Professional Documents
Culture Documents
Coordinate with other MEP services layouts and submit the coordinated
layout for review / approval.
Submit the cable tray sizing schedules with necessary calculation tables
separately for review / approval. Ensure to not to exceed the cable space
occupancy as specified.
Cleary identify the segregated distribution domain for all the floor DBs in the
layout.
Indicate all the relevant installation / sectional details for the electrical
outlets / equipment etc.
Indicate the dimensional reference for all the electrical points / outlets /
panels etc. w.r.t. nearby structural columns / walls etc.