"TRANGHITTAL OF SHOP DRAWINGS, EQUIPMENT OATA MATERIAL SANPLES, OR —TOATE
‘MANUFACTURER § CERTIFICATE OF COMPLIANCE
amas
REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS
[PORTRACT Wo.
worzvete0-0012
“Task Ore 8001
|SREGK ONE THs TRANGUTTALIS
{EOC I DRW AND SAR AT TRUULLO
Ne.
Fon: ( )F0 (x) covtapeRovaL
‘CONTRACT REFERENCE ror | VARIATION | FOR
oF DOCUMENT, atest ce
— USE cove ie
sec. DRAWING ‘cope
PARA No. SHEET,
i * 1 2 4
7 [ns CATION CORE a z zs wa
2 [STANDARD STEEL FRAMES Sas 2 NAL
Eas
|e you may fd atachedExcancing Foam ste shot an te ng fr met doar
‘The Expanding oar wi be uses meta doors (-01 P22. 98, Pe)
Thies fore rjc, autos ana Tro
SEE ATTACHED COMMENTS,
l
| coy atte stove sabiid tama have ben vevaved heal end we
[rect andin set concrmance wiht cantac ings on peste
lrcets ctor stat
=
‘ALEX VASQUEZ NAVARRO
‘hak Cone Manager
[NAME AND SIGNATURE OF CONTRACTOR
[ENCLOSURES RETURNED
‘SECTION TATION
ANE, THTLE aN SIGN
See
om
7
2/24 fro/s
eoTRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, [DATE TRANSMITTAL NO.
MATERIAL SAMPLES, OR MANUFACTURER'S 3/24/2015 os 12 13-1.2
CERTIFICATES OF COMPLIANCE
PROJECT TITLE PER HA EOC/DRW 20172/20169 10 21620 TRU ‘CONTRACT NO, PAGE
1278-13-0-0012 0001
LOCATION QUITOS AND TRUJILLO, PERU bedi idiot cd
1 Insulation Cores No.
2 ‘Standard Stee! Frame:
tem 1. CODE A
tem 2, CODE B Shop drawings will be required prior to start fabrication and trimming the metal frames.
hi 2]
are ores aoa