MANUFACTURER'S CERTIFICATE OF COMPLIANCE
“FRANSHITTAL OF SHOP DRAWINGS, EGUIPHENT OATA MATERIAL SANBLES, OR
[REQUEST FOR APPROVAL OF THE FOLLOWING TEMS
FFROw [GORTRACT Ne
F ENGINEERS.
worz7e130.0012
taro Task rser0003
ge mh 50 Ba Pate A Ta, Ps
[PROJECT TTLE AND LOCATION
[Desron BUILD EOC /DRWAT JUITOS AND, EOG/DRW AND SAR AT TRUILLO.
‘DESCRIPTION OF ITEM SUBMITTED TMFG.OR CONTR. | Wo. ‘CONTRACT REFERENCE
[An SUPPLY, DISTRIBUTION, VENTILATION AND cear.cunve | OF ‘SOCUMENT,
‘BeHAUST SYSTENS rAwINGOR | COPIES
[BROCHURE NO. spec. ‘RAW
PARA Mo. SHEET,
» 4 . t
7 [eens ERTS FAS oe Zane Ww
fRewanrs cary at eet eid lar have ean evened Gaal and we
\rect angn set conformance win the canact ewig ard speceaons
[rss eve wil be eae in wal -batooms
SEE ATTACHED COMMENTS.
Joceptes ere states
[ewcLOsuRES RETURNED
4/40/2018TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, | DATE TRANSMITTAL NO.
MATERIAL SAMPLES, OR MANUFACTURER'S 04/20/2015 23 00 00-2.2
CERTIFICATES OF COMPLIANCE |
PROJECT TITLE PERCHA EOG/DRW 20172120169 10 21670 TRU ‘CONTRACT NO. PAGE
LOCATION (QUITOS AND TRUJILLO, PERU ee et
‘CODE B: To be installed on ceiling,
‘Attachment to ENG FORM 4025-R. Range: Selocod Transits