DRAINAGE CRITERIA MANUAL (V.

2)

DESIGN EXAMPLES

DESIGN EXAMPLESSECTION 4
CONTENTS
Section
4.0

Page
DECASE STUDYROCK CREEK .................................................................................................... 50

Figures for Section 4


Figure 1Flor Storage Facility Plan View.................................................................................................. 53
Figure 2Typical Pond Edge Adjacent to Community Ditch ..................................................................... 54
Figure 3Typical Embankment Crest........................................................................................................ 54
Figure 4Typical Pond Edge Adjacent to Filing No. 13 ............................................................................ 55
Figure 5Typical Clay Cutoff Trench......................................................................................................... 55
Figure 6Profile Pond Outlet Works.......................................................................................................... 56
Figure 7Plan Drop Box............................................................................................................................ 56
Figure 8Section Drop Box ....................................................................................................................... 57
Figure 9Plan 78" RCP Outlet .................................................................................................................. 58
Figure 10Section 78 RCP Outlet............................................................................................................ 58
Figure 11Rock Creek Flor Storage and Landscape Plan ....................................................................... 59
Figure 12Landscape Plan Construction Notes and Plant Legend .......................................................... 60
Figure 13Planting and Trail Details ......................................................................................................... 61
Figure 14Grouted Boulder Drop Structures ............................................................................................ 64
Figure 15 LB3 Channel Profile ................................................................................................................ 65
Figure 16Typical Drop Structure ............................................................................................................. 65
Figure 17Grout Cutoff Section ................................................................................................................ 66
Figure 18Drop Structure Profile .............................................................................................................. 66
Figure 19Typical Drop Basin Section and Sill......................................................................................... 67
Figure 20Typical Drop Face Section....................................................................................................... 67
Figure 21Drop Structure Measurement Table ........................................................................................ 68
Figure 22LB3 Channel Plan .................................................................................................................... 72
Figure 23Typical Wetland Channel Section and LB3 Channel Profile.................................................... 72
Figure 24Check Structure Plan ............................................................................................................... 73
Figure 25Check Structure Profile ............................................................................................................ 73
Figure 26Check Structure Layout Table ................................................................................................. 74
Figure 27Check Structure Details ........................................................................................................... 75
Figure 28Stream Stabilization Plan......................................................................................................... 79
Figure 29Grouted Boulder Check Structure with Low-Water Crossing Site Plan................................... 80
Figure 30Typical Stream Stabilization Detail .......................................................................................... 81
Figure 31Stream Stabilization Site Plan ................................................................................................. 81

06/2001
Urban Drainage and Flood Control District

DE-i

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

4.0

CASE STUDYROCK CREEK

The purpose of this case study is to demonstrate the following features:

Detention facility

Grouted boulder drop structure

Grouted boulder check structures and wetland bottom channels

Stream bank stabilization including grouted boulder check structure with low-water crossing,
slope flattening and revegetation

McLaughlin Water Engineers, Ltd. (MWE) and the Norris/Dullea Company (both based in Denver)
prepared the attached drawings. Photographs are provided for each of the facilities featured in this case
study.
The formal names of these projects are:
1. Tributary LB-3 Channel and Flor Storage Facility
2. Rock Creek Stabilization, Tributary RB-3 Outfall Pipe, and Community Pond East
The client for MWE and Norris/Dullea Company was Superior Metropolitan District No. 1 and the relevant
drawings were prepared in 1994 and 1997.
Public reaction to the facilities shown on the attached pages and to the overall drainage plan has been
extremely positive due to the aesthetic nature of the facilities, the fact that they nicely integrate into the
community, their environmentally-sensitive nature and multi-purpose benefits. There is no question that
the drainage system in Rock Creek substantially enhances community character and the value of
residential properties.

DE-50

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Detention FacilityFlor Storage Facility

06/2001
Urban Drainage and Flood Control District

DE-51

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

Detention FacilityFlor Storage Facility


and Interpretive Sign

DE-52

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Figure 1Flor Storage Facility Plan View

06/2001
Urban Drainage and Flood Control District

DE-53

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

Figure 2Typical Pond Edge Adjacent to Community Ditch

Figure 3Typical Embankment Crest

DE-54

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Figure 4Typical Pond Edge Adjacent to Filing No. 13

Figure 5Typical Clay Cutoff Trench

06/2001
Urban Drainage and Flood Control District

DE-55

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

Figure 6Profile Pond Outlet Works

Figure 7Plan Drop Box

DE-56

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Figure 8Section Drop Box

06/2001
Urban Drainage and Flood Control District

DE-57

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

Figure 9Plan 78" RCP Outlet

Figure 10Section 78 RCP Outlet

DE-58

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Figure 11Rock Creek Flor Storage and Landscape Plan

06/2001
Urban Drainage and Flood Control District

DE-59

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

Figure 12Landscape Plan Construction Notes and Plant Legend

DE-60

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Figure 13Planting and Trail Details

06/2001
Urban Drainage and Flood Control District

DE-61

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

Grouted Boulder Drop Structures on Tributary LB-3 Channel


DE-62

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Grouted Boulder Drop Structures on Tributary LB-3 Channel

06/2001
Urban Drainage and Flood Control District

DE-63

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

Figure 14Grouted Boulder Drop Structures

DE-64

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Figure 15 LB3 Channel Profile

Figure 16Typical Drop Structure

06/2001
Urban Drainage and Flood Control District

DE-65

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

Figure 17Grout Cutoff Section

Figure 18Drop Structure Profile

DE-66

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Figure 19Typical Drop Basin Section and Sill

Figure 20Typical Drop Face Section

06/2001
Urban Drainage and Flood Control District

DE-67

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

Figure 21Drop Structure Measurement Table

DE-68

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Grouted Boulder Check Structures And Wetland Bottom Channels

06/2001
Urban Drainage and Flood Control District

DE-69

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

Grouted Boulder Check Structures And Wetland Bottom Channels

DE-70

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Wetland Bottom Channel

06/2001
Urban Drainage and Flood Control District

DE-71

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

Figure 22LB3 Channel Plan

Figure 23Typical Wetland Channel Section and LB3 Channel Profile

DE-72

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Figure 24Check Structure Plan

Figure 25Check Structure Profile

06/2001
Urban Drainage and Flood Control District

DE-73

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

Figure 26Check Structure Layout Table

DE-74

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Figure 27Check Structure Details

06/2001
Urban Drainage and Flood Control District

DE-75

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

Stream Bank Stabilization Including Grouted Boulder Check Structure With


Low-Water Crossing, Slope Flattening, And Revegetation

DE-76

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Stream Bank Stabilization Including Grouted Boulder Check Structure With


Low-Water Crossing, Slope Flattening, And Revegetation

06/2001
Urban Drainage and Flood Control District

DE-77

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

Stream Bank Stabilization Including Grouted Boulder Check Structure With


Low-Water Crossing, Slope Flattening, And Revegetation

DE-78

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Figure 28Stream Stabilization Plan

06/2001
Urban Drainage and Flood Control District

DE-79

DESIGN EXAMPLES

DRAINAGE CRITERIA MANUAL (V. 2)

Figure 29Grouted Boulder Check Structure with Low-Water Crossing Site Plan

DE-80

06/2001
Urban Drainage and Flood Control District

DRAINAGE CRITERIA MANUAL (V. 2)

DESIGN EXAMPLES

Figure 30Typical Stream Stabilization Detail

Figure 31Stream Stabilization Site Plan

06/2001
Urban Drainage and Flood Control District

DE-81