Professional Documents
Culture Documents
ELECTRICAL ENGINEERING
Sr.No.
Aim of practical
1 To study and plot the CT saturation characteristics.
2 Characteristics of Fuse and MCB
3 Performance of a short transmission line
4 Performance of a Meduim transmission line
5 Voltage distribution over a string of suspension insulators
6 Floating star point in a three-phase distribution system
Required Equipment
Quantity
SET UP KIT
SET UP KIT
SET UP KIT
1
1
1
1,16,000/1,49,000/2,20,000/1,49,000/-
Balanced load and system neutral connected with star point of load
94,000/-
METLAB
1,10,000/-
.D.)
Unit Price (Rs.)
Aim of practical
Required Equipment
1.
2.
3.
To study three phase inverter using 120 and 180 conduction mode.
4.
5.
6.
7.
8.
9.
10.
METLAB
ROYAL ELECTRONICS
Rs.68,500/-[NITECH]
Rs.96,000/-[NITECH]
Rs.22,000/-[HEM]
NIJITRONICS
[ADTRON]
10000/10000/27000/28000/20000/-
Regret
72,600/-[NITECH]
10000/-
1
1
-
1,12,500/-[NITECH]
45000/-