You are on page 1of 1

ETAP

Project:

Page:

12.6.0H

Location:

Date:

Contract:
Study Case: SC
aji

3-phase fault at bus:

= 100.00 % of nominal bus kV ( 16.500


500.000kV)
kV)
= 100.00 % of base ( 16.500
500.000kV)
kV)

Prefault voltage = 16.500


Contribution

= 100.00 % of nominal bus kV ( 16.500 kV)


1/2 Cycle
= 100.00 % of base ( 16.500 kV)

From Bus
ID
From Bus
ID

Revision:

Base

Config.:

Normal

SHORT-CIRCUIT REPORT

Bus5
Bus6
Bus7
Bus8
Bus9
Bus11
Bus12

Prefault voltage = 16.500


500.000
3-phase fault at bus: Bus4

Bus5
Bus6
Bus7
Bus8
Bus9
Bus11
Bus12

03-30-2016

SN:

Engineer:
Filename:

87654321

Contribution
Total

Bus4
Bus11
Bus6
Bus7
Bus8
Bus5
Bus4
Bus7
Bus11
Bus8
Bus9
Gen2
Gen1

Bus12
Bus5
Bus6
Bus7
Bus8
Bus9
Bus11
Total
Bus6
Bus5
Bus7
Bus8
Bus11
Bus12

Bus12
Bus12
NACD Ratio = 1.00

Bus4
Bus4

To Bus
ID
To Bus
ID

%V
From Bus

kA
Real

0.00 1355.069
490.412
297.663
521.345
0.359
%V
kA
From Bus
Real
94.20
65.69
39.68
95.33
48.81
0.00 361.654
677.534
490.412
297.663
0.000
0.359
0.00 1355.069
100.00
94.20
0.00 159.690
677.534
0.000

1.5 to 4 Cycle

kA
Imaginary

Imag.
/Real

kA Symm.
Magnitude

%V
From Bus

-3272.547
-452.658
-87.604
-43.832
-1.636
kA
Imaginary
-226.329
-87.604
-43.832
-78.738
0.000
-1.636
-452.658
-3193.809
-226.329
0.000

0.3
0.2
0.1
4.6
6.3
Imag.
/Real
999.9
0.3
0.1
4.6
0.2
0.3
999.9
20.0
0.3

1428.674
3313.814
498.175
300.873
1.675
kA Symm.
Magnitude
714.337
498.175
300.873
370.127
0.000
1.675
1428.674
3197.798
714.337
0.000

0.00 1355.069
490.412
297.663
521.345
0.359
%V
kA
Real
From Bus
94.20
65.69
39.68
95.33
48.81
0.00 361.654
677.534
490.412
297.663
0.000
0.359
0.00 1355.069
100.00
94.20
0.00 159.690
677.534
0.000

-226.329
-226.329

0.3
0.3

1/2 Cycle

kA
Real

kA
Imaginary

Imag.
/Real

kA Symm.
Magnitude

-3272.547
-452.658
-87.604
-43.832
-1.636
kA
Imaginary
-226.329
-87.604
-43.832
-78.738
0.000
-1.636
-452.658
-3193.809
-226.329
0.000

0.3
0.2
0.1
4.6
6.3
Imag.
/Real
999.9
0.3
0.1
4.6
0.2
0.3
999.9
20.0
0.3

1428.674
3313.814
498.175
300.873
1.675
kA Symm.
Magnitude
714.337
498.175
300.873
370.127
0.000
1.675
1428.674
3197.798
714.337
0.000

1.5 to 4 Cycle

94.20
94.20

677.534
677.534

-226.329
-226.329

0.3
0.3

714.337
714.337

Bus7 Ratio = 0.04


Bus6
0.00
0.000
0.000
999.9
0.000
NACD
1.00current contribution
Indicates a fault
* #Bus4
Bus6from a three-winding transformer 0.00 677.534
-226.329
0.3
714.337
*Bus11
Indicates a fault current through aBus5
tie circuit breaker
94.20 677.534
-226.329
0.3
714.337
Indicates a fault current contribution
a three-winding transformer 0.00 677.534
* #If
Bus6
Bus5
Bus5from
Bus6
-226.329
0.3
714.337
busaisfault
involved
loops formed
by protection
* faulted
Indicates
currentinthrough
a tie circuit
breaker devices, the short-circuit contributions through these PDs will not be reported.

0.00
0.00
94.20
0.00

0.000
677.534
677.534
677.534

0.000
-226.329
-226.329
-226.329

999.9
0.3
0.3
0.3

0.000
714.337
714.337
714.337

faulted bus is involved in loops formed


these PDs will
reported.
* If
Bus6
Bus4 by protection devices, the short-circuit
0.00contributions
677.534 through
-226.329
0.3not be714.337
NACD Ratio = 1.00
* Bus5
Bus6
0.00 677.534
-226.329
0.3
714.337
# Indicates a fault current contribution from a three-winding transformer
* Indicates a fault current through a tie circuit breaker
NACD Ratio = 1.00
If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.

0.00

677.534

-226.329

0.3

714.337

0.00

677.534

-226.329

0.3

714.337

94.20
94.20

677.534
677.534

714.337
714.337

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.

You might also like