Professional Documents
Culture Documents
Consultant:
ALHARAY
1
1049
Haray
G+2
1373
Haray
G+1
507
Haray
G+1
1571
Haray
G+1
1524
Haray
G+1
1088
Haray
G+1
505
Haray
G+1
1214
Haray
G+1
822
Haray Ind
Ground
10
142
Haray Ind
Ground
11
465
Haray Ind
Ground
12
230
Haray Ind
Ground
13
819
Haray Ind
Ground
HAYAWA
304
Hayawa
G+2
272
Hayawa
G+2
504
Hayawa
G+1
Loulouea
801
Loulouea
G+1
490
Loulouea
Ground
993
Loulouea
G+1
Other Works
CW+Gate
Drainage + WS
Electrical
Alum.
Doors/Win.
Painting
Plastering
Blockworks
Structural
Prelim.
Type
Location
Plot#
PROJECT LIST
Consultant:
Loulouea
Ground
928
Loulouea
G+1
841
Loulouea
G+1
793+794 Loulouea
G+1
Other Works
24
CW+Gate
Drainage + WS
G+1
Electrical
Loulouea
Alum.
Doors/Win.
514
Painting
Plastering
G+1
Blockworks
Loulouea
Structural
797
Prelim.
Plot#
Type
Location
PROJECT LIST
Consultant:
MUDIFI
1
1030
Mudifi
G+1
889
Mudifi
Extension
737
Mudifi
G+1
1035
Mudifi
G+1
986/1
Mudifi
G+1
734
Mudifi
Extension
1058
Mudifi
Ground
741
Mudifi
Extension
1038
Mudifi
G+1
MUSALLA
340
Musalla
G+1
QADDISIYA
779
Qaddisiya
Extension
528
Qaddisiya
Ground
SHERIQQA
543
Sheriqqa
G+6
555
Sheriqqa
G+5
YARMOOK
648
Yarmook
G+1
ZUBARA
37
Other Works
CW+Gate
Drainage + WS
Electrical
Alum.
Doors/Win.
Painting
Plastering
Blockworks
Structural
Prelim.
Type
Location
Plot#
PROJECT LIST
Plot#
2
1506
Zubara
3
147/8
Zubara Ind Extension
G+1
Other Works
CW+Gate
Drainage + WS
Electrical
Alum.
Doors/Win.
Painting
Plastering
Blockworks
Structural
Prelim.
Type
Location
Consultant:
PROJECT LIST
Total
Percentage
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
Percentage
Total
Percentage
0
0
0
0
0
0
0
0
0
30-Apr
0
0
expenses
900 pau
ac repair
200
500 chard
bed
190
700 tonet
utang jhay
600
600 jeff
500 new
0
0
0
600 macoy
100 internet
3900 total
30-May
990
fewa+rent
total collec
11300
600 macoy
check
8750
900 pau
500 chard
expenses
390
2160
1080
700 tonet
600 jeff
300 new
100 internet
3700 total
600 macoy
3300
1200
4500
3510 balance
Total
Percentage
0
0
900 pau
129
500 chard
129
700 tonet
99
600 jeff
84
300 new
441
100 internet
242
3700 total
1
ALHARAY
10
11
12
13
HAYAWA
3
Loulouea
Other Works
CW+Gate
Drainage + WS
Electrical
Alum.
Doors/Win.
Painting
Plastering
Blockworks
Structural
Prelim.
Type
Location
Plot#
Consultant:
PROJECT LIST
9
Other Works
CW+Gate
Drainage + WS
Electrical
Alum.
Doors/Win.
Painting
Plastering
Blockworks
Structural
Prelim.
Type
Location
Plot#
Consultant:
PROJECT LIST
1
MUDIFI
9
MUSALLA
1
SHERIQQA
2
YARMOOK
Other Works
CW+Gate
Drainage + WS
Electrical
Alum.
Doors/Win.
Painting
Plastering
Blockworks
Structural
Prelim.
Type
Location
Plot#
Consultant:
PROJECT LIST
3
ZUBARA
Other Works
CW+Gate
Drainage + WS
Electrical
Alum.
Doors/Win.
Painting
Plastering
Blockworks
Structural
Prelim.
Type
Location
Plot#
Consultant:
PROJECT LIST
Total
Percentage
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
Percentage
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
Percentage
0
0
0
Total
Percentage
Consultant: DARONA
ENGINEERING CONSULTING
End Date:
Contractor:
rF
lr
Fl
r
8.0%
8.0%
Slab
1.5%
Parapet
5.0%
0.5%
1s
t
rF
lr
Fl
r
1s
t
rF
lr
Fl
r
Column
Outside
1.0%
Finishing
4.0%
4.0%
Ceramic Villa
1.0%
Outside
Stone
2.0%
2.0%
Ceramic
Bath
0.5%
2.0%
Bitumen
3.0%
2.0%
Cache Above
WP
3.5%
TOTAL
0.5%
1.0%
Interlock
8"
Interlock
6"
DONE
2.0%
2.5%
3.5%
8%
1.5%
PCC+RCC
1.5%
TB
Column +
Coping
Beam
Blockwork+P
lastering
1.0%
Kerbstone
1.0%
1.0%
Outside
steel stair
2.0%
0.5%
Clearing
2.0%
Painting
Drainage +
WS
11.0%
9.0%
8%
0.5%
0.5%
Inside Pipe
1.0%
1.0%
14%
Electrical
TOTAL
rF
lr
TOTAL
+G
Other
Works
4%
8.0%
2.5%
Below
Tiebam
Above Tie
Beam
Fl
r
12.0%
2.5%
1s
t
at
e
3.0%
DONE
1.0%
1.0%
1.0%
cw
1.0%
1.0%
3.0%
DONE
1st Coat
rF
lr
1.0%
20%
Inside
1.0%
1.0%
Fl
r
0.5%
1s
t
0.5%
Date:
1.0%
rF
lr
Primer
6%
Dur.:
20%
0.5%
Fl
r
0.5%
Blockworks
1s
t
6%
Plastering
1s
t
rF
lr
lr
1s
tF
Owner:
Plot # 462
Painting
Project Type:
ro
un
d
Starting Date:
6%
0.3%
0.3%
Conduit pipe
0.5%
0.5%
Wash Basin
Acces.
0.4%
0.4%
Ground Pipe
1.5%
1.5%
1.0%
Pipe Outside
0.6%
0.6%
Cable
2.0%
2.0%
0.5%
Manhole
0.6%
0.9%
MDB
1.3%
Septic Tank
0.3%
0.3%
Socket /
Light
1.2%
Soakway
0.3%
1.0%
Main Cable
0.5%
4.0%
8.0%
2.0%
0.5%
6.0%
Water Tank
0
2.5%
3.5%
4.0%
4.0%
Action
Taken
14%
Mobilization
PCC
RCC
Neck
Column
Tie Beam
Grade Slab
rF
lr
Alum.Door
s/
Windows
8%
Door Frame
Door
Aluminum
Work
6
10
11
Plot#
Location
Type
37
1506
147/8