You are on page 1of 2

MSETCL INFRASTRUCTURE as on 31.12.

2015

Sr No

F.Y.

Transmission
Losses

1
2
3
4
5
6

2010-11
2011-12
2012-13
2013-14
2014-15
2015-16

(%)
4.31
4.25
1.12
4.09
3.89
3.95

No of
Substations

Total
Transformation
Capacity

EHV Line
Length

Transmission System
Availability of EHV
AC System

(Nos.)
536
559
584
608
609
615

(MVA)
82619.5
89178.5
99716.5
103602.5
105112
106817

(CKM)
38068
39871.29
41390
42578.25
41591.362
42503

(%)
99.68
99.72
99.71
99.72
99.73
99.70

Voltage Level

EHV
Substation
(Nos.)

Transformation
Capacity
(MVA)

EHV LINES
(CKT KM.)

500 kV HVDC
2
3582
1504
400 kV
27
22395
7468.36
220 kV
202
48047.5
14587.64
132 kV
299
26401.5
13312.84
110 kV
35
2280
1738.25
100 kV
38
2628
697.15
66 kV
11
833
683.5
Total
614
106167
39991.74
This information is based on available data in SAP upto 31st Dec 2015.