You are on page 1of 3
‘TOTAL CREST LENGTH=420" GROOVED JOINTS FILLED WITH MASTIC M_ FOUNDATION a GALLERY IN DAM SECTION RESERVOIR CONTROL STRUCTURE GALLERY IN TUNNEL, UPSTREAM ELEVATION DRAINAGE HOLES CONVENTIONAL CONCRETE FACING 0.8 ROLLER, COMPACTED CONCRETE 4" GROUT CURTAIN ROCK FOUNDATION MAXIMUM CROSS SECTION OF THE DAM MIDDLE FORK DAM TEMPERATURE IN * F 70 «0 LOCATION A MIDDLE FORK DAM THERMAL RESPONSE WITH TIME PREDICTED VERSUS ACTUAL ACTUAL, SIMULATED PREDICTION a ‘TEMPERATURE DROP DUE _TO FILLING RESERVOIR TO OPERATING LEVEL LOCATION & LOCATIONB => ACTUAL oe SIMULATED PREDICTION->>~__ ce ee sept oct 1M tee TANT FEB own | aR tar TIME FROM START OF PLACEMENT IN DAYS 80 MIDDLE FORK DAM PREDICTED VERSUS ACTUL ISOTHERMAL LINES 200 DAYS AFTER START OF CONSTRUCTION LOCATION OF 7 DAY PAUSE 120 UPPER MIDDLE Spemarional 100 LOCATION OF ! RESERVOIR ory pause RESERV SURFACE 0 TEMPERA- TORE 32° 60 80 WATER LEVEL © AT TIME OF MEASUREMENTS 40 289 2 i 20 80 9. ° fap gedo-eeee@or tt ears messi 0 | 2 440 «66080 DAM BASE (FEET) SIMULATION MODEL DAM BASE (FEET) ACTUAL ‘THERMOCOUPLE LEVELS

You might also like