DARONA ENGINEERING CONSULTING

Consultant:

ALHARAY
1

1049

Haray

G+2

1373

Haray

G+1

507

Haray

G+1

1571

Haray

G+1

1524

Haray

G+1

1088

Haray

G+1

505

Haray

G+1

1214

Haray

G+1

822

Haray Ind

Ground

10

142

Haray Ind

Ground

11

465

Haray Ind

Ground

12

230

Haray Ind

Ground

13

819

Haray Ind

Ground
HAYAWA

304

Hayawa

G+2

272

Hayawa

G+2

504

Hayawa

G+1
Loulouea

801

Loulouea

G+1

490

Loulouea

Ground

993

Loulouea

G+1

Other Works

CW+Gate

Drainage + WS

Electrical

Alum.
Doors/Win.

Painting

Plastering

Blockworks

Structural

Prelim.

Type

Location

Plot#

PROJECT LIST

DARONA ENGINEERING CONSULTING

Consultant:

Loulouea

Ground

928

Loulouea

G+1

841

Loulouea

G+1

793+794 Loulouea

G+1

Other Works

24

CW+Gate

Drainage + WS

G+1

Electrical

Loulouea

Alum.
Doors/Win.

514

Painting

Plastering

G+1

Blockworks

Loulouea

Structural

797

Prelim.

Plot#

Type

Location

PROJECT LIST

DARONA ENGINEERING CONSULTING

Consultant:

MUDIFI
1

1030

Mudifi

G+1

889

Mudifi

Extension

737

Mudifi

G+1

1035

Mudifi

G+1

986/1

Mudifi

G+1

734

Mudifi

Extension

1058

Mudifi

Ground

741

Mudifi

Extension

1038

Mudifi

G+1
MUSALLA

340

Musalla

G+1
QADDISIYA

779

Qaddisiya

Extension

528

Qaddisiya

Ground
SHERIQQA

543

Sheriqqa

G+6

555

Sheriqqa

G+5
YARMOOK

648

Yarmook

G+1
ZUBARA

37

Zubara Ind G+2

Other Works

CW+Gate

Drainage + WS

Electrical

Alum.
Doors/Win.

Painting

Plastering

Blockworks

Structural

Prelim.

Type

Location

Plot#

PROJECT LIST

Plot#

2
1506
Zubara

3
147/8
Zubara Ind Extension
G+1

Other Works

CW+Gate

Drainage + WS

Electrical

Alum.
Doors/Win.

Painting

Plastering

Blockworks

Structural

Prelim.

Type

Location

Consultant:

DARONA ENGINEERING CONSULTING

PROJECT LIST

Total
Percentage
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0

Total
Percentage

Total
Percentage
0
0
0
0
0
0
0
0
0

30-Apr

0
0

expenses

900 pau

ac repair

200

500 chard

bed

190

700 tonet

utang jhay

600

600 jeff
500 new

0
0
0

600 macoy

100 internet
3900 total
30-May

990
fewa+rent
total collec

11300

600 macoy

check

8750

900 pau
500 chard

expenses

390
2160

1080

700 tonet
600 jeff
300 new

100 internet
3700 total

600 macoy

3300
1200
4500
3510 balance

Total
Percentage
0
0

900 pau

129

500 chard

129

700 tonet

99

600 jeff

84

300 new

441

100 internet

242

3700 total

1
ALHARAY

10

11

12

13
HAYAWA

3
Loulouea

Other Works

CW+Gate

Drainage + WS

Electrical

Alum.
Doors/Win.

Painting

Plastering

Blockworks

Structural

Prelim.

Type

Location

Plot#

Consultant:

MUSAMMIM ENGINEERING CONSULTING

PROJECT LIST

9
Other Works

CW+Gate

Drainage + WS

Electrical

Alum.
Doors/Win.

Painting

Plastering

Blockworks

Structural

Prelim.

Type

Location

Plot#

Consultant:

MUSAMMIM ENGINEERING CONSULTING

PROJECT LIST

1
MUDIFI

9
MUSALLA

1
SHERIQQA

2
YARMOOK

Other Works

CW+Gate

Drainage + WS

Electrical

Alum.
Doors/Win.

Painting

Plastering

Blockworks

Structural

Prelim.

Type

Location

Plot#

Consultant:

MUSAMMIM ENGINEERING CONSULTING

PROJECT LIST

3
ZUBARA

Other Works

CW+Gate

Drainage + WS

Electrical

Alum.
Doors/Win.

Painting

Plastering

Blockworks

Structural

Prelim.

Type

Location

Plot#

Consultant:

MUSAMMIM ENGINEERING CONSULTING

PROJECT LIST

Total
Percentage
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

Total
Percentage

0
0
0
0
0
0
0
0
0

0
0

0
0

Total
Percentage

0
0
0

Total
Percentage

Consultant: DARONA
ENGINEERING CONSULTING

End Date:

Contractor:

rF
lr

Fl
r
8.0%

8.0%

Slab

1.5%

Parapet

5.0%

0.5%

1s
t

rF
lr

Fl
r
1s
t

rF
lr

Fl
r

Column

Outside

1.0%

Finishing

4.0%

4.0%

Ceramic Villa

1.0%

Outside
Stone

2.0%

2.0%

Ceramic
Bath

0.5%

2.0%

Bitumen

3.0%

2.0%

Cache Above
WP

3.5%

TOTAL
0.5%
1.0%

Interlock
8"
Interlock
6"

DONE

2.0%

2.5%

3.5%

8%

1.5%

PCC+RCC

1.5%

TB
Column +
Coping
Beam
Blockwork+P
lastering

1.0%

Kerbstone

1.0%

1.0%

Outside
steel stair

2.0%

0.5%

Clearing

2.0%

Painting

Drainage +
WS

11.0%

9.0%

8%

0.5%

0.5%

Inside Pipe

1.0%

1.0%

14%

Electrical

TOTAL

rF
lr

TOTAL

+G

Other
Works

4%

8.0%

2.5%

Below
Tiebam
Above Tie
Beam

Fl
r

12.0%

2.5%

1s
t

at
e

3.0%

DONE

1.0%

1.0%

1.0%

cw

1.0%

1.0%

3.0%

DONE

1st Coat

rF
lr

1.0%

20%

Inside

1.0%

1.0%

Fl
r

0.5%

1s
t

0.5%

Date:

1.0%

rF
lr

Primer

6%

Dur.:

20%

0.5%

Fl
r

0.5%

Blockworks

1s
t

6%

Plastering

1s
t

rF
lr

lr
1s
tF

Owner:
Plot # 462

Painting

Project Type:

ro
un
d

Starting Date:

6%

0.3%

0.3%

Conduit pipe

0.5%

0.5%

Wash Basin
Acces.

0.4%

0.4%

Ground Pipe

1.5%

1.5%

1.0%

Pipe Outside

0.6%

0.6%

Cable

2.0%

2.0%

0.5%

Manhole

0.6%

0.9%

MDB

1.3%

Septic Tank

0.3%

0.3%

Socket /
Light

1.2%

Soakway

0.3%

1.0%

Main Cable

0.5%

4.0%

8.0%

2.0%

0.5%

6.0%

Water Tank
0

2.5%

3.5%

TOTAL PERCENTAGE OF WORK

4.0%

4.0%

Action
Taken

14%
Mobilization
PCC
RCC
Neck
Column
Tie Beam
Grade Slab

rF
lr

Alum.Door
s/
Windows

8%
Door Frame
Door
Aluminum
Work

6
10
11

Plot#

Location

Type

37
1506
147/8

Zubara Ind G+2


Zubara
G+1
Zubara Ind Extension