B's 1 day work = 1/9 [because B take half time than A] (A+B)'s one day work =
(118+19)=(1+218)=16
So in one day 1/6 work will be done.
has two punctures. The first puncture alone would have made the tyre flat in 9 minutes and the second alone would have done it in 6 minutes. If air leaks out at a constant rate, how long does it take both the punctures together to make it flat ? 1. 315min 2. 325min 3. 335min 4. 345min Answer: Option C Explanation: Do not be confused, Take this question same as that of work done question's. Like work done by 1st puncture in 1 minute and by second in 1 minute. Lets Solve it: