Element '
D.COOK' is local reference in separated area of '
Grid split into 2 isolated areas
Calculating load flow...

1'

Start Newton-Raphson Algorithm...


itr= 1 / '
1' / 8.04e+000 / '
tw-gen' / 4.03e+000
itr= 2 / '
1' / 1.78e-001 / '
ee-hydro' / 5.60e-002
1' / 2.11e-004 / '
12-load' / 2.61e-005
itr= 3 / '
Newton-Raphson converged with 3 iterations.
Load flow calculation successful.
DIgSILENT
PowerFactory
14.0.520

Project:
Date:

Load Flow Calculation

5/28/2011
Total System Summary

AC Load Flow, balanced, positive sequence


Automatic Tap Adjust of Transformers
Consider Reactive Power Limits

Automatic Model Adaptation for Convergency


Max. Acceptable Load Flow Error for
Nodes
Model Equations

No
No

Total System Summary

Study Case: Study Case

No. of Substations
No. of 2-w Trfs.
No. of Loads

33
7
28

No. of Busbars
No. of 3-w Trfs.
No. of Shunts

Generation
External Infeed
Load P(U)
Load P(Un)
Load P(Un-U)
Motor Load
Grid Losses
Line Charging
Compensation ind.
Compensation cap.

=
=
=
=
=
=
=
=
=
=

203.50
8.38
206.50
206.50
0.00
0.00
5.38

MW
MW
MW
MW
MW
MW
MW

Installed Capacity
Spinning Reserve

=
=

419.60
216.10

MW
MW

Total Power Factor:


Generation
Load/Motor

=
=

0.93
0.99 / 0.00

-83.58
42.22
-25.00
-25.00
0.00
0.00
41.08
-0.00
0.00
-57.44

[-]
[-]

33
1
7
Mvar
Mvar
Mvar
Mvar
Mvar
Mvar
Mvar
Mvar
Mvar
Mvar

No. of Terminals
No. of syn. Machines
No. of SVS
219.99
43.04
208.01
208.01

MVA
MVA
MVA
MVA

0.00

MVA

No
1.00 kVA
0.10 %

Annex:
441
4
0

No. of Lines
No. of asyn.Machines

/ 1
31
0

DIgSILENT
PowerFactory
14.0.520
Load Flow Calculation

Grid: Grid

Total:

No
No

System Stage: Grid

0.00
0.00

Date:

5/28/2011

Complete System Report: Substations, Voltage Profiles, Grid Interchange

AC Load Flow, balanced, positive sequence


Automatic Tap Adjust of Transformers
Consider Reactive Power Limits

Volt. Generation
Level
[MW]/
[ ]
[Mvar]

Project:

Motor
Load
[MW]/
[Mvar]

Load
[MW]/
[Mvar]

0.00
0.00

0.00
0.00

Compensation
[MW]/
[Mvar]
0.00
0.00

Automatic Model Adaptation for Convergency


Max. Acceptable Load Flow Error for
Nodes
Model Equations
Study Case: Study Case

External
Infeed
[MW]/
[Mvar]
0.00
0.00

Interchange
to

No
1.00 kVA
0.10 %

Annex:

Power
Interchange
[MW]/
[Mvar]
0.00
0.00

/ 1

Total
Losses
[MW]/
[Mvar]

Load
Losses
[MW]/
[Mvar]

Noload
Losses
[MW]/
[Mvar]

0.00
0.00

0.00
0.00

0.00
0.00

DIgSILENT
PowerFactory
14.0.520
Load Flow Calculation

Date:

5/28/2011

Complete System Report: Substations, Voltage Profiles, Grid Interchange

AC Load Flow, balanced, positive sequence


Automatic Tap Adjust of Transformers
Consider Reactive Power Limits

Grid: USA-DESIGN

Project:

System Stage: USA-DESIGN

rated
Voltage
Bus-voltage
[kV] [p.u.]
[kV]
[deg]

Automatic Model Adaptation for Convergency


Max. Acceptable Load Flow Error for
Nodes
Model Equations

No
No

Study Case: Study Case

No
1.00 kVA
0.10 %

Annex:

Active Reactive Power


Power
Power
Factor Current Loading
[MW]
[Mvar]
[-]
[kA]
[%]

/ 2

Additional Data

14
14
Cub_1
Cub_1
Cub_1
Cub_1
Cub_1

34.50
/Lod
/Lne
/Lne
/Lne
/Tr2

1.04
35.75
14-load
14-19
14-20
14-21
2-14

-1.84

15
Cub_1
Cub_1
Cub_1

34.50
/Lne
/Lne
/Tr2

1.03
35.59
15-18
15-22
4-15

-5.74

17
Cub_1
Cub_1
Cub_1

34.50
/Lne
/Lne
/Tr2

1.04
35.72
17-26
17-27
8-17

-5.00

18
Cub_1
Cub_1
Cub_1
Cub_1
Cub_1
Cub_1
Cub_1

34.50
/Lod
/Lod
/Shnt
/Sym
/Lne
/Lne
/Lne

1.03
35.46
18-load
syn.conden
ee-cap
ee-hydro
15-18
18-30
18-31
Total
Load:

-6.17

17.00
6.18
6.93
16.60
-46.71

44.00
1.68
1.84
1.91
-49.43

0.36
0.96
0.97
0.99
-0.69

0.76
0.10
0.12
0.27
1.10

22.08
24.71
44.79
43.07

Pl0:
Pv:
Pv:
Pv:
Tap:

20.53
59.54
-80.07

3.50
6.00
-9.50

0.99
0.99
-0.99

0.34
0.97
1.31

20.19
58.00
68.39

Pv:
Pv:
Tap:

4.14
42.12
-46.26

6.45
3.53
-9.97

0.54
1.00
-0.98

0.12
0.68
0.76

26.43
40.82
47.99

21.00
-0.00
-0.00
3.50
-20.49
-9.85
12.84

5.00
-8.00
-12.68
-0.78
-3.33
7.46
10.78

0.97
-0.00
-0.00
0.98
-0.99
-0.80
0.77

0.35
0.13
0.21
0.06
0.34
0.20
0.27

21.00

-3.00

17.00
19.11
22.98
78.01
5.00

MW
kW
kW
kW

Ql0: 44.00 Mvar


cLod: 0.00 Mvar L:
cLod: 0.00 Mvar L:
cLod: 0.00 Mvar L:
Min:
-10
Max:

1.00 km
1.00 km
1.00 km
10

48.92 kW
656.03 kW
5.00

cLod:
cLod:
Min:

0.00 Mvar L:
0.00 Mvar L:
-10
Max:

1.00 km
1.00 km
10

Pv:
Pv:
Tap:

27.22 kW
83.32 kW
5.00

cLod:
cLod:
Min:

0.00 Mvar L:
0.00 Mvar L:
-10
Max:

1.00 km
1.00 km
10

Pl0:
Pl0:

21.00 MW
0.00 MW

Ql0:
Ql0:

Typ:
Pv:
Pv:
Pv:

PV
48.92 kW
37.57 kW
61.96 kW

cLod:
cLod:
cLod:

15

17

18

89.62
20.19
28.62
29.12

5.00 Mvar
-8.00 Mvar
0.00 Mvar L:
0.00 Mvar L:
0.00 Mvar L:

1.00 km
1.00 km
1.00 km

Grid: USA-DESIGN

System Stage: USA-DESIGN

Study Case: Study Case

Annex:

/ 3

rated
Voltage
Bus-voltage
[kV] [p.u.]
[kV]
[deg]

Active Reactive Power


Power
Power
Factor Current Loading
[MW]
[Mvar]
[-]
[kA]
[%]

19
Cub_1
Cub_1

34.50
/Lne
/Lne

1.03
35.58
14-19
19-20

-2.20
-6.16
6.16

-1.63
1.63

-0.97
0.97

0.10
0.10

22.08
22.08

Pv:
Pv:

19.11 kW
1.15 kW

cLod:
cLod:

0.00 Mvar L:
0.00 Mvar L:

1.00 km
1.00 km

20
Cub_1
Cub_1
Cub_1
Cub_1

34.50
/Lod
/Lne
/Lne
/Lne

1.03
35.57
20-load
14-20
19-20
21-20

-2.22
7.50
-6.91
-6.16
5.57

4.50
-1.79
-1.63
-1.08

0.86
-0.97
-0.97
0.98

0.14
0.12
0.10
0.09

24.71
22.08
15.28

Pl0:
Pv:
Pv:
Pv:

7.50
22.98
1.15
9.08

MW
kW
kW
kW

Ql0:
cLod:
cLod:
cLod:

