POWER GRID CORPORATION OF INDIA LIMITED,


Vemagiri 765/400kV GIS Station, Surampalem
765kV GIS
400k V GIS
Control
CGL Works
Hall
Hall
Room
Building
i. Priority
area first
layer of
2 nos AHU
flooring.
ROOMS
ii. Cable
Sheeting and
trenchbrick work,
250/400.
Plastering.
iii. Earthmat
iv. Brick
work
8 reactors
v. Plastering
main plinth
i. RCC
to be
Flooring
completed.
Cable Trench
Panel
Inside GIS.
in full shape.
Erection.
ii. Complete
in all aspects.
Full
completion
FULL IPS.
Flooring
of ground
Illumination
completion.
floor except
Painting.
i. AHU
Rooms.
Full
ii.
completion in
Illumination
All aspects.
iii. Electrical
works

Alstom

Auxilary
Foundatio
ns