As mentioned in the report there are redundant links connecting all the switches
together and also to the Distribution layer switch and to the Router. Just to remove
all the possibilities of any single point of failures all the redundant links have been
tested and put together. The links have been tested by forcefully shutting down the
ports and then checking whether the alternate ports have taken over the network or
not. The testing plans have been carried out successfully and redundant links were
found functional. Also, there was no effect on the flow of the normal traffic between
the network devices.