Material Submittal BMS cables

Approved As Noted
Submittal comments:
The Contractor have indicated the type and size for the proposed BMS
system installation. However the same shall be provided as per the
specialist detailed design to offer a complete well coordinated BMS system
as specified.
Provide LSF sheathed and plenum rated cable as specified.
The specialist shall advise and provide appropriate containment with
adequate spacing etc. to achieve the EMI within the acceptable limit.
The storage, handling and installation shall be carried out strictly as per
manufacturers recommendation.
The complete cabling and accessories shall be from the single approved
manufacturer only.
The certificate of origin shall be submitted along with the delivery of
material at site.
This approval is for the BMS system cabling only. The Contractor shall
coordinate with the supplier of the approved BMS System, with respect to
compatibility / different communication protocols involved etc., and it is
the sole responsibility of the Contractor to provide the fully & correctly
functioning BMS system as specified.