You are on page 1of 2

First Balfour

Memorandum
To:

RTRellera

Location:

H.O. Procurement

Franz Kristopher S.
Flores
Location: Estimating

Tel: 791-4047 /
0917-806-8968
Fax: 791-4002/4003

Our Ref: RFE-16-074-SS002

Your Ref:
Date:

From:

May 11, 2016

Copies:

Subcontractor Enquiry
Project Title & Location
Description

Cargill Chicken Dressing Plant


Brgy. Sta. Teresita, Sto. Tomas, Batangas
Structural Steel
Supply, Fabrication, Delivery and Installation of all
structural steel
Scope includes roof trusses, purlins, girders, columns,
steel connections (base plates, connector plates, anchor
bolts with nuts and washers), sag rods and all other
accessories necessary for installation
Welding works for connections should be included
Special Notes
Advise subcontractor to fill out the BOM excel file
indicating material unit rate. Other materials necessary
that are not stated in the BOM may be added by
inserting separate lines in the excel file. STRICTLY
FOLLOW THE FORMAT IN THE BOM.
Subcontractor preliminaries should be separated from
the unit cost by adding a separate line item in the BOM
excel file.
FBI equipment required by the subcontractor in
installation/erection should be specified.
Supersedes previous RFEs concerning Structural Steel

Validity of the Quotation


Suppliers/Subcontractors Quotation
Required
Documentation / Information on which
quotation is to be based
No. of Quotations Required per Work Item
Other Information required from
Suppliers/Subcontractors other than
Price proposal
Additional Info to Procurement /
Subcontractor

Prepared by:

Ninety (90) days


On or before May 17, 2016
Drawings, Specifications and Bill of Materials
Five (5)
1. Prices to be inclusive of VAT; other duties, etc.
2. The project site is located in Brgy. Sta. Teresita, Sto. Tomas,
Batangas.
3. Local Subcontractors and Suppliers should be prioritized
1. Area for temfacil will be provided by First Balfour (FB), but
the office/barracks, water and electricity will be by the
subcontractor.
2. The workers Personal Protection Equipment (PPE) will be
provided by the subcontractor.
Franz Kristopher S. Flores

BM021ROP/MEMFB (1.50)/083104
Page 1 of 2