4.50
0.00
0.00
0.00

Mvar
Mvar L:
Mvar L:
Mvar L:

1.00 km
1.00 km
1.00 km

21
Cub_1
Cub_1
Cub_1
Cub_1

34.50
/Lod
/Lne
/Lne
/Lne

1.03
35.54
21-load
14-21
21-20
21-26

-2.46
11.00
-16.52
-5.56
11.08

3.50
-1.72
1.10
-2.88

0.95
-0.99
-0.98
0.97

0.19
0.27
0.09
0.19

44.79
15.28
39.70

Pl0:
Pv:
Pv:
Pv:

11.00
78.01
9.08
197.73

MW
kW
kW
kW

Ql0:
cLod:
cLod:
cLod:

3.50
0.00
0.00
0.00

Mvar
Mvar L:
Mvar L:
Mvar L:

1.00 km
1.00 km
1.00 km

22
Cub_1
Cub_1
Cub_1

34.50
/Lod
/Lne
/Lne

1.02
35.10
22-load
15-22
23-22

-7.57
6.50
-58.88
52.38

-4.50
-4.03
8.53

0.82
-1.00
0.99

0.13
0.97
0.87

58.00
52.16

Pl0:
Pv:
Pv:

6.50 MW
656.03 kW
353.65 kW

Ql0: -4.50 Mvar


cLod: 0.00 Mvar L:
cLod: 0.00 Mvar L:

1.00 km
1.00 km

23
Cub_1
Cub_1
Cub_1
Cub_1

34.50
/Lod
/Shnt
/Lne
/Lne

1.01
34.76
-8.68
23-load
23.00
Shunt/Filter(2)
-0.00
23-22
-52.03
23-24
29.03

7.50
-8.12
-7.44
8.07

0.95
-0.00
-0.99
0.96

0.40
0.13
0.87
0.50

Pl0:

23.00 MW

52.16
53.39

Pv:
Pv:

24
Cub_1
Cub_1

34.50
/Lod
/Lne

1.01
34.71
24-load
23-24

29.00
-29.00

8.00
-8.00

0.96
-0.96

0.50
0.50

53.39

25
Cub_1
Cub_1
Cub_1

12.00
/Lod
/Shnt
/Tr2

1.01
12.16
-6.91
25-load
14.00
Shunt/Filter(1)
-0.00
4-25
-14.00

5.00
-10.26
5.26

0.94
-0.00
-0.94

0.71
0.49
0.71

Additional Data

19

20

21

22

23
Ql0:

7.50 Mvar

353.65 kW
26.82 kW

cLod:
cLod:

0.00 Mvar L:
0.00 Mvar L:

1.00 km
1.00 km

Pl0:
Pv:

29.00 MW
26.82 kW

Ql0:
cLod:

8.00 Mvar
0.00 Mvar L:

1.00 km

Pl0:

14.00 MW

Ql0:

5.00 Mvar

24
-8.79

25

29.53

Tap:

0.00

Min:

Max:

Grid: USA-DESIGN

System Stage: USA-DESIGN

rated
Voltage
Bus-voltage
[kV] [p.u.]
[kV]
[deg]

Study Case: Study Case

Annex:

Active Reactive Power


Power
Power
Factor Current Loading
[MW]
[Mvar]
[-]
[kA]
[%]

/ 4

Additional Data

26
26
Cub_1
Cub_1
Cub_1

34.50
/Lod
/Lne
/Lne

1.03
35.37
26-load
17-26
21-26

-5.11

27
Cub_1
Cub_1
Cub_1

34.50
/Lod
/Lne
/Lne

1.03
35.64
27-load
17-27
27-28

-5.16

28
Cub_1
Cub_1
Cub_1

34.50
/Lod
/Lne
/Lne

1.03
35.57
28-load
27-28
28-30

-5.29

29
Cub_1
Cub_1

12.00
/Lod
/Tr2

0.97
11.62
29-load
8-29

-8.68

30
Cub_1
Cub_1
Cub_1

34.50
/Lod
/Lne
/Lne

1.03
35.39
30-load
18-30
28-30

-5.74

31
Cub_1
Cub_1
Cub_1

34.50
/Lod
/Lne
/Lne

1.02
35.15
31-load
18-31
31-32

-6.44

32
Cub_1
Cub_1
Cub_1

34.50
/Lod
/Lne
/Lne

1.01
34.90
32-load
16-32
31-32

-5.90

15.00
-4.11
-10.89

3.00
-6.38
3.38

0.98
-0.54
-0.96

0.25
0.12
0.19

26.43
39.70

Pl0:
Pv:
Pv:

15.00 MW
27.22 kW
197.73 kW

6.00
-42.03
36.03

-2.00
-3.40
5.40

0.95
-1.00
0.99

0.10
0.68
0.59

40.82
35.27

Pl0:
Pv:
Pv:

15.00
-35.97
20.97

2.50
-5.31
2.81

0.99
-0.99
0.99

0.25
0.59
0.34

35.27
41.05

25.00
-25.00

5.00
-5.00

0.98
-0.98

1.27
1.27

11.00
9.89
-20.89

10.00
-7.37
-2.63

0.74
0.80
-0.99

17.00
-12.78
-4.22

3.00
-10.62
7.62

7.00
-11.26
4.26

1.50
6.03
-7.53

Ql0:
cLod:
cLod:

3.00 Mvar
0.00 Mvar L:
0.00 Mvar L:

1.00 km
1.00 km

6.00 MW
83.32 kW
62.20 kW

Ql0: -2.00 Mvar


cLod: 0.00 Mvar L:
cLod: 0.00 Mvar L:

1.00 km
1.00 km

Pl0:
Pv:
Pv:

15.00 MW
62.20 kW
80.03 kW

Ql0:
cLod:
cLod:

2.50 Mvar
0.00 Mvar L:
0.00 Mvar L:

1.00 km
1.00 km

52.68

Pl0:
Tap:

25.00 MW
0.00

Ql0:
Min:

5.00 Mvar
0
Max:

0.24
0.20
0.34

28.62
41.05

Pl0:
Pv:
Pv:

11.00 MW
37.57 kW
80.03 kW

Ql0: 10.00 Mvar


cLod: 0.00 Mvar L:
cLod: 0.00 Mvar L:

1.00 km
1.00 km

0.98
-0.77
-0.48

0.28
0.27
0.14

29.12
30.55

Pl0:
Pv:
Pv:

17.00 MW
61.96 kW
40.24 kW

Ql0:
cLod:
cLod:

3.00 Mvar
0.00 Mvar L:
0.00 Mvar L:

1.00 km
1.00 km

0.98
-0.88
0.49

0.12
0.21
0.14

35.08
30.55

Pl0:
Pv:
Pv:

7.00 MW
73.37 kW
40.24 kW

Ql0:
cLod:
cLod:

1.50 Mvar
0.00 Mvar L:
0.00 Mvar L:

1.00 km
1.00 km

27

28

29
0

30

31

32

Grid: USA-DESIGN

System Stage: USA-DESIGN

rated
Voltage
Bus-voltage
[kV] [p.u.]
[kV]
[deg]

Study Case: Study Case

Annex:

Active Reactive Power


Power
Power
Factor Current Loading
[MW]
[Mvar]
[-]
[kA]
[%]

/ 5

Additional Data

33
33
Cub_1
Cub_1
Cub_1

34.50
/Lod
/Shnt
/Lne

1.00
34.44
-6.80
33-load
12.50
Shunt/Filter(4)
0.00
16-33
-12.50

0.50
-3.99
3.49

1.00
0.00
-0.96

0.21
0.07
0.22

Pl0:
81.23

Pv:

12.50 MW

Ql0:

0.50 Mvar

253.44 kW

cLod:

0.00 Mvar L:

1.00 km

8.00 Mvar
0.00 Mvar L:
0.00 Mvar L:

1.00 km
1.00 km

Dunlop
7
138.00
Cub_1 /Lod
Cub_1 /Lne
Cub_1 /Lne

0.99 137.03
dun-load
du-con
ee-dun

13.00
-75.37
62.37

8.00
-35.34
27.34

0.85
-0.91
0.92

0.06
0.35
0.29

34.22
27.99

Pl0:
Pv:
Pv:

13.00 MW
217.90 kW
150.53 kW

Ql0:
cLod:
cLod:

East Elkhart
6
138.00
Cub_1 /Lod
Cub_1 /Sym
Cub_1 /Lne
Cub_1 /Lne
Cub_1 /Tr3

0.99 135.96
-2.76
General Load
19.00
Synchronous Machin
0.00
ee-dun
-62.22
north-ee
14.13
3-Winding Transfor
29.09

