity

Fertilizer

Shredder
Waste
water
treatme
nt

Storage tank

Waste Treatment Plant


Waste reduction by Anaerobic digestion capacity 80 tons/day.
Biogas for generate electricity 800 kW (6,400,000 unit/yr.)
Solid digestate from AD can mix with
yard waste to produce Fertilizer
production 21 tons/day
Refuse derived fuel 8 tons/day
It can recycle water 80 m3/day and simple for operate.

Waste Treatment Plant :


phase Phase
II I : Under construction
MSW
Bag Opener

SSOW

Thommel

Manual sort

Wet separator

RDF
Anaerobic
Digest
ion
PHAS
E I

MSW

Fertilizer

leachet
Dry Cell

Organic

thommel
Comp
osting
Plant

Extuder

RDF

Gasifier

Plastic
from Rehab
landfill site

Pretreatment

RDF Process

Plastic Waste

Feed stock

Plastic
from Mix
Waste
(MSW)

Plastic from
site Rehab
(exiting landfill)

By Product
RDF

Main Equipment for RDF


Process

Plastic Shredder

Extuder

LO

GO

www site
.them
Rehabitation landfill
egallery.co
m

www.themegallery.com

LOGO

Rehabitation landfill site by


Thommel

www.themegallery.com

LOGO

plasti
c

www.themegallery.com

Soil condition

LOGO

Compaction for construction


plant

www.themegallery.com

LOGO

Compaction for construction


plant

www.themegallery.com

LOGO

Facility Building

Front end Building

Fertilizer Building

Maintenance Building

Weighting Building

Sand drying bed

Anaerobic Digester (cover


lagoon 2 stage)

Thank you