DI preston WANDROOK FOR REIN
igure 124
ery 1
=
~
1c. portion ofthe fotng i nota
Such conditions lad vo a neiient footing sine a port
contact with shevl A , endo BeeceiveyD
‘hen ¢« 16 bh Sd 4, are post nother wor the Footing,
omact with che oi ovr Fl gh shows in Figure 125.
ing aly
ars propose ot ae hath fig ily
7 hl eu in hw FT
PAU fom the coke cenetie
Yh ning. The central third is frequent
aga
‘ef e asthe km
uw
‘A column transite an asia ad N= 600
EN and 2 moment f= 78 kNm co the
footing, Determine de length ofthe foosng,
Tif che wid B= 29 and the maxim
permimible oil bearing capaciy 4 = 150
we
pure 126
rooriwas 215
Sournion
M78
Feeentcy loading, «= Mt = 78 95,
19 oan, «== Gg = 0-138
Subing 39 fr gn ation 12,
150 5 a 6x019)
Fr
Soking fr he ted gh
300 = 600% 1 + 6006 0.13,
Bo2x1-156-0
L=260m
se the derived vale of 2.6 m for Lin equation 12.1 a check o che sil easing
pressure and plo the inal dsibution,
on
. 2626x0113
4" Taal )
4,5 150 EDs
4-81 KP
12.4 Combined Footings and Strap Footings
In commer lings he ever cons are guy po de 0 o ad
teint te ulin hxndars mainte wef an ane tel Lod
‘Sri The clam ington tela bingeing ecleig od
eat high lens
Sing Pema icy RH? j
pews "howere e
‘combine the exterior and rm
net ran
fog wis age
fang The feng
Cael ne! ting
Situ porsiond
eevee eee
ProTech
Fe clot cnn
ta inert he
ace of of
Soing The sap he
feans Meee
impel whore
re 127 i