Professional Documents
Culture Documents
One other suggestion would be to grind a flat spot at the 12 oclock position at the vertical joints of
the turbine and exhaust casings (shown in the image below). Ensure they are flat and level. Then
once a year a drop check measurement can be verified and recorded between the two casings,
monitoring the exhaust casing slippage.