SHREE GOLI LOWER SECONDRY SCHOOL

1)

Inspection:-

Inspector-Er. Sunil Shrestha / Er.Rup Bahadur Rawal


Organization-Co-Efficient Consult Pvt.Ltd
Date-12 June, 2015
Time-1:30 PM

2)

Building Description:-

Name-Shree Goli lower secondary school


Address-goli-7, Solukhumbu
Date of establish
Structural system- stone masonry
Roof Type-Pitch roof
No. of block- 4
No. of storey-1
No. of room-11
No. of toilet-2

3)

GPS survey

Elevation-1598m
LocationN2731
E08623

4)

Social survey

No. of household-100
No. of students-68
Max-14
Min-5
Growth rate- constant

5)

Geotechnical survey

Soil type- gravel mixed loose soil


Terrain- steep
Ground type- step
Soil failure condition-no

SHREE GOLI LOWER SECONDRY SCHOOL


Cause of failure- no

6)

Geographical survey

Wind -high
Snow fall-Seasonal
Temperature-(0 to 30) C
Rainfall-Moderate

7)

Material surveys

Soil- available cohesive clay


Stone- Yes (Available)
Wood-yes (Available)
Steel-No (Transport need)
Plywood- No (Transport need)
Cement- No (Transport need)
CGI sheet- No (Transport need)
Brick-No

8)

Damage Assessment

- Fall of wall stone max. at outside the room.


- 75% of remaining walls are out of plumb.
- No binding material is used.
- No tie, sill, lintel & roof band is used.
- Lots of voids at wall.
- Weak foundation.
- No support for ridge beam.
- two blocks are damaged.
Reconstruction is necessary.

9)

Measurement

Block-1
-Existing size (15.1m*5.1m*2.5m&3.5m)
-Door size (1.95m*1.15m)
-window size (1.4m*1.4)
Block-2
-Existing size (14.3m*6.4m)
Block-3
-Existing size (10.5m*4.6m)
Block-4
-Existing size (15.2m*5.8m)
Land area-

SHREE GOLI LOWER SECONDRY SCHOOL


10)

Proposed plan

- Earthquake resistance building construction

11)

Photographs