So lets solve now,

A's 1 day work = 1/18


B's 1 day work = 1/9 [because B take half time than A]
(A+B)'s one day work =

(118+19)=(1+218)=16

So in one day 1/6 work will be done.


has two punctures. The first puncture alone
would have made the tyre flat in 9 minutes and the second
alone would have done it in 6 minutes. If air leaks out at a
constant rate, how long does it take both the punctures
together to make it flat ?
1. 315min
2. 325min
3. 335min
4. 345min
Answer: Option C
Explanation:
Do not be confused, Take this question same as that of work
done question's. Like work done by 1st puncture in 1 minute and
by second in 1 minute.
Lets Solve it: