Professional Documents
Culture Documents
go to expense log
12
10
This shape represents a slicer. Slicers are supported in Excel 2010 or later.
subcategory
category
date
If the shape was modified in an earlier version of Excel, or if the workbook was
saved in Excel 2003 or earlier, the slicer cannot be used.
expense log
date
category
go to dashboard
subcategory
Page 2 of 3
amount
note
main categories
subcategories
go to expense log
category name
Main Materials
Plant & Machaneries
Main Material s
Authority fees
Insurance
Subcontract Works
Safety Materials
Authority fees
132kV Cables
Excavators
DM Planning
Grease
LC
HDD Works
Safety Cones
JCB
Typing Charges
UpVC -160mm
Installation Supervision
Insurance
FO Cable
Shovel
Other Fees
Subcontract Works
FO Accessories
Bobcat
Safety Materials
LHS Cable
Generator
Troughs
Engineers Car
3Ton Tipper
Low bed trailer
Flat Bed Trailer
Hiab
20 Ton Tipper
Wrench Machine
Safety Barriers
Installation
Tiger Tape
Soil Investigation
Safety Nets
Fire extinguisher