30000 Tons per Year Multi-function fertilizer equipments line

No

Product Name

Electronic
scale

Screw conveyor

Specification and Model

belt Model:B650,Length of the


belt=2m,Power=0.75kw3
400X2000mm,Power=2.2x2
3t

Feed
hopper, 1600x1600mmx4 sets;
Protective net
900x900mmx2 sets;
5t
Model:FLS60
Cage grinder(mill)
Power=15kw+11kw,Weight=2.8t
Model:B650
Total Length of 11 sets Belt=157.5m
Belt
conveyor
Speed=0.8m/s
1-11#
Total Power of 11 sets belt
conveyor=48.5kw

Set
s
3
2

11

Double
mixer

shaft Model:WJ500,Power=15kw,Weight=
2t

Drum granulator

Rotary dryer 1#

Rotary dryer 2#
Rotary screen 1#

10
11

12

Vertical grinder

Rotary cooler

Rotary screen 2#
13
14

Coating machine

Model:15006000mm
reducer is ZQ400
Power=11kw Weight=11t

Speed
1

HG180018000mm
Style of speed reducer is ZQ650
Power=22kw ,Weight=27t

HG180018000mm
Style of speed reducer is ZQ650
Power=22kw,Weight=26t

15005000mm
Speed reducer is ZQ400
Power=11kw. Weight= 5t
Model:LF600
Power=18.5kw ,Weight=0.7t
HL120012000mm
Style of speed reducer is ZQ400
Power=11kw Weight=13.5t
12005000mm
Speed reducer is ZQ350
Power=5.5kw. Weight=2.6t
Model:TM1000X4000,speed reducer
is ZQ350,Power=5.5kw,Weight=5t

.
1
1

15

Stock bin

2m
1t

The material is Q235B carbon steel,=6mm

18

Induced draft fan

47210C,Flow=31237-43722m3/
h,total
press=1902-1505pa
Power=30kw,

It is working for the rotary dryer 1#

25

Steam boiler

2 ton steam boiler, Power=22kw

Including steam boilers installation fees, pipes


and valves.

26

The buyer should pay 80-90 USD per day per


worker, the travel expense, lodging and lift
charges will be responsible by the buyer.

Installation fees

Total Factory Price


FOB
QINGDAO
PROT,CHINA
CIF Cat Lai Port, Ho
Chi Minh, Vietnam

power

354.1 kw

352,750+13000(land
freight)=365,750USD
365,750+12000(ocean
freight)=377,750 USD

Its about twelve 40 feet open top containers

REMARK:
1.Manufacturing time:45-50 days after receiving the deposit.
2. Delivery time: 15-20 working days
3. Time of the installation, training and Trial production: 40-50 working days to install, commissioning and other
things.
4.Payment terms 100% by L/C ,30% of the total amount as deposit in advance after contract,50% of the total
amount will be paid after shipping documents, the last 20% of the total amount will be paid after installation and
commissioning.


Tai An Li Feng Chemical Equipments Co.,Ltd
5. Quantity of our technicians: 4-6 technicians. (Please look for some local workers, welding equipment and
Lifting equipments to assist our technicians to install the fertilizer machines.)
6. Daily salary of the technicians: USD 80 Per Working Day per person. And the flight tickets, lodging and
accommodation fees will be borne by the buyer.