16.00
-43.99
-26.35
-21.89
-11.74

0.76
0.00
-0.92
0.54
0.93

0.11
0.19
0.29
0.11
0.13

Pl0:
Typ:
Pv:
Pv:
Tap:

19.00 MW
PV
150.53 kW
11.19 kW
-5.00

Ql0:

29.32
27.99
10.80
73.20

cLod:
cLod:
Min:

0.00 Mvar L:
0.00 Mvar L:
-5
Max:

1.00 km
1.00 km
5

Northland
5
138.00
Cub_1 /Lod
Cub_1 /Lne
Cub_1 /Lne

0.99 136.15
-2.84
General Load(2)
10.00
north-ee
-14.12
osolo-north
4.12

3.00
21.95
-24.95

0.96
-0.54
0.16

0.04
0.11
0.11

10.80
10.46

Pl0:
Pv:
Pv:

10.00 MW
11.19 kW
17.08 kW

Ql0:
cLod:
cLod:

3.00 Mvar
0.00 Mvar L:
0.00 Mvar L:

1.00 km
1.00 km

1.01
12.09 -10.87
12-load
30.00
Shunt/Filter
-0.00
Shunt/Filter(3)
0.00
3-12
-30.00
Total
Compensation:

10.00
-10.15
-4.06
4.21

0.95
-0.00
0.00
-0.99

1.51
0.48
0.19
1.45

Pl0:

30.00 MW

Ql0:

60.13

Tap:

0.00

0.96
0.93
-0.96
1.00

0.04
0.41
0.57
0.13

49.66
69.00
60.13

Pl0:
Pv:
Pv:
Tap:

9.00 MW
378.96 kW
1280.15 kW
0.00

cle-12
12
Cub_1
Cub_1
Cub_1
Cub_1

12.00
/Lod
/Shnt
/Shnt
/Tr2

cleveland
3(1)
138.00
Cub_1 /Lod
Cub_1 /Lne
Cub_1 /Lne
Cub_1 /Tr2

1.00 137.70
cle-load
cl-osolo
tb-cle
3-12

-2.04

Min:

16.00 Mvar

10.00 Mvar
0

Max:

-14.21

-2.29
9.00
90.35
-129.35
30.00

2.50
35.65
-38.46
0.31

Ql0:
cLod:
cLod:
Min:

2.50 Mvar
0.00 Mvar L:
0.00 Mvar L:
0
Max:

1.00 km
1.00 km
0

Grid: USA-DESIGN

System Stage: USA-DESIGN

rated
Voltage
Bus-voltage
[kV] [p.u.]
[kV]
[deg]
concord
8
138.00
Cub_1 /Lod
Cub_1 /Lne
Cub_1 /Lne
Cub_1 /Lne
Cub_1 /Tr2
Cub_1 /Tr2

1.00 138.30
con-load
Line
co-lack
du-con
8-17
8-29

-1.28

dcook
1(1)
345.00
Cub_1 /Xnet
Cub_1 /Tr2

1.00 345.00
D.COOK
1-2

0.00

dragon
11
138.00
Cub_1 /Lod
Cub_1 /Lne
Cub_1 /Lne
Cub_1 /Lne

1.01 139.41
Dr-lo
Line
dra-tb
ire-dra

-0.60

ee-69
13
Cub_1
Cub_1

69.00
/Lod
/Tr3

0.99
68.15
-3.37
13-load
3-Winding Transfor

ee16
16
Cub_1
Cub_1
Cub_1
Cub_1

34.50
/Shnt
/Lne
/Lne
/Tr3

ireland
10
138.00
Cub_1 /Lod
Cub_1 /Lne
Cub_1 /Lne

Study Case: Study Case

Annex:

Active Reactive Power


Power
Power
Factor Current Loading
[MW]
[Mvar]
[-]
[kA]
[%]

/ 6

Additional Data

28.00
-68.49
-106.35
75.59
46.26
25.00

-12.00
-31.02
-15.29
36.68
13.16
8.47

0.92
-0.91
-0.99
0.90
0.96
0.95

0.13
0.31
0.45
0.35
0.20
0.11

30.62
66.18
34.22
47.99
52.68

Pl0:
Pv:
Pv:
Pv:
Tap:
Tap:

