You are on page 1of 2

TIL 1819 Recommendations from Page 2:

One other suggestion would be to grind a flat spot at the 12 oclock position at the vertical joints of
the turbine and exhaust casings (shown in the image below). Ensure they are flat and level. Then
once a year a drop check measurement can be verified and recorded between the two casings,
monitoring the exhaust casing slippage.

You might also like