The followings are transaction codes related to Make to Order :

by: Yadav
Create material (material type FERT) : MM01
Create Sales Order MTO : VA01
Make Sales order BOM : CS61
Create production order : CO08
Goods issue : MIGO/MB1A
Order Confirmation : CO15/Co11N
Deliver the Order : MB31
Deliver the Sales Order : VA02
Make invoice : VL01
The Cycle of Make to order: Steps : MTO Scenario
1. Material Creation (Make To order Material with major changes of: Item
Category: 0004-make to order/assem. , or 0001-make to order)
2. Routing Creation
3. Creation of BOM
4. Sales order creation
5. Production order Scheduling, Costing, Release and Save
6. Production order Quantity confirmations for operations, Parallel task of
material issue to order or to reservations (261)
7. Calculate WIP
8. Fully Produced Production Quantities will be put into stock (GR) (Spl
stock indicator E)
9. Delivery against sales order
10. Invoicing.
11. Settlement that production order.
2. Describe the overall process of KANBAN step by step.
3. Currently, SAP KANBAN functionality is used only for procuring raw
materials from outside vendors and transferring stock between plants.

4. Interplant transfers (STO's) use internally generated schedule lines for


replenishment. Vendor kanban uses Summarized JIT Calls to communicate JIT
requirements to suppliers.
5. Interplant Kanban is transparent to supplying plant. No additional work is
required from the supplying plant.
6. Advantages:
7. 1. Keeps raw material inventory in check
2. Prevents overshipping
3. Incorrect inventory balances, BOMs, etc. do not affect shipping
4. Supplier schedules stay in sync with actual production
8. Disadvantages:
9. 1. Requires more discipline from the supplier and the shop floor. Example:
controls in processing of scrap; maintenance and tracking of
Kanbancards;adherence to ship windows.
2. More master data to maintain.
3. May hide procedural or data problems.
10.T-codes for Kanbans
11. Control cycle is a pre-requisite for KANBAN. You can create it with t code
PK01
12.The major steps in KANBAN are:
13.1. Maintain supply area, PK05
2. Create control cycle, PK01
3. Kanban correction, PK31
4. Quantity signal input, PK22
5. Kanban board, PK13N