You are on page 1of 2

Laporan Kerja Praktik di PT.

Nippon Shokubai Indonesia


Daftar ISI

DAFTAR ISI
BAB IV SARANA PENUNJANG
4.1. Water Treatment Plant
4.1.1. PengolahanEkstermal
4.1.2. Pengolahan Internal
4.1.3. Industrial Water
4.1.4. Filtered Water
4.1.4.1.Dual Filter
4.1.4.2.Proses Filter Water
4.1.4.3.Operasidalam filtration Unit
4.1.4.4.Proses Service dalam filtration unit
4.1.5. Polished Water
4.1.5.1.Service
4.1.5.2.Regenerasi
4.1.5.3.Regenerasi Backwash Process
4.1.6. Deaerator.
4.1.6.1.Deaerator UT-1084
4.1.6.2.Deaerator AT-2084
4.2. Steam Plant
4.2.1. Steam.
4.2.2. Condensate
4.2.2.1.Condensate Recovery Process
4.2.3. Boiler Unit.
4.2.4. Boiler Feed Water Unit.
4.2.5. Waste Heat Boiler (WHB) Unit
4.3. Electric Power Plant.
4.3.1. Listrik.
4.3.2. Co-Generation Turbine.
4.3.2.1.Gas Turbin Generator
4.3.2.2.Heat Recovery Steam Generation
4.4. Alkali Sistem.
4.5. Gas Unit
4.5.1. Instrument Air (IA )dan Process Air (PA).
4.5.2. Nitrogen (N2)
4.5.3. Oksigen (O2)
4.5.4. Mix Gas (MG)
4.6. BahanBakar (Fuel)
4.6.1. Fuel Oil.
4.6.2. Natural Gas.
4.7. Sea Water.
4.8. Cooling Water System
4.8.1. Close Cooling Water System (CCW)
4.8.2. Open Cooling Water System (OCW)
4.9. Brine Water
4.10.
Sssssssssssssss
4.11.
Sssssssssssssss
Prodi Teknik Kimia - ITI
Februari 2016

NurWulanFiany
NIM : 114.12.2022

Laporan Kerja Praktik di PT. Nippon Shokubai Indonesia


Daftar ISI
4.12.
4.13.

Ssssssssssssss
sssssssssssssss

Prodi Teknik Kimia - ITI


Februari 2016

NurWulanFiany
NIM : 114.12.2022

You might also like