8.38
8.38

42.22
42.22

0.19
0.19

0.07
0.07

10.76

Sk": 10000.00 MVA


Tap:
6.00

Min:

51.00
68.67
-80.63
-39.04

-6.00
32.09
-43.11
17.02

0.99
0.91
-0.88
-0.92

0.21
0.31
0.38
0.18

30.62
50.28
23.42

Pl0:
Pv:
Pv:
Pv:

Ql0: -6.00 Mvar


cLod: 0.00 Mvar L:
cLod: 0.00 Mvar L:
cLod: 0.00 Mvar L:

5.00
-5.00

4.00
-4.00

0.78
-0.78

0.05
0.05

73.20

Pl0:
Tap:

5.00 MW
-5.00

1.01
34.87
-5.08
Shunt/Filter(5)
-0.00
16-32
11.34
16-33
12.75
3-Winding Transfor -24.09

-8.17
-5.86
-3.15
17.18

-0.00
0.89
0.97
-0.81

0.14
0.21
0.22
0.49

35.08
81.23
73.20

Pv:
Pv:
Tap:

6.00
-16.89
10.89

0.95
0.92
-0.98

0.08
0.18
0.24

23.42
32.51

Pl0:
Pv:
Pv:

1.01 139.33
ire-lo
ire-dra
jack-ire

28.00
174.51
505.80
217.90
5.00
0.00

51.00
174.51
409.59
31.99

MW
kW
kW
kW

MW
kW
kW
kW

Ql0: -12.00
cLod: 0.00
cLod: 0.00
cLod: 0.00
Min:
-10
Min:
0

-6

Mvar
Mvar L:
Mvar L:
Mvar L:
Max:
Max:

Max:

1.00 km
1.00 km
1.00 km
10
0

1.00 km
1.00 km
1.00 km

Ql0:
Min:

4.00 Mvar
-5
Max:

73.37 kW
253.44 kW
-5.00

cLod:
cLod:
Min:

0.00 Mvar L:
0.00 Mvar L:
-5
Max:

1.00 km
1.00 km
5

19.00 MW
31.99 kW
71.91 kW

Ql0:
cLod:
cLod:

6.00 Mvar
0.00 Mvar L:
0.00 Mvar L:

1.00 km
1.00 km

-0.42
19.00
39.07
-58.07

Grid: USA-DESIGN

System Stage: USA-DESIGN

rated
Voltage
Bus-voltage
[kV] [p.u.]
[kV]
[deg]

Study Case: Study Case

Annex:

Active Reactive Power


Power
Power
Factor Current Loading
[MW]
[Mvar]
[-]
[kA]
[%]

/ 7

Additional Data

jackson
9
138.00
Cub_1 /Lod
Cub_1 /Sym
Cub_1 /Lne
Cub_1 /Lne

1.01 139.38
-0.14
jack-load
-165.00
Synchronous Machin
0.00
co-lack
106.86
jack-ire
58.14

-45.00
-38.07
17.54
-10.61

-0.96
0.00
0.99
0.98

0.71
0.16
0.45
0.24

38.07
66.18
32.51

Pl0:
Typ:
Pv:
Pv:

-165.00 MW
PV
505.80 kW
71.91 kW

cLod:
cLod:

0.00 Mvar L:
0.00 Mvar L:

1.00 km
1.00 km

osolo
4(1)
138.00
Cub_1 /Lne
Cub_1 /Lne
Cub_1 /Tr2
Cub_1 /Tr2

0.99 136.56
cl-osolo
osolo-north
4-15
4-25

-2.91
-89.97
-4.10
80.07
14.00

-34.39
25.02
13.54
-4.17

-0.93
-0.16
0.99
0.96

0.41
0.11
0.34
0.06

49.66
10.46
68.39
29.53

Pv:
Pv:
Tap:
Tap:

378.96 kW
17.08 kW
5.00
0.00

cLod:
cLod:
Min:
Min:

0.00 Mvar L:
0.00 Mvar L:
-10
Max:
0
Max:

1.00 km
1.00 km
10
0

twinbranch
2(1)
138.00
Cub_1 /Lod
Cub_1 /Sym
Cub_1 /Lne
Cub_1 /Lne
Cub_1 /Tr2
Cub_1 /Tr2

