You are on page 1of 8
DIRECTION OF TRAFFIC FLANGED CHANNEL DIMENSIONS T= Channel] Mass filo [ A (in) [8 Cin) [C (in) [D-(n)|E Cin) PFP25 3.00__[ 1.750 | 3.500 | 1.625] .718 | 160 PEP26 4.00 | 1.840 [3.500 / 1.625 .740 | .250 & CHICAGO HEIGHTS STEEL Lay7/2014 afety Splice Breakaway System SPECIFICATIONS Posts shall be hot rolled flanged channel section from high strength steel conforming to ASTM A-499, grade 60 modified to 70,000 psi minimum yield. Posts shall be machined straightened to have smooth uniform finish, free from defects affecting their strength, durability, or appearance. All edges shall be free from burrs, The permissible tolerance for straightness shall be 1/4" in a 5' span. Posts shall be punched with continuous 3/8" diameter holes on 1" centers for the entire length of the posts, beginning 1" from one end of the post. If the first hole is less than 1" from the cutting edge on either the base or sign post. After fabrication, the posts may be painted green or black, or hot dip galvanized according to ASTM A-123. INTENDED USE The Chicago Heights Stee! U-channel posts may be used in the Direct Burial U-Post (SSF40a-b), and the Chicago Heights Steel Safety Splice System (SSPOSa-c). CONTACT INFORMATION Chicago Heights Steel 211 E Main Street P.O, Box 129 Chicago Heights, IL 60411 800-424-4487 708-756-5619 708-756-5628 Fax All Chicago Heights Steel products are produced from 100% recycled steel. framny Walters [2/11/2013 la7y014 g CHICAGO HEIGHTS STEEL Safety Splice Breakaway System ISSPO5. PUNO See Detail A Sheet 5 Base Post: IRONY DSS YY NN CG, SS 48" min for PFP25 54" min for PFP26 Side Front SYSTEM Sign Post Base Post '$5POSa (1 Post) | PFP25-26 PFP25-26 A a SSPOSB (2 Post) | PFP25-26 PEP25-26 ‘SSPO5C (3 Post) | PFP25-26 PFP25-26 fay Watters [2/11/2013 [reece r byrp2o14 & CHICAGO HEIGHTS STEEL fe Y = afety Splice Breakaway System ee eas 2 aw T INTENDED USE ‘The Chicago Heights Steel Safety Splice breakaway system can be used as a single (SSPO5a), double (SSPOSb}, or Triple (SSPO5c) post sign support system within a 84" (or 7') span with a PFP25 or PFP26 upper and lower post. These systems have been crash tested in both strong and weak soil and have been judged to satisfy the requirements of 1994 AASHTO Standard Specification for Structural Supports for Highway Signs, Luminaires and traffic signals. Testing was conducted in accordance with the required NCHRP Report 350. The PFP25-26 base posts may be driven or installed in preformed holes with back fill COMPONENTS ‘The Chicago Heights Steel Safety Splice System consists of three components: a base post (PFP25-26), a sign post (PFP25-26), and the splice hardware. The sign post and base post shall be of like weight per foot, as specified by the user. (PFP25-26). The sign post lengths shall be supplied in 12” increments beginning from 72" to 240" as required for the installation location. The splice hardware required is proprietary and consists of two %s" diameter x 2" long proprietary, grade 9, bolts and nuts. Two 1" diameter x %" long spacers shall be used per splice to stiffen the connection. Each spacer shall be drilled with a 7/16" diameter hole, traversing its entire length, along the center line of the spacer. The spacer shall be fabricated from hot rolled carbon steel bars conforming to AASHTO M183 (ASTM A-36) or M1021 steel. Splice hardware may be cadmium plated pursuant to ASTM A-165 or zinc plated to ASTM B-633. soil plate (PLSO3) is required for all soil conditions. INSTALLATION ‘The Chicago Heights Steel Safety Splice breakaway system requires a base post (Min of 48” for PFP25 and 54” for PFP26) with a PLSO3 soil plate bolted a minimum of 4" to a maximum of 8" below grade using %s" diameter bolts x 2%4" long grade 9 bolts and flange nuts. Base post can be installed flushed with grade or project no more than 4”. Soil plate can be installed on either side of base post with bolts being inserted from either side of the post. The base posts may be driven or installed in preformed holes with backfill. fray Waters [2/11/2013 Ee bios 2 CHICAGO HEIGHTS STEEL —o jafety Splice Breakaway System mt UNO leer 4 oF 8 Bolts may be installed from either direction 48" PFP25 54" PFP26 ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° Detail A FRONT Splice Connection PARTS LIST TTEM [QTY] PART NUMBER DESCRIPTION i_[ 1 [Prp2s-26 3.0 or 4.0 Ib. Channel, Ground Post 2 2_|MKS-120305 |Hex Flange Screw - Grade 9 3 2_|MKS-120302 1" x 5/8" Steel Spacer, Zinc Plated A 4 | 1 |PFP25-26 3.0 or 4.0 Ib. Channel, Sign Post 5 2_|MKS-120309 |Hex Flange Nut - Grade 9 fe13j2013, 7/2014 & CHICAGO HEIGHTS STEEL afety Splice Breakaway System 8 on" Fl bie MKS-120302 Steel Spacer, Zinc Plated 0X 45° Chamfer" E MKS-120305 Hex Flange Screw, Grade 9 Lay7/2014 Lajtsy2013 MKS-120309 Hex Flange Nut, Grade 9 CHICAGO HEIGHTS STEEL Safety Splice Breakaway System ISSPO5 LN 3/8" Hol SIDE optional 3/8" 9/16" set FRONT PLSO3 Soil Plate ysy2013, 7/2014 CHICAGO HEIGHTS STEEL Safety Splice Breakaway System jimmy Walters SsP0s UNO 8 SPECIFICATIONS The soil plate shall be manufactured using AASHTO M183M (ASTM A36M) steel. After all punching, drilling, stamping and weld is complete the soil plate may be zinc-coated according to AASHTO M111 (ASTM A123) or painted. Dimensional tolerances not shown or implied are intended to be those consistent with the proper functioning of the part, including its appearance and accepted manufacturing practices. INTENDED USE ‘The soil plate is required for the SSPOS Safety Splice System. The soil plate provides additional support in poor soil conditions. INSTALLATION The soil plate is attached to the post using 2, %s" diameter x 274" long grade 9 bolts and nuts. The top of the soil plate embedded depth is a min. 4” and max 8" below grade. The soil plate can be installed on either side of the post with the bolts and nuts going from either direction. pts _puzon_) €* CHICAGO HEIGHTS STEEL

You might also like