Professional Documents
Culture Documents
PP Cert1 - 20
PP Cert1 - 20
b) Master recipes
c) Resources
d) Production/resource tools
e) Production versions
06. Which of the following organizational units does the manufacturing, planning,
and execution process use?
Note: There are 2 correct answers to this question.
a) Storage Location
b) Sales Area
c) Purchase Organization
d) Plant
07. You want to enhance the system statuses of a production order with user
statuses.
How do you do this?
Note: Please choose the correct answer.
a) Define the user statuses in the order type-dependent parameters.
b) Define a status profile in Customizing and assign it to the production scheduling profile.
c) Define a status profile in Customizing and assign it to the order type.
d) Define the user statuses in the Customizing table of the system statuses.
08. You enter a new BOM (Bill of Materials) in SAP ECC but forget to enter a plant
reference.
Which of the following statements describes what happens when you try to save
it?
Note: Please choose the correct answer.
a) When saving the BOM, a group BOM is created which can, under certain conditions, be
assigned to a plant later.
b) When saving the BOM, a dialog box appears prompting the user to enter a plant.
c) When saving the BOM, an error message appears stating that it is not possible to save a
BOM without a plant reference.
d) When saving the BOM, a warning message appears. In the corresponding dialog box, it is
possible to create a plant-specific engineering BOM.
09. You want to use the different options for planning in SAP ECC.
What is the correct sequence of the planning procedures?
Note: Please choose the correct answer.
a) Sales and operations planning -> Demand management -> Long-term planning ->
Material requirements planning -> Capacity planning
b) Demand management -> Sales and operations planning -> Capacity planning -> Longterm planning -> Material requirements planning
c) Material requirements planning -> Demand management -> Sales and operations
planning -> Long-term planning -> Capacity planning
d) Long-term planning -> Sales and operations planning -> Demand management ->
Material requirements planning -> Capacity planning
10. In the SAP ECC system, you interpret the result of a routing schedule.
When scheduling a routing in the SAP ECC system which of the following time
elements are interoperation times?
Note: There are 2 correct answers to this question.
a) Safety time
b) Floats before and after production
c) Processing time
d) Move time
11. Which activity can trigger an automatic availability check for the components
of a production order?
Note: Please choose the correct answer.
a) Material staging
b) Order rescheduling
c) Order release
d) Goods receipt for a missing part
12. During the implementation of SAP ECC material requirements planning, the
project team defines MRP controller numbers in Customizing under the entry
"Define MRP Controller" that can be assigned to the planners responsible for the
material.
Which of the following statements are correct concerning these MRP controllers?
Note: There are 2 correct answers to this question.
a) The MRP controller number is a central selection
b) A planner responsible for a material can have multiple MRP controller numbers.
c) In multilevel single-item planning, materials are selected using the MRP controller
number.
d) The MRP controller number is assigned using the production version.
13. Which of the following scheduling types can only be used in capacity planning?
Note: Please choose the correct answer.
a) Midpoint
b) Forward
c) Only capacity requirements
d) Backward
14. The company you are advising uses a plant data collection system from
company XYZ and would like to distribute production orders to the terminals on
this system and enter feedback using these terminals.
Which integration possibilities would you recommend so that as little work as
possible is required for the customer to implement this?
Note: Please choose the correct answer.
Solutions:
QUESTION: 01
QUESTION: 02
QUESTION: 03
QUESTION: 04
QUESTION: 05
Answer: a, d, e
Answer: a
Answer: b, d
Answer: b, d, e
Answer: b, c, e
QUESTION: 06
QUESTION: 07
QUESTION: 08
QUESTION: 09
QUESTION: 10
Answer: a, d
Answer: c
Answer: a
Answer: a
Answer: b, d
QUESTION: 11
QUESTION: 12
QUESTION: 13
QUESTION: 14
QUESTION: 15
Answer: c
Answer: a, b
Answer: a
Answer: b
Answer: c
QUESTION: 16
QUESTION: 17
QUESTION: 18
QUESTION: 19
QUESTION: 20
Answer: a, c, e
Answer: b
Answer: a, b
Answer: a, d, e
Answer: b, e