1.02 140.76
TW-load
tw-gen
dra-tb
tb-cle
1-2
2-14

-0.11
-50.00
200.00
81.04
130.63
-8.38
46.71

-100.00
-0.75
44.22
44.31
-41.79
52.52

-0.45
1.00
0.88
0.95
-0.20
0.66

0.46
0.82
0.38
0.57
0.17
0.29

83.33
50.28
69.00
10.76
43.07

Pl0:
Typ:
Pv:
Pv:
Tap:
Tap:

-50.00 MW
PV
409.59 kW
1280.15 kW
6.00
5.00

Ql0: -45.00 Mvar

Ql0:-100.00 Mvar
cLod:
cLod:
Min:
Min:

0.00 Mvar L:
0.00 Mvar L:
-6
Max:
-10
Max:

1.00 km
1.00 km
6
10

DIgSILENT
PowerFactory
14.0.520
Load Flow Calculation

System Stage: USA-DESIGN


rtd.V
[kV]

Bus - voltage
[p.u.]
[kV] [deg]

14
14

34.50

1.036

35.75

-1.84

15

34.50

1.032

35.59

-5.74

17

34.50

1.035

35.72

-5.00

18

34.50

1.028

35.46

-6.17

19

34.50

1.031

35.58

-2.20

20

34.50

1.031

35.57

-2.22

21

34.50

1.030

35.54

-2.46

22

34.50

1.018

35.10

-7.57

23

34.50

1.008

34.76

-8.68

24

34.50

1.006

34.71

-8.79

25

12.00

1.013

12.16

-6.91

26

34.50

1.025

35.37

-5.11

27

34.50

1.033

35.64

-5.16

28

34.50

1.031

35.57

-5.29

29

12.00

0.968

11.62

-8.68

30

34.50

1.026

35.39

-5.74

15
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Date:

5/28/2011

Complete System Report: Substations, Voltage Profiles, Grid Interchange

AC Load Flow, balanced, positive sequence


Automatic Tap Adjust of Transformers
Consider Reactive Power Limits

Grid: USA-DESIGN

Project:

No
No

Automatic Model Adaptation for Convergency


Max. Acceptable Load Flow Error for
Nodes
Model Equations
Study Case: Study Case
-10

-5

No
1.00 kVA
0.10 %

Annex:
Voltage - Deviation [%]
0
+5

/ 8
+10

Grid: USA-DESIGN

System Stage: USA-DESIGN


rtd.V
[kV]

Bus - voltage
[p.u.]
[kV] [deg]

31

34.50

1.019

35.15

-6.44

32

34.50

1.012

34.90

-5.90

34.50

0.998

34.44

-6.80

138.00

0.993

137.03

-2.04

138.00

0.985

135.96

-2.76

138.00

0.987

136.15

-2.84

12.00

1.008

138.00

0.998

137.70

-2.29

138.00

1.002

138.30

-1.28

345.00

1.000

345.00

0.00

138.00

1.010

139.41

-0.60

69.00

0.988

68.15

-3.37

34.50

1.011

34.87

-5.08

138.00

1.010

139.33

-0.42

138.00

1.010

139.38

-0.14

138.00

0.990

136.56

-2.91

138.00

1.020

140.76

-0.11

32
33
33
Dunlop
7
East Elkhart
6
Northland
5
cle-12
12
cleveland
3(1)
concord
8
dcook
1(1)
dragon
11
ee-69
13
ee16
16
ireland
10
jackson
9
osolo
4(1)
twinbranch
2(1)

12.09 -10.87

Study Case: Study Case


-10

-5

Annex:
Voltage - Deviation [%]
0
+5

/ 9
+10

DIgSILENT
PowerFactory
14.0.520
Load Flow Calculation

Grid: USA-DESIGN

12.00

0.00
0.00

No
No

3.50
-0.78

System Stage: USA-DESIGN


Motor
Load
[MW]/
[Mvar]

Load
[MW]/
[Mvar]

0.00
0.00

69.00
20.00

Compensation
[MW]/
[Mvar]
-0.00
-24.48

Study Case: Study Case

External
Infeed
[MW]/
[Mvar]

Interchange
to

0.00
0.00

198.50
78.50

-0.00
-32.96

0.00
0.00

5.00
4.00

0.00
0.00

138.00 kV
138.00

200.00
-82.80

0.00
0.00

-66.00
-127.50

0.00
0.00

34.50 kV
69.00 kV
345.00 kV

Annex:

/ 10
Noload
Losses
[MW]/
[Mvar]

-69.00
4.48

0.00
0.00
-0.00
9.08

0.00
0.00
-0.00
9.08

0.00
0.00
0.00
0.00

-10.75
8.52
-187.63
-59.35

2.13
5.41
0.00
0.51
-0.00
11.14

2.13
5.41
0.00
0.51
-0.00
11.14

0.00
0.00
0.00
0.00
0.00
0.00

10.75
-8.01
-16.01
3.80

0.00
0.00
0.00
0.51
0.00
0.18

0.00
0.00
0.00
0.51
0.00
0.18

0.00
0.00
0.00
0.00
0.00
0.00

69.00
4.60
187.63
70.49
16.01
-3.62
-8.38
-41.79

3.25
14.41
-0.00
9.08
-0.00
11.14
0.00
0.18
-0.00
0.43

3.25
14.41
-0.00
9.08
-0.00
11.14
0.00
0.18
-0.00
0.43

-0.00
-0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
12.00 kV

1.00 kVA
0.10 %

Load
Losses
[MW]/
[Mvar]

0.00
0.00
34.50 kV

No

Total
Losses
[MW]/
[Mvar]

0.00
0.00
138.00 kV

0.00
0.00

Power
Interchange
[MW]/
[Mvar]

0.00
0.00

69.00 kV

69.00

5/28/2011

Automatic Model Adaptation for Convergency


Max. Acceptable Load Flow Error for
Nodes
Model Equations

138.00 kV
34.50

Date:

Complete System Report: Substations, Voltage Profiles, Grid Interchange

AC Load Flow, balanced, positive sequence


Automatic Tap Adjust of Transformers
Consider Reactive Power Limits

Volt. Generation
Level
[MW]/
[kV]
[Mvar]

Project:

Grid: USA-DESIGN
Volt. Generation
Level
[MW]/
[kV]
[Mvar]
345.00

0.00
0.00

System Stage: USA-DESIGN


Motor
Load
[MW]/
[Mvar]

Load
[MW]/
[Mvar]

0.00
0.00

0.00
0.00

Compensation
[MW]/
[Mvar]
0.00
0.00

Study Case: Study Case

External
Infeed
[MW]/
[Mvar]

Interchange
to

203.50
-83.58

0.00
0.00

206.50
-25.00

-0.00
-57.44

Power
Interchange
[MW]/
[Mvar]

8.38
42.22

/ 11

Total
Losses
[MW]/
[Mvar]

Load
Losses
[MW]/
[Mvar]

Noload
Losses
[MW]/
[Mvar]

8.38
42.22

0.00
0.00
-0.00
0.43

0.00
0.00
-0.00
0.43

0.00
0.00
0.00
0.00

0.00
0.00

5.38
41.08

5.38
41.08

-0.00
-0.00

8.38
42.22
138.00 kV

Total:

Annex:

DIgSILENT
PowerFactory
14.0.520
Load Flow Calculation

5/28/2011

Automatic Model Adaptation for Convergency


Max. Acceptable Load Flow Error for
Nodes
Model Equations

No
No

Total System Summary

[MW]/
[Mvar]

Date:

Complete System Report: Substations, Voltage Profiles, Grid Interchange

AC Load Flow, balanced, positive sequence


Automatic Tap Adjust of Transformers
Consider Reactive Power Limits

Generation

Project:

Study Case: Study Case

Motor
Load
[MW]/
[Mvar]

Load
[MW]/
[Mvar]

Compensation
[MW]/
[Mvar]

External
Infeed
[MW]/
[Mvar]

Inter Area
Flow
[MW]/
[Mvar]

No
1.00 kVA
0.10 %

Annex:

/ 12

Total
Losses
[MW]/
[Mvar]

Load
Losses
[MW]/
[Mvar]

Noload
Losses
[MW]/
[Mvar]

\Demo\EE472-PR2-1526458\Network Model\Network Data\Grid


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

\Demo\EE472-PR2-1526458\Network Model\Network Data\USA-DESIGN


203.50
0.00
206.50
-0.00
8.38
-83.58
0.00
-25.00
-57.44
42.22

0.00
0.00

5.38
41.08

5.38
41.08

-0.00
-0.00

5.38
41.08

5.38
41.08

-0.00
-0.00

Total:
203.50
-83.58

0.00
0.00

206.50
-25.00

-0.00
-57.44

8.38
42.22