You are on page 1of 2
‘TRANSMITTAL OF SHOP DRAWINGS, EQUPHENT DATA, WATERIAL SAMPLES, OR — [BATE FFRANSRITTAL Wa: [MANUFACTURER'S CERTIFICATE OF COMPLIANCE remap 0024232 [REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS. Ho: Jus army comps oF ENGINEERS JEONTRACT Wa wor27s-13.0.0012 ask Ose 6001 [OnEGK ONE TH TRANSUTTALS om ayo nA TRURLO om pmo (x) cor aePRo. i CORNET RERRERET Ta] oF DOCUMENT o- cE comes soemicron vse sore even cove anne | Sree ‘ P aaa ‘i a Fi ' oa ta = a or ae = 4 : + iE = 7S c= h above eared tana have boon rovewndTh Gal we JPRoPoseo use oF ADHERENT RESIN TO THE STUCCO TO REINFORCE 5 re ann set coromance wth he cata rigs and pester Jeser as tere ated SEE ATTACHED COMMENTS te) [MELISSA M SILVA HERRERA ualy Corr Manager [NAME ANO SIGNATURE OF CONTRACTOR ‘SEETON 1 APBRDVALAC [ENCLOSURES RETURNED Nate TLE AND Sih iom Ps /iy [2014 eT ‘TRANSMITTAL OF SHOP DRAWINGS, | EQUIPMENT DATA, OATE TRANSMITTAL NO. MATERIAL SAMPLES, OR MANUFACTURER'S 5/14/2014 09 24 23-2 CERTIFICATES OF COMPLIANCE PROJECT TITLE PERCHA EOC/DRW 20172720169 10 21620 TRU ‘CONTRACT NO. PAGE LOCATION 1QUITOS AND TRUJILLO, PERU Saeco sae aS Item 1. CODE B: Prior communication will be adherence of mortar. required if this product will be use for repair. Approved to reinforce the ‘Aitachment to ENG FORM 4025 Range’ Selected Transmitale

